For more project specific information and to get involved: TampaBayNext.com | [email protected] | (813) 975-NEXT (6398) | /TampaBayNext | @TampaBayNext Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 1 (800) 955-8770 (Voice). Comuníquese con nosotros: Nos importa mucho la opinión del público sobre el proyecto. Si tiene preguntas o comentarios, o simplemente desea más información, por favor comuníquese con nosotros. Nuestra representante en español es: Manny Flores, 813-975-4248, [email protected]. 09/10/2020 Section 7 FPID 431821-2-52-01 and 443770-1-52-01 I-275 North of Downtown Tampa Tampa Bay Next Program Tampa Bay Next is a program to modernize Tampa Bay’s transportation infrastructure and a process for engaging the public. Within the majority of the program area, the addition of express lanes is being considered to provide additional capacity, relieve congestion and provide a more reliable travel time option for passenger and transit vehicles. In addition, improvements address safety and traffic operations on the interstates. Interstate modernization projects incorporate additional elements such as opportunities to add bicycle and pedestrian facilities, aesthetic treatments, transit accommodations, and reconnecting streets where possible. I-275 North of Downtown Tampa The I-275 corridor north of downtown Tampa is a major north-south thoroughfare connecting to downtown Tampa. It also serves as a link to the regional and statewide transportation network. FDOT completed a study on proposed corridor improvements, which identified adding one general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Bearss Avenue and where required, widening inside shoulders to accommodate potential future transit. The improvements are partially funded for construction. Along the corridor, FDOT will construct dedicated auxiliary lanes from the I-4 ramps to north of Dr. Martin Luther King, Jr. Boulevard to provide drivers with a transition from the I-275/I-4 interchange (FPID 443770-1-52-01). FDOT will also construct one additional general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Hillsborough Avenue. To accommodate potential future transit in this area (FPID 431821-2-52-01), FDOT will widen the inside and outside shoulders of the roadway to provide flexibility for future transit operations. Additionally, FDOT will construct noise barriers in some areas along this corridor and complete improvements at underpasses to make them more pedestrian friendly. Improvements at underpasses may include various combinations of removing portions of the sloped embankment under bridge ends and utilizing vertical walls to open the space, widening sidewalks, painting bridge structures, providing LED lighting, and installing special fencing. FDOT will identify landscaping opportunities along the corridor. The project will be a design-bid-build procurement and construction is anticipated to begin in Fall 2021. For additional information visit www.fdottampabay.com. CONSTRUCTION ESTIMATE $83.3 Million (as of September 2020)* Funded for construction CONSTRUCTION SCHEDULE Construction to begin Fall 2021 PUBLIC HEARING March 26, 2019 IN PROJECT DEVELOPMENT PINELLAS HILLSBOROUGH HILLSBOROUGH COUNTY POLK COUNTY Old Tampa Bay Tampa Bay Hillsborough Bay Clearwater Clearwater Clearwater St Petersburg St Petersburg St Petersburg Tampa Tampa Tampa SEIS LIMITS SEIS LIMITS Howard Frankland Bridge Downtown Interchange Veterans Expy I-4 and Connector Westshore Area Interchange NW Expy I-4/I-75 Interchange Project Limit E of Branch Forbes Rd PD&E Study Limit Po l k Pk w y I-275 North Corridor I-75 North Corridor th Corridor I-275 Pinellas Corridor Gateway Expressway Project Bearss Ave Bruce B. Downs Blvd Howard Frankland Bridge Downtown Interchange Veterans Expy I-4 and Connector Westshore Area Interchange NW Expy I-4/I-75 Interchange Project Limit E of Branch Forbes Rd PD&E Study Limit Po l k Pk w y I-275 North Corridor I-75 North Corridor th Corridor I-275 Pinellas Corridor Gateway Expressway Project Bearss Ave Bruce B. Downs Blvd 618 618 589 60 60 580 580 574 574 75 4 4 75 275 275 275 275 19 41 41 301 301 92 92 92 19 Tampa International Airport St. Pete/Clearwater International Airport Port Tampa Bay Lakeland Linder Regional Airport Lakeland Linder Regional Airport Lakeland Linder Regional Airport MacDill Airforce Base University of South Florida Tampa International Airport St. Pete/Clearwater International Airport Port Tampa Bay Lakeland Linder Regional Airport MacDill Airforce Base University of South Florida 618 60 4 275 275 275 275 41 41 92 92 41 41 41 BUS 7th Ave Cypress St N Boulevard N Boulevard 34th St 40th St 15th St 30th St Rome Ave Armenia Ave e Dale Mabry Hwy Howard Ave Dr MLK Jr Blvd 21st Ave Hillsborough Ave Fowler Ave Busch Blvd Sligh Ave Hanna Ave Osborne Ave Fletcher Ave Bearss Ave Bearss Ave Bruce B. Downs Blvd Waters Ave Linebaugh Ave Dale Mabry Hwy 50th St 50th St McKinley Dr Nebraska Ave Florida Ave Nebraska Ave Florida Ave Tampa St Livingston Ave SEMINOLE HEIGHTS HISTORIC DISTRICT SEMINOLE HEIGHTS HISTORIC DISTRICT Funded for Construction Funded for Construction FPID 443770-1-52-01 FPID 443770-1-52-01 Future Phase Not Funded for Construction Future Phase Not Funded for Construction FPID 431821-2-52-01 FPID 431821-2-52-01 N 12' 12' 12' 15' 12' New GP Lane 12' 12' 12' 15' 12' New GP Lane 12' 12' 2' Proposed Typical Section (from north of Dr. Martin Luther King, Jr. Boulevard to north of Hillsborough Avenue) *Present Day Cost

Upload: others

Post on 04-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-275 North of Downtown Tampa

For more project speci� c information and to get involved: TampaBayNext.com | [email protected] | (813) 975-NEXT (6398) | /TampaBayNext | @TampaBayNextPublic participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 1 (800) 955-8770 (Voice).Comuníquese con nosotros: Nos importa mucho la opinión del público sobre el proyecto. Si tiene preguntas o comentarios, o simplemente desea más información, por favor comuníquese con nosotros. Nuestra representante en español es: Manny Flores, 813-975-4248, [email protected].

09/10/2020

Section 7 FPID 431821-2-52-01 and 443770-1-52-01

I-275 North of Downtown Tampa

Tampa Bay Next ProgramTampa Bay Next is a program to modernize Tampa Bay’s transportation infrastructure and a process for engaging the public. Within the majority of the program area, the addition of express lanes is being considered to provide additional capacity, relieve congestion and provide a more reliable travel time option for passenger and transit vehicles. In addition, improvements address safety and traffic operations on the interstates. Interstate modernization projects incorporate additional elements such as opportunities to add bicycle and pedestrian facilities, aesthetic treatments, transit accommodations, and reconnecting streets where possible.

I-275 North of Downtown TampaThe I-275 corridor north of downtown Tampa is a major north-south thoroughfare connecting to downtown Tampa. It also serves as a link to the regional and statewide transportation network. FDOT completed a study on proposed corridor improvements, which identified adding one general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Bearss Avenue and where required, widening inside shoulders to accommodate potential future transit. The improvements are partially funded for construction.

Along the corridor, FDOT will construct dedicated auxiliary lanes from the I-4 ramps to north of Dr. Martin Luther King, Jr. Boulevard to provide drivers with a transition from the I-275/I-4 interchange (FPID 443770-1-52-01). FDOT will also construct one additional general purpose lane in each direction from north of Dr. Martin Luther King, Jr. Boulevard to north of Hillsborough Avenue. To accommodate potential future transit in this area (FPID 431821-2-52-01), FDOT will widen the inside and outside shoulders of the roadway to provide flexibility for future transit operations.

Additionally, FDOT will construct noise barriers in some areas along this corridor and complete improvements at underpasses to make them more pedestrian friendly. Improvements at underpasses may include various combinations of removing portions of the sloped embankment under bridge ends and utilizing vertical walls to open the space, widening sidewalks, painting bridge structures, providing LED lighting, and installing special fencing. FDOT will identify landscaping opportunities along the corridor.

The project will be a design-bid-build procurement and construction is anticipated to begin in Fall 2021. For additional information visit www.fdottampabay.com.

CONSTRUCTION ESTIMATE $83.3 Million (as of September 2020)* Funded for construction

CONSTRUCTION SCHEDULE Construction to begin Fall 2021

PUBLIC HEARING March 26, 2019

IN PROJECT DEVELOPMENT

PINELLAS COUNTY

PASCO COUNTY

HILLSBOROUGH COUNTY

PIN

ELL

AS

HIL

LSB

OR

OU

GH

HILLSBOROUGH COUNTY

HIL

LSB

OR

OU

GH

CO

UN

TY

HILLSBOROUGH COUNTY

MANATEE COUNTY

HILLSBOROUGH COUNTY

MANATEE COUNTY

POLK COUNTY

HARDEE COUNTY

PASCO COUNTY POLK COUNTY

PO

LK C

OU

NT

Y

O l d T a m p a B a y

T a m p a B a y

H i l l s b o r o u g h B a y

ClearwaterClearwaterClearwater

St PetersburgSt PetersburgSt Petersburg

TampaTampaTampa

SEIS LIMITSSEIS LIMITS

Howard Frankland Bridge

Downtown Interchange

Vet

eran

s E

xpy

I-4 and C

onnector

Westshore Area Interchange

NW

Exp

y

I-4/I-75Interchange

Project LimitE of Branch Forbes Rd

PD&EStudy Limit

Po

lk Pkw y

I-27

5 N

ort

h C

orr

ido

r

I-75

No

rth

Co

rrid

or

I-75

So

uth

Co

rrid

or

I-27

5 P

inel

las

Co

rrid

or

Gateway ExpresswayProject

Bearss Ave

54th Ave S

Moccasin Wallow Rd

Bruce

B. D

owns Blvd

Howard Frankland Bridge

Downtown Interchange

Vet

eran

s E

xpy

I-4 and C

onnector

Westshore Area Interchange

NW

Exp

y

I-4/I-75Interchange

Project LimitE of Branch Forbes Rd

PD&EStudy Limit

Po

lk Pkw y

I-27

5 N

ort

h C

orr

ido

r

I-75

No

rth

Co

rrid

or

I-75

So

uth

Co

rrid

or

I-27

5 P

inel

las

Co

rrid

or

Gateway ExpresswayProject

Bearss Ave

54th Ave S

Moccasin Wallow Rd

Bruce

B. D

owns Blvd

618

618

589

60

60

580

580

574574

674

75

4

4

75

75

275

275

275

275

275

275

375

175

19

41

41

41

41

301

301

301

301

92

92

92

19

54

56

TampaInternational

Airport

St. Pete/ClearwaterInternational

Airport

PortTampa Bay

Lakeland Linder Regional AirportLakeland Linder Regional AirportLakeland Linder Regional Airport

MacDillAirforce Base

University ofSouth Florida

TampaInternational

Airport

St. Pete/ClearwaterInternational

Airport

PortTampa Bay

Lakeland Linder Regional Airport

MacDillAirforce Base

University ofSouth Florida

618

60

574

4

275

275

275

275

41

41

92

92

41

41

41BUS

7th Ave

Cypress St

N B

oule

vard

N B

oule

vard

34th

St

40th

St

15th

St

30th

St

Rom

e A

ve

Arm

enia

Ave

Him

es A

ve

Dal

e M

abry

Hw

y

How

ard

Ave

Dr MLK Jr Blvd

21st Ave

Hillsborough Ave

Fowler Ave

Busch Blvd

Sligh Ave

Hanna Ave

Osborne Ave

Fletcher Ave

Bearss Ave

Bearss AveBru

ce B

. Downs B

lvd

Waters Ave

Linebaugh AveDal

e M

abry

Hw

y

Lois

Ave

56th

St

50th

St

50th

St

McK

inle

y D

r

Neb

rask

a A

ve

Flor

ida

Ave

Neb

rask

a A

ve

Flor

ida

Ave

Tam

pa S

t

Livi

ngst

on A

ve

Selmon Expy

SEMINOLE HEIGHTS

HISTORIC DISTRICT

SEMINOLE HEIGHTS

HISTORIC DISTRICT

Fund

ed fo

r Con

stru

ctio

nFu

nded

for C

onst

ruct

ion

FPID

443

770-

1-52

-01

FPID

443

770-

1-52

-01

Fut

ure

Phas

e No

t Fun

ded

for C

onst

ruct

ion

Fut

ure

Phas

e No

t Fun

ded

for C

onst

ruct

ion

FPID

431

821-

2-52

-01

FPID

431

821-

2-52

-01

N

12' 12' 12'15' 12'New GP

Lane

12'12'12' 15'12'New GP

Lane

12'12' 2'

Proposed Typical Section(from north of Dr. Martin Luther King, Jr. Boulevard

to north of Hillsborough Avenue)

*Present Day Cost