Page 1 Safety
ROYAL COMMISSION RISK ASSESSMENT FORMAREA / PROJECT:Buffer Zone
Contract #:021-C05R
DATE Assessed:29/12/2014
RA No: RISK ASSESSMENT: Instellation of water and Fire Line Reviewed date: 29/12/2014
Hydro TestSPECIFIC LOCATION
Presure Pump
Se
r N
o.
PR
OB
AB
ILIT
Y (
P)
SE
VE
RIT
Y (
S)
RIS
K S
CO
RE
RIS
K R
AT
ING
WITH CONTROLS
PR
OB
AB
ILIT
Y (
P)
SE
VE
RIT
Y (
S)
RIS
K S
CO
RE
RIS
K R
AT
ING
Responsible Person
Hyd
ro T
est
Explosion Death, Fatality 3 5 15 H 1 2 2 L
Death, Fatality 3 5 15 H 1 2 2 L
6- Additional PPE:
PROBABILITY (P) SEVERITY SEVERITY
1 Unlikely 1 First Aid or slight injury 1 2 3 4 5
2 Rare 2 Recordable, medical and restricted work
Pro
bab
ility
(P
) 1 1 - Low 2 - Low 3 Low 4 - Low 5 - Med
3 Possible 3 Lost time injury or permanent disability 2 2 - Low 4 - Low 6 - Medium 8 - Medium 10 - High
4 Likely 4 3 3 Low 6 - Medium 9 - Medium 12 - High 15 - High
5 Very Likely 5 multiple fatalities 4 4 - Low 8 - Medium 12 - High 16 - High 20- High5 5 - Medium 10 - High 15 - High 20- High 25 - High
Name Designation Date
Prepared by: ROBY.K.THOMAS H S E MANAGER 29/12/2014
Reviewed by: MAGDY ELSHERIBING CONSTRUCTION MANAGER 30/12/2014
Approved by: KULDEEP TYAGI PROJECT MANAGER 30/12/2014
TASK / OPERATION /
ACTIVITY DESCRIPTION:
TOOLS & EQUIPMENT IN USE:
Tasks(What one does in logical steps)
Hazards identified with each task
(What can hurt one / others?)
Harm / Consequence / Parties affected (What can
happen / go wrong)Current Controls / Safeguards (What do we
do to prevent incidents?)
Additional & or Site Controls (What additional could we do to reduce the
risk?)
1-Area Shall be demarcated Properly. 2-Display safety signboard for preventing unauthorized Entrance. 3-Make sure all pipe supports are in good condition and have been inspected. 4-All hoses must be tied down. 5-Water temperature must be more than 60 F 6-The Hydrostatic -presurizing pump is completed with safety relief valve. 7-Wear Proper P P E . 8-Ensure the gage meter is caliberated by third party & Certificate should be keep in site safety office. 9-Safety relief valve to be caliberated
Site engineer & Site safety officers make
sure all safety precuations
implemented before start Job
Engineer/Safety officer/ Forman.
Uncontrolled releasing of Energey or water
1-Start depressurization by opening gradually the vent valve.Do it slowly 2-Do not open the drain valve if the vent valve if still closed.This is to avoid vacum condition inside the Pipe line. 3-Open the lowest drain point to completely remove water from the pipe line. 5-Ensure that no remaining presure trapped inside the pipe line. 6-
Site engineer & Site supervisors.
Engineer/Safety officer/ Forman.
Risk Rating = Probability x Severity
Single fatality or permanent disablity of 3 or more person