I. BASIC PROFILE S. No. Information Sought Details 1. Name of the proponent NHAI, PIU- Thiruvananthapuram 2. Name of applicant NHAI, PIU- Thiruvananthapuram 3. Contact person R. Venkatakrishan 4. Designation Project Director, T.C 36/414(5), Koyikkal Veedu, Kavu Lane, Palkulangara, Thiruvananthapuram 5. Telephone No. 0471-2460924 6. Mobile No. 9447071347 7. Fax No. 0471-2460924 8. Email Address [email protected], [email protected] 9. Website (if any) http://www.nhai.org/ 10. Pin code 695024 11. State Kerala 12. District Thiruvananthapuram 13. Town/Village Thiruvananthapuram II. PROJECT PROFILE S. No. Information Sought Details 1. Name of the project Detailed Project Report (DPR) study for 4 laning of Cherthala Thiruvananthapuram Section of NH-47 (New NH-66) (from KM 379/100 to KM 551/900) [Package III] under NHDP Phase III in the State of Kerala 2. Project Sector HIGHWAY 3. Project Cost (In Lacs) INR 408894 Lacs 4. Location of the Project Kerala 5. Shape of the Project Land Strip 5.1 Upload GPS file (KML only) Enclosed in Folder as 03-NH47-CRZ-GPS File.kml 5.2 Upload copy of Survey of India Toposheet (pdf only- As Annexure Survey of India Toposheet) (Scale 1:50,000) Enclosed in Folder as 04-CRZ_Toposheets 1- 50000.pdf 6. Site alternative under consideration No 7. Brief summary of project The project is related to 4 laning of section of National Highway no. 47 (NH-47, new NH- 66) from Chertalai to Thiruvananthapuram (from km 379.100 to km 551.900). The project road length is 172.8 km. It starts from km

Upload: tranque

Post on 05-Sep-2018

220 views

Category:

Documents


1 download

TRANSCRIPT

I. BASIC PROFILE

S.

No.

Information Sought Details

1. Name of the proponent NHAI, PIU- Thiruvananthapuram

2. Name of applicant NHAI, PIU- Thiruvananthapuram

3. Contact person R. Venkatakrishan

4. Designation Project Director,

T.C 36/414(5), Koyikkal Veedu,

Kavu Lane, Palkulangara,

Thiruvananthapuram

5. Telephone No. 0471-2460924

6. Mobile No. 9447071347

7. Fax No. 0471-2460924

8. Email Address [email protected], [email protected]

9. Website (if any) http://www.nhai.org/

10. Pin code 695024

11. State Kerala

12. District Thiruvananthapuram

13. Town/Village Thiruvananthapuram

II. PROJECT PROFILE

S.

No.

Information Sought Details

1. Name of the project Detailed Project Report (DPR) study for 4

laning of Cherthala – Thiruvananthapuram

Section of NH-47 (New NH-66) (from KM

379/100 to KM 551/900) [Package –III] under

NHDP Phase III in the State of Kerala

2. Project Sector HIGHWAY

3. Project Cost (In Lacs) INR 408894 Lacs

4. Location of the Project Kerala

5. Shape of the Project Land Strip

5.1 Upload GPS file (KML only) Enclosed in Folder as 03-NH47-CRZ-GPS

File.kml

5.2 Upload copy of Survey of India

Toposheet (pdf only- As Annexure

Survey of India Toposheet) (Scale

1:50,000)

Enclosed in Folder as 04-CRZ_Toposheets 1-

50000.pdf

6. Site alternative under consideration No

7. Brief summary of project The project is related to 4 laning of section of

National Highway no. 47 (NH-47, new NH-

66) from Chertalai to Thiruvananthapuram

(from km 379.100 to km 551.900). The project

road length is 172.8 km. It starts from km

S.

No.

Information Sought Details

379.100 of NH-47 at the junction of

Thuravoor and ends at Kazhakottam junction

at km 551.900. This stretch of road passes

through three districts viz. Alappuzha, Kollam

and Thiruvananthapuram. There are 88 built-

up locations along the project road. The

existing ROW along the project road is about

30m. There are 8 nos. of major bridges, 16

nos. of minor bridges, 165 nos. of culverts

existing along the project road. The project

road from Km 379.100 to 387.500 is 4-lane,

whereas rest of the project road is 2 lanes.

There are two under construction bypasses at

Alappuzha and Kollam along the project road.

It is proposed to develop the project road to

2x2 lane divided carriageway and service

roads as per IRC guidelines having a ruling

speed of 100kms per hour. The design length

of the project shall be 170.56 kms. All existing

major bridges, minor bridges and culverts will

be retained/reconstructed to match the road

configuration. Total 54 nos. of new culverts

have been proposed. Apart from existing

bypasses, a new bypass road is proposed for

Attingal town. All bypass shall be constructed

as 2x2 lane divided carriageway and service

roads as per IRC guidelines. Two toll plazas

are proposed at Km 409+000 in Alappuzha

Bypass and Km 488+500 in Kollam Bypass.

The project road is passing through Costal

Zone Regulation (CRZ) areas at 13 locations

as submitted in CRZ status report prepared by

Centre for Earth Science Studies (CESS) in

2010 (Report Attached). Based on this study,

the MoEF&CC had accorded two

separate CRZ clearances for (i) improvement

of 2 lane to 4/6 lane Cherthala - Kazhakuttam

Road except Alappuzha and Kollam Bypass

vide letter dated 13.10.2014 and (ii) for

construction of Alappuzha and Kollam Bypass

vide letter dated 30.12.2013 (Both clearance

letters are attached).

8. Does your project location fall under out None of above areas

S.

No.

Information Sought Details

of any following areas (Ghaziabad (UP),

Indore (M.P), Jharsuguda (Orissa),

Ludhiana (Punjab), Panipat (Haryana),

Patancheru-ollaram (A.P.), Singraulli (UP

and MP), Vapi (Gujarat), (None of above

Areas)

9. Number of states in which project will be

executed

01

9.1 Main State of the project Kerala

9.1.1 State Kerala

9.1.2 District Alappuzha, Kollam, Thiruvananthapuram

9.1.3 Tehsil Alappuzha, Cherthala, Ambalappuzha,

Kollam, Karunagappally, Thiruvananthapuram

10. Town/Village (Name of more than one

town may be entered by separating with

',')

Thuravoor, PonnamVeli, Pattanakkad,

Cherthala, Mathilakam, Mayithara,

S.N.Puram, Kanichukulangara, Kanjikuzhy,

Mararikulam, Valavanadu, Kalavoor,

Pathirappally, Poonkavu, Kalarcode, Paravoor,

Punnapra, Kuravanthodu, Valanjavazhi,

Pallimukku, Vandanam, Neerkunnam,

Kakkazhom, Ambalapuzha, Purakkad,

Thottappally, Karuvatta, Kumarapuram,

Narakathara Junction, Danapady, Madhava

Junction, Thekke Nada, Harippad,

Nangiarkulangara, Cheppadu, Evoor,

Ramapuram, Maliyekkal Junction, Pathiyoor,

Kareelakulangara, Chavara, Kottukulangara,

Kayamkulam, Kunnathalumoodu, Mukkada,

Oachira Krishnapuram, Changankulangara,

Vavvakkavu, Puliyankulangara, K.S. Puram,

Puthentheruvu, Puthiyakavu, Pallimukku,

Karunagapalli, Kuttivattion, Vettamukku,

Edappallikotta, Panmana, Thattassery,

Sankaramangalam, Puthenthura, Parimanam,

VettutharaMukku, Neendakara,

Sakthikulangara, Kollam Bypass, Mevaram,

Umayanalloor, Kottiyam, Mylakkad,

Ithikkara, Standard Junction, Thirumukku,

Chathanoor, Seematti Junction, Karamcode,

Kalluvathukkal, Sriramapuram, Parippally,

Kadambattukonam, Navayikulam

Kallambalam, Palamoodu, Korani,

Chempakamangalam, Thonnakkal,

Mangalapuram, Pallipuram, Kaniyapuram,

S.

No.

Information Sought Details

Kazhakuttam

11. Plot/Survey/Khasra No. The existing ROW along the project road is

about 30m. At Alappuzha, Kollam bypasses

the available ROW is 45m. For improvement

of the project road, 45m ROW is proposed to

be acquired as per design requirement.

12. Project/activity as per CRZ notification

2011

Road and Highways

13. Project Type (New, Expansion under

para7(ii)) If Expansion or Modernization

is selected -

Expansion

13.1 File No. F.No.10-35/2010-IA.III

13.2 Date of apply for TOR -

13.3 Date of Issue of TOR -

13.4 Upload TOR letter -

13.5 Date of apply for EC/CRZ 05.07.2013 - CRZ Clearance of Alappuzha

and Kollam Bypass

19.03.2014 - 2 lane to 4/6 lane Cherthala -

Kazhakuttam Road except Alappuzha and

Kollam Bypass

13.6 Date of Issue of EC/CRZ 30.12.2013 – CRZ Clearance of Alappuzha

and Kollam Bypass

13.10.2014 - 2 lane to 4/6 lane Cherthala -

Kazhakuttam Road except Alappuzha and

Kollam Bypass

13.7 Upload EC/CRZ letter -

13.8 Existing capacity/area etc. 172.80 Kms

14. Proposed capacity/area/length/tonnage to

be handled/command area/lease

area/number or wells to be drilled

170.56 Kms

15. Category of project (CRZ) CRZ-I(A), CRZ-I(B), CRZ-II, CRZ-III, CRZ-

IV, CRZ-V

16. CRZ classification of the area (CRZ-

I,CRZ-II,CRZ-III,CRZ-IV)

CRZ-I(A), CRZ-I(B), CRZ-II, CRZ-III, CRZ-

IV, CRZ-V

17. Is there any litigation pending against the

project?

No

III. PROJECT PROFILE (Post submission of undertaking)

S.

No.

Information Sought Details

1. Nearest railway station Alappuzha Railway Station

Kollam Railway Station

2. Distance from the project site (in km) Alappuzha Railway Station (200 m)

S.

No.

Information Sought Details

(Nearest Railway Station) Kollam Railway Station (4.0 km)

3. Nearest Airport Nearest airport from the starting point of the

project i.e. Thuravoor is Kochi International

Airport which is situated around 51 KM

distance.

Nearest airport at the end point of the project

i.e. Kazhakootam is Trivandrum International

Airport which is situated around 11 KM

distance.

4. Distance from the project site (in km)

(Nearest Airport)

Kochi International Airport - 51 KM

Trivandrum International Airport - 11 KM

5. Nearest Town/City/District Chertalai, Marary Kulam, Alappuzha,

Ambalapuzha, Purakkad, Thottapally, Haripad,

Nagiar Kulangara, Kayamkulam,

Krishnapuram, Oachira, Vavvakkavu,

Karunagapally, Chavara, Neendakara,

Kavanadu (Kollam), Mevaram (Kollam),

Kottiyam, Chathanoor, Paripally,

Kallambalam, Attingal, Manglapuram,

Pallipuram and Kazhakottam

6. Distance from the project site (in km)

(Nearest Town/City/District)

Zero Kms

7. Details of alternative sites examined?

(Yes/No)

No

8. Whether part of interlinked projects?

(Yes/No)

No

8.1 Whether separate application of

interlinked project has been

submitted? (Yes/No)

No

8.1.3 Reason (If “No” is selected) The project is expansion of existing road.

9. Whether the proposal involves

approval/clearance under the Forest

(Conservation) Act, 1980? (Yes/No)

No

10. Whether the proposal involves

approval/clearance under the wildlife

(Protection) Act, 1972? (Yes/No)

No

11. Whether the proposal involves

approval/clearance under the C.R.Z

notification, 2011? (Yes/No)

Yes

12. Whether there is any Government

Order/Policy relevant/relating to the site?

(Yes/No) If “Yes”,

Yes

12.1 Upload Order/Policy (only pdf,

Attach as Annexure-

S.

No.

Information Sought Details

order/policy)

13. Whether there is any litigation pending

against the project and/or land in which

the project is proposed to be set up?

(Yes/No)

No

IV. Activity (II)

1. Construction, operation or decommissioning of the Project involving actions, which will

cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

1.1 Permanent or temporary change in

land use, land cover or topography

including increase in intensity of

land use (with respect to local land

use plan)

Yes Land use shall change where land will be

acquired in built-up, agricultural and

vacant/barren land along the project road.

About 233.9694 ha land will have to be

acquired where insufficient land is available

for road widening. Topographic changes

shall take place at locations of cutting and

filling to improve the vertical and horizontal

profile of road as per design standards.

1.2 Clearance of existing land,

vegetation and buildings?

Yes Total 15564 trees (above 10cm) are expected

to be removed for road expansion. Buildings

falling in proposed ROW shall be

demolished after acquisition of land.

1.3 Creation of new land uses? Yes Use of land shall change from Built-up,

agricultural and vacant/barren land to road /

highway.

1.4 Pre-construction investigations e.g.

bore houses, soil testing?

Yes Soil investigations and analysis has been

done as part detailed designed study of the

road. Soil quality analysis was also

performed at selected sites details of which

are presented in EIA report.

1.5 Construction works? Yes Project will involve various construction

activities (construction of embankment,

subgrade, pavement, bridges, culverts, truck

laybyes, bus stops, toll plaza, road furniture

etc.)

1.6 Demolition works? Yes Proposed development will involve

demolition of structures within the proposed

ROW.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

1.7 Temporary sites used for

construction works or housing of

construction workers?

Yes Temporary sites for construction

works/labour camps will be established along

the project road at identified locations.

Appropriate measures shall be taken to

avoid/minimize impacts due to proposed

camps for construction works/ housing of

labour.

1.8 Above ground buildings, structures

or earthworks including linear

structures, cut and fill or

excavations

Yes Project will involve various construction

activities (construction of embankment,

subgrade, pavement, bridges, culverts, truck

laybyes, bus stops, toll plaza, road furniture

etc.). Cutting and filling shall be done

selected locations to improve the vertical and

horizontal profile of road as per design

standards.

1.9 Underground works including

mining or tunneling?

No Not Applicable

1.10 Reclamation works? No Not Applicable

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and manufacturing

processes?

No Not Applicable

1.14 Facilities for storage of goods or

materials?

Yes Construction material like aggregates, sand,

cement, fuel, bitumen, etc. will be

temporarily stored during the construction

stage in designated areas along the project

corridor. During operation phase, goods and

materials required for maintenance of project

road shall be stored at storage yards near site

offices.

1.15 Facilities for treatment or disposal

of solid waste or liquid effluents?

Yes During construction stage liquid effluent/

waste and solid waste are likely to be

generated from construction camps and site

offices. Mobile toilets shall be provided and

waste will be collected and disposed

appropriately. Solid waste shall be collected

in bins and appropriately disposed as per

prevailing rules.

1.16 Facilities for long term housing of

operational workers?

No Not Applicable

1.17 New road, rail or sea traffic during

construction or operation?

Yes During the construction stage, temporary

access roads could be used (for transportation

of materials, worker movements, etc.) for

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

connecting camps with project road.

However, this will be limited to the duration

of the construction. During operation phase,

permanent access road shall be constructed to

site office. Necessary consents from land

owners and appropriate authorities shall be

obtained prior to construction of access road.

No rail or sea traffic is envisaged.

1.18 New road, rail, air waterborne or

other transport infrastructure

including new or altered routes and

stations, ports, airports etc.?

Yes The project will lead to construction of

various road related infrastructure including,

road pavement, bridges, culverts, truck lay

byes, bus stops, toll plaza, road furniture etc.

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

Yes Temporary diversions of existing roads

during the construction stage is envisaged.

IRC guidelines will be followed to ensure

uninterrupted traffic movement.

1.20 New or diverted transmission lines

or pipelines?

Yes Transmission lines shall be relocated/

diverted as per utility shifting plan.

1.21 Impoundment, damming,

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

No All existing bridges, culverts shall be

retained/reconstructed/cleared to maintain the

natural water flow. No existing drain shall be

closed. In addition to existing cross drainage

structures 54 nos. of new culverts are

proposed along the project road.

1.22 Stream crossings? Yes The alignment crosses over River/Canal/

Nallah/Lake/Backwaters at several locations

as listed below – S.

No.

Chainage

(Km)

River/Canal/

Nallah/Lake

1. 382.400 Chandatod Nallah

2. 390.400 A S Canal

3. 433.400 Thottapally River

4. 434.100 Thottapally Canal

5. 436.200 Kannukalipalam canal

6. 443.100 Narakathara Canal

7. 458.000 Kayamkulam branch

canal

8. 461.000 Krishnapuram Thodu

9. 474.600 Kennettil – Pallikal

Canal

10. 483.100 T S Canal

11. 487.600 Ashtamudi Lake

12. 499.600 Churanga River

13. 508.700 Ithikkara River

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

14. 523.900 Vamanapuram River

15. 536.500 Mamom River

1.23 Abstraction or transfers of water

from ground or surface waters?

Yes Approximately, 1090573 KL of water will be

required during construction stage, which

shall be extracted from ground / surface

water body after obtaining necessary consent

from competent authority.

1.24 Changes in water bodies or the land

surface affecting drainage or run-

off?

No The proposed development is being planned

in such a way that natural drainage or runoff

will not be affected. Bridges and culverts at

appropriate locations are planned to maintain

natural flow of the rivers/streams/canals, etc.

1.25 Transport of personnel or materials

for construction, operation or

decommissioning?

Yes Construction Phase: Movement of

construction material including cement,

bitumen, aggregates, rock, sand, steel, etc.,

Movement of construction workers by

vans/buses. Operation Phase: Vehicular

traffic will ply over the roads during its

operation phase.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No Not applicable

1.27 Ongoing activity during

decommissioning which could have

an impact on the environment?

No Not applicable

1.28 Influx of people to an area in either

temporarily or permanently?

Yes During the construction stage there will be

temporary influx of people to the project area

as labourers and other people who will be

involved in the proposed development.

Proposed project will provide resource for

people to commute between places and will

open up opportunities for setting up

businesses, other employment opportunities,

etc.

1.29 Introduction of alien species? No Not applicable

1.30 Loss of native species or genetic

diversity?

No Not applicable

1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land,

water, materials or energy, especially any resources which are non-renewable or in short

supply)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

2.1 Land especially undeveloped or

agricultural land (ha)

Yes About 233.9694 ha land will have to be

acquired where insufficient land is available

for road widening. Extent of undeveloped or

agricultural land required for the project shall

be worked out post completion of social

impact assessment study.

2.2 Water (expected source &

competing users) unit: KLD

Yes Approximately, 1090573 KL of water will be

required during construction stage, which

shall be extracted from ground / surface

water body after obtaining necessary consent

from competent authority. Daily water

demand shall be about 1454 KLD.

2.3 Minerals (MT) Yes Soil: 7,204,708 Cum

Coarse Aggregate: 70,829 Cum

Fine Aggregate: 273,750 Cum

2.4 Construction material – stone,

aggregates, sand / soil (expected

source – MT)

Yes Soil: 7,204,708 Cum

Coarse Aggregate: 70,829 Cum

Fine Aggregate: 273,750 Cum

Steel: 32,917 MT

Cement: 206,188 MT

2.5 Forests and timber (source – MT) No Not Applicable

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

Yes Energy requirement will mostly be during the

construction stage. Power requirement will

mostly be met from DG sets and/or supply

from Kerala State Electricity Board, if

available.

2.7 Any other natural resources (use

appropriate standard units)

No Not Applicable

3. Use, storage, transport, handling or production of substances or materials, which could

be harmful to human health or the environment or raise concerns about actual or

perceived risks to human health.

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

3.1 Use of substances or materials,

which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna, and

water supplies)

Yes Diesel for use in DG sets and other

equipment’s; however, no fuel storage

(except for very small quantities) is

envisaged to be stored at site.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g. insect

or water borne diseases)

No Not Applicable

3.3 Affect the welfare of people e.g. by

changing living conditions?

No Proposed project is envisaged to have

positive impacts by providing benefits to the

people like providing new road connectivity

between places, reducing travel time,

reducing traffic congestions on the existing

roads thereby improving environmental

quality in the area. Project also provides

opportunities for business development.

Employment opportunities during

construction and operation stage, etc. will

provide economic benefits to the people.

3.4 Vulnerable groups of people who

could be affected by the project e.g.

Hospital patients, children, the

elderly etc.

Yes Project can be envisaged to have positive

impacts on Vulnerable Group, e.g. improved

connectivity especially if required to travel to

health care facilities, etc.

3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning

(MT/month)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine wastes Yes Top soil removed from borrow areas, quarry

shall be stored scientifically to retain the

untiring and moisture content and shall be

subsequently used in other agricultural/

plantation areas and for spreading over fill

materials in low lying areas.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes During construction stage, municipal waste

shall be generated from construction/labour

camps; which shall be collected and disposed

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

appropriately as per prevailing rules. During

municipal waste shall be generated from site

offices, which again will be disposed off

according to the prevailing rules.

4.3 Hazardous wastes (as per

Hazardous Waste Management

Rules)

Yes During construction stage used oil/other

waste will be stored in closed drums/

containers and transferred to authorized

disposal locations/vendors.

4.4 Other industrial process wastes No Not Applicable

4.5 Surplus product No Not Applicable

4.6 Sewage sludge or other sludge

from effluent treatment

No Not Applicable

4.7 Construction or demolition wastes Yes Proposed development will have demolition

wastes which will be reused in the road

construction activities to maximum possible

extent; balance material will be disposed

safely/suitably as per KSPCB guidelines

4.8 Redundant machinery or

equipment

No Not Applicable

4.9 Contaminated soils or other

materials

No Not Applicable

4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

5.1 Emissions from combustion of

fossil fuels from stationary or

mobile sources

Yes During construction stage, emissions are

envisaged from vehicles used for transporting

construction materials, machineries involved

in the construction, diesel generating (DG)

sets, hot mix plant, etc. However, these

emissions are local and short-term in nature

and will cease upon completion of

construction activities. During operation

stage, emissions are envisaged from vehicles

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

running on the road.

5.2 Emissions from production

processes

No Not Applicable

5.3 Emissions from materials

handling including storage or

transport

Yes Dust generation is expected due to handling

(loading/unloading) and transportation of

materials at construction site/camps.

5.4 Emissions from construction

activities including plant and

equipment

Yes During construction stage emissions are

envisaged from DG Sets, construction

equipment/machineries, hot mix plant,

crusher plant, movement of vehicles, etc.

However, these emissions are local, short-

term in nature and will cease upon

completion of construction activities.

5.5 Dust or odours from handling of

materials including construction

materials, sewage and waste

Yes Dust will be generated during construction

related activities like site clearance,

transportation of materials, loading/unloading

of materials, construction, crusher plant, etc.

5.6 Emissions from incineration of

waste

No Not Applicable

5.7 Emissions from burning of waste

in open air (e.g. slash materials,

construction debris)

No Not Applicable. Strict measure shall be taken

to prevent burning of waste.

5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

6.1 From operation of equipment e.g.

engines, ventilation plant,

crushers

Yes Noise standard at aggregate crushing plants,

batching plant, hot mix plant will be strictly

monitored to prevent exceeding of GOI noise

standards. Workers in the vicinity of strong

noise will be provide with ear plugs and their

working time should be limited as a safety

measure. In construction sites within 150 m

of sensitive receptors construction will be

stopped from 22:00 to 06:00. Machinery and

vehicles will be maintained to keep their

noise to a minimum. Temporary noise barrier

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

will be provided during construction at noise

sensitive locations throughout the

construction period.

6.2 From industrial or similar

processes

No Not Applicable

6.3 From construction or demolition Yes Noise shall be generated from the

construction activities and running of the

construction equipment. This will be in the

range about 65-90 dB(A). In construction

sites within 150 m of sensitive receptors

construction will be stopped from 22:00 to

06:00. Equipment shall be maintained

regularly which will help in reducing these

noise level.

6.4 From blasting or piling No Not Applicable

6.5 From construction or operational

traffic

Yes Noise will be generated from various

construction activities like site clearance, use

of equipment, vehicular movements, etc.

Noise will also be generated during the

operation stage due to vehicular movements

on the road. During the construction activities

utmost care will be taken to control the noise

levels within the standards. Similarly, during

operation appropriate mitigation measures

will be implemented.

6.6 From lighting or cooling systems No Not Applicable

6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or

into sewers, surface waters, groundwater, coastal waters or the sea

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

7.1 From handling, storage, use or

spillage of hazardous materials

Yes Storage of hazardous materials is not

envisaged. However, if needed to be stored,

hazardous materials will be stored and

handled as per the provisions of Hazardous

Wastes (Management and Handling) Rules

and Amendments thereof.

7.2 From discharge of sewage or

other effluents to water or the land

(expected mode and place of

discharge)

No During the construction stage liquid

effluent/waste will be generated from

construction camps for which mobile toilets

shall be provided. Discharge of sewage or

other effluents to water or land is not

envisaged. All liquid waste/sewage shall be

collected in tanks, which will be cleared off

regularly by approved collector.

7.3 By deposition of pollutants

emitted to air into the land or into

water

Yes There can be dust from back filters installed

in hot mix plant during construction phase.

This may deposit on land and surface water.

7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build-

up of pollutants in the

environment from these sources?

No Not Applicable

8. Risk of accidents during construction or operation of the Project, which could affect

human health or the environment

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible) with

source of information data

8.1 From explosions, spillages, fires

etc. from storage, handling, use or

production of hazardous

substances

Yes During the construction stage, asphalt is to be

heated for use in road construction.

Appropriate care will be taken to maintain the

optimum temperature so as to prevent fire/

accident hazards. Adequate safety measures

will be taken in storage and handling of

hazardous materials, if stored at site. Also,

fire extinguishers shall be maintained at site.

No such risks are envisaged during the

operation stage.

8.2 From any other causes No Not Applicable

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g.

floods, earthquakes, landslides,

cloudburst etc.)?

Yes Identification of risk, suggesting risk

mitigation measures and observations made

towards the identification of landslide zones,

proposed mitigation measures for the

identified landslide zones, area seismicity and

evaluation of soil permeability. During the

design stage, the effects from natural disasters

will be considered and necessary

precautionary measures would be built in or

implemented (e.g. provision of adequate

number of cross drainage structures to

prevent flooding, etc.). Appropriate

engineering codes will be used during the

design process.

9. Factors which should be considered (such as consequential development) which could

lead to environmental effects or the potential for cumulative impacts with other existing or

planned activities in the locality

S.

No.

Information/Checklist

confirmation

Yes/No Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

9.1 Lead to development of supporting

facilities, ancillary development or

development stimulated by the project

which could have impact on the

environment e.g.

o Supporting infrastructure (roads,

power supply, waste or waste water

treatment, etc.)

o housing development

o extractive industries

o supply industries

o Other

Yes The proposed project will provide

various benefits to the people of the area

like providing improved connectivity

provide opportunities for business

development, support other

developmental activities by providing

improved accessibility, etc. Proposed

development is likely to bring in

induced developments and not cause

adverse impact on environment as well

as on the people living in the region.

9.2 Lead to after-use of the site, which

could have an impact on the

environment

Yes The proposed project will set precedent

for further induced developments in the

region.

9.3 Have cumulative effects due to

proximity to other existing or planned

projects with similar effects

No Not Applicable

V. ENVIRONMENTAL SENSITIVITY

S.

No.

Information/Checklist

confirmation

Yes/No (Yes/No) (If Yes, Aerial distance

(within 15km.) Proposed project

location boundary)

1. Areas protected under international

conventions, national or local

legislation for their ecological,

landscape, cultural or other related

value

Yes The project road is located in the coastal

belt of Kerala state, passing over CRZ-I,

CRZ-II, CRZ-III areas at several

locations.

2. Areas which are important or Yes The alignment crosses over River/Canal/

S.

No.

Information/Checklist

confirmation

Yes/No (Yes/No) (If Yes, Aerial distance

(within 15km.) Proposed project

location boundary)

sensitive for ecological reasons -

Wetlands, watercourses or other water

bodies, coastal zone, biospheres,

mountains, forests

Nallah/Lake/Backwaters at several

locations in the coastal belt of Kerala as

listed below – S.

No.

Chainage

(Km)

River/Canal/

Nallah/Lake

1. 382.400 Chandatod Nallah

2. 390.400 A S Canal

3. 433.400 Thottapally River

4. 434.100 Thottapally Canal

5. 436.200 Kannukalipalam

canal

6. 443.100 Narakathara Canal

7. 458.000 Kayamkulam branch

canal

8. 461.000 Krishnapuram Thodu

9. 474.600 Kennettil – Pallikal

Canal

10. 483.100 T S Canal

11. 487.600 Ashtamudi Lake

12. 499.600 Churanga River

13. 508.700 Ithikkara River

14. 523.900 Vamanapuram River

15. 536.500 Mamom River

3. Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting,

over wintering, migration

No The project road does not pass through

or fall within 15 Km of any notified

Protected Areas and Eco-Sensitive Area.

4. Inland, coastal, marine or

underground waters

Yes The alignment crosses over River/Canal/

Nallah/Lake/Backwaters at several

locations in the coastal belt of Kerala as

listed below – S.

No.

Chainage

(Km)

River/Canal/

Nallah/Lake

1. 382.400 Chandatod Nallah

2. 390.400 A S Canal

3. 433.400 Thottapally River

4. 434.100 Thottapally Canal

5. 436.200 Kannukalipalam

canal

6. 443.100 Narakathara Canal

7. 458.000 Kayamkulam branch

canal

8. 461.000 Krishnapuram Thodu

9. 474.600 Kennettil – Pallikal

Canal

S.

No.

Information/Checklist

confirmation

Yes/No (Yes/No) (If Yes, Aerial distance

(within 15km.) Proposed project

location boundary)

10. 483.100 T S Canal

11. 487.600 Ashtamudi Lake

12. 499.600 Churanga River

13. 508.700 Ithikkara River

14. 523.900 Vamanapuram River

15. 536.500 Mamom River

5. State, National boundaries No Not Applicable

6. Routes or facilities used by the public

for access to recreation or other

tourist, pilgrim areas

Yes The project area is a tourist hub. Hence,

tourist may face little difficulties due to

diversions during construction stage.

7. Defense installations No Not Applicable

8. Densely populated or built-up area Yes The project road passes through as many

as 88 densely populated areas along its

length.

9. Areas occupied by sensitive man-

made land uses (hospitals, schools,

places of worship, community

facilities)

Yes There are about 22 religious properties,

8 educational institutions, 4 medical

facilities and 23 common property

resources that are likely to affected due

to proposed project.

10. Areas containing important, high

quality or scarce resources (ground

water resources, surface resources,

forestry, agriculture, fisheries,

tourism, minerals)

Yes Fish resources of the variety of water

bodies constitute the major fauna of the

project area of influence. The Arabian

Sea, brackish water bodies and fresh

water rivers have distinct assemblages

of fishes. Common wetland birds and

birds of the rural, semi-urban and urban

areas are also components of the faunal

assemblage. Snakes, rodents, frogs etc.

are also found along the project

corridor. Ashtamudi estuary is a rich

bio-diversity spot because of its fish

resources and the wetland birds (both

resident and migratory).

11. Areas already subjected to pollution

or environmental damage. (those

where existing legal environmental

standards are exceeded)

No Not Applicable

12. Areas susceptible to natural hazard

which could cause the project to

present environmental problems

(earthquakes, subsidence, landslides,

erosion, flooding or extreme or

Yes Project area is in Seismic Zone III

(moderate earthquake zone) as per IS

1893 (Part I) of Indian Seismic

Map/Seism tectonic Atlas of India.

During the design stage, the effects from

S.

No.

Information/Checklist

confirmation

Yes/No (Yes/No) (If Yes, Aerial distance

(within 15km.) Proposed project

location boundary)

adverse climatic conditions) natural disasters will be considered and

necessary precautionary measures

would be built-in/implemented

PROJECT DETAILS IN CRZ AREA

1. DETAILS OF CRZ AREA

S.

No. Information/Checklist confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

1.1 Is any CRZ-I (A) nearby? Yes The alignment of Kollam bypass (under

construction) crossing over Ashtamudi

Kayal (Thrikkadavur) is passing over a

small patch of mangrove. The total area

of CRZ-I(A) is about 396.461 sqm

(Length – 30m approx.)

The MoEF&CC Infrastructure and CRZ

Project’s Expert Appraisal Committee

(EAC), while hearing the cases for CRZ

clearance for Alappuzha Bypass and

Kollam Bypass decided to do physical

verification of alignment. Accordingly,

a team of MoEF&CC representatives

physically verified the CRZ areas. On

physical verification, it was found that

the actual standing mangrove

vegetation at Ashtamudi Kayal, is

limited to an area of 140 sqm instead of

300 sqm as reported in CESS study It

was further reported that mangroves

located near Ashtamudi Kayal are not

likely to be affected in any way during

the construction of the proposed

project.

1.2 Project details in CRZ area in CRZ- Yes The alignment of Alappuzha bypass

S.

No. Information/Checklist confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

I(B) (under construction) is crossing over an

intertidal zone near Alappuzha Sea

Coast. The total area of CRZ-I(B) is

about 528.569 sqm (Length – 20m

approx.)

1.3 Project details in CRZ area in CRZ-II Yes The alignment of Alappuzha bypass

(under construction) is crossing

between 500m distance from HTL on

landward side. The total area of CRZ-II

is about 150779.863 sqm (Length –

3319m approx.)

1.4 Project details in CRZ area in CRZ-

III

Yes The project road is crossing CRZ-III at

following locations –

From To

Length

of CRZ

(m)

Area

(Sq. m.)

382.359 382.396 22 929.118

423.886 433.065 9179 399303.488

456.079 456.179 100 2132.637

471.778 472.043 169 7685.632

480.118 480.300 133 5809.046

480.456 484.130 3674 167441.094

484.614 485.203 204 9316.494

487.278 487.99 226 10907.893

490.115 490.413 227 10516.084

491.829 492.965 322 11966.945

505.542 505.730 134 6001.898

529.308 529.445 96 4628.194

Total 14486 636638.523

1.5 Project details in CRZ area in CRZ-

IV

Yes The project road is crossing CRZ-IV

(between LTLs on opposite banks of

river/canal/backwaters) at following

locations –

From To Length of

CRZ (m)

Area

(Sq. m.)

382.359 382.396 15 677.488

456.079 456.179 81 1902.235

471.778 472.043 96 4294.362

480.118 480.300 49 2430.381

484.614 485.203 385 17541.177

487.278 487.99 486 21191.679

S.

No. Information/Checklist confirmation

Yes/

No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

490.115 490.413 69 2987.599

491.829 492.965 814 36105.755

505.542 505.730 54 2530.359

529.308 529.445 41 1929.928

Total 2090 91650.963

1.6 Project details in CRZ area in CRZ-V Yes The project is crossing rivers, lake and

backwaters at several locations in the

State of Kerala

1.7 Details of Shoreline Change No Not Applicable

1.8 Whether the area is prone to cyclone,

tsunami, tidal surge, subduction,

earthquake etc.?

Yes The Project area is prone to Cyclone,

Tsunami, Tidal Surage and subduction.

Detailed studies of the area based on

Metrological studies were done at every

regular interval.

The state Kerala comes under Zone-III

(Moderate) in Seismic zone mapping of

India

1.9

Whether the area is prone for

saltwater ingress?

No Not Applicable

1.10 Upload CRZ Map (Upload KML

only- normally covering 7km radius

around the project site) (Scale –

1:50,000)

Yes Enclosed in Folder as 05-NH47-CRZ

Map-7Km.kml

1.11 Upload Project Layout superimposed

on the CRZ Map (Upload KML only)

(Scale – 1:4000)

Yes Enclosed in Sub-Folder 06-NH47_CRZ

Maps_1-4000

PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

1. Upload Proposed TOR File

(Upload pdf only and attach it as

Annexure- Proposed TOR File)

Enclosed in Folder as 07-TOR-EIA.docx

2. Upload scanned copy of covering

letter

(Upload pdf only)

Enclosed in Folder as 01-Draft Letter.docx

3. Upload Pre-feasibility

Report(PFR) (Upload pdf only

and attach it as Annexure-Pre-

feasibility Report(PFR) File)

Enclosed in Folder as 08-FFSR_Vol I Main

Report.pdf

4. Upload Additional Attachments if

any (Only single pdf file) (Upload

pdf only and attach it as

Annexure-Additional Attachments

File)

Enclosed in Folder as -

1. 09-CESS CRZ Report.pdf

2. 10-Draft EIA ANNEXURE_05.09.17.docx

3. 11-CRZ-Clearance-Widening of Cherthala –

Kazhakuttam Section of NH-47.pdf – dated

13.10.2014

4. 12-CRZ Clearance Letter – Alappuzha Bypass and

Kollam Bypass.pdf – dated 30.12.2013