taean igcc project update - globalsyngas.org · turbine/ generator. nuclear epc . water . casting...
TRANSCRIPT
Taean IGCC Project Update Seungmin Kim, Manager, Future Energy Marketing Doosan Heavy Industries & Construction
Gasification Technologies Conference 2015 October 12-14 , Colorado Springs
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
1
Doosan Heavy Industries & Construction’s Business
Business Group
Overseas Subsidiaries
Doosan HydroTech.
Doosan IMGB
Doosan HF Controls
Doosan Lentjes
DPSI
Doosan E&S
Škoda Power1
Doosan Babcock
Doosan VINA
Turbine/ Generator Nuclear EPC Water Casting &
Forging Boiler
Doosan Enpure
• Industrial materials and components
• Fabricates ~1,000MW boilers for power plants
• Gasification Plant in future energy business unit
• Nuclear power plant key equipment manufacturing and service
• Power Plant EPC • Seawater desalination
• Water treatment
• Designs and fabricates steam, gas, hydroelectric models
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
Global Projects since 1980
300 Total power generation capacity
170GW
2
Taean IGCC Project Overview
The first IGCC project in South Korea
Source: KOWEPO
Plant Owner: Korea Western Power
Net Power: 305 MWe (Overall Power: 380 MWe)
Plant Efficiency: 42% (Net, HHV)
− Coal Consumption: 2,670 TPD (as received)
− Clean Syngas to Power Block: 615 MJ/s (Process Design)
Selected Technology Providers
− Gasification: SCGP by Shell
− HCN/COS Hydrolysis: By Shell
− AGRU: Sulfinol-M by Shell
− SRU: Wet Sulfuric Acid by Haldor Topsoe
− ASU: Air Product
− GT/ST: 7FB Syngas GT by GE
Contractors
− Gasification EPC: Doosan Heavy Industries & Construction
− ASU EPC: Doosan E&C. This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
3
Current Status of Taean IGCC project
The first coal firing through burner system was successfully carried out on 10 Sept. 2015 by Doosan’s commissioning team.
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
10 Sept. 2015
Gasification Island Project Key Milestone
Mar. 2016 Oct. 2008
Commercial operation
Sept. 2015
Initial Coal Firing
May 2015
: Completion Date
Selection of Gasification Licensor
FEED
EPC Contract and Ground Breaking
Gasifier, Syngas Coolers at the Site
Mechanical Completion
Performance Test Run
Dec. 2013 Nov. 2011 Mar.2010
POST FEED
Nov. 2010
Doosan’s Technical Support
Doosan’s Work Scope Doosan’s Technical Support
4
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
5
Taean IGCC Process Configuration
Source: KOWEPO
Syngas O2/N2 Water/Solvent Steam Solid
Fly Ash
Slag
Wet Scrubber
HPHT Filter
N2 O2
ASU
Slag Handling
Sys.
HCN/COS Hydrolysis
AGR
SRU
H2SO4
Condenser
ST
GT
To Stack
Saturator
GasifierSGC
Coal Milling and Drying
Coal Storage
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
Econo-mizer
6
Manufacturing Critical Equipment of Gasification Plant in Doosan
The most critical and complicated items of gasification plant, Gasifier and Syngas Coolers, were manufactured in Doosan’s own manufacturing base in Changwon, South Korea.
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
7
Installing Critical Equipment of Gasification Plant at the Site
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
8
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
A video clip Installation of Gasifier and Syngas Coolers at Taean Site.
Installing Critical Equipment of Gasification Plant at the Site
Namhae IGCC Project
9
Taean IGCC Plant
Gwangyang SNG plant
Gwangyang Port
Namhae IGCC Area
15.3 km
51.2 km
S. Korea
√ Location: Namhae-gun, Gyeongsangnam-do
√ Developer : POSCO E&C Doosan Heavy Industries & Construction √ Plant Capacity: > 300MWe (Net, HHV)
√ Project Schedule
- Feb.2015 : MOU with Namhae-gun - Jul. 2015 : List-up of Gov.’s 7th Basic Plan for long term electricity supply and demand of South Korea - 4Q. 2015: Pre-feasibility study completion - 1Q. 2019: Ground Breaking - 1Q. 2023: Commercial operation
Namhae IGCC perspective view
This document is the informational asset of Doosan Heavy Industries & Construction. Unauthorized access, revision, distribution and/ or copying of this document are strictly prohibited.
Namhae IGCC Plant
Doosan’s manufacturing
base in Changwon