hydrokinetic turbine farms - new energy update · 2016. 12. 8. · hydroquest river 1.40 is a...

7
HYDROKINETIC TURBINE FARMS Designed for electricity producers Oceans, rivers, man- made channels and estuaries NEW GENERATION PATENTED TECHNOLOGY www.hydroquest.net [email protected]

Upload: others

Post on 06-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

HYDROKINETIC TURBINE FARMS

Designed for electricity producers Oceans, rivers, man- made channels and estuaries

NEW GENERATION PATENTED TECHNOLOGY

www.hydroquest.net

[email protected]

Page 2: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

TIDAL TURBINE CONSTRUCTION

An ongoing partnership with Constructions Mécaniques de Normandie (CMN), a leading world shipyard,

located in Cherbourg, France, will enable the construction of tidal turbines and the development of tidal marine

farms around the world.

Page 3: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

TIDAL TURBINES

Modular concept to adapt different depths

Bidirectional operation in tidal condition. No moving of the machine or of blade orientation.

Simple and robust concept reducing manufacturing costs, operation and maintenance

Low sensitivity to the current orientation using cross-flow turbines

Machine adapted to service boats developed by our partners

High impact resistance and excellent recyclability : all metal fabrication

Page 4: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

Test of the first tidal demonstrator in France,

on Paimpol Bréhat testing platform, with

ADEME support

Commercial deployment of

tidal turbine farms

Development of a high performance hydrokinetic tidal

turbine

Development of pilot tidal turbine farm

TIDAL TURBINES ROAD MAP

Video

Page 5: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

THE HYDROQUEST RIVER SOLUTION

Hydropower from the kinetic energy of water, does

not require fall

Predictable, regular and economic energy

Fast deployment and installation, within few

months. No civil engineering required.

Reliability and robustness of the system,

especially against debris, through the manufacturing

process and proven materials : lifetime over 25

years

Modularity allows adjusting of the number of levels

and the number of hydrokinetic turbines to the

depths of sites

Operating and maintenance is simple, by raising the hydrokinetic turbine in the dry and with built-in monitoring system

Extremely low environmental impact

Video

Page 6: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

RIVER TURBINES

40 kW HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly

with one level and two wheels.

• Minimum depth of the watercourse 2,2 m

• Nominal electrical power 40 kW with a flow speed 3,1 m/s.

5 900 mm

1 8

00

mm

80 kW HYDROQUEST RIVER 2.80 is a hydrokinetic turbine assembly

turbine with two levels and two wheels each. Main features:

• Minimum depth of the watercourse 4,2 m

• Nominal electrical power 80 kW with a flow speed 3,1 m/s.

5 900 mm

3 8

00

mm

READY TO INSTALL

Commercial offer Installed in farms up to 5MW

Page 7: HYDROKINETIC TURBINE FARMS - New Energy Update · 2016. 12. 8. · HYDROQUEST RIVER 1.40 is a hydrokinetic turbine assembly with one level and two wheels. • Minimum depth of the

First hydrokinetic turbine to supply a

village in French Guiana, 10kW

First hydrokinetic turbine connected to

the French grid Orléans, 40kW

Installation of the first hydrokinetic

farms in Genissiat, France - 2MW, 39

machines

Prototype of the concept Grenoble,

30kW

DGA test in towing tank Performance

validation

RIVER TURBINES ROAD MAP