h2 turbine development for igcc with ccs: project ... library/events/2011/2011 uts research... ·...

28
Copyright © Siemens Energy Inc. 2011. All rights reserved. H2 Turbine Development for IGCC with CCS: Project Overviews and Technical Issues Susan Scofield Siemens Energy, Inc. 2011 UTSR Conference Ohio State University October 25, 2011

Upload: phungkiet

Post on 06-Feb-2018

227 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Copyright © Siemens Energy Inc. 2011. All rights reserved.

H2 Turbine Development

for IGCC with CCS:

Project Overviews and

Technical Issues

Susan Scofield

Siemens Energy, Inc.

2011 UTSR Conference

Ohio State University

October 25, 2011

Page 2: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 2Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Acknowledgements

• This material is based upon work supported by the US Department of

Energy, under Award Number DE-FC26-ONT42644.

• The Siemens team wishes to thank Mr. Robin Ames, NETL Project

Manager and Mr. Rich Dennis, NETL Turbine Technology Manager for the

opportunity to collaborate on the development of these novel technologies

for the Advanced Hydrogen Turbine.

Page 3: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 3Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 4: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 4Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 5: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 5Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

PHASE 2 Extension

ARRA Technology Acceleration

.

DOE - Siemens

Advanced Hydrogen Turbine Program Strategic Goal

• 3-5% pt. improvement in CC efficiency over baseline

• H2 Turbine with 2 ppm NOx

• 20 – 30% ($/kW) Cost Reduction in Power Plant

Siemens was contracted for PHASE 1 and PHASE 2 of a multi-year program to develop an

advanced GT for Hydrogen / Syngas applications.

2006 2007 20132009 2010 20122008 2011 2014 20152005FY:

PHASE 2

H2 Technology Development

PHASE 1

Concept Feasibility

PHASE 3

Technology Demonstration

2016 2017

Not Yet Awarded

Page 6: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 6Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

IGCC Market Challenges

• IGCC plant capital and O&M costs

• Improved IGCC plant performance and

plant availability

• Minimizing the impact of CO2 capture

• Legislative and regulatory uncertainty related

to CO2

CO2 Sequestration, Plant Efficiency

20 Oct: Duke Energy expects that the

Edwardsport IGCC plant cost =

$2.98 billion, 618MW

(Previous estimate $2.72 billion)

H.R. 2454: American Clean Energy and Security Act of 2009

Efficient GT

Overall Cycle Efficiency

Demonstrating that IGCC technology is a viable

coal based power generation option brings

significant R&D Challenges

Page 7: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 7Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Page 8: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 8Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Hydrogen Turbine Program Development Activities

IGCC Plant

CO2

Sequestration

Ready

Low Emissions

Improved

Efficiency

Fuel Flexibility

NG,Syngas,H2

Reduction in

Plant Cost $/KW

Program Development and Major Activities

Driven by Plant Level Goals

Targeted Areas of R&D

Page 9: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 9Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Carbon Capture and Sequestration Impacts Plant Cycle

Hydrogen turbine Program technology advancements power block efficiency :

Recover >50% of the CCS penalty

Gas shift

CO2 compression

Gasification

Page 10: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 10Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 11: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 11Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Benefits: Premix Combustor allows for

Higher Firing Temperature and Lower Dilution

Premix Combustor

• Flame Speed

• Flashback

• Combustion Dynamics / Acoustics

• Fuel Flexibility (Always need back-up fuel)

• Low Emissions at Increased Temperature

• Potential for Large variation in fuel

properties depending on feedstock.

Combustion Systems

Challenges and Areas for R&D

Page 12: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 12Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Diffusion Flame Combustion

- <15 ppm NOx achievable at high firing

temperature

- Requires dilution for NOx

- 25 ppm NOx emissions with dilution on

natural gas

Current Offering Development Target

Combustion System

Options for IGCC Applications

Premix Combustion System

- Demonstrated rig testing at high

temperature without N2 dilution.

- Gains on flashback/dynamics reduction.

- Proven single digit NOx emissions with

natural gas.

Advanced Premix Combustor: Additional R&D in Progress

Page 13: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 13Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 14: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 14Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Improved Aerodynamic and Heat

Transfer Predictions

Advanced 3D CFD Modeling

Manufacturing of Novel Component

Concepts

Rapid Design Iterations

Rapid Prototyping

Sealing Technology

Turbine Material Advancements

Turbine Systems

Challenges and Areas for R&D

Benefits: Opportunity for Significant Efficiency Gain

Page 15: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 15Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Turbine Development Options

For IGCC Manufacturing Applications

Continuing the legacy of high-tech R&D and Manufacturing Methods

http://www.fe.doe.gov/news/techlines/2011/11044-Research_Grant_Leads_to_Gas_Turbin.html

Page 16: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 16Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 17: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 17Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

• Leveraging IGCC and

NGCC Experience

• Target Demonstration

• Design data generated

• Design tools updated

• Environmental Testing

Advanced materials and coatings are critical to the success of H2 Turbine

components and systems development.

Challenges:

• Advancement of High Temperature TBC for Low Thermal Conductivity

• Environmental Issues with Syngas & High Hydrogen Fuels

• Corrosion & Oxidation Capability of Syngas & High Hydrogen Fuels

Baseline

• Literature Search

• Initial Hypotheses

• Design of Experiments

• Target Setting

Experiments Validation

Materials & Coatings Systems

Challenges and Areas for R&D

Page 18: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 18Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Materials Systems Status

For Advanced Design Applications

Next Step: Prototype Manufacturing and Validation Phase

TBC:

• Surface temperature initial trials complete:

• Initial validation shows increase in

surface temperature compared to the

baseline

Enables higher firing temperatures Improved oxidation.

Longer life until TBC spallation

Bond Coat:

• Concept down-selection completion criteria:

• Oxidation

• Mechanical integrity

• Spallation properties

Increasing Temperature

Te

st

Tim

e t

o F

ail

ure

Increased Firing

Temperatures

Increased Hours

of Operation

Baseline Bond Coat

New Bond Coat

Page 19: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 19Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Agenda

Hydrogen Turbine Program Goals

Technology Areas / Advancements• Combustion

• Turbine

• Materials

Siemens - DOE – UTSR Partnership

Page 20: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 20Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Technology Collaboration:

Leveraging Relationships in World-Wide R&D Network

Significant Benefit:

• Siemens is a part of a broad and collaborative Research & Development, Product

Manufacturing and Validation Network.

• Common Goal: Accelerate emerging technologies for thermodynamic and

environmental performance in Turbo Machinery.

Energy Policy:

•Global Warming

•Create New Jobs

•Energy Independence

Market Trends:

•Emissions

•Efficiency

•Life Cycle Cost

SIEMENS

Business

Partners

Government

Funding

Universities

Page 21: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 21Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Siemens – UTSR Partnership:

UT-Austin and Penn State

Improving Turbine Components Durability

Trenched Film Cooling, Contoured End Walls

Page 22: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 22Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Siemens – UTSR Partnership:

University of North Dakota and Ohio State

Cooling Strategies for Vane Leading Edges in a Syngas Environment

Including Effects of Deposition and Turbulence

Page 23: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 23Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Siemens – UTSR Partnership:

Virginia Tech

Heat Transfer Effects from Advanced Internal Cooling Geometries

Double Wall Schemes With and Without Effect of Rotation

Page 24: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 24Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Hot Gas Path

Cooling Channel Flow

Turbine Blade Wall

Turbine-Cooling Design and Analysis

The Role of Biot Number

Siemens – UTSR Partnership:

Purdue

Page 25: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 25Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

• Innovations in Gas Turbine Technologies for increasing

Combined Cycle Power Plant Efficiencies and Performance

• Reduction of ~12,000 tons of CO2 emissions per year by each

Next Generation Siemens Gas Turbine

• Partnering with 25 top U.S. universities for R&D in the field of

Turbo- machinery

• over 75 graduate students

• Over 150 Invention Disclosures submitted to USPTO

• Establishing an “engineering talent pipe-line” for our future

• Job creation / economic development of local U.S. economy

Siemens - DOE - Universities

The Leverage of Mutual Partnership: Estimated by 2015

Page 26: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 26Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Siemens SGT6-5000F

• Carbon capture and sequestration ready

• Improving gas turbine and combined cycle efficiency

• Providing near term technology infusion into current

engines

• Lowering $/kW cost with increased output and

efficiency

• Significantly reducing CO2 and NOx emissions

• Enabling greater reliance on domestic resources

Summary:

Ensuring Commercial Viability of the Hydrogen Turbine

Siemens advanced GT technology aligns with future industry drivers

Page 27: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 27Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

U.S. – 70,000 Employees

Siemens Investing in the Future

Siemens Diverse Energy Product Portfolio

Wind, Solar, Gas Turbines, Clean Coal

Supporting US and Global policy for clean energy / energy efficiency

Siemens is Hiring in US

Thinking Globally, Acting Locally

• Nacelle manufacturing facility for wind power - Hutchinson Kansas

• New N. American Hub for GT Manufacturing - Charlotte, North Carolina

• New Amtrak contract (medium-size light rails)

– Manufacturing facility developed - Sacramento, California

Infrastructure Investment ~ $.5 Billion; Hired 3,000 people (last 2 – 3 years)

http://www.usa.siemens.com/en/jobs_careers/us_jobs.htm

Page 28: H2 Turbine Development for IGCC with CCS: Project ... Library/Events/2011/2011 UTS Research... · •Turbine •Materials Siemens ... natural gas Current Offering Development Target

Page 28Oct. 2011

2011 UTSR – Ohio State Univ. Copyright © Siemens Energy, Inc 2011. All rights reserved.

Thank You

The content of this presentation is copyrighted by Siemens Energy, Inc. and is licensed to NETL for publication and distribution only.

Any inquiries regarding permission to use the content of this paper, in whole or in part, for any purpose must be addressed to

Siemens Energy, Inc. directly.