    TRAINING ON

    REJECTION TAG

    THIS SESSION IS ARRANGED

    FOR TRAINING PROGRAMM ONHOW TO BUILT REJECTION TAG

    PREPAIRED BY:

    GAURAW KUMAR GUPTA

  • 7/25/2019 How to Built Rejn Tag-1

    3/28

    FIRST OF ALL LOGIN THROUGH USER ID

    AFTER LOGIN

    THIS PAGE WILL

    APPEAR

  • 7/25/2019 How to Built Rejn Tag-1

    4/28

    TO BUILT REJECTION TAG FIRSTLY WE HAVE

    TO BOOK THE PRODUCTION QTY.

    SO

    INSERT THE CO11NCOMMAND IN THE COMMAND

    FIELD AND THEN PRESS ENTER.

    WE WILL WATCH THE FOLLOWING SHEET

  • 7/25/2019 How to Built Rejn Tag-1

    5/28

    TO BOOK THE QTY. FOLLOWING

    DATA IS REQUIRED

    ORDER NUMBER

    ACTIVITY CODE

    SHIFT ( A, B, C, G)

  • 7/25/2019 How to Built Rejn Tag-1

    6/28

    HERE ARISES A FEW QUESTIONS

    IN OUR MIND

    WHAT IS ORDER ( PRODUCTION ORDER) NUMBER

    FROM WHERE THE ORDER NUMBER CAN BE GET

    WHAT IS ACTIVITY CODE

    HOW IT CAN BE GET

  • 7/25/2019 How to Built Rejn Tag-1

    7/28

    TO GET ORDER NO.

    OPEN A NEW SESSION

    ENTER YPP5 IN COMMAND FIELD AND PRESS ENTER.

  • 7/25/2019 How to Built Rejn Tag-1

    8/28

    AFTER ENTERING YPP IN COMMAND FIELD

    CLICK ON PROD.

    SCHEDULER

    WISE

  • 7/25/2019 How to Built Rejn Tag-1

    9/28

    AND THEN THIS SHEET WILL

    APPEAR

    PRODUCTION ORDER TYPE

    STARTED DATE

    PRODUCTION SCHEDULER

  • 7/25/2019 How to Built Rejn Tag-1

    10/28

    PRODUCTION ORDER TYPE PRODUCTION SCHEDULER

    CLICK

    ON THIS

  • 7/25/2019 How to Built Rejn Tag-1

    11/28

    CLICK ON

    THIS

  • 7/25/2019 How to Built Rejn Tag-1

    12/28

    FROM HERE WEWILL GET THE

    P.O. NUMBER

  • 7/25/2019 How to Built Rejn Tag-1

    13/28

    NOW ENTER THE P.O.

    NUMBER IN THEPRODUCTION BOOKING

    SHEET

    ENTER 0010 IN

    OPERATION !ACTIVITY NO.

    COLLOM

    ENTER SHIFT (G)

    AFTER FILLING THESE DATA

    PRESS ENTERAND THEN

    WE WILL GET THE FOLLOWING PAGE

    WE HAVE TO FILL HERE

    THE QTY. WHICH IS TO

    BE BOOKED

    ENTER THE

    PRODUCTION QTY. AND

    THEN SAVE IT BYCLICKING ON SAVE

    BUTTON.

  • 7/25/2019 How to Built Rejn Tag-1

    14/28

    IN THIS SHEET FOLLOWING

    DATA CAN BE OBSERVED

    MATERIAL CODE " MATERIAL

    DESCRIPTION (TO BE BOOKED)

    WORK CENTER.

    CONFIRMATION TYPE

    YIELD QUANTITY

    POSTING DATE

  • 7/25/2019 How to Built Rejn Tag-1

    15/28

    THUS WE HAVEBOOKED THE

    PRODUCTIONQUANTITY

  • 7/25/2019 How to Built Rejn Tag-1

    16/28

    NOW WE HAVE TO REJECT

    THE PRODUCTION QUANTITY FOR THIS TYPE SQ01IN COMMAND

    FIELD AND PRESS ENTER.

    THEN FOLLOWING SHEET WILL

    APPEAR.

  • 7/25/2019 How to Built Rejn Tag-1

    17/28

    HERE WE NEED FOLLOWING DATA

  • 7/25/2019 How to Built Rejn Tag-1

    18/28

  • 7/25/2019 How to Built Rejn Tag-1

    19/28

    JUST DOUBLE CLICK ON

    THE QTY. WHICH WE

    HAVE BOOKED EARLIER.

    IF IT IS TO BUILT

    SCRAP TAG THEN

    FILL THE QTY. INSCRAP ROW,

    AND IF IT IS TO BUILT

    MATERIAL FAULT TAG

    THEN FILL THE QTY. INBLOCKED STOCK ROW,

    " REJN IN TH NE#T

    CELL

  • 7/25/2019 How to Built Rejn Tag-1

    20/28

  • 7/25/2019 How to Built Rejn Tag-1

    21/28

    NOTE DOWN THEINSPECTION LOT

    NUMBER FOR PRINTING

    OF REJECTION TAG

  • 7/25/2019 How to Built Rejn Tag-1

    22/28

    TILL NOW WE HAVE DONE

    TWO THINGS. WE HAVE BOOKED THE PRODUCTION

    QUANTITY

    AND WE HAVE REJECTED THE QUANTITY

    ALONG WITH THE FAULT TYPE.

  • 7/25/2019 How to Built Rejn Tag-1

    23/28

    NOW WE HAVE TO TAKE

    PRINT OUT OF THE

    REJECTION TAG

  • 7/25/2019 How to Built Rejn Tag-1

    24/28

    FOR THIS ENTER THE YQM

    IN COMMAND FIELD

    AND THEN PRESS ENTER .

    WE WILL FIND FOLLOWING SHEET.

    ENTER THE INSPECTION LOT NO,AND PRESS F$

    OR CLICK ON E#ECUTE BUTTON

  • 7/25/2019 How to Built Rejn Tag-1

    25/28

  • 7/25/2019 How to Built Rejn Tag-1

    26/28

    TAKE OUT THE PRINTOUTOF IT

    AND THUS NOW WE ARE

    ABLE TO BUILT THE

    REJECTION TAG

  • 7/25/2019 How to Built Rejn Tag-1

    27/28

    AT LAST LET US SUMMERISE THE

    COMMANDS USED

    CO11N(BOOKING THE PRODUCTION)

    YPP5(FOR GETTING P.O. NUMBER) SQ01(FOR BOOKING THE

    REJECTION)

    YQM(FOR TAKING PRINT OUT)