how to built rejn tag-1
TRANSCRIPT
-
7/25/2019 How to Built Rejn Tag-1
1/28
WELCOME
TO
ALL MEMBERS
PRESENT OVERHERE
-
7/25/2019 How to Built Rejn Tag-1
2/28
TRAINING ON
REJECTION TAG
THIS SESSION IS ARRANGED
FOR TRAINING PROGRAMM ONHOW TO BUILT REJECTION TAG
PREPAIRED BY:
GAURAW KUMAR GUPTA
-
7/25/2019 How to Built Rejn Tag-1
3/28
FIRST OF ALL LOGIN THROUGH USER ID
AFTER LOGIN
THIS PAGE WILL
APPEAR
-
7/25/2019 How to Built Rejn Tag-1
4/28
TO BUILT REJECTION TAG FIRSTLY WE HAVE
TO BOOK THE PRODUCTION QTY.
SO
INSERT THE CO11NCOMMAND IN THE COMMAND
FIELD AND THEN PRESS ENTER.
WE WILL WATCH THE FOLLOWING SHEET
-
7/25/2019 How to Built Rejn Tag-1
5/28
TO BOOK THE QTY. FOLLOWING
DATA IS REQUIRED
ORDER NUMBER
ACTIVITY CODE
SHIFT ( A, B, C, G)
-
7/25/2019 How to Built Rejn Tag-1
6/28
HERE ARISES A FEW QUESTIONS
IN OUR MIND
WHAT IS ORDER ( PRODUCTION ORDER) NUMBER
FROM WHERE THE ORDER NUMBER CAN BE GET
WHAT IS ACTIVITY CODE
HOW IT CAN BE GET
-
7/25/2019 How to Built Rejn Tag-1
7/28
TO GET ORDER NO.
OPEN A NEW SESSION
ENTER YPP5 IN COMMAND FIELD AND PRESS ENTER.
-
7/25/2019 How to Built Rejn Tag-1
8/28
AFTER ENTERING YPP IN COMMAND FIELD
CLICK ON PROD.
SCHEDULER
WISE
-
7/25/2019 How to Built Rejn Tag-1
9/28
AND THEN THIS SHEET WILL
APPEAR
PRODUCTION ORDER TYPE
STARTED DATE
PRODUCTION SCHEDULER
-
7/25/2019 How to Built Rejn Tag-1
10/28
PRODUCTION ORDER TYPE PRODUCTION SCHEDULER
CLICK
ON THIS
-
7/25/2019 How to Built Rejn Tag-1
11/28
CLICK ON
THIS
-
7/25/2019 How to Built Rejn Tag-1
12/28
FROM HERE WEWILL GET THE
P.O. NUMBER
-
7/25/2019 How to Built Rejn Tag-1
13/28
NOW ENTER THE P.O.
NUMBER IN THEPRODUCTION BOOKING
SHEET
ENTER 0010 IN
OPERATION !ACTIVITY NO.
COLLOM
ENTER SHIFT (G)
AFTER FILLING THESE DATA
PRESS ENTERAND THEN
WE WILL GET THE FOLLOWING PAGE
WE HAVE TO FILL HERE
THE QTY. WHICH IS TO
BE BOOKED
ENTER THE
PRODUCTION QTY. AND
THEN SAVE IT BYCLICKING ON SAVE
BUTTON.
-
7/25/2019 How to Built Rejn Tag-1
14/28
IN THIS SHEET FOLLOWING
DATA CAN BE OBSERVED
MATERIAL CODE " MATERIAL
DESCRIPTION (TO BE BOOKED)
WORK CENTER.
CONFIRMATION TYPE
YIELD QUANTITY
POSTING DATE
-
7/25/2019 How to Built Rejn Tag-1
15/28
THUS WE HAVEBOOKED THE
PRODUCTIONQUANTITY
-
7/25/2019 How to Built Rejn Tag-1
16/28
NOW WE HAVE TO REJECT
THE PRODUCTION QUANTITY FOR THIS TYPE SQ01IN COMMAND
FIELD AND PRESS ENTER.
THEN FOLLOWING SHEET WILL
APPEAR.
-
7/25/2019 How to Built Rejn Tag-1
17/28
HERE WE NEED FOLLOWING DATA
-
7/25/2019 How to Built Rejn Tag-1
18/28
-
7/25/2019 How to Built Rejn Tag-1
19/28
JUST DOUBLE CLICK ON
THE QTY. WHICH WE
HAVE BOOKED EARLIER.
IF IT IS TO BUILT
SCRAP TAG THEN
FILL THE QTY. INSCRAP ROW,
AND IF IT IS TO BUILT
MATERIAL FAULT TAG
THEN FILL THE QTY. INBLOCKED STOCK ROW,
" REJN IN TH NE#T
CELL
-
7/25/2019 How to Built Rejn Tag-1
20/28
-
7/25/2019 How to Built Rejn Tag-1
21/28
NOTE DOWN THEINSPECTION LOT
NUMBER FOR PRINTING
OF REJECTION TAG
-
7/25/2019 How to Built Rejn Tag-1
22/28
TILL NOW WE HAVE DONE
TWO THINGS. WE HAVE BOOKED THE PRODUCTION
QUANTITY
AND WE HAVE REJECTED THE QUANTITY
ALONG WITH THE FAULT TYPE.
-
7/25/2019 How to Built Rejn Tag-1
23/28
NOW WE HAVE TO TAKE
PRINT OUT OF THE
REJECTION TAG
-
7/25/2019 How to Built Rejn Tag-1
24/28
FOR THIS ENTER THE YQM
IN COMMAND FIELD
AND THEN PRESS ENTER .
WE WILL FIND FOLLOWING SHEET.
ENTER THE INSPECTION LOT NO,AND PRESS F$
OR CLICK ON E#ECUTE BUTTON
-
7/25/2019 How to Built Rejn Tag-1
25/28
-
7/25/2019 How to Built Rejn Tag-1
26/28
TAKE OUT THE PRINTOUTOF IT
AND THUS NOW WE ARE
ABLE TO BUILT THE
REJECTION TAG
-
7/25/2019 How to Built Rejn Tag-1
27/28
AT LAST LET US SUMMERISE THE
COMMANDS USED
CO11N(BOOKING THE PRODUCTION)
YPP5(FOR GETTING P.O. NUMBER) SQ01(FOR BOOKING THE
REJECTION)
YQM(FOR TAKING PRINT OUT)
-
7/25/2019 How to Built Rejn Tag-1
28/28