Horst Schindler Budapest, September 17th, 2013Danube Commission, Budapest
Conditions of navigation, Bottlenecks, 2 Recommendations of the DC
![Page 2: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/2.jpg)
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
• Masterplan for achieving recommended fairway parameters
• Joint Statement – Annex 3
• Recommendations on Parameters of Fairway
OverviewOverview
![Page 3: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/3.jpg)
Masterplan for achieving recommended fairway parameters
Basis
Belgrade ConventionTEN-T priority areasWaterway ClassificationReports of Memberstates
Structure
IntroductionStatus Quo
Development of InfrastructureIdentification of priority areas
Masterplan
Masterplan
Structure follows ClassificationBridges and fairway distinguishedFields of actionGeneral descriptions of projects
Adopted
through DecisionDK/TAG 77/13
from the 25th December 2011
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 4: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/4.jpg)
Masterplan for achieving recommended fairway parameters
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 5: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/5.jpg)
Wachau
Masterplan for achieving recommended fairway parameters
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 6: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/6.jpg)
Port Devinska Nova Ves
Bratislava/WolfsthalGabcikovo/Nagymaros
Masterplan for achieving recommended fairway parameters
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 7: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/7.jpg)
Study Szob-Mohács
Apa
tinV
erm
elj/P
etre
sS
takl
ar
7 cr
itica
l sec
tions
Masterplan for achieving recommended fairway parameters
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 8: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/8.jpg)
7 cr
itica
l sec
tions
ISPA 2ISPA 1B
elen
eB
atin
Sulina Canal
Masterplan for achieving recommended fairway parameters
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 9: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/9.jpg)
Joint Statement
a guiding document for
• the maintenance of the currentinland navigation
• the planning and the investments infuture infrastructure andenvironmental protection projects
• the development of a‚Programme of Measures‘
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 10: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/10.jpg)
Joint Statement
an approach towards
• integrated and interdisciplinary planning
• public communication and stakeholder involvement
• sustainable infrastructure projects
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 11: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/11.jpg)
Joint Statement
5. Joint Statement Follow Up MeetingZagreb, November 18-19, 2013
• national Reports
• Project list & Report template
• Update of Annex 3
• t.b.d.
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 12: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/12.jpg)
Recommendations on Parameters of the Fairway
Basis
Analysis of the waterwayDemands and needs of IWTSustainability
Structure
IntroductionDefinitions
Specific Chapters and Paragraphsetc.
Adopted
through DecisionDK/TAG 77/13
from the 25th December 2011
in Forcefrom the 1st of January 2013
Result
Harmonized draught conditionsFlexibility of major parametersFocus on Safety
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 13: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/13.jpg)
min.waterdepth
freeflowing sectors
sectors with backwater
h………..min.waterdepthB………..widthENR……Regulation low waterN.r.min…lowest backwater level
Recommendations on Parameters of the Fairway
OLD definition schemes
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 14: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/14.jpg)
min.waterdepth
Recommendations on Parameters of the Fairway
NEW definition schemes
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013
![Page 15: Horst Schindler Budapest, September 17th, 2013 Danube Commission, Budapest Conditions of navigation, Bottlenecks, 2 Recommendations of the DC](https://reader035.vdocuments.us/reader035/viewer/2022062314/56649f075503460f94c1cbbd/html5/thumbnails/15.jpg)
Thank you for your attention
Horst SchindlerChief Engineer
Danube CommissionBenczúr utca 251068 Budapest
Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013