  • 7/21/2019 GuideBook PD 2nd Phase

    1/14

    GUIDELINES BOOK 1

    2015

    GUIDEBOOK

    P L A N T D E S I G Nnd

    2 PHASE COMPETITION

    IChEC 2015INDONESIA CHEMICAL ENGINEERING CHALLENGE

  • 7/21/2019 GuideBook PD 2nd Phase

    2/14

    SUBMISSION RULES

    1. ONLY teams that have passed the 1st phase abstract selection may continue to the 2nd phase

    of Plant Design Competition

    2. Participating teams must submit the required 2nd phase documents via e-mail to

    14 February 2015. Late

    submission up to 12 hours after the time stamp will be accepted but heavy penalties will be

    given (5 pts deduction for every hour of lateness). No submission is accepted after that and

    will result in immediate disqualification

    3. The 2nd phase document consists of:

    FINAL REPORT

    (Details regarding the content and the format are explained in the next chapter)

    4. The document must be compressed into a single file (*.zip or *.rar) with the file name and

    subject:

    XXXXX is your team number

    5. Participating teams will receive an e-mail confirmation within 2 x 24 hours after sending the e-

    mail

    6. Selection process results of the 2nd phase can be accessed on:

    7. Participating teams that have successfully passed the 2nd phase selection process will be

    further competing in the Grand Final on 27 March 2015. Further details regarding the Grand

    Final will be notified via e-mail.

    [email protected]

    http://www.ichec-itb.com

    before the deadline at 11.59 pm (GMT+7) on

    IChEC2015_PD2_XXXXX

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 20152

    http://www.ichec-itb.com/mailto:[email protected]://www.bkpm.go.id/contents/p16/statistics/17http://www.ichec-itb.com/http://www.bkpm.go.id/contents/p16/statistics/17http://www.bkpm.go.id/contents/p16/statistics/17http://www.bkpm.go.id/contents/p16/statistics/17http://www.ichec-itb.com/http://www.bkpm.go.id/contents/p16/statistics/17mailto:[email protected]
  • 7/21/2019 GuideBook PD 2nd Phase

    3/14

    PLANT DESIGN REPORT CONTENT AND

    ASSESSMENT CRITERIA

    The final report must contain three following main sections, explained in sub-chapterA, B and C, as well as several supporting documents and references.

    Executive summary (2 page maximum) should contain a summary or brief description

    of the proposed plant design. The executive summary must also deliver arguments that

    explain and answer these questions below in the executive summary:

    - Why does the proposed plant deserve to be implemented?

    - Is the proposed plant a new design or an improvement of an existing plant?

    - Can the new plant design produce more efficiently in terms of energy, chemical

    reactions, by-products generation, etc.? Make a comparison with similar existing

    plants (if any)

    - Is the technology used can be categorized as hybrid or part of the green

    (sustainable) technologies development?

    - How can you guarantee that the plant is designed safely for both humanity andthe environment?

    Arguments should correspond to the proposed plant design and are to be written into

    paragraphs form, NOT into bullet points. Those questions above are only cues of the

    arguments. Headings, relevant figures, equations and/or any other relevant items in

    strengthening the arguments are allowed.

    Please display your arguments sharply to show that your plant is better than others.

    Clearly explain and specify your arguments to avoid overgeneralizing.

    The Plant Performance and Economic Summary Sheet template can be downloaded

    on our official website (along with this guidebook). Both sheets must be attached to the

    front of the report after executive summary. Note that the provided template only

    serves as the general guidance of the sheet; participants are highly encouraged to

    customize the sheet to suit their own proposed plant design, as the details are

    dependent on each own design.

    A. Executive Summary

    B. Plant Performance and Economic Summary Sheet

    3PLANT DESIGN 2ND PHASE COMPETITION GUIDEBOOK

  • 7/21/2019 GuideBook PD 2nd Phase

    4/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 20154

    C. Plant Design Main Report

    This section is the most comprehensive aspect of the final report and should consist of

    several chapters. The chapter structure and its corresponding score weight factors are

    as follows: (Please note that adherence to chapter structure is mandatory, however participants

    may add more sub-chapters, as well as the points included in each of it)

    CHAPTER WEIGHT FACTOR

    A Chapter I Introduction 10

    B Chapter II Plant Design Methodology 12

    ASSESSMENTCRITERIA

    Sub-chapters:

    1.1 Background

    - Objectives

    - Sharpness in seeing opportunities

    - Impact to industrial regional sector

    1.2 Raw Materials

    - Selection of raw materials, availability, suppliescontinuity, etc.

    1.3 Market Analysis

    - Market research

    - Product competiveness in the market (competitors,commodity complementary and substitute)

    - Product off taker: local, regional, or internationalmarket? Other companies or direct off taker?

    1.4 Site Selection

    - Supply plan and access to raw material and utility

    - Product marketing plans

    - Supporting facilities (facilities and infrastructures,telecommunications, ports, etc.)

    - Other related conditions (geographical, social, political,labor, etc.)

    Sub-chapters:

    2.1 Theoretical Background

    - Detailed description to support process selection basisused in the plant

    - The whole description must be taken from reliablereferences or thorough personal analysis

    2.2 Methodology

    - Step-by-step explanation of plant design

    - Approaches and assumptions used in designing the plant

  • 7/21/2019 GuideBook PD 2nd Phase

    5/14

    5

    C Chapter III Comprehensive Process Description 23

    DChapter IV Process Safety and Environmental

    Considerations 12

    E Chapter V Equipment Specifications 15

    Sub-chapters:

    3.1 Plant Design Basis

    - Plant Capacity

    - Specification of feed and product- Ambient environmental conditions (air temperature,

    water, wind speed and direction, etc.)

    - Mode of the operation (continuous, batch, semi-batch,or semi-continuous)

    3.2 Process Flow Diagram (PFD)

    Refer to Turton et al (2009) for standard use in this competition(see the Appendix of this guidebook)

    - Operating units and operating conditions of mainequipments and streams

    - Detailed sequence of processes of raw materials intoproducts

    - Mass and energy balances for every stream process

    - Energy consumption and release for every unit operationand total energy consumption per production unit

    - Process control instrumentation (emphasis onphilosophy of the control itself; complex and specificcode number is not necessary)

    3.3 Utility Flow Diagram

    - Utilities involved in the process

    - Equipments and streams of utilities

    Sub-chapters:

    4.1 Process Safety

    - Hazards that may arise from the plant operation

    - Prevention and mitigation to avoid and/or overcomepotential hazards

    - Safety-related equipments for hazardous materialshandling process

    - Hazardous materials/chemicals that are used orcontained in PFD (MSDS can be attached if necessary)

    4.2 Environmental Impact and Waste Management- Government regulations (local and international) of the

    environmental impact of waste generated from processoperations

    - Types of waste and pollution generated, including theway to handle them

    Sub-chapters:

    5.1 Consideration in Equipments Selection

    - Personal consideration and explanation of selectiondepending on several factors

    5.2 List of Equipments

    - Specification of primary equipments, including type,

    PLANT DESIGN 2ND PHASE COMPETITION GUIDEBOOK

  • 7/21/2019 GuideBook PD 2nd Phase

    6/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 20156

    F Chapter VI Layout 8

    G Chapter VII Economic Investment and Calculations 15

    Sub-chapters:

    6.1 Plot Plan

    Schematic layout of various areas in plant consists of:

    - Primary infrastructures in process inside plant

    - Utilities- Raw materials and products storage

    - Office

    - Road plan

    - Personal additional objects

    6.2 Plant Layout

    - Detailed equipment layout in the plant (consider factorsof safety, traffic, accessibility of operation andmaintenance)

    6.3 Pipe Rack

    - Management and placement of pipes across the plant

    Sub-chapters:

    7.1 Capital Cost Estimation

    Refer to Turton et al (2009) on chapter 7 for standard use inthis competition

    - Engineering cost

    - Procurement cost

    - Construction cost

    - Commisioning cost

    - Start-up cost- Others

    7.2 Manufacturing Cost Estimation

    Refer to Turton et al (2009) on chapter 8 for standard use inthis competition

    - Variable cost

    - Raw materials, utilities, labour, fringe, benefits,maintenance, distribution, packaging, storage, salesexpense, R&D, promotion, etc.

    - Fixed cost: depreciation, taxes, insurance, patents,royalties, etc.

    7.3 Profitability AnalysisRefer to Turton et al (2009) on chapter 9 and 10 for standard

    size, material, number, and others

    5.3 List of Piping

    - Type of pipe, diameter, and total length of the apropriatediameter

    5.4 Material Selection and Specifications for Pipe and

    Primary Equipments- Operating conditions (pressure and temperature)

    - Durability of the materials compared to physicalproperties of the process fluid

    - Analysis of materials selection

  • 7/21/2019 GuideBook PD 2nd Phase

    7/14

    7

    H Chapter VIII Final 5

    APPENDIX

    use in this competition

    - Cash flow from designing to finishing

    - Detailed cash flow can be inserted in Appendix

    - Profitability criteria from discounted method

    - NPV, DPBP, ROI, DCFROR (IRR)

    - IDC (interest during construction), taxes, O&M cost,amortization, and depreciation (Use straight line methodfor depreciation)

    7.4 Sensitivity Analysis

    Spider web diagram, impact of changes in product prices,sales volume, raw materials, and investment to the valueof IRR

    Conclusion of the plant design proposal

    1. Specification Sheet: covering the calculation and majorequipement specifications with clear assumptions andreferences (computer typing or manual writing is allowed)

    2. Cash Flow Sheet, Economic Summary Sheet, etc.

    3. Bibliography and Other References

    PLANT DESIGN 2ND PHASE COMPETITION GUIDEBOOK

  • 7/21/2019 GuideBook PD 2nd Phase

    8/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 20158

    COMPETITION TERMS

    A. Plant Design Regulations

    Regulations are given with the intention to meet minimum reporting standards,uniformity and to facilitate assessment. The regulations are:

    1. The drawing of Process Flow Diagram, Plant Layout, etc., must be equipped with

    plant name and its capacity (in tons of products/year). It is recommended that the

    drawing is made by using a drawing software (i.e. AutoCAD) on A3 paper size and

    follows our stated reference for the standard (Turton et al., 2009)

    2. Use metric units for the whole calculation, especially in the summary and the

    conclusion. Imperial units are only allowed, as long as it is followed by a

    conversion to metric unit

    3. Do not use scientific number on the Investment and Economic Calculation (use

    1341 instead of 1,34 x 103)

    4. Use number rounding up to two decimal points

    5. Numbering format must be the following: comma for digit separator (,) and dot for

    decimal separator (.) e.g. 34,500.23 or 14,225,821.53

    6. The economic estimation, if present, must be calculated based in USD. If currency

    exchanges are needed, provide the currency rates and its date along

    7. Process Flow Diagram must be drawn on A3 size paper

    8. Plot Plan and Plant Layout must be drawn on A4 size paper with appropriate scale

    9. Include the estimation of revenue (i.e. USD XX,X00,000,000 per year)

    10. Include the percentage of corporate tax that follows the standard set by the

    government based on revenue per year

    11. Include detailed data of total investment (total equipment cost, manufacturing cost,

    etc.)

    12. Use assumption of 10-year plant life

    13. The construction period is standardized to 2 years

    14. The inflation and interest rate value depend on the country where the plant is

    located (also attach the basis of assumptions or facts)

  • 7/21/2019 GuideBook PD 2nd Phase

    9/14

    9

    15. The value of IDC (Interest During Construction) is approximately 10% per annum

    16. All relevant references must be inserted in Appendix section of the report

    17. Violation of the provisions above will result in score deduction of the report

    B. Report Writing Technical Regulations

    The plant design report must be written by using proper UK or US English on A4

    size paper with a left and upper margin of 3 cm and 2.5 cm for the lower and right

    margins. The report should be written using Times New Roman or Calibri

    typeface, 11 pt font size, and a minimum spacing of 1.15. Page numbers are to be

    given at the bottom right corner on every pages, including the flow sheet. The

    content of the report should be no more than 150 pages (Chapter I until VIII,

    excluding appendix, executive summary and table of contents/figures/tables). Foreach excess page, there will be 1 point deduction.

    C. Competition Rules

    Participants are allowed to design the equipments required in the process or

    incorporate either standard or non-standard existing design. Equipment designs

    must include the design, working principles, and the calculations used for the

    design.

    1. Design Report Format and Requirements

    a. The plant design included in the competition must be original

    b. The design must follow all the requirements stated in this guidebook

    2. Assessment

    a. Assessment will be carried out by international judges drawn from college

    academician, industrial practitioners, and others who are determined by

    organizing committee

    b. Assessment will be carried out based on the reports submitted by the

    participants and the decision of the judges is final and cannot be changed

    3. Final Presentation

    a. Participating teams that are chosen as grand finalists are the top six teams

    with the highest overall score

    b. Finalists will be immediately informed by e-mail and phone for furtherparticipation in the Grand Final

    PLANT DESIGN 2ND PHASE COMPETITION GUIDEBOOK

  • 7/21/2019 GuideBook PD 2nd Phase

    10/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 201510

    c. Regulations regarding the final presentation will be announced in conjunction

    with the announcement of the finalists

    4. Miscellaneous

    a. All submitted plant design reports will become the property of IChEC 2015

    organizing committee

    b. Only accommodation and transportation of the finalists during the Grand

    Final in Bandung will be provided by the organizing committee. Finalists

    should provide tickets to and from Indonesia themselves

    c. Further information regarding the Grand Final will be delivered later along

    with the finalists announcement.

  • 7/21/2019 GuideBook PD 2nd Phase

    11/14

    PLANT DESIGN 2ND PHASE COMPETITION GUIDEBOOK 11

    Main Reference:

    Turton, R.; Bailie, R.C.; Whiting, W.B.; Shaewitz, J.A. Analysis, Synthesis, and Design ofChemical Processes 3rd Edition. Boston: Pearson Education, Inc., 2009.

    Process flow diagram example of a certain plant section (Turton et al., 2009):

    Flow table which shows mass and energy balance from the process flow diagram (Turton et al.,

    2009):

    APPENDIX

  • 7/21/2019 GuideBook PD 2nd Phase

    12/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 201512

    Preliminary equipment summary table from the process flow diagram (Turton et al., 2009):

    Utility flow table from the process flow diagram (Turton et al., 2009):

  • 7/21/2019 GuideBook PD 2nd Phase

    13/14

    GUIDELINES BOOK 13

    @IChEC2015

    www.ichec-itb.com

    ichec.2015@gmailcom

    CP: Kevin (+6281299069168)

    https://www.facebook.com/IChEC2015

  • 7/21/2019 GuideBook PD 2nd Phase

    14/14

    INDONESIA CHEMICAL ENGINEERING CHALLENGE 201514

    2015

    IChEC 2015INDONESIA CHEMICAL ENGINEERING CHALLENGE 2015

    Organized by: Supported by: