plx iec 61850

21
PLX IEC 61850 PICS Statement Version 1.3 September 20, 2011 PICS STATEMENT

Upload: others

Post on 01-Nov-2021

34 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLX IEC 61850

PLX IEC 61850 PICS Statement

Version 1.3

September 20, 2011

PICS STATEMENT

Page 2: PLX IEC 61850

Your Feedback Please

We always want you to feel that you made the right decision to use our products. If you have suggestions, comments, compliments or complaints about our products, documentation, or support, please write or call us.

How to Contact Us

ProSoft Technology 5201 Truxtun Ave., 3rd Floor Bakersfield, CA 93309 +1 (661) 716-5100 +1 (661) 716-5101 (Fax) www.prosoft-technology.com [email protected]

Copyright © 2011 ProSoft Technology, Inc., all rights reserved.

IEC 61850 PICS Statement

September 20, 2011

ProSoft Technology ®, ProLinx

®, inRAx

®, ProTalk

®, and RadioLinx

® are Registered Trademarks of ProSoft

Technology, Inc. All other brand or product names are or may be trademarks of, and are used to identify products and services of, their respective owners.

ProSoft Technology® Product Documentation

In an effort to conserve paper, ProSoft Technology no longer includes printed manuals with our product shipments. User Manuals, Datasheets, Sample Ladder Files, and Configuration Files are provided on the enclosed CD-ROM in Adobe

® Acrobat Reader file format (.PDFs). These product documentation files may also be freely downloaded from

our web site: www.prosoft-technology.com

Page 3: PLX IEC 61850
Page 4: PLX IEC 61850
Page 5: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement Contents Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 5 of 21 September 21, 2011

Contents

Your Feedback Please ........................................................................................................................ 2 How to Contact Us .............................................................................................................................. 2 ProSoft Technology

® Product Documentation .................................................................................... 2

1 PICS – Protocol Implementation Conformance Statement 7

1.1 ACSI Basic Conformance Statement ........................................................................ 8 1.2 ACSI Models Conformance Statement ..................................................................... 9 1.3 ACSI Service Conformance Statement ................................................................... 10 1.4 Profile Conformance ................................................................................................ 12 1.5 SCL Conformance ................................................................................................... 13 1.6 Logical Nodes Conformance ................................................................................... 14

Index 21

Page 6: PLX IEC 61850

Contents PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 6 of 21 ProSoft Technology, Inc.

September 21, 2011

Page 7: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 7 of 21

September 21, 2011

1 PICS – Protocol Implementation Conformance Statement

In This Chapter

� ACSI Basic Conformance Statement ...................................................... 8

� ACSI Models Conformance Statement .................................................... 9

� ACSI Service Conformance Statement ................................................. 10

� Profile Conformance .............................................................................. 12

� SCL Conformance ................................................................................. 13

� Logical Nodes Conformance ................................................................. 14

This section describes the Protocol Implementation Conformance Statement (PICS) for the ProSoft IEC 61850 Protocol Driver.

The following ACSI Basic Conformance Statement and ACSI Service Conformance Statements shall be used to provide an overview and details about the 61850 driver’s claiming conformance with ACSI.

Page 8: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 8 of 21 ProSoft Technology, Inc.

September 21, 2011

1.1 ACSI Basic Conformance Statement

Client / Subscriber

Server / Publisher

Value / Comments

Client-server roles

B11 Server side (of TWO-PARTY-APPLICATION-ASSOCIATION)

- F

B12 Client side (of TWO-PARTY-APPLICATION-ASSOCIATION)

Y

-

SCSMs supported

B21 SCSM: IEC 61850-8-1 used Y F

B22 SCSM: IEC 61850-9-1 used N N

B23 SCSM: IEC 61850-9-2 used F F

B24 SCSM: other - -

Generic substation event model (GSE)

B31 Publisher side N F

B32 Subscriber side Y F

Transmission of sampled value model (SVC)

B41 Publisher side - F

B42 Subscriber side F -

Page 9: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 9 of 21

September 21, 2011

1.2 ACSI Models Conformance Statement

Client / Subscriber

Server / Publisher

Value / Comments

If Server side (B11) supported

M1 Logical device Y F

M2 Logical node Y F

M3 Data Y F

M4 Data set Y F

M5 Substitution - F

M6 Setting group control F F

Reporting

M7 Buffered report control Y F

M7-1 Sequence-number Y F

M7-2 Report-time-stamp Y F

M7-3 Reason-for-inclusion Y F

M7-4 Data-set-name Y F

M7-5 Data-reference Y F

M7-6 Buffer-overflow Y F

M7-7 entryID Y F

M7-8 BufTm Y F

M7-9 IntgPd Y F

M7-10 GI Y F

M8 Unbuffered report control

M8-1 Sequence-number Y F

M8-2 Report-time-stamp Y F

M8-3 Reason-for-inclusion Y F

M8-4 Data-set-name Y F

M8-5 Data-reference Y F

M8-6 BufTm Y F

M8-7 IntgPd Y F

M8-8 GI Y F

Logging

M9 Log control F F

M9-1 IntgPd F F

M10 Log F F

M11 Control Y F

If GSE (B31/B32) is supported

GOOSE

M12-1 entryID Y F

M12-2 DataReflnc Y F

M13 GSSE F F

If SVC (B41/B42) is supported

M14 Multicast SVC F F

M15 Unicast SVC F F

M16 Time F F

M17 File Transfer F F

Page 10: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 10 of 21 ProSoft Technology, Inc.

September 21, 2011

1.3 ACSI Service Conformance Statement

Services AA: TP / MC

Client / Subscriber

Server / Publisher

Comments

Server (Clause 6)

S1 ServerDirectory TP Y F

Application association (Clause 7)

S2 Associate Y F

S3 Abort Y F

S4 Release Y F

Logical device (Clause 8)

S5 Logical Device Directory TP F F

Logical node (Clause 9)

S6 Logical Node Directory TP F F

S7 Get All Data Values TP F F

Data (Clause 10)

S8 GetDataValues TP Y F

S9 SetDataValues TP Y F

S10 GetDataDirectory TP F F

S11 GetDataDefinition TP F F

Data set (Clause 11)

S12 GetDataSetValues TP Y F

S13 SetDataSetValues TP Y F

S14 CreateDataSet TP F F

S15 DeleteDataSet TP F F

S16 GetDataSetDirectory TP Y F

Substitution (Clause 12)

S17 SetDataValues TP - F

Setting group control (Clause 13)

S18 SelectActiveSG TP F F

S19 SelectEditSG TP F F

S20 SetSGValues TP F F

S21 ConfirmEditSGValues TP F F

S22 GetSGValues TP F F

S23 GetSGCBValues TP F F

Reporting (Clause 14)

Buffered report control block (BRCB)

S24 Report TP Y F

S24-1 data-change (dchg) Y F

S24-2 qchg-change (qchg) Y F

S24-3 data-update (dupd) Y F

S25 GetBRCBValues TP Y F

S26 SetBRCBValues TP Y F

Unbuffered report control block (URCB)

S27 Report TP Y F

S27-1 data-change (dchg) Y F

S27-2 qchg-change (qchg) Y F

S27-3 data-update (dupd) Y F

S28 GetURCBValues TP Y F

Page 11: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 11 of 21

September 21, 2011

Services AA: TP / MC

Client / Subscriber

Server / Publisher

Comments

S29 SetURCBValues TP Y F

Logging (Clause 14)

Log control block

S30 GetLCBValues TP F F

S31 SetLCBValues TP F F

Log

S32 QueryLogByTime TP F F

S33 QueryLogAfter TP F F

S34 GetLogStatusValues TP F F

Generic substation event model (GSE) (14.3.5.3.4)

GOOSE-CONTROL-BLOCK

S35 SendGOOSEMessage MC Y F

S36 GetGoReference TP F F

S37 GetGOOSEElementNumber TP F F

S38 GetGoCBValues TP Y F

S39 SetGoCBValues TP Y F

GSSE-CONTROL-BLOCK

S40 SendGSSEMessage MC F F

S41 GetGsReference TP F F

S42 GetGSSEElementNumber TP F F

S43 GetGsCBValues TP F F

S44 SetGsCBValues TP F F

Transmission of sampled value model (SVC) (Clause 16)

Multicast SVC

S45 SendMSVMessage MC F F S46 GetMSVCBValues TP F F

S47 SetMSVCBValues TP F F Unicast SVC

S48 SendUSVMessage TP F F

S49 GetUSVCBValues TP F F

S50 SetUSVCBValues TP F F Control (17.5.1)

S51 Select F F

S52 SelectWithValue TP Y F S53 Cancel TP F F

S54 Operate TP Y F S55 Command-Termination TP F F

S56 TimeActivated-Operate TP F F File transfer (Clause 20)

S57 GetFile TP F F

S58 SetFile TP F F S59 DeleteFile TP F F

S60 GetFileAttributeValues TP F F Time (5.5)

T1 Time resolution of internal clock 1 ms F

T2 Time accuracy of internal clock +/- 0.1 ms F

T3 Supported TimeStamp resolution 1 ms F

Page 12: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 12 of 21 ProSoft Technology, Inc.

September 21, 2011

1.4 Profile Conformance

Client / Subscriber

Server / Publisher

Value / Comments

PICS for A-Profile Support

A1 Client/Server A-Profile Y F

A2 GOOSE/GSE Management A-Profile Y F

A3 GSSE A-Profile F F

A4 TimeSync A-Profile Y F

PICS for T-Profile Support

T1 TCP/IP T-Profile Y F

T2 OSI T-Profile N N

T3 GOOSE/GSE T-Profile Y F

T4 GSSE T-Profile F F

T5 TimeSync T-Profile N N

Page 13: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 13 of 21

September 21, 2011

1.5 SCL Conformance

Client / Subscriber

Server / Publisher

Value / Comments

SCL Conformance Degrees

SCL.1 SCL File for Implementation Available (offline)

Y F

SCL.2 SCL File available from implementation online

F F

SCL.3 SCL implementation reconfiguration supported online

F F

Supported ACSI services for SCL.2 and SCL.3

ACSI Services

GetFileAttributeValues N N

GetFile N N

SetFilE N N

DeleteFile N N

GetDataValues N N

SetDataValues N N

SCL Control Block N N

SCL File Structure N N

Remote Creation of SCL File N N

Additional MMS services for SCL.2 and SCL.3

MMS Services N F

GetCapabilityList N F

GetDomainAttributes N N

LoadDomainContent N N

StoreDomainContent N N

Definition of SCL control block

Validate N N

ValState N N

Activate N N

Page 14: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 14 of 21 ProSoft Technology, Inc.

September 21, 2011

1.6 Logical Nodes Conformance

Client / Subscriber

Server / Publisher

Value / Comments

IEC61850-7-4 Logical Nodes Required for Servers

(L) System Logical Nodes

LLNO Common Logical Node Zero Y F

LPHD Physical Device Y F

(P) Protection Functions

PDIF Differential Y F

PDI Directional Y F

PDOP Directional Over Power Y F

PDUP Directional Under Power Y F

PFRC Rate of Frequency Change Y F

PHAR Harmonic Constraint Y F

PHIZ Ground Detection Y F

PIOC Instantaneous Over Current Y F

PMRI Motor Restart Inhibition Y F

PMSS Motor Starting Time Supervision Y F

POPF Over power Factor Y F

PPAM Phase Angle Measuring Y F

PSC Protection Scheme Y F

PSDE Sensitive Directional Earth Fault Y F

PTEF Transient Earth Fault Y F

PTOC Time Over Current Y F

PTOF Over Frequency Y F

PTOV Over Voltage Y F

PTRC Protection Trip Conditioning Y F

PTTR Thermal Overload Y F

PTUC Under Current Y F

PTUV Under Voltage Y F

PUPF Under Power Factor Y F

PTUF Under Frequency Y F

PVOC Voltage Controlled Time Over Current Y F

PVPH Volts per Hertz Y F

PZSU Zero Speed or Under Speed Y F

(R) Protection Related Functions

RDRE Disturbance Recorder Function Y F

RADR Disturbance Recorder Channel Analogue Y F

RBDR Disturbance Recorder Channel Binary Y F

RDRS Disturbance Record Handling Y F

RBRF Breaker Failure Y F

RDIR Directional Element Y F

RFLO Fault Locator Y F

RPSB Power Swing Detection/Blocking Y F

RREC Auto Reclosing Y F

RSYN Synchronism Check or Synchronizing Y F

(C) Control

CALH Alarm Handling Y F

Page 15: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 15 of 21

September 21, 2011

Client / Subscriber

Server / Publisher

Value / Comments

CCGR Cooling Group Control Y F

CILO Interlocking Y F

CPOW Point on Wave Switching Y F

CSWI Switch Controller Y F

(G) Generic References

GAPC Generic Automatic Process Control Y F

GGIO Generic Process I/O Y F

GSAL Generic Security Application Y F

(I) Interfacing and Archiving

IARC Archiving Y F

IHMI Human Machine Interface Y F

ITCI Telecontrol Interface Y F

ITMI Telemonitoring Interface Y F

(A) Automatic Control

ANCR Neutral Current Regulator Y F

ARCO Reactive Power Control Y F

ATCC Automatic Tap Changer Controller Y F

AVCO Voltage Control Y F

(M) Metering and Measurement

MDIF Differential Measurements Y F

MHAI Harmonics or Interharmonics Y F

MHAN Non-Phase Related Harmonics or Interharmonics

Y F

MMTR Metering Y F

MMXU Measurement Y F

MSQI Sequence and Imbalance Y F

MSTA Metering Statistics Y F

(S) Sensors and Monitoring

SARC Monitoring and Diagnostics for arcs Y F

SIMG Insulation Medium Supervision (gas) Y F

SIML Insulation Medium Supervision (liquid) Y F

SPDC Monitoring and Diagnostics for Partial Discharges

Y F

(X) Switchgear

XCBR Circuit Breaker Y F

XSWI Circuit Switch Y F

(T) Instrument Transformers

TCTR Current Transformer Y F

TVTR Voltage Transformer Y F

(Y) Power Transformers

YEFN Earth Fault Neutralizer Y F

YLTC Tap Changer Y F

YPSH Power Shunt Y F

YPTR Power Transformer Y F

(Z) Further Power System Equipment

ZAXN Auxilliary Network Y F

ZBAT Battery Y F

Page 16: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 16 of 21 ProSoft Technology, Inc.

September 21, 2011

Client / Subscriber

Server / Publisher

Value / Comments

ZBSN Bushing Y F

ZCAB Cable Y F

ZCAP Capacitor Bank Y F

ZCON Converter Y F

ZGEN Generator Y F

ZGIL Gas Insulated Line Y F

ZLIN Power Overhead Line Y F

ZMOT Motor Y F

ZREA Reactor Y F

ZTCF Thyristor Controlled Frequency Converter Y F

ZTCR Thyristor Controlled Reactive Component Y F

Logical Nodes for Hydro Power Plants

(LNs specific for Hydro are in bold text)

Hydro Power: Logical nodes for control functions

CALH Alarm handling Y F

CSWI Switch controller Y F

Hydro Power: Logical nodes representing functional blocks

FCNT Counter function Y F

FCSD Curve shape description Y F

FFIL Filter function Y F

FLIM Limiter function Y F

FPID Proportional, integral and derivative regulator function

Y F

FRMP Ramp control function Y F

FSPT Setpoint control function Y F

FXOT Action at over threshold Y F

FXUT Action at under threshold Y F

Hydro Power: Hydropower specific logical nodes

HBRG Turbine – generator shaft bearing Y F

HBRK Braking system for the generator shaft Y F

HCOM Combinator (3D-CAM or 2D-CAM) Y F

HDAM Hydropower dam, water reservoir Y F

HDLS Dam leakage supervision Y F

HGPI Gate position indicator Y F

HGTE Dam gate Y F

HITG Intake gate Y F

HJCL Power plant joint control function Y F

HLKG Leakage supervision Y F

HLVL Dam water level indicator Y F

HNDL Needle control Y F

HNHD Net head data Y F

HOTP Dam overtopping protection Y F

HSEQ Start / stop sequencer Y F

HSPD Speed monitoring Y F

HUNT Hydropower production unit Y F

HWCL Water control function Y F

Hydro Power: Logical nodes for interface and archiving

Page 17: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 17 of 21

September 21, 2011

Client / Subscriber

Server / Publisher

Value / Comments

IARC Generic archiving function Y F

IHMI Generic human – machine interface Y F

ISAF Generic safety device Y F

Hydro Power: Logical nodes for mechanical and non-electric primary equipment

KFAN Fan Y F

KFIL Filter Y F

KPMP Pump Y F

KTNK Tank Y F

KVLV Valve or aperture gate Y F

Hydro Power: Logical nodes for metering and measurement

MDIF Differential current measurement Y F

MENV Environmental data Y F

MHAI Harmonics measurement Y F

MHYD Hydrological measurement Y F

MMDC DC current and voltage measurement Y F

MMET Meteorological measurement Y F

MMXN Single-phase measurement Y F

MMXU Three-phase measurement Y F

Hydro Power: Protection functions

PDIF Generator differential, restricted earth-fault Y F

PDOP Reverse power Y F

PDUP Loss of field (excitation system failure) Y F

PHIZ Residual over-voltage Y F

PIOC Phase over-current Y F

PPAM Phase angle, out-of-step Y F

PRTR Rotor protection Y F

PSDE Directional earth-fault Y F

PTHC Thyristor failure protection Y F

PTOC Time over-current, rotor earth-fault, bearing current, stator earth-fault

Y F

PTOF Over-frequency Y F

PTOV Over- / under-voltage Y F

PTUF Under-frequency Y F

PTTR Overload Y F

PVOC Under impedance Y F

PVPH Over-fluxing Y F

PZSU Energising at stand-still Y F

Hydro Power: Logical nodes for protection related functions

RBRF Breaker-fail protection Y F

RPSB Power swing detection Y F

RSYN Synchronizing Y F

Hydro Power: Logical nodes for supervision and monitoring

SPDC Partial discharge sensor Y F

STMP Temperature supervision Y F

SVBR Vibration supervision Y F

Hydro Power: Logical nodes for sensors

TANG Angle Y F

Page 18: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 18 of 21 ProSoft Technology, Inc.

September 21, 2011

Client / Subscriber

Server / Publisher

Value / Comments

TAXD Axial displacement Y F

TCTR Current transformer Y F

TDIS Distance Y F

TFLW Liquid flow Y F

TFRQ Frequency Y F

THUM Humidity Y F

TLEV Media level Y F

TMGF Magnetic field Y F

TPOS Position indicator Y F

TPRS Pressure Y F

TRTN Rotation Y F

TSND Sound pressure Y F

TTMP Temperature Y F

TTNS Mechanical tension / stress Y F

TVBR Vibration sensor Y F

TVTR Voltage transformer Y F

TWPH Water acidity Y F

Hydro Power: Logical nodes for power system equipment

ZAXN Auxiliary network (power plant supply) Y F

ZBAT DC battery Y F

ZMOT Motor Y F

ZREA Reactor Y F

ZRES Neutral resistor Y F

ZSCR Semi-conductor controlled rectifier Y F

ZSMC Synchronous machine Y F

Logical Nodes for Wind Power Plants

(LNs specific for Wind Power are in bold text)

Wind Power specific logical nodes

WTUR Wind turbine general information Y F

WALM Wind power plan alarm information Y F

WMET Wind power plant meteorological information Y F

WAPC Wind power plant active power control information

Y F

WRPC Wind power plant reactive power control information

Y F

Wind Turbine specific logical nodes

WTUR Wind turbine general information Y F

WROT Wind turbine rotor information Y F

WTRM Wind turbine transmission information Y F

WGEN Wind turbine generator information Y F

WCNV Wind turbine converter information Y F

WTRF Wind turbine transformer information Y F

WNAC Wind turbine nacelle information Y F

WYAW Wind turbine yawing information Y F

WTOW Wind turbine tower information Y F

WALM Wind power plant alarm information Y F

WSLG Wind turbine state log information Y F

Page 19: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement PICS – Protocol Implementation Conformance Statement Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 19 of 21

September 21, 2011

Client / Subscriber

Server / Publisher

Value / Comments

WALG Wind turbine analogue log information Y F

WREP Wind turbine report information Y F

Page 20: PLX IEC 61850

PICS – Protocol Implementation Conformance Statement PLX IEC 61850 ♦ PICS Statement PICS Statement Version 1.3

Page 20 of 21 ProSoft Technology, Inc.

September 21, 2011

Page 21: PLX IEC 61850

PLX IEC 61850 ♦ PICS Statement Index Version 1.3 PICS Statement

ProSoft Technology, Inc. Page 21 of 21

September 21, 2011

Index

A

ACSI Basic Conformance Statement • 8 ACSI Models Conformance Statement • 9 ACSI Service Conformance Statement • 10

H

How to Contact Us • 2

L

Logical Nodes Conformance • 14

P

PICS – Protocol Implementation Conformance Statement • 7

Profile Conformance • 12 ProSoft Technology® Product

Documentation • 2

S

SCL Conformance • 13

Y

Your Feedback Please • 2