Hyundae mipo chosun. 2008013448 Choi Su Min. Ship Process. Ship Process. 1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are required to assemble one ship. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/1.jpg)
2008013448Choi Su Min
![Page 2: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/2.jpg)
![Page 3: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/3.jpg)
1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are required to assemble one ship.
2.TRANSPORTING - The equipment to transport block to the work place.
3.FITTING WORK - block undergoes fitting and painting work in shelter house.
4.DOCK WORK - Blocks are assembled in the dock. After assembling all block the dock is filled with the sea-water for launching the ship.
5.QUAY - The work -place for fitting works after launching, and Various on-board tests are carried out before sea-trial. HMD has 2.6Km long quay.
![Page 4: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/4.jpg)
![Page 5: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/5.jpg)
![Page 6: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/6.jpg)
![Page 7: Hyundae mipo chosun](https://reader035.vdocuments.us/reader035/viewer/2022062409/56814a54550346895db775f0/html5/thumbnails/7.jpg)