horst schindler budapest, october 9th, 2013 danube commission, budapest the current list of projects...
TRANSCRIPT
Horst Schindler Budapest, October 9th, 2013Danube Commission, Budapest
The current list of projects on bottlenecks on the Danube river
High-level meetingHigh-level meeting 2013 2013 "Danube Navigation – a European Perspective"
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Basis
Belgrade ConventionTEN-T priority areasWaterway ClassificationReports of Memberstates
Structure
IntroductionStatus Quo
Development of InfrastructureIdentification of priority areas
Masterplan
Masterplan
Structure follows ClassificationBridges and fairway distinguishedFields of actionGeneral descriptions of projects
Adopted
through DecisionDK/TAG 77/13
from the 25th December 2011
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Wachau
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Port Devinska Nova Ves
Bratislava/WolfsthalGabcikovo/Nagymaros
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Study Szob-Mohács
Apa
tinV
erm
elj/P
etre
sS
takl
ar
7 cr
itica
l sec
tions
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
7 cr
itica
l sec
tions
ISPA 2ISPA 1B
elen
eB
atin
Sulina Canal
Masterplan for achieving recommended fairway parameters
Danube Navigation – a European Perspective Budapest, October 9th, 2013
Thank you for your attention
Horst SchindlerChief Engineer
Danube CommissionBenczúr utca 251068 Budapest
Danube Navigation – a European Perspective Budapest, October 9th, 2013