  • 7/27/2019 Haliburton Offshore Cementing Equipment

    1/8

    OffshoreCementing

    Systems

    nstallation

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    2/8

    2

    Thats right, Halliburton OffshoreMixing and Pumping Systems

    From tidelands to shelf to deepwater Halliburton first

    cemented wells in the Gulf of Mexico tidelands in 1938,

    using barge-mounted equipment. In 1947, as drilling

    contractors ventured offshore, they did so with skid

    units developed by Halliburton. e pattern continues

    with Halliburton equipment serving on every type of

    offshore rig.

    Today, shipyards around the world are building new

    rigs and refitting existing ones to meet the growing

    demand. Halliburton is building units to meet the

    demand.

    Primary Cementing Services

    What is composed of many specially engineered components thattechnicians assemble into a functional system that accomplishesa specific job, often in hostile environments?

    HAL 3049

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    3/8

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    4/8

    4

    Halliburton OffshoreCementing Skids

    Safe, reliable and effective operation depends upon the

    dependability of each component. Halliburtons HCS

    Advantage cementing skids are powerful units that

    comprise six modules joined together to provide

    improved mixing, pumping and environmental

    performance.

    e modular design helps reduce the amount of time and

    cost required to install on offshore drilling rigs. e

    modular design also provides greater exibility since it

    can be adapted to meet the operators exact power-trainconguration. Each module is tested and certied as

    built and commissioned as a complete system, as is the

    complete system upon installation.

    Halliburton skids are certied by ABS and DNV for SafeArea or Zone II hazardous area classication.

    HAL 24153

    HAL 3048

    HAL 3049

    HAL 3048

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    5/8

    Shown here is a typical installation

    of Halliburtons offshore HCS

    Advantage cementing equipment

    system. Actual hookups varydepending upon the rig. e

    Halliburton systems major

    components include:

    Mixing/pumping unit

    Continuous metering (liquid-

    additive) system

    Steady ow separator

    Pneumatic bulk delivery system

    HAL 30499

    HAL 3049

    HAL 3050

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    6/8

    6

    HCS Advantage Cementing System

    Today's most intelligent cement mixing system offers more advantages than ever before.

    Enhanced environmental performance including soundabatement, vibration control and dust control

    Conforms to ISO 9001 quality standards and is built under theHalliburton Equipment and Product Organization's certifiedquality management system

    RCM IIIr mixing system is proven worldwide and used bymore operators than any other mixing system

    Automatic Density Control (ADC ) mixing equipment toprovide consistent, precise density control for the cement slurry

    Unprecedented data acquisition capability using Halliburton's

    CompuPacTM system

    Designed for offshore and certifiable for Zone II hazardous

    operations

    Modular construction for faster and easier installation, andadaptability to power train requirements

    Reliability through complete manual backup to help assure job

    completion, either electronically or manually.

    e HCS Advantage cementing system is type certified by

    ABS-CDS and DNV.

    Designed for hazardous installation, the HCS Advantage systemcan be made suitable for Gas Group IIA, Temperature T3.

    HAL30882

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    7/8

    Safe, reliable and effective operation is animperative for Halliburton. On offshore drilling

    installations, the cementer operating the

    equipment is trained to achieve the best

    cement placement possible.

    Halliburton trains cementers on full-scale

    simulators in training centers strategically

    located globally.

    Cementers are trained in the safe and efficient operation of each of the modules

    that make up a Halliburton offshore cementing system. Process Logic Control(PLC) technology assists the cementer in providing accurate and successful

    slurry delivery.

    And the ultimate purpose is life-of-the-well zonal isolation.

    Halliburton has engineered solutions to meet every requirement from time-bound shallow-water ow and gas-migration remedies tomulti-tiered react-and-respond cementing systems that are designed to survive planned and unplanned stresses on the well for years to come.

    HAL 3050

    HAL 30491 HAL 30489

    HAL 3050

    Training and Support

  • 7/27/2019 Haliburton Offshore Cementing Equipment

    8/8

    2010 Halliburton. All rights reserved. Sales of Halliburton products and services will be in accord solely with theterms and conditions contained in the contract between Halliburton and the customer that is applicable to the sale.

    H06680 8/10

    www.halliburton.co