f1 1103-pipe roof singapore sun -all ,38 pg
Post on 21-Oct-2014
1.132 views
DESCRIPTION
Construction of Pipe Roof and Support System in Proposed Outlet Drain Undercrossing North Buona Vista Road, Singapore T Sun, W& M Consultants, Singapore. [email protected] Land Transport Authority, Singapore , Public Utilities Board, Singapore, Or Kim Peow Contractors (Pte) Ltd, Singapore Abstract: The project in the paper included design and construction of a permanent 120m long RC box culvert and sewer diversion at North Buona Vista Road (NBV) Singapore. The pipe roof method was selected by the design and build contractor in fulfilment of the contract requirement for the 53 m box section undercrossing NBV Road. The adopted methodology comprised the installation by pipe jacking of numbers of interlocking steel pipes followed by traverse series of steel frames for safe mining of the tunnel. This served to maintain uninterrupted service conditions for the road, subways tunnel and other services. There are many challenges in the construction of pipe roof and mined tunnel. This paper deals with the consideration in the design and construction of such works. It also highlighted the problems encountered during the construction, subsequent solution adopted and protection of existing utilities as well as monitoring of settlement of the surrounding areas of the project.TRANSCRIPT
1305-TT –Myanmar –
Pipe Roof Construction in Singapore
Trisha Sun
Trenchless Technology Seminar
-Myanmar 5 to 7 June 2013
Pipe Roof Construction
in Singapore
Trisha Sun
Principal W& M Consutlants
1 of 38.
1 of 38. -Pipe Roof In Singapore-Sun
2 of 38.
2 of 38. -Pipe Roof In Singapore-Sun
3 of 38.
3 of 38. -Pipe Roof In Singapore-Sun
4 of 38.
4 of 38. -Pipe Roof In Singapore-Sun
5 of 38.
5 of 38. -Pipe Roof In Singapore-Sun
6 of 38.
6 of 38. -Pipe Roof In Singapore-Sun
7 of 38.
7 of 38. -Pipe Roof In Singapore-Sun
8 of 38.
8 of 38. -Pipe Roof In Singapore-Sun
9 of 38.
9 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
1
PIPE Roof
• Exepereince in Singapore –
Pipe roof costruction
•Sun , email: [email protected]
1Pipe Roof Singapore-Sun, OKP
Topics 1-2
•Introduction
•Pipe roof concept
•Design issues
•Machine and problems
•Problems of jacking
•Constrction process2Pipe Roof Singapore- Sun
10 of 38.
10 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
2
Tpoics-2-2
• Jacking and receiving shafts
•Jacking ,mining
•Monitoring
•Risk
•Tender- design
•and documentationsPipe Roof Singapore- Sun 3
Introduction•Trenchless Methods for providing “No dig “
solution to installation of large culverts/pipes
•Alternatives:
•Pipe ramming / pipe roof by ramming/auger
machine
•Pipe roof by microtunnelling
•Pipe pushing/box culvert direct jacking
•Open cut
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 4
11 of 38.
11 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
3
Various shapes
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 5
Construction Sequence1. Execution of sheet piles2. Execution of the pipe arch microtunnelling3. Mined excavation of tunnel with steel ribs with reinforced shotcrete & fibre glass elements4. Casting of permanent concrete lining
Pipe Arch Tunnel – Concept
Site picture of project by Metropolitan Atlanta Rapid Transit Authority in USA
6IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKPIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
12 of 38.
12 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
4
pipe roof Plan view (1-2)
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 7
Pipe roof -Plan view(2-2)
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP8
13 of 38.
13 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
5
Pipe roof
SG ,Pipe roof Tunnel•Long section view
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 9
• Design Issues
10IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
14 of 38.
14 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
6
Design Issues- 1
•Physical site constraints
Close to MRT CCL-central
circular Line
Close to Viaduct foundation E
west line ,Sewer line ,services
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 11
Design Issues -2 Physical site constraints-mining below
joint bay cables
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 12
15 of 38.
15 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
7
Design Issues- 3
critical issues
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
13
Design Issues -4-
geological profile
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 14
16 of 38.
16 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
8
Design 5-during break out-soil treatment, steel
portal frame
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 15
Design 6-
during break through at exit -soil treatment( soft alluvial), steel portal
frame
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 16
17 of 38.
17 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
9
Design 7 -stage excavation
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 17
Design 8 -Face Stability
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 18
18 of 38.
18 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
10
Design 9 -Design Model
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 19
Adopted Solution 1-3 The pipe jacking method adopted
-jacking from one end (jacking Shaft)
to the other end(receiving shaft)
using steel pipes to form a horizontal
and vertical temporary structure (
around the proposed reinforced box
culvert.)
•
20IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
19 of 38.
19 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
11
Adopted Solution 2-3
The pipe roof (see below Sketch
)comprises rows of 780mm dia Steel pipes
(10 on top and bottom and 6 rows on each
sides to form the vertical wall.
Each row of the steel pipes -interlock
together using steel T- clutches prefabricated
together with the pipes.
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP -22
Adopted Solution 2-3
Each row of the pipe which is
approximately 54m is formed
by welding together 9 to 10 number (
6 m long ) of steel pipe using the full
butt penetration welds
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 22
20 of 38.
20 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
12
SKETCH – CONFIGURATION OF THE PIPE
ROOF -drilling sequence
23IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
•Machine and
problems
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 24
21 of 38.
21 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
13
Machine 2-2 -Layout
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
25
PIPE JAKCING PROCESS -
Problems- jacking
•Obstruction
•Alignment
•Clutch
•Soil information
•SettlementIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 26
22 of 38.
22 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
14
•Construction process
27IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction process 1-
Jacking shaft –typical
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 28
23 of 38.
23 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
15
Construction process 2
Construction of Jacking & Receiving Shaft
29IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction 7
Setting of Jacks
30IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
24 of 38.
24 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
16
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 31
Construction process 8
Steel pipes
Construction process 9
Sample clutch details
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 32
25 of 38.
25 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
17
Construction process 14
Pipe Jacking in Progress
33-
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
Construction process 16
Ultrasonic Test to welded joint
34-IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP
26 of 38.
26 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
18
Construction process 19
TBM Through at Receiving Shaft
35IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
Construction process 21
Completed Horizontal Row of Pipe
Roof
36IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
27 of 38.
27 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
19
Construction process 22
Completed pipe roof
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP37
•Mining of Tunnel
India No Dig-Dec 9,2010 -
Pipe Roof , cheng
38
28 of 38.
28 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
20
Construction –Mining of tunnel 3 -
Installing portal frame at jacking shaft
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 39
Construction –Mining of tunnel 4
Installing portal frame at jacking shaft
India No Dig-Dec 9,2010 -
Pipe Roof , cheng
40
29 of 38.
29 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
21
Construction –Mining of tunnel 6
install entrance frame before
mining
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP41
Construction –Mining of tunnel 8A
EXCAVATON
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 42
30 of 38.
30 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
22
•Monitoring
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, 43
Monitoring 1-
Services –need for monitoring
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP44
31 of 38.
31 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
23
Monitoring 3 A
Sample-installations of
instrumentations
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 45
Monitoring 3 B
Installations of instrumentations –Joint
Bay
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 46
32 of 38.
32 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
24
Instrumentation – Monitoring 4
INSTALL PRISM INSIDE THE STEEL PIPE –for
monitoring settlements
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP47
Monitoring 5 A
MRT Line below project
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 48
33 of 38.
33 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
25
Monitoring 5B
MRT-FIXING PRISMS
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 49
Monitoring 6
- Predictions
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
50
34 of 38.
34 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
26
Monitoring 7
Readings
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
51
• Completion
52IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
35 of 38.
35 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
27
Completion
Final stage
IEM Conf Mar 2011- Pipe Roof Singapore-Sun,
OKP cheng53
• Risk Assessment
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP54
36 of 38.
36 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
28
Risk Assessment
Risk factors (1)•Risk from Soil information, services
•Settlement control and damages
•Insurance cover on adjacent structures
•Pre con survey
•Sharing of risks
•Design and build contract
•Allowance of claimIEM Conf Mar 2011- Pipe Roof
Singapore-Sun, OKP55
Risk Assessment
Risk factors (2)•Client risks
•Contractors
•Stakeholders
•3rd party client ( Authorities)
•Selection- method, main contractor ,specialist ( soil
treatment , shaft, pipe jacking , structures )
•Selecting –machine & skilled operators
•Luck /planningIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 56
37 of 38.
37 of 38. -Pipe Roof In Singapore-Sun
25/10/2012
29
Preparing for contract
•Contract documentation
•Design/drawings
•Specifications
•Bills /Lump sum/VO
IEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP 57
Thank you ,
58IIEM Conf Mar 2011- Pipe Roof Singapore-Sun, OKP
38 of 38.
38 of 38. -Pipe Roof In Singapore-Sun