ground movement analysis of pipe roof construction in … pipe roof method has leading advantages on...

6
1 Ground Movement Analysis of Pipe Roof Construction in Soft Clay Daniel T.C. Yao & Chih-Hung Wu Moh and Associates, Inc., 11F., No. 3, Tunhwa South Road, Section 1, Taipei 105 Taiwan [email protected] & [email protected] Abstract: The pipe roofing method has been widely recognized as an alternative for tunnel construction in urban areas to reduce ad- verse effects on underground utilities and ground surface activities. In those tunneling projects through various geological formations using pipe roofing method, the assessment of ground movement in soft clay is the most endeavoring engineering exercise. The soil be- havior, pipe roof characteristics, and construction sequence have significant influence on the ground movement in the tunnel construc- tion. In this paper, the methodology of ground movement assessment for pipe roofing method in soft clay is introduced. The key fac- tors concerning settlement from soil behavior, pipe roof characteristics, and construction are identified. In addition, the monitoring data from the vehicle tunnel construction with pipe roofing method along the Fuhsing North Road passing through the Taipei International Airport is used for validation of this methodology. 1 INTRODUCTION The call for tunnel construction in urban areas is often justified by minimizing the disturbance to existing underground utilities and ground surface activities. One of the most sever adverse ef- fects from tunnel construction is excessive ground movement. Ground movement prediction is therefore particularly important in tunneling work for designers and contractors to better evaluate the risk on proposed construction technique. Piping during tunnel construction in granular formation of high groundwater levels can cause cavities in ground and potential sudden ground subsi- dence. In clay formation, construction disturbance usually induce excess pore pressure increase and cause strength reduction, which may result in long term ground subsidence. Both of these effects above pose significant threats to facilities in the neighbor- hood of tunnel construction site. The pipe roof method is de- signed to minimize these potential threats in tunnel construction and has been successfully used in many projects in various coun- tries such as United States, Germany, Japan, Portugal, and Tai- wan (Yao, Wu, and Chang, 2004). In all of these successful pro- jects, the vehicle tunnel construction using pipe roof method along the Fuhsing North Road in Taiwan is the only one at such magnitude completed through soft clay formation. The Fuhsing North Road vehicle tunnel project in Taiwan will be used in this paper to illustrate the ground movement analysis process. Unlike the forepoling method (Fig. 1), which has a long his- tory in tunnel construction, pipe roof method constitutes a better temporary structure with respect to water tightness and structural integrity. Comparing to the traditional shield method in a short tunnel, pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004). The detail configuration of vehicle tunnel project along the Fuhsing North Road in Taipei, Taiwan was introduced in Hsiung (1997), and Moh et al. (1999). The tunnel layout and profile are illustrated in Fig. 2. It is a four-lane tunnel of 592m long, ap- proximately 22m wide, and 7.8m high under and crossing the main runways of Taipei International Airport. The pipe roof method was used in two sections, respectively, a 77m section of conventional interior braced excavation under a lawn area be- tween work shafts C and D, and a 103.5m section between work shafts D and E directly under the runway with a width of 60m. To further reduce the ground movement and interference of flight operation in runway area, the Endless Self Advance (ESA) method was used in junction with pipe roof method in tunnel construction of the section under runway. In this paper, the ground movement of 77m conventional braced excavation sec- tion between work shafts C and D is discussed and the monitor- ing data is used for the demonstration. 1.1 Pipe Roof Structure The pipe roof structure consisted of 83 steel pipes of a uniform diameter of 0.812m and a length of 77m. The average cover above the pipe roof is approximately 5.8m in thickness. The de- tail configuration of pipe roof is shown on Fig. 3. The steel pipe has a wall thickness of 0.0127m and Young’s modulus of 210 GPa. The exterior envelop of this pipe roof constitutes a rectan- gle box of 24.9m × 10.1m × 77m and an interior space of 23.3m × 8.4m × 77m. The key lock between adjacent pipes is configured to provide interlocking between pipes and proper waterproof dur- ing tunnel excavation. The pipe roof structural integrity and strength were significantly improved with these key locks and they also served as a guide for adjacent pipe during pipe jacking. The key locks were filled with waterproof sealant to form a wa- ter-tight box structure. The key lock configuration is shown on Fig. 4. Fig. 1. Forepiling Method (After Kuo et al., 1998) 300cm Excavation length 900cm 300cm Excavation length 900cm Overlap Steel Tunnel fore- Excavation

Upload: phamdung

Post on 15-Mar-2018

226 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

1

Ground Movement Analysis of Pipe Roof Construction in Soft Clay

Daniel T.C. Yao & Chih-Hung Wu Moh and Associates, Inc., 11F., No. 3, Tunhwa South Road, Section 1, Taipei 105 Taiwan

[email protected] & [email protected]

Abstract: The pipe roofing method has been widely recognized as an alternative for tunnel construction in urban areas to reduce ad-verse effects on underground utilities and ground surface activities. In those tunneling projects through various geological formations using pipe roofing method, the assessment of ground movement in soft clay is the most endeavoring engineering exercise. The soil be-havior, pipe roof characteristics, and construction sequence have significant influence on the ground movement in the tunnel construc-tion. In this paper, the methodology of ground movement assessment for pipe roofing method in soft clay is introduced. The key fac-tors concerning settlement from soil behavior, pipe roof characteristics, and construction are identified. In addition, the monitoring data from the vehicle tunnel construction with pipe roofing method along the Fuhsing North Road passing through the Taipei International Airport is used for validation of this methodology.

1 INTRODUCTION

The call for tunnel construction in urban areas is often justified by minimizing the disturbance to existing underground utilities and ground surface activities. One of the most sever adverse ef-fects from tunnel construction is excessive ground movement. Ground movement prediction is therefore particularly important in tunneling work for designers and contractors to better evaluate the risk on proposed construction technique. Piping during tunnel construction in granular formation of high groundwater levels can cause cavities in ground and potential sudden ground subsi-dence. In clay formation, construction disturbance usually induce excess pore pressure increase and cause strength reduction, which may result in long term ground subsidence. Both of these effects above pose significant threats to facilities in the neighbor-hood of tunnel construction site. The pipe roof method is de-signed to minimize these potential threats in tunnel construction and has been successfully used in many projects in various coun-tries such as United States, Germany, Japan, Portugal, and Tai-wan (Yao, Wu, and Chang, 2004). In all of these successful pro-jects, the vehicle tunnel construction using pipe roof method along the Fuhsing North Road in Taiwan is the only one at such magnitude completed through soft clay formation. The Fuhsing North Road vehicle tunnel project in Taiwan will be used in this paper to illustrate the ground movement analysis process.

Unlike the forepoling method (Fig. 1), which has a long his-tory in tunnel construction, pipe roof method constitutes a better temporary structure with respect to water tightness and structural integrity. Comparing to the traditional shield method in a short tunnel, pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004).

The detail configuration of vehicle tunnel project along the Fuhsing North Road in Taipei, Taiwan was introduced in Hsiung (1997), and Moh et al. (1999). The tunnel layout and profile are illustrated in Fig. 2. It is a four-lane tunnel of 592m long, ap-proximately 22m wide, and 7.8m high under and crossing the main runways of Taipei International Airport. The pipe roof method was used in two sections, respectively, a 77m section of conventional interior braced excavation under a lawn area be-tween work shafts C and D, and a 103.5m section between work shafts D and E directly under the runway with a width of 60m.

To further reduce the ground movement and interference of flight operation in runway area, the Endless Self Advance (ESA) method was used in junction with pipe roof method in tunnel construction of the section under runway. In this paper, the ground movement of 77m conventional braced excavation sec-tion between work shafts C and D is discussed and the monitor-ing data is used for the demonstration.

1.1 Pipe Roof Structure

The pipe roof structure consisted of 83 steel pipes of a uniform diameter of 0.812m and a length of 77m. The average cover above the pipe roof is approximately 5.8m in thickness. The de-tail configuration of pipe roof is shown on Fig. 3. The steel pipe has a wall thickness of 0.0127m and Young’s modulus of 210 GPa. The exterior envelop of this pipe roof constitutes a rectan-gle box of 24.9m × 10.1m × 77m and an interior space of 23.3m × 8.4m × 77m. The key lock between adjacent pipes is configured to provide interlocking between pipes and proper waterproof dur-ing tunnel excavation. The pipe roof structural integrity and strength were significantly improved with these key locks and they also served as a guide for adjacent pipe during pipe jacking. The key locks were filled with waterproof sealant to form a wa-ter-tight box structure. The key lock configuration is shown on Fig. 4.

Fig. 1. Forepiling Method (After Kuo et al., 1998)

Tunnelforepole

Steel Rib

Overlap length ≈ 300cm

Excavation length ≈ 900cm

Tunnelforepole

Steel Rib

Overlap length ≈ 300cm

Excavation length ≈ 900cm

Overlap

Steel

Tunnel fore-

Excavation

Page 2: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

2

1.2 Bracing System

The bracing system consisted of welding, post, ties, and corner pieces as illustrated in Fig. 5. To minimize the risk resulted from full face excavation, two levels of benched excavation with 4.7m of upper level and 3.7m of lower level were employed. The steel bracing frames were erected every 4m along the tunnel advanc-ing direction. The bracing system was designed accordingly us-ing mostly H beams. The temporary upper level bracing was re-placed with full face bracing immediately after the excavation of lower level was completed.

1.3 Subsurface Condition

The subsurface soil condition was summarized from the geotech-nical borings and laboratory test results. The boring location lay-out is illustrated in Fig. 6 and the boring information is shown on Fig. 7. Normally consolidated clay was encountered from ground surface to the bottom of boring with an exception of a layer of medium dense silty sand from approximately 4m to 7m below ground level. The ground water table was found at approximately the ground surface. The soil test results including the water con-tents, liquid limits and plasticity index, as well as unconfined compressive strengths are shown in Fig. 8.

(a) General layout

Keelung RiverKeelung River

Taipei InternationalAirport

Runway

Taxiway

FuH

sing

N. R

oad

Sun Yet Sen Freeway

BinJiang Street

Ta C

hieh

Brid

ge

ProjectLocation

N

Bin

jiang

Stre

etAirport fence

Airport fence

Fuhsing N. Road

Taxiway

(b) Site Plan

Shaft B Shaft C Shaft D Shaft E

Site fence

Site fence

Shaft A

N

Runway

(c) Longitudinal section

40m TaxiwayFence Fence

Vehicle tunnelφ=1500mm Passageway

103.5m77m

Culvert

Shaft A Shaft B Shaft C Shaft D Shaft E

60m Runway

77m 80m

Pipe Roof

Binjiang Street

(a) General layout

Keelung RiverKeelung River

Taipei InternationalAirport

Runway

Taxiway

FuH

sing

N. R

oad

Sun Yet Sen Freeway

BinJiang Street

Ta C

hieh

Brid

ge

ProjectLocation

N

(a) General layout

Keelung RiverKeelung River

Taipei InternationalAirport

Runway

Taxiway

FuH

sing

N. R

oad

Sun Yet Sen Freeway

BinJiang Street

Ta C

hieh

Brid

ge

ProjectLocationProject

Location

NN

Bin

jiang

Stre

etAirport fence

Airport fence

Fuhsing N. Road

Taxiway

(b) Site Plan

Shaft B Shaft C Shaft D Shaft E

Site fence

Site fence

Shaft A

N

Runway

Bin

jiang

Stre

etAirport fence

Airport fence

Fuhsing N. Road

Taxiway

(b) Site Plan

Shaft B Shaft C Shaft D Shaft E

Site fence

Site fence

Shaft A

NN

Runway

(c) Longitudinal section

40m TaxiwayFence Fence

Vehicle tunnelφ=1500mm Passageway

103.5m77m

Culvert

Shaft A Shaft B Shaft C Shaft D Shaft E

60m Runway

77m 80m

Pipe Roof

Binjiang Street

(c) Longitudinal section

40m TaxiwayFence Fence

Vehicle tunnelφ=1500mm Passageway

103.5m77m

Culvert

Shaft A Shaft B Shaft C Shaft D Shaft E

60m Runway

77m 80m

Pipe Roof

Binjiang Street

Fig. 2. Layout and Profile of Vehicle Tunnel along Fuhsing North Road

Fig. 3. Configuration of Pipe Roof

1.4 Ground Movement during Construction

The ground movement in tunnel construction is significantly af-fected by the subsurface conditions, construction sequence as well as quality of management, and bracing systems. In the con-ventional braced excavation, other factors such as the timing and workmanship of excavation and support erection can also be sub-stantially important in pipe roof tunnel construction due to the ef-fects of soil creep and disturbance. In addition, the excavation rate and sequence can affect the magnitudes and distribution of ground movement. Because ground movement is an irreversible process, optimization of excavation sequence can be surprisingly advantageous in minimizing the adverse effect of ground move-ment. An adequate numerical analysis with correct analytical model is critical in the pipe roof design.

Fig. 4. Configuration of Steel Pipe Interlocking Design

Fig. 5. Configuration of Bracing System

(φ=812.8mm,t=12.7mm)Pipe Roof

CL

8.4m

10.1

m

1.4m

5.0m

1.4m

7.8m

24.9m23.3m

22.0m

9.5m9.5m 1.0m1.1m 1.1m

(φ=812.8mm,t=12.7mm)Pipe Roof

CLCL

8.4m

10.1

m

1.4m

5.0m

1.4m

7.8m

24.9m23.3m

22.0m

9.5m9.5m 1.0m1.1m 1.1m

Pipe Roof (φ=812.8mm,t=12.7mm)

(b)Longitudinal Section

Temporary frame

Intermediate Steel Pipe

4.7m

8.4m

3.7m

(a)Cross Section

4.7m

8.4m

3.7mIntermediate Steel Pipe

@ 4m @ 4m

Jack

6.2m6.2m5.4m 5.4m

(b)Longitudinal Section

Temporary frame

Intermediate Steel Pipe

4.7m

8.4m

3.7m

(b)Longitudinal Section

Temporary frame

Intermediate Steel Pipe

4.7m

8.4m

3.7m

4.7m

8.4m

3.7m

(a)Cross Section

4.7m

8.4m

3.7mIntermediate Steel Pipe

@ 4m @ 4m

Jack

6.2m6.2m5.4m 5.4m

(a)Cross Section

4.7m

8.4m

3.7mIntermediate Steel Pipe

@ 4m @ 4m

Jack

6.2m6.2m5.4m 5.4m

4.7m

8.4m

3.7mIntermediate Steel Pipe

@ 4m @ 4m

Jack

6.2m6.2m5.4m 5.4m

(a) Interlocking method of steel pipes

925.8mm925.8mm

d=812.8mm

(b) Details of interlocks

L-shape plat

Waterproof sealant

t=12.7mm

(a) Interlocking method of steel pipes

925.8mm925.8mm

d=812.8mm

925.8mm925.8mm

d=812.8mm

(b) Details of interlocks

L-shape plat

Waterproof sealant

t=12.7mm

L-shape plat

Waterproof sealant

(a) Interlocking method of steel pipes

(b) Details of Interlocks

Page 3: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

3

2 NUMERICAL SIMULATION

The soil and structure deformation is modeled using packaged commercial software FLAC (Itasca, 2000). A two-dimensional plane strain numerical model using explicit finite difference scheme with assumptions of soil isotropy and homogeneity was analyzed. Mohr-Coulomb failure criteria and linear elastic-perfectly plastic stress-strain relationship were adopted for the soil model. The effects of ground water flow and consolidation are not considered in the analysis. The temporary bracing system was simulated with beam elements and the pipe roof structure was approximated with a layer of continuum.

2.1 Material Properties

In the analysis, three major categories of material properties were assigned to, respectively: soil including natural and improved, bracing systems, and pipe roof structure. The soil strata and pa-rameters were concluded from the geotechnical investigation re-sult and shown in Table 1. According to a previous study (Aba-zovic & Pintar, 1999), the Young’s moduli of cohesive soils of 400 times of undrained shear strengths were used in the analysis. In addition, Poisson’s ratio of 0.49 was used for the cohesive soils since the undrained condition was assumed and the effect of consolidation was not considered. As for the granular soils, their Young’s moduli were evaluated using Standard Penetration Test (SPT) N-values and a Poisson’s ratio of 0.3 was adopted. The properties of beam elements as temporary bracing systems were directly obtained from the material properties, geometries, and layouts of steel H beams. For the properties of pipe roof structure, the geometries of both pipes and interlocks, properties of steel, and presumed deformation patterns were considered.

To reduce the risk and increase the safety during tunnel exca-vation, ground improvement was used in many areas for various purposes. The areas of ground improvement are illustrated in Fig. 9. At two ends of the tunnel, ground improvement was used to increase the soil strength for the stability of initial excavation and to decrease the permeability to avoid piping. In the silty sand layer above pipe roof, grout was used to mainly decrease the permeability and reduce the risk of piping. For the portion of silty sand enclosed in the pipe roof structure, ground improve-ment using horizontal double packer method was conducted to improve the strength and to reduce the permeability. To improve the stability of excavation and reduce the ground deformation, improvement of strength was carried out also with horizontal double packer method on the clay soil within the pipe roof. The unconfined compressive strength of improved clay and silty sand soils was designed to be no less than 80 kPa and had been veri-fied with test results.

Runway

Shaft C Shaft D

Borehole C-3N

Cone Penetration Test EC-3

RunwayShaft C Shaft D

Borehole C-3N

Cone Penetration Test EC-3

Fig. 6. Geotechnical Boring Layout

0

5

10

15

20

25

30

35

40

0 2 4 6 8 10 12

Borehole C-3N

SPT-N

0

5

10

15

20

25

30

35

40

0 1 2 3 4 5 6 7

CPT Test EC-3TIP RESISTANCE

Qt (MPa)

0

5

10

15

20

25

30

35

40

0 0.02 0.04 0.06 0.08 0.1

CPT Test EC-3LOCAL FRICTION

Fs(MPa)

0

5

10

15

20

25

30

35

40

SoilLayer

Dep

th (m

)

siltyclay(CL)

SM

CL

Fig. 7. Geotechnical Boring Information

0

5

10

15

20

25

30

35

40

0 10 20 30 40 50

Water Contentwn (%)

LLPLwn

0

5

10

15

20

25

30

35

40

0 20 40 60 80 100 120 140 160

Undrained Shear Strengthsu (kPa)

CPT test

UC test

UU test

Field Vanetest

0

5

10

15

20

25

30

35

40

SoilLayer

Dep

th (m

)

siltyclay(CL)

SM

CL

Fig. 8. Soil Test Results

Fig. 9. Illustration of Ground Improvement Areas

Ground improvement was used to decrease the permeability of silty Sand Ground improvement was used to decrease the permeability and increase the strength of silty sand Ground improvement was used to improve the stability of excavation face

5m

5.4m

(a)Cross Section

(b)Longitudinal Section

Mirror Face Mirror FaceRetained Wall Retained Wall

16m

Page 4: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

4

2.2 Mesh Scheme and Boundary Conditions

The mesh scheme used in analysis around the tunnel was illus-trated in Fig. 10 and the full mesh was extended 24m from either sides of work shafts and 37m from bottoms of work shafts to re-duce boundary effects. The initial equilibrium with excavated work shafts on either sides was calculated to obtain the initial states of stress and strain before tunnel excavation. After the ini-tial equilibrium, all the displacements were zeroed and support elements were placed at tunnel entrance before the start of exca-vation simulation.

2.3 Construction Sequence Simulation

After the initial equilibrium state of stress and strain was ob-tained and the boundary conditions were reset, the numerical simulation was executed according to the designed sequence of excavation. The soil mass within pipe roof structure was removed according to designated excavation stage as illustrated in Fig. 11. After the soil mass was removed for each designated excavation

stage, the equilibrium state of stress and strain was calculated and used as the initial condition for the next excavation stage.

Table 1. Soil Strata and Parameters

Soil Classification

Depth(m)

γ Bt B

(kN/mP

3P)

φ’ (de-gree)

sBu (kPa) KB0B

E (MPa) υ

CL 4.4 18.5 30 26 0.50 10.4 0.49SM 7.0 19.2 32 - 0.47 7.0 0.30CL 16.2 18.6 29 28 0.52 11.2 0.49CL 25.0 18.6 29 38 0.52 15.2 0.49CL 35.0 19.0 30 60 0.50 24.0 0.49CL 45.0 19.0 31 80 0.48 32.0 0.49CL 56.0 20.0 32 128 0.47 51.2 0.49

Where φ’=effective friction angle; sBuB= undrained shear strength; KB0B=lateral earth pressure coefficient; E=Young’s modulus; υ=Poisson’s ratio.

Fig. 10. Initial Mesh

Fig. 11. Mesh at Excavation Stages

Shaft C Shaft DShaft C Shaft D

Shaft C Shaft D

Work Shaft Excavation Zone

Soil

CLSM

CL

CL

CL

CL

CL

SM

Pipe Roof

Ground Treatment (Work Shaft & Mirror Face)

Retained Wall

( ) Tunnel Excavation Stages

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18)

(19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (31) (32) (33) (34) (35) (36)(30) (37)

Shaft C Shaft D

Work Shaft Excavation Zone

Soil

CLSM

CL

CL

CL

CL

CL

SM

Soil

CLSM

CL

CL

CL

CL

CL

Soil

CLSM

CL

CL

CL

CL

CL

SM

Pipe Roof

Ground Treatment (Work Shaft & Mirror Face)

Retained Wall

( ) Tunnel Excavation Stages

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18)

(19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (31) (32) (33) (34) (35) (36)(30) (37)

Pipe Roof

Retained Wall

Work Shaft Excavation Zone

Ground Treatment

(Work Shaft & Mirror Face)

Tunnel

Excavation Stage

Page 5: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

5

-50

-45

-40

-35

-30

-25

-20

-15

-10

-5

00 10 20 30 40 50 60 70

Distance from Shaft C (m)

Settl

emen

t of P

ipe

Roo

f at C

ente

rLi

ne(c

m)

Excavate Upper Heading at 5th Stage (FLAC) Excavate Upper Heading at 5th Stage (Observed)Excavate Upper Heading at Final Stage (FLAC) Excavate Upper Heading at Final Stage (Observed)Excavate Lower Heading at Final Stage (FLAC) Excavate Lower Heading at Final Stage (Observed)

Direction of Excavation

Shaft C Shaft D

3 FIELD MONITORING PROGRAM

3.1 Instrumentation System

A comprehensive monitoring program was implemented in the field and consisted of instrumentations on loads, deformations, and pore water pressures. For the ground deformation measure-ments ground settlement points, horizontal inclinometers, and ground extensiometers were used to collect the data. The in-strumentation layout for ground deformation measurement was illustrated in Fig. 12 and the settlement measurement from the horizontal settlement meters (HSM) along the longitudinal cen-ter line in the pipe roof was presented in Fig. 13.

9.78m 6m 6m 11.2m 11.2m6m 6m 6m 12.06m

Shaft

C

HSCC01

HSCC02

HSCC03

HSCC04

HSCC05

HSCC06

HSCC07

HSCC08

Shaft

D

(b) Plan

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

(a) Cross Section

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

strain gauges

Convergencepoint

9.78m 6m 6m 11.2m 11.2m6m 6m 6m 12.06m

Shaft

C

HSCC01

HSCC02

HSCC03

HSCC04

HSCC05

HSCC06

HSCC07

HSCC08

Shaft

D

(b) Plan

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

9.78m 6m 6m 11.2m 11.2m6m 6m 6m 12.06m

Shaft

C

HSCC01

HSCC02

HSCC03

HSCC04

HSCC05

HSCC06

HSCC07

HSCC08

Shaft

D

(b) Plan

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

(a) Cross Section

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

strain gauges

Convergencepoint

(a) Cross Section

horizontal inclinometers

(HSID)

horizontal inclinometers

(HSID)

horizontal settlement meters

(HSM)

strain gauges

Convergencepoint

Fig. 12. Partial Instrumentation Layout

3.2 Comparison of Analytical Solution and Field Data

As shown in Fig. 13, comparison between the predicted defor-mation and field measurement presents a satisfactory simulation result. The numerical prediction closely identifies the signifi-cance of ground movement in tunnel construction with pipe roof method. The maximum deformation was well captured in the analysis.

4 DISCUSSIONS

Disturbance of surrounding soil/rock formation was almost in-evitable in tunnel construction. At this project site, cohesive soil is the dominant type of soil encompassing pipe roof tunnel. The disturbance of cohesive soils could cause pore pressure increase, and resulted in strength reduction and consolidation as a conse-quence of afterward pore pressure dissipation. Although the dis-turbance to the cohesive soil was inevitable, the structure of pipe roof had effectively reduced the influence of tunnel construction to the surrounding soil and the disturbance-induced settlement was believed to be minimal. The actual contribution of distur-bance in ground deformation was yet to be determined.

Two major sources of deformations, respectively the vertical deformations of soil and pipe roof structure, could attribute to the ground settlements. In this study, an important part of pipe roof structure deformation was observed, which was the ring de-flections of hollow steel pipes at the contacts of temporary welding elements as shown in Fig. 14. Even with a load redistri-bution plate, a concentrated load transferred from the weight of soil overburden was still applied at the crown of pipe ring as il-lustrated in Fig. 15. Since the geometry of pipe interlock was not designed to provide significant lateral confinement, the pipe ring will continue to deform until sufficient lateral confinement was provided by adjacent pipes or the load equilibrium was reached for each individual pipe. The load-deformation relation-ship was shown in Fig. 16. An independent study of ring deflec-tion with the field approximated conditions indicated a vertical deflection of approximately 5cm on the steel pipe could occur at the intermediate pipes while the lateral confinement was not provided.

Fig. 13. Settlement Data at Center Line

Page 6: Ground Movement Analysis of Pipe Roof Construction in … pipe roof method has leading advantages on construction economy and flexibility of tunnel cross section (Yao et al., 2004)

6

IntermediateSteel Pipe

Jack

Upper Level Post Temporary

Welding

IntermediateSteel Pipe

Jack

Upper Level Post Temporary

Welding

Fig. 14. Configuration of Upper Level Post Bearing System

FLAC (Version 4.00)

LEGEND

12-Mar-04 15:02step 24428

-8.673E-01 <x< 7.949E-01-8.242E-01 <y< 8.380E-01Grid plot

0 5E -1 Beam plot

-0.700

-0.500

-0.300

-0.100

0.100

0.300

0.500

0.700

-0.700 -0.500 -0.300 -0.100 0.100 0.300 0.500 0.700

JOB TITLE :

Moh and Associates, Inc.Taipei, Taiwan

P

δ

P : Loadδ : Y-deformation at

Crown

FLAC (Version 4.00)

LEGEND

12-Mar-04 15:02step 24428

-8.673E-01 <x< 7.949E-01-8.242E-01 <y< 8.380E-01Grid plot

0 5E -1 Beam plot

-0.700

-0.500

-0.300

-0.100

0.100

0.300

0.500

0.700

-0.700 -0.500 -0.300 -0.100 0.100 0.300 0.500 0.700

JOB TITLE :

Moh and Associates, Inc.Taipei, Taiwan

P

δ

P : Loadδ : Y-deformation at

Crown

Fig. 15. Analytical Simplification

0

10

20

30

40

50

60

70

80

0 20 40 60 80 100 120 140

P , Load (t/m)

δ , Y

-def

orm

atio

n at

cro

wn

(mm

)

Fig. 16. The load-deformation relationship

In the numerical simulation of excavation, proper modeling

of soil behavior of stress relief has often been an important and difficult issue. This difficulty results from different soil stress-strain constitutive relationships in the loading and unloading stages and the time effect of soil deformation on the construc-tion sequence simulation. Before the soil stress-strain relation-

ship and the time effect can be properly modeled in the analysis, the common resolutions of stress relief in excavation include us-ing partial weight elements in initial equilibrium, constrained boundary conditions, and actual lateral stress coefficients for the shallow cohesive formations.

The methodology of prediction and analysis of ground de-formation in pipe roof construction using a 2-D model with an approximated plane strain condition is presented in this paper. Instead of using a costly 3-D numerical simulation, fairly con-sistent prediction using the 2-D model with the field measure-ment can provide the designer and contractor with a fast review of the design and construction process. Most of the significant features affecting ground movement including material proper-ties and construction issues were discussed. However, several important issues such as soil disturbance, numerical difficulties, and soil constitutive modeling still require further attention.

ACKNOWLEDGMENTS

The authors are grateful to the Department of New Construc-tions of Taipei Municipal Government for the permission to publish this paper. Sincere appreciation is due to Dr. Za-Chieh Moh, Dr. Chung-Tien Chin, Mr. Chien-Hong Wang and Mr. Yuan-Yao Tsai for their valuable advices and to Mr. Ting-En Wu and Mr. Ching-Nan Wu for providing field data during the preparation of this manuscript.

REFERENCES

Abazovic, E. & Pintar, G. 1999. Dimensioning and Stability Analysis of Segmental Tunnel Linings Undergoing Changes in the Stress Conditions. FLAC and Numerical Modeling in Geomechanics. Minnesota, USA.

Hsiung, K.I. 1997. Design of Fushing N. Road Underpassing Taipei International Airport. Proc., Cross-Strait Symposium on City Planning. China. (in Chinese).

Itasca Consulting Group Inc.. 2000. FLAC Version 4.0, User’s Manual. Minnesota, USA.

Kuo, C.C. & Liu, H.S. 1998. Case Study on Application of Tun-nel Forepoling Method in Taiwan. Sino-Geotechnics 66: 25–36. (in Chinese).

Moh, Z.C., Hsiung, K.I., Huang, P.C. & Hwang, R.N. 1999. Underpass beneath Taipei International Airport. Proc. Con-ference on New Frontiers and Challenges. Bangkok.

Yao, D.T.C., Wu, C.-H. & Chang, Y.H. 2004. An Introduction to Design and Analysis of Pipe Roof in Soft Clay. 4 P

thP Cross

Strait Seminar on Tunnel and Underground Construction. (in Chinese).