For more project speci� c information and to get involved: TampaBayNext.com | [email protected] | (813) 975-NEXT (6398) | /TampaBayNext | @TampaBayNextPublic participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 1 (800) 955-8770 (Voice).Comuníquese con nosotros: Nos importa mucho la opinión del público sobre el proyecto. Si tiene preguntas o comentarios, o simplemente desea más información, por favor comuníquese con nosotros. Nuestra representante en español es: Manny Flores, 813-975-4248, [email protected].
09/10/2020
Section 7 FPID 431821-2-52-01 and 443770-1-52-01
I-275 North of Downtown Tampa
Tampa Bay Next ProgramTampa Bay Next is a program to modernize Tampa Bay’s transportation infrastructure and a process for engaging the public. Within the majority of the program area, the addition of express lanes is being considered to provide additional capacity, relieve congestion and provide a more reliable travel time option for passenger and transit vehicles. In addition, improvements address safety and traffic operations on the interstates. Interstate modernization projects incorporate additional elements such as opportunities to add bicycle and pedestrian facilities, aesthetic treatments, transit accommodations, and reconnecting streets where possible.
I-275 North of Downtown TampaThe I-275 corridor north of downtown Tampa is a major north-south thoroughfare connecting to downtown Tampa. It also serves as a link to the regional and statewide transportation network. FDOT completed a study on proposed corridor improvements, which identified adding one general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Bearss Avenue and where required, widening inside shoulders to accommodate potential future transit. The improvements are partially funded for construction.
Along the corridor, FDOT will construct dedicated auxiliary lanes from the I-4 ramps to north of Dr. Martin Luther King, Jr. Boulevard to provide drivers with a transition from the I-275/I-4 interchange (FPID 443770-1-52-01). FDOT will also construct one additional general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Hillsborough Avenue. To accommodate potential future transit in this area (FPID 431821-2-52-01), FDOT will widen the inside and outside shoulders of the roadway to provide flexibility for future transit operations.
Additionally, FDOT will construct noise barriers in some areas along this corridor and complete improvements at underpasses to make them more pedestrian friendly. Improvements at underpasses may include various combinations of removing portions of the sloped embankment under bridge ends and utilizing vertical walls to open the space, widening sidewalks, painting bridge structures, providing LED lighting, and installing special fencing. FDOT will identify landscaping opportunities along the corridor.
The project will be a design-bid-build procurement and construction is anticipated to begin in Fall 2021. For additional information visit www.fdottampabay.com.
CONSTRUCTION ESTIMATE $83.3 Million (as of September 2020)* Funded for construction
CONSTRUCTION SCHEDULE Construction to begin Fall 2021
PUBLIC HEARING March 26, 2019
IN PROJECT DEVELOPMENT
PINELLAS COUNTY
PASCO COUNTY
HILLSBOROUGH COUNTY
PIN
ELL
AS
HIL
LSB
OR
OU
GH
HILLSBOROUGH COUNTY
HIL
LSB
OR
OU
GH
CO
UN
TY
HILLSBOROUGH COUNTY
MANATEE COUNTY
HILLSBOROUGH COUNTY
MANATEE COUNTY
POLK COUNTY
HARDEE COUNTY
PASCO COUNTY POLK COUNTY
PO
LK C
OU
NT
Y
O l d T a m p a B a y
T a m p a B a y
H i l l s b o r o u g h B a y
ClearwaterClearwaterClearwater
St PetersburgSt PetersburgSt Petersburg
TampaTampaTampa
SEIS LIMITSSEIS LIMITS
Howard Frankland Bridge
Downtown Interchange
Vet
eran
s E
xpy
I-4 and C
onnector
Westshore Area Interchange
NW
Exp
y
I-4/I-75Interchange
Project LimitE of Branch Forbes Rd
PD&EStudy Limit
Po
lk Pkw y
I-27
5 N
ort
h C
orr
ido
r
I-75
No
rth
Co
rrid
or
I-75
So
uth
Co
rrid
or
I-27
5 P
inel
las
Co
rrid
or
Gateway ExpresswayProject
Bearss Ave
54th Ave S
Moccasin Wallow Rd
Bruce
B. D
owns Blvd
Howard Frankland Bridge
Downtown Interchange
Vet
eran
s E
xpy
I-4 and C
onnector
Westshore Area Interchange
NW
Exp
y
I-4/I-75Interchange
Project LimitE of Branch Forbes Rd
PD&EStudy Limit
Po
lk Pkw y
I-27
5 N
ort
h C
orr
ido
r
I-75
No
rth
Co
rrid
or
I-75
So
uth
Co
rrid
or
I-27
5 P
inel
las
Co
rrid
or
Gateway ExpresswayProject
Bearss Ave
54th Ave S
Moccasin Wallow Rd
Bruce
B. D
owns Blvd
618
618
589
60
60
580
580
574574
674
75
4
4
75
75
275
275
275
275
275
275
375
175
19
41
41
41
41
301
301
301
301
92
92
92
19
54
56
TampaInternational
Airport
St. Pete/ClearwaterInternational
Airport
PortTampa Bay
Lakeland Linder Regional AirportLakeland Linder Regional AirportLakeland Linder Regional Airport
MacDillAirforce Base
University ofSouth Florida
TampaInternational
Airport
St. Pete/ClearwaterInternational
Airport
PortTampa Bay
Lakeland Linder Regional Airport
MacDillAirforce Base
University ofSouth Florida
618
60
574
4
275
275
275
275
41
41
92
92
41
41
41BUS
7th Ave
Cypress St
N B
oule
vard
N B
oule
vard
34th
St
40th
St
15th
St
30th
St
Rom
e A
ve
Arm
enia
Ave
Him
es A
ve
Dal
e M
abry
Hw
y
How
ard
Ave
Dr MLK Jr Blvd
21st Ave
Hillsborough Ave
Fowler Ave
Busch Blvd
Sligh Ave
Hanna Ave
Osborne Ave
Fletcher Ave
Bearss Ave
Bearss AveBru
ce B
. Downs B
lvd
Waters Ave
Linebaugh AveDal
e M
abry
Hw
y
Lois
Ave
56th
St
50th
St
50th
St
McK
inle
y D
r
Neb
rask
a A
ve
Flor
ida
Ave
Neb
rask
a A
ve
Flor
ida
Ave
Tam
pa S
t
Livi
ngst
on A
ve
Selmon Expy
SEMINOLE HEIGHTS
HISTORIC DISTRICT
SEMINOLE HEIGHTS
HISTORIC DISTRICT
Fund
ed fo
r Con
stru
ctio
nFu
nded
for C
onst
ruct
ion
FPID
443
770-
1-52
-01
FPID
443
770-
1-52
-01
Fut
ure
Phas
e No
t Fun
ded
for C
onst
ruct
ion
Fut
ure
Phas
e No
t Fun
ded
for C
onst
ruct
ion
FPID
431
821-
2-52
-01
FPID
431
821-
2-52
-01
N
12' 12' 12'15' 12'New GP
Lane
12'12'12' 15'12'New GP
Lane
12'12' 2'
Proposed Typical Section(from north of Dr. Martin Luther King, Jr. Boulevard
to north of Hillsborough Avenue)
*Present Day Cost