KM - 300
1 2 3 5 6 7 8 9 10 11 12
300 Lal Kuan 500 85 594.50 540.45 1040.45 1040.45 1040.45
300 Lal Kuan 510 85 594.50 540.45 1050.45 1050.45 1050.45 from
300 Lal Kuan 540 85 594.50 540.45 1080.45 1080.45 1080.45 =( 8
300 Lal Kuan 600 85 594.50 540.45 1140.45 1140.45 1140.45 DisQuar
300 Lal Kuan 600 85 594.50 540.45 1140.45 1140.45 1140.45
Cos300 Lal Kuan 600 85 594.50 540.45 1140.45 1140.45 1140.45 up t
51 t
300 Lal Kuan 470 85 594.50 540.45 1010.45 1010.45 1010.45 76 t
Tota
300 Lal Kuan 550 85 594.50 540.45 1090.45 1090.45 1090.45 Less
300 Lal Kuan 500 85 594.50 540.45 1040.45 1040.45 1040.45
1) Distances from quarry have been taken from the shortest route.
2) Quarry rates have been taken of the respective circle applicable.
3) Cartage rates has been taken approved by SE Lko. Circle in the RMR.
4) Quarry rates are for approved quarry and RMR rates are minimum .
N.H. Construction Division
PART - C ROAD METAL RATES
CIRCLE : 28th .Circle, N.H. P.W
NH-74 ( New N H No -30 ) BAREILLYKm.
No.
Quarry Quarry
Rate
( Rs)
Distence
from
Quarry to
Site (KM)
Cost of
cartage
without
loadin
Cost of
cartage
excluding
C.P. (Rs)
Stone grit 5.6 mm and below
Total
(3+7)
(Rs)
I.S.
Transit
Tax
(Rs)
Total of
col.
(8+9)
(Rs)
Trade
Tax on
col. 11
(Rs)
G.Total of
col
11+12
(Rs)
Stone Ballast ( 45-90 mm)
Stone Ballast ( 45-63 mm)
Stone Ballast ( 22.4-53 mm)
16mm-22.4mm/ 11.2mm/13.2mm/ 10-16mm
11.2-2.8 mm / 2.3-9.5 (6.7mm)
Stone Dust
stone boulder 25-60 Kgs
Coarse Sand
JUNIOR ENGINEER EXECUTIVE ENGINEER SUPERINTEND
N.H. Construction Division 28th Cir
P.W.D. Bareilly P.W.D. Bareilly P.W.D
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 2/33
PART - C
Analysis of Rates
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 3/33
3004 Filling Pot-holes and Patch Repairs with open
Graded Premix surfacing, 20mm.
Removal of al l failed mater ial , t rimming of completed
excavation to provide f irm vertical faces, cleaning of
surface, paint ing of tack coat on the sides and base of
excavation as per clause 503, back fil ling the pot holes
with hot bituminous material as per clause 504,
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(405 tonne)
a) Labour
Mate Day 3.760 130.00 488.80
Mazdoor Day 90.000 125.00 11250.00
Mazdoor skilled Day 4.000 135.00 540.00
b) Machinery
Air compressor 250 cfm hour 6.000 206.00 1236.00
HMP 100-110 TPH Capacity hour 6.000 11167.00 67002.00
Tipper 5.5 tonnes capacity hour 45.000 200.00 9000.00
Smooth wheeled roller 8-10 tonnes hour 12.000 297.00 3564.00
add : escaslation @ 35 % on machinery 28280.70
c) Material
Crushed stone aggregates nominal size 13.2mm cum 184.500 1140.45 210413.86
Crushed stone aggregates nominal size 11.2mm cum 92.250 1140.45 105206.93
Bitumen 60/70 tonne 14.970 38910.64 582492.24
Bitumen emulsion for tack coat including vertical
sides of pot hole.
tonne 2.460 33979.25 83588.96
d) Overhead charges @10% input on (a+b+c) 110306.35
e) Contractor's profit @10% input on (a+b+c+d) 121336.98
Cost for 10250 sqm = a+b+c+d+e 1334706.83
Rate per sqm = (a+b+c+d+e)/10250 130.22
say 130.20
Junior Engineer Assistant Engineer Executive Engineer
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 4/33
513 Seal Coat(ii) Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A and B seal coats
Case - II : Type BProviding and laying of premix sand seal coat with HMP
of appropriate capacity not less than 75 tonnes/ hours
using crushed stone chipping 6.7 mm size and
penetration bitumen of suitable grade.
Unit = sqm
Taking output = 7858 sqm (47.16 cum)
Labour
a) Mate day 0.160 130.00 20.80
b) Mazdoor day 4.000 130.00 520.00
Machinery
HMP of 75 tonnes/hour. hour 2.000 11167.00 22334.00
Electric Generator Set 250 KVA hour 2.000 450.00 900.00Front end loader 1 cum bucket capacity hour 2.000 520.00 1040.00
Tipper 10 tonne capacity tonne.k
m
104 x 5' 14.50 75400.00
Add 10 per cent of cost of carriage to cover cost of
loading and unloading
7540.00
Paver finisher hydrostatic with sensor attachment hour 2.000 629.00 1258.00
Smooth wheeled 8-10 tonnes capacity hour 2.000 297.00 594.00
add : escaslation @ 35 % on machinery 30041.20
c) Material
Bitumen@ 6.80 kg per 10 sqm tonne 5.340 38910.64 207782.80
Crushed stone chipping of 6.7 mm size defined as
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.06 cum per 10 sqm
cum 47.160 1140.45 53783.62
d) Overhead charges @10% input on (a+b+c) 40121.44e) Contractor's profit @10% input on (a+b+c+d) 44133.59
Cost for 7858 sqm = a+b+c+d+e 485469.46
Rate per sqm = (a+b+c+d+e)/7858 61.78
say 61.80
Junior Engineer Assistant Engineer Executive Engineer
506 Built-up-Spray Grout
Analysis of Rates
Analysis of Rates
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 5/33
Providing, laying and rolling of built-up-spray grout layer
over prepared base consisting of a two layer composite
construction of compacted crushed coarse aggregates
using motor grader for aggregates. key stone chips
spreader may be used with application of bi tuminous
binder after each layer, and with key aggregates placed
on top of the second layer to serve as a Base conforming
to the line, grades and cross-section specified, the
compacted layer thickness being 75 mm
Unit = sqm
Taking output = 3000 sqm (225 cum)
a) Labour
Mate day 0.400 130.00 52.00
Mazdoor including for brooming of key aggregates day 8.000 130.00 1040.00
Mazdoor skilled day 2.000 135.00 270.00
b) Machinery
Hydraulic self propelled chip spreader both for
aggregates and key aggregates@ 1500 sqm per hour for
3000 x 3 sqm
hour 6.000 1700.00 10200.00
Bitumen pressure distributor for 3000 x 2 sqm @ 1750
sqm per hour
hour 3.430 516.00 1769.88
Tipper 5.5 cum capacity hour 10.000 200.00 2000.00
smooth wheel roller 8 tonnes hour 6.000 297.00 1782.00
Front end loader 1 cum bucket capacity hour 6.000 520.00 3120.00
add : escaslation @ 35 % on machinery 6605.16
c) Material
Bitumen30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer
tonne 9.000 38910.64 350195.74
Crushed stone coarse aggregate passing 53 mm and
retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each
layer
cum 300.000 1080.45 324136.36
Key aggregates passing 22.4 mm and retained on 2.8
mm sieve @ 0.13 cum per 10 sqm
cum 39.000 1140.45 44477.73
d) Overhead charges @10% input on (a+b+c) 74564.89e) Contractor's profit @10% input on (a+b+c+d) 82021.38
Cost for 3000 sqm = a+b+c+d+e 902235.13
Rate per sqm = (a+b+c+d+e)/3000 300.75
say 300.70
Junior Engineer Assistant Engineer Executive Engineer
3004.2 10.4 Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm.
Analysis of Rates
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 6/33
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504, compacting, trimming and finishing
the surface to form a smooth continuous surface, all as per
clause 3004.2
Unit = Sqm
Taking out put = 4900 sqm (196 cum)(450 Tonnes)
a) Labour
Mate Day 2.920 130.00 379.60
Mazdoor Day 70.000 125.00 8750.00
Mazdoor skilled Day 3.000 135.00 405.00
b) Machinery
Air compressor 250 cfm hour 6.000 206.00 1236.00
HMP 100-110 TPH Capacity hour 6.000 11167.00 67002.00
Tipper 10 tonnes capacity hour 45.000 200.00 9000.00
Smooth wheeled roller 8-10 tonnes hour 12.000 297.00 3564.00
add : escaslation @ 35 % on machinery 8080.20
c) Material
I) Bitumen tonne 22.500 38910.64 875489.34
ii) Bitumen emulsion for tack coat . tonne 1.180 33979.25 40095.52
iii) Aggregates
Grading I - 19mm(Nominal size)
20-10mm 35 per cent cum 99.750 1140.45 113760.34
10-5 mm 23 per cent cum 65.550 1140.45 74756.80
5mm and below40 per cent cum 114.000 1010.45 115191.82
Add 5 per cent for wastage 15185.45
or
Any one of the above alternatives of aggregate i.e. 19mm or
13mm nominal size may be adopted as per approved design.
(i) for grading I Material
d) Overhead charges @10% input on (a+b+c) 133289.61e) Contractor's profit @10% input on (a+b+c+d) 146618.57
Cost for 4900 cum = a+b+c+d+e 1612804.24
Rate per cum = (a+b+c+d+e)/4900 329.14
say 329.10
Junior Engineer Assistant Engineer Executive Engineer
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 7/33
Sr No
Ref. to
MoRTH
Spec.
Description Unit Quantity Rate Rs Cost Rs
5.21 (ii) Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm
Providing and laying of a stress absorbing membrane over acracked road surface, with crack width 6 to 9 mm after
cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 11 kg per 10
sqm and spreading 11.2 mm crushed stone aggregates @
0.12 cum per 10 sqm, sweeping the surface for uniform
spread of aggregates and surface finished to conform to
clause 902.Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate day 0.240 130.00 31.20
Mazdoor day 6.000 125.00 750.00
SUB TOTAL 781.20
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 6.000 230.00 1380.00
Air compressor 250 cfm capacity hour 6.000 206.00 1236.00
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000 516.00 3096.00
Hydraulic Chip spreader hour 6.000 1700.00 10200.00
Smooth wheeled road roller 8-10 tonne hour 6.000 297.00 1782.00
17694.00
ADD 35 % ESCALATION ON MACHINARY 6192.90
SUB TOTAL 23886.90c) Material
Modified binder tonne 11.550 38910.64 449417.86
Crushed stone chipping 11.2 mm size cum 105.000 1140.45 119747.73
SUB TOTAL 569165.59
A+B+C 593833.69
d) Overhead charges @ input on (a+b+c) 59383.37
e) Contractor's profit @ input on (a+b+c+d) 65321.71
Cost for 10500 sqm = a+b+c+d+e 718538.77
Rate per sqm = (a+b+c+d+e)/10500 68.43
say 68.40
Junior Engineer Assistant Engineer Executive Engineer
Analysis of Rate
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 8/33
PART - C ( From km 294.00 to 304.00 )
NH-74 300
Distance from Mathura Refinery 279
Distance from Panipat Refinery 489
MATERIAL Bitumen VG-
30(Bulk) From
Mathura Refinery
( Rs )
Emulsion M/S (Packed
Reconditioned Drums from
Panipat Refinery)
( Rs )
CRMB-55(Bulk) from
Mathura Refinery
( Rs )
Basic Rates
01-10-2012
A 33231.00 30328.00 33761.00
ExciseDuty@14%
on 'A'
B 4652.34 4245.92 4726.54
Education
Cess@
3% on 'B'
C 139.57 127.38 141.80
Cartage(1.75/km
) excluding 10%
O.H.
279×2
km
D 887.73 - 887.73
Cartage(1.75/km
) excluding 10%
O.H.
489X1.75
E - 777.95
EMPTY DRUMS (-)1500
Total
'(A+B+C+D+
E)'
F 38910.64 33979.25 39517.06
SAY G 38911 33979 39517
UNIOR ENGINEER ASSISTANT ENGINEER EXECUTIVE ENGINEER
Rate w.e.f. 01- 10 - 2012
CIRCLE : 28th Circle, NH , PWD, BAREILLY
DIVISION : N H Construction Division, PWD ,Bareilly
IN KM
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 9/33
surfacing From km 295.00 to 304.00 of NH-74 (New NH-30 )
S. No. Item of work Unit Qty. Rate Per Amount1 Built-up-Spray Grout
Providing, laying and rolling of built-up-
spray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed coarse
aggregates using motor grader for
aggregates. key stone chips spreader may
be used with application of bituminous
binder after each layer, and with key
aggregates placed on top of the second
layer to serve as a Base conforming to theline, grades and cross-section specified, the
compacted layer thickness being 75 mm
in km - 295 Sqm 280.00
in km - 296 460.00
in km - 297 180.00
in km - 298 300.00
in km - 299 150.00in km - 300 210.00
in km - 301 230.00
in km - 302 150.00
in km - 303 247.00
in km - 304 150.00
from km-294.00 to 304.00 of NH-74 sqm 2357.00 300.70 708749.90
2 Filling Pot-holes and Patch Repairs with
open-Graded Premix surfacing, 20mm.
BILL OF QUANTITY
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
PART - C. FDR To NH-74 Road (From km 294.00 to 304.00)under2012-2013
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 10/33
Removal of all failed material, trimming of
completed excavation to provide firm
vertical faces, cleaning of surface, painting
of tack coat on the sides and base of
excavation as per clause 503, back filling
the pot holes with hot bituminous material
as per clause 511, compacting, trimming
and finishing the surface to form a smooth
continuous surface, all as per clause 3004.2
from km-294.00 to 304.00 of NH-74 sqm 2357.00 130.20 306881.40
3 Filling Pot-holes and Patch Repairs with
Bituminous concrete, 40mm.
Removal of all failed material, trimming of
completed excavation to provide firm
vertical faces, cleaning of surface, painting
of tack coat on the sides and base of
excavation as per clause 503, back filling
the pot holes with hot bituminous material
as per clause 504, compacting, trimming
and finishing the surface to form a smooth
continuous surface, all as per clause 3004.2
in km - 295 Sqm 120.00
in km - 296 265.00in km - 297 152.00
in km - 298 198.00
in km - 299 152.00
in km - 300 180.00
in km - 301 302.00
in km - 302 147.00
in km - 303 160.00
in km - 304 210.00
from km-294.00 to 304.00 of NH-74 sqm 1886.00 329.10 620682.60
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 11/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 12/33
surfacing From km 295.00 to 304.00 of NH-74 (New NH-30 )
1 Date of Calling Tender
2 Date of Receiving Tender
3 Date of Openning Tender
4 Security E/M
5 Time of Completion
6 Validity Period
7 Cost of Tender Form
S. No. Item of work Unit Qty. Rate
1 Built-up-Spray Grout In Figure In Words
Providing, laying and rolling of built-up-spray
grout layer over prepared base consisting of a
two layer composite construction of compacted
crushed coarse aggregates using motor grader
for aggregates. key stone chips spreader may beused with application of bituminous binder after
each layer, and with key aggregates placed on
top of the second layer to serve as a Base
conforming to the line, grades and cross-section
specified, the compacted layer thickness being
km-295 sqm 280.00
km-296 sqm 460.00
km-297 sqm 180.00
km-298 sqm 200.00
km-299 sqm 150.00
km-300 sqm 200.00
km-301 sqm 180.00
km-302 sqm 120.00
km-303 sqm 200.00
Total sqm 1970.00 300.70
2 Filling Pot-holes and Patch Repairs with
open-Graded Premix surfacing, 20mm.
Removal of all failed material, trimming of
completed excavation to provide firm vertical
faces, cleaning of surface, painting of tack coat
on the sides and base of excavation as per
clause 503, back filling the pot holes with hotbituminous material as per clause 511,
compacting, trimming and finishing the surface to
form a smooth continuous surface, all as per
km-295 sqm 300.00
km-296 sqm 500.00
km-297 sqm 200.00
km-298 sqm 200.00
One Month
Three Months
150+500+88 = 738/-
Rate
BILL OF QUANTITY
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
25th december 2012
11th January 2013
14 th January 2013
Rs. 50000/-
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 13/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 14/33
km-302 sqm 400.00
km-303 sqm 350.00
km-304 sqm 350.00
Total 4550.00 68.40
I/We here by tender my / our rates ………………………………...% above/below/atpar the departmental rates.
Signature of Contractor Officer Calling Tender Officer Openning Tender
Complete Adress of Contractor Officer Accepting Tender
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 15/33
1 Date of Calling Tender
2 Date of Receiving Tender
3 Date of Openning Tender4 Security E/M
5 Time of Completion
6 Validity Period
7 Cost of Tender Form
S. No. Item of work Unit Qty.
1 Stress absorbing membrane (SAM) with
crack width 6 mm to 9 mm In Figure In Words
Providing and laying of a stress absorbing
membrane over a cracked road surface, with
crack width 6 to 9 mm after cleaning with a
mechanical broom, using modified binder complying with clause 521, sprayed at the rate of
11 kg per 10 sqm and spreading 11.2 mm
crushed stone aggregates @ 0.12 cum per 10
sqm, sweeping the surface for uniform spread of
aggregates and surface finished to conform to
km-295 sqm 950.00
km-296 sqm 1200.00
km-297 & 298 sqm 950.00
km-299 & 300 sqm 1050.00
km-301 & 302 sqm 1400.00
km-303 & 304 sqm 1450.00
Total sqm 7000.00 71.00 Rs Seventy One only
I/We here by tender my / our rates ………………………………...% above/below/atpar the departmental rates.
Signature of Contractor Officer calling Tender Officer openning Tender
Complete Adress of Contractor
Officer Accepting Tender
One Month
Three Months
150+500+88 = 738/-
Rate
BILL OF QUANTITY
Name of work : Crack Sealing with Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm repair over a crack road surface From km 294.00 to 304.00 of NH-74 (New NH-
30 )
25th April 2012
11th May 2012
14 th May 2012Rs. 50000/-
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 16/33
surfacing and with B.C. From km 294.00 to 304.00 of NH-74 (New NH-30 )
S. No. Item of work no. L B H/D Qty
1 Built-up-Spray Grout
Providing, laying and rolling of built-
up-spray grout layer over prepared
base consisting of a two layer
composite construction of
compacted crushed coarse
aggregates using motor grader for
aggregates. key stone chipsspreader may be used with
application of bituminous binder
after each layer, and with key
aggregates placed on top of the
second layer to serve as a Base
conforming to the line, grades and
cross-section specified, the
compacted layer thickness being 75
mm
km-295 sqm 4.80 2.10 10.08
5.40 3.30 17.82
6.90 2.70 18.63
7.80 2.90 22.62
4.20 3.10 13.02
6.50 3.30 21.45
3.90 3.00 11.70
8.15 3.50 28.53
3.70 2.40 8.88
4.70 2.80
13.164.40 2.30 10.12
6.70 2.70 18.09
3.80 3.00 11.40
5.80 2.80 16.24
6.90 3.20 22.08
2.55 2.40 6.12
5.70 2.50 14.25
4.80 3.30 15.84
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
PART - C
FDR Work to NH-74 From km 294.00 to 304.00 Under ( 2012 - 2013 )
Details Of Measurments
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 17/33
280.03
say 280.00
km-296 sqm 3.45 2.20 7.59
4.25 2.60 11.05
9.70 3.60 34.92
8.80 3.35 29.48
5.00 3.10 15.509.10 3.90 35.49
7.65 3.40 26.01
5.30 3.60 19.08
6.70 3.05 20.44
4.50 2.30 10.35
5.90 3.00 17.70
7.00 3.50 24.50
9.80 3.80 37.24
4.10 2.60 10.66
5.45 3.45 18.80
2.80 1.90 5.32
6.60 3.50 23.10
3.85 2.85 10.97
6.10 3.75 22.88
2.40 2.00 4.80
5.30 2.90 15.37
7.45 2.95 21.98
6.80 3.60 24.48
3.85 3.20 12.32
460.02
say 460.00 km-297 sqm 4.00 2.80 11.20
5.40 3.35 18.09
3.40 2.20 7.48
5.80 2.90 16.82
4.45 3.00 13.35
6.95 3.60 25.02
6.25 3.70 23.13
2.65 2.10 5.57
3.85 2.70 10.40
4.80 2.45 11.76
6.20 3.25 20.15
4.95 3.45 17.08
180.03
say 180.00
km-298 sqm 3.60 2.80 10.08
4.10 2.00 8.20
4.65 3.40 15.81
3.05 1.90 5.80
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 18/33
6.80 3.50 23.80
4.00 3.00 12.00
5.80 2.80 16.24
5.80 3.70 21.46
7.50 3.55 26.63
4.10 3.35 13.74
6.15 3.50 21.533.20 2.20 7.04
6.60 3.55 23.43
5.05 3.30 16.67
3.90 3.60 14.04
2.70 1.90 5.13
4.85 2.50 12.13
5.50 2.70 14.85
4.30 3.40 14.62
5.60 3.00 16.80
299.97
say 300.00
km-299 sqm 5.10 3.00 15.30
3.70 2.40 8.88
4.85 3.30 16.01
7.30 3.70 27.01
5.45 3.50 19.08
3.00 2.10 6.30
4.80 2.65 12.72
5.20 3.10 16.12
3.25 3.20 10.40
5.50 3.30 18.15149.96
say 150.00
km-300 sqm 5.25 2.40 12.60
3.90 2.75 10.73
5.50 3.50 19.25
3.55 2.95 10.47
6.00 3.10 18.60
4.10 3.30 13.53
7.00 3.60 25.20
6.30 3.80 23.94
4.80 2.90 13.92
3.80 2.75 10.45
4.80 2.80 13.44
5.80 3.40 19.72
5.20 3.50 18.20
210.05
say 210.00
km-301 sqm 2.90 2.40 6.96
3.90 3.00 11.70
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 19/33
6.05 3.40 20.57
4.00 2.95 11.80
5.90 3.70 21.83
4.15 2.90 12.04
5.20 3.40 17.68
6.50 3.90 25.35
5.30 3.80 20.144.35 2.75 11.96
4.80 4.00 19.20
6.25 3.85 24.06
2.90 2.70 7.83
5.80 3.25 18.85
229.97
say 230.00
km-302 sqm 2.00 1.80 3.60
2.90 1.80 5.22
4.90 2.00 9.80
5.10 3.40 17.34
2.65 1.90 5.04
3.90 2.90 11.31
4.40 3.20 14.08
4.60 3.75 17.25
4.40 3.50 15.40
3.70 3.00 11.10
5.10 3.25 16.58
3.25 2.80 9.10
2.90 2.50 7.25
3.15 2.20 6.93149.99
say 150.00
km-303 sqm 4.60 2.50 11.50
3.90 2.90 11.31
5.85 3.55 20.77
4.30 3.00 12.90
6.30 3.70 23.31
3.90 3.20 12.48
4.30 2.90 12.47
5.80 3.45 20.01
5.30 3.40 18.02
6.00 4.00 24.00
5.30 3.50 18.55
4.60 2.95 13.57
4.80 2.85 13.68
6.80 3.85 26.18
3.20 2.60 8.32
247.07
say 247.00
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 20/33
km-304 sqm 4.30 3.20 13.76
5.60 3.80 21.28
12.20 3.50 42.70
8.50 2.95 25.08
4.80 2.50 12.00
6.90 3.90 26.91
3.00 2.80 8.40150.13
say 150.00
2 Filling Pot-holes and Patch
Repairs with open-Graded Premix
surfacing, 20mm.
Removal of all failed material,
trimming of completed excavation to
provide firm vertical faces, cleaning
of surface, painting of tack coat on
the sides and base of excavation as
per clause 503, back filling the pot
holes with hot bituminous material
as per clause 511, compacting,
trimming and finishing the surface to
form a smooth continuous surface,
all as per clause 3004.2
same to above as under
km-295 sqm 280.00 280.00
km-296 sqm 460.00 460.00
km-297 sqm 180.00 180.00
km-298 sqm 300.00 300.00
km-299 sqm 150.00 150.00
km-300 sqm 210.00 210.00
km-301 sqm 230.00 230.00
km-302 sqm 150.00 150.00
km-303 sqm 247.00 247.00
km-304 sqm 150.00 150.00
Total 2357.003 Filling Pot-holes and Patch
Repairs with Bituminous
concrete, 40mm.
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 21/33
Removal of all failed material,
trimming of completed excavation to
provide firm vertical faces, cleaning
of surface, painting of tack coat on
the sides and base of excavation as
per clause 503, back filling the pot
holes with hot bituminous material
as per clause 504, compacting,
trimming and finishing the surface to
form a smooth continuous surface,
all as per clause 3004.2
km-295 sqm 2.70 2.00 5.40
3.90 3.00 11.70
4.00 2.60 10.40
3.20 2.40 7.68
3.60 2.80 10.08
4.20 2.90 12.18
4.80 2.60 12.48
5.10 2.90 14.79
4.40 3.10 13.64
3.80 2.80 10.64
3.80 2.90 11.02
120.01
say 120.00
km-296 sqm 3.80 1.90 7.226.80 3.80 25.84
4.40 3.50 15.40
4.60 3.10 14.26
2.90 2.55 7.40
6.60 3.70 24.42
5.50 3.50 19.25
3.30 2.80 9.24
6.20 4.00 24.80
5.35 3.40 18.19
6.05 3.85 23.29
4.90 3.40 16.66
5.90 3.55 20.95
3.40 2.90 9.86
5.70 3.35 19.10
3.50 2.60 9.10
264.97
say 265.00
km-297 sqm 3.10 2.60 8.06
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 22/33
3.40 2.60 8.84
3.65 2.00 7.30
3.90 3.00 11.70
4.60 2.70 12.42
3.40 3.75 12.75
6.20 3.50 21.70
6.70 3.00 20.104.90 3.70 18.13
4.00 3.10 12.40
3.30 2.20 7.26
4.05 2.80 11.34
152.00
say 152.00
km-298 sqm 2.65 1.90 5.04
3.90 2.90 11.31
4.40 3.20 14.08
4.60 3.75 17.25
3.20 3.00 9.60
5.60 2.60 14.56
6.50 3.75 24.38
5.40 3.60 19.44
4.70 3.60 16.92
5.85 3.80 22.23
3.90 3.10 12.09
4.25 3.00 12.75
5.55 3.30 18.32
197.96
say 198.00 km-299 sqm 2.60 2.35 6.11
4.20 3.00 12.60
4.80 3.35 16.08
5.70 3.90 22.23
5.00 3.50 17.50
4.00 3.40 13.60
5.10 3.60 18.36
6.00 3.80 22.80
3.65 2.90 10.59
4.50 2.70 12.15
152.02
say 152.00
km-300 sqm 5.15 2.30 11.85
4.00 2.80 11.20
4.80 3.35 16.08
6.20 3.40 21.08
5.75 3.50 20.13
6.70 3.50 23.45
3.10 3.00 9.30
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 23/33
4.30 3.50 15.05
3.80 3.10 11.78
4.90 3.20 15.68
3.50 2.70 9.45
2.95 2.40 7.08
3.30 2.40 7.92
180.04say 180.00
km-301 sqm 4.00 2.50 10.00
2.80 2.60 7.28
4.60 3.60 16.56
5.90 3.60 21.24
6.35 2.40 15.24
3.10 2.80 8.68
7.20 3.80 27.36
5.40 3.00 16.20
4.20 3.30 13.86
5.75 3.70 21.28
6.10 3.25 19.83
5.50 3.20 17.60
4.15 2.85 11.83
4.10 3.50 14.35
3.90 3.30 12.87
6.80 3.85 26.18
4.30 2.80 12.04
3.90 3.00 11.70
5.60 3.20 17.92
302.01say 302.00
km-302 sqm 3.00 2.15 6.45
3.80 2.90 11.02
4.60 3.50 16.10
4.60 3.80 17.48
4.40 3.60 15.84
3.70 3.40 12.58
5.60 3.90 21.84
5.50 3.00 16.50
4.00 3.00 12.00
5.20 3.30 17.16
146.97
say 147.00
km-303 sqm 4.00 3.40 13.60
2.85 2.90 8.27
5.30 3.00 15.90
4.60 3.60 16.56
4.85 3.60 17.46
5.60 3.50 19.60
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 24/33
5.90 3.60 21.24
6.00 3.60 21.60
4.20 3.30 13.86
3.50 3.40 11.90
159.99
say 160.00
km - 304 Sqm 5.60 3.90 21.8416.50 4.20 69.30
11.20 3.50 39.20
9.80 5.60 54.88
6.90 3.60 24.84
210.06
say 210.00
4 Providing and laying of a stress
absorbing membrane over a
cracked road surface, with crack
width 6 to 9 mm after cleaning with a
mechanical broom, using modifiedbinder complying with clause 521,
sprayed at the rate of 11 kg per 10
sqm and spreading 11.2 mm
crushed stone aggregates @ 0.12
cum per 10 sqm, sweeping the
surface for uniform spread of
aggregates and surface finished to
conform to clause 902.
km-295 sqm 8.10 2.40 19.44
9.60 3.20 30.72
7.90 1.80 14.22
11.40 2.80 31.92
14.20 3.00 42.60
7.90 3.40 26.86
18.50 2.90 53.65
8.40 3.30 27.72
9.90 2.30 22.77
12.70 3.00 38.10
308.00
say 308.00
km-296 sqm 14.40 2.80 40.32
10.00 2.60 26.00
8.40 2.20 18.48
9.80 2.80 27.44
11.60 2.70 31.32
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 25/33
16.80 3.40 57.12
21.20 2.60 55.12
9.20 3.00 27.60
13.80 2.50 34.50
11.40 3.00 34.20
352.10
say 352.00
km-297 sqm 9.00 2.00 18.00
12.20 2.80 34.16
22.00 2.40 52.80
11.90 2.30 27.37
14.20 2.00 28.40
28.60 2.40 68.64
18.50 3.00 55.50
9.20 2.40 22.08
9.90 2.80 27.7213.00 2.90 37.70
25.50 2.50 63.75
20.80 2.40 49.92
9.60 3.20 30.72
7.90 1.80 14.22
11.40 2.80 31.92
14.80 2.60 38.48
7.90 2.60 20.54
18.50 2.70 49.95
11.60 2.90 33.64
9.90 2.30 22.77
24.80 2.40 59.52
787.80
say 788.00
km-298 sqm 18.10 2.50 45.25
15.40 2.80 43.12
9.60 2.00 19.20
11.60 2.80 32.48
11.40 2.40 27.367.90 1.90 15.01
20.20 2.10 42.42
9.80 2.10 20.58
14.70 1.80 26.46
9.10 1.70 15.47
24.30 2.60 63.18
14.20 3.00 42.60
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 26/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 27/33
21.70 2.60 56.42
25.50 2.50 63.75
12.80 3.00 38.40
28.60 2.80 80.08
13.30 2.40 31.92
660.98
say 661.00
km-302 sqm 12.30 2.30 28.29
18.90 2.40 45.36
27.20 2.90 78.88
17.40 2.70 46.98
16.80 2.90 48.72
19.60 2.60 50.96
11.40 2.10 23.94
27.50 2.80 77.00
16.50 2.40 39.60439.73
say 440.00
km-303 sqm 9.50 1.80 17.10
12.00 2.40 28.80
17.00 2.40 40.80
15.60 2.00 31.20
26.60 2.50 66.50
21.90 2.40 52.56
11.40 2.40 27.36
27.30 2.60 70.98
12.80 2.10 26.88
362.18
say 362.00
km-304 sqm 18.80 2.20 41.36
11.50 2.20 25.30
18.50 2.50 46.25
21.30 2.90 61.77
10.50 1.80 18.90
8.40 2.00 16.80
22.00 2.60 57.20
13.90 2.40 33.36
300.94
say 301.00
Junior Engineer Assistant Engineer Executive Engineer
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 28/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 29/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 30/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 31/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 32/33
8/13/2019 Maintenance Km 295.00 to 304.00 of NH-74
http://slidepdf.com/reader/full/maintenance-km-29500-to-30400-of-nh-74 33/33