hidden oaks/annandale park improvementshidden oaks/annandale park improvements fairfax county park...

16
Hidden Oaks/Annandale Park Improvements Fairfax County Park Authority

Upload: others

Post on 30-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Hidden Oaks/Annandale

Park Improvements Fairfax County Park Authority

Page 2: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Agenda

Introductions

Funded Projects

Playground Replacement

ADA improvements to trails

Stream Restoration

Picnic Shelter Renovation for ADA and Lifecycle

Hidden Oaks Nature Center Expansion and Renovation

Potential Impacts

Multi Use court removal or relocation

Improve and expand Field #1 and removal of Field #2

Page 3: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Existing Playground Replacement

End of lifecycle

Not accessible due to slopes,

Play features are separately

located

Page 4: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Opportunity for new playground

Preferred location is in area of

current multi purpose court

Maintains proximity to Picnic

Shelter/ Restrooms.

Allows for better integration with

Nature Center programs

Playground as proposed will

require removal or relocation of

multi purpose court

Page 5: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Upgrade existing trails for accessibility

Project will add a new accessible

route to the playground and

Picnic Shelter from the parking lot

Packard Center to Hidden Oaks

May impact current location of

the multi-purpose court

Page 6: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Coons Branch Stream

Restoration

Phase One

1600 lf of stream Coons Branch at Annandale Community Park

Currently in design.

Water lines are being upgraded from asbestos pipe to ductile iron to comply with current standards

Raising the stream bed and reconnecting to the floodplain

Potential Impact to Diamond Field #2

FY 2021 Construction/ Winter 2020 Start

18 month construction timeframe

Phase Two

Starts near Nature Center, no impacts to existing facilities

In design Phase, wastewater design and easement acquisition

Construction 2022

Page 7: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Picnic Shelter Improvements

• Upgrade existing restroom to make

two fully accessible unisex toilet

rooms

• Fully accessible picnic area

including grills

• Fully accessible water fountain

• Lifecycle upgrades

• Painting

• Lighting

• Roof

Page 8: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Nature Center

Added multi purpose room

Accessible restrooms

New Office Area

Lifecycle improvements

and finishes throughout the

center

Page 9: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

'

A ADll.fOM..E1'tl AQAQllTQ)

- - _e:~.....,..--~'fw

I I

/]

ROOM LEGEND

DADA TOLET(1)

DADA TOLET(2)

CJClOSET

O CORRJOOR(1)

D CORRIOOR(2)

OELEC

D MANAGER'S OFFICE

D NEW AOMIN OFFICE W/TRANS LEDGE IN PARTITION

D NEW MULTl-PURPOSE ROOM

DOPEN WORKAREA

QPANTRY

D SHARED OFFICE

DTOLET

® PROPOSED MAil LEVEL PlAN

FAIRFAX COUNTY PARK AUTHORITY Hidden Oaks Nature Center Expansion

Page 10: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Potential Impact Diamond Field #Two

Located mostly in the Coons

Branch Flood Plain

Subject to periodic inundations

causing play cancellations

Fields Two used by NVGSL and

Adult groups

Other area 60’/65’ skinned

diamond fields can

accommodate this use

Page 11: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Potential Impact Multi Use Court

Current conditions

Needs extensive lifecycle repairs

Lightly used

Xx courts within 1 mile of this site

for community use

Page 12: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Possible Basketball Court relocation

B

C

A No Replacement

B Half court option

C Full court in baseball outfield

Page 13: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Options

Remove Diamond Field Two

Improve and expand field one

Allows for reforestation for stream

restoration project improving downstream

conditions

Allows for relocation of multi-purpose court

Floodplain impact to field #2

Page 14: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

PROCESS

Park Bond Approved 2016

Plan and project development

Public Update Meeting (tonight)

30-day comment period

Project revisions

Contract and construction phase

Page 15: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Community Input

Questions or Suggestions

Email

Mail

Phone

Public Meeting

Page 16: Hidden Oaks/Annandale Park ImprovementsHidden Oaks/Annandale Park Improvements Fairfax County Park Authority . Agenda Introductions ... Hidden Oaks Nature Center Expansion . Potential

Comments and Feedback

Email: [email protected]

Written comments:

Pat Rosend, Project Manager

FCPA Planning & Development Division, Suite 406

12055 Government Center Parkway, Fairfax, VA 22035

Or leave comment slip with us tonight!