Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1

Upload: others

Post on 08-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Planlæg din præsentation: • Indledning (sæt

scenen) • Indhold (handling) • Afslutning (løsning

eller perspektiv) Find inspiration til din præsentation på InSite under Værktøjer – Kommunikation Husk at udfylde dok. nr. til Public 360 samme sted som dato.

Tip:

Indsæt dato, dok. nr. og sidefod på alle slides • Vælg Indsæt i

topmenuen • Vælg Sidehoved og

Sidefod • Indsæt dato og dok. nr. i

feltet Fast • Indsæt evt. titel/

beskrivelse i Sidefod • Vælg Anvend på alle

eller Anvend hvis det kun skal være på et enkelt slide

Grid connection of near shore wind farms methods, preconditions and results

Rene Starup

5. Marts 2015 1

Page 2: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Topics

• Methods

• Preconditions

• Technical and socio-economic analysis

5. Marts 2015 2

Page 3: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd om billeder: Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation Brug billeder i den rigtige opløsning (fx 96dpi til PowerPoint) Brug hellere ét godt billede end mange. Brug evt. billeder til opdeling af din præsentation, når du går fra et emne til et andet.

5. Marts 2015 3

60, 150 and 400 kV POC: 33 or 60 kV

50, 132 and 400 kV POC: 33 or 50 kV

60 kV POC: 33 or 60 kV

Page 4: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Methods

• Standard concepts

• Grid analysis

• Construction costs

• Calculation of grid losses

• Estimated costs for operation and maintenance

• Allocation of costs

5. Marts 2015 4

Page 5: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Standard concepts

Analysis of the optimal connection method onshore is based on

four general standard concepts that covers different voltage

levels and principles.

The four standard concepts are assessed socio-economically

and technically for all possible combinations of the size of wind

farms (50, 100, 150 and 200 MW) and geographical location.

5. Marts 2015 5

Concept 1 Concept 2 Concept 3 Concept 4

Description New onshore XX/33 kV substation close to coast

33 kV export cables connected to existing substation

50-60 kV export cables connected to existing 50-60 kV substation

Connection point

132-150 kV (SC 1a) or 50-60 kV (SC 1b)

132-150 kV (SC 2)

50-60 kV (SC 3)

50-60 kV (SC 4)

Export cables 33 kV 33 kV 33 kV 50-60 kV

Page 6: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Grid analysis

The necessary development of the 132-150 kV grid is

determined by load flow calculations stage 2020, and the

analysis is based on the analysis assumptions of Energinet.dk

from 2013.

The results of the load flow analysis has been used as inputs to

the EIA for each location.

The analysis contains wind farms at 200 MW in all areas except

the location at Bornholm that due to the ampacity in the

submarine cable between Sweden and Bornholm is reduced to

50 MW.

5. Marts 2015 6

Page 7: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

The CAPEX on shore are generally based on standard unit

prices.

For components in the 132 kV, 150 kV and 400 kV grid the

costs are based on previously completed projects while the

costs of components in the 33 kV, 50 kV and 60 kV grid are

based partly on the dialogue with the grid companies and

based partly on prices from reinforcements due to connection

of wind farms on shore.

5. Marts 2015 7

Page 8: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Calculation of grid losses

The calculation and estimation of the grid losses due to the

near shore wind farms are based on a historical production

profile from other offshore wind farms.

These profiles from existing offshore wind farms are used:

• “Horns Rev 2” profile is used to “Vesterhav Syd” and

“Vesterhav Nord”

• “Anholt” profile is used to “Sæby” and “Sejerø Bugt”

• “Rødsand 2” profile is used to “Smålandsfarvandet” and

“Bornholm”

The profiles has been selected from mid 2013 to mid 2014.

5. Marts 2015 8

Page 9: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd om billeder: Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation Brug billeder i den rigtige opløsning (fx 96dpi til PowerPoint) Brug hellere ét godt billede end mange. Brug evt. billeder til opdeling af din præsentation, når du går fra et emne til et andet.

5. Marts 2015 9

Page 10: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Calculation of grid losses

The capitalized grid losses from the 33 kV or the 60 kV export

cables are included in the total cost of connectivity.

The grid losses are included from the edge of the wind farms in

the park corridor and up to the point of connection (POC) on

shore.

The internal grid losses in the inter-array cables are not

included because the layout of the wind farms and the internal

cross sections of the inter-array cables are not known at this

time.

5. Marts 2015 10

Page 11: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Estimated costs of operation and maintenance

The OPEX in the total project are not known in detail for now,

instead there has been used a fixed percentage of 3 % of the

total CAPEX in each area.

5. Marts 2015 11

Page 12: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Allocation of costs

All the costs at sea, including export cables etc. falls to the

wind farm owner.

In addition, the Danish Energy Association, DEA has presented

a proposal for a breakdown of costs onshore from the coastal

line to the POC, which means that CAPEX belonging to the

export cables onshore and any distribution system or

switchgears between the wind farm and the POC also falls to

the wind farm owner including the associated OPEX.

The grid losses due to the wind farm until the POC shall be

included in the OPEX and falls to the wind farm owner.

5. Marts 2015 12

Page 13: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Allocation of costs

Example of breakdown of costs:

5. Marts 2015 13

Wind farm owner TSO/DSO

• Export cables • Switchgear and building • Acquisition of building plot • OPEX including grid losses

• Transformer • Switchgear and building • Land cable • OPEX including grid losses

Point of connection (POC)

Page 14: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Preconditions

• Dimensioning criteria

• Economical preconditions

• Export cables

• 33 kV substation onshore

• Construction costs

5. Marts 2015 14

Page 15: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Dimensioning criteria

When integrating renewable energy in the grid above 100 kV,

the grid is not designed to be n-1 secure i.e. failure of a single

component can disconnect the wind farm.

When a substation above 100 kV is connected with more than

one overhead line or underground cable to other substations, it

is the aim in a n-1 situation that the wind farm can produce at

full speed in 40 hours.

5. Marts 2015 15

Page 16: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Economical preconditions

• Year of interest: 2020

• Real rate of interest: 4 %

• Time horizon: 25 years for the wind farm and

40 years for reinforcements

onshore

The capitalized grid losses is calculated for the time horizon.

The costs is calculated in fixed 2014 prices.

5. Marts 2015 16

Page 17: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Export cables

Cross sections on export cables and inter-array cables should

be chosen from a loss economical condition, that means the

ampacity and the number of export cables are expected to

vary from area to area.

It is not expected that more than a maximum of six export

cables is necessary to connect a 200 MW wind farm.

It is assumed that the supply of a wind turbine is either 33 kV

or 50 to 60 kV. 33 kV is standard while 50-60 kV is not that

widespread yet.

5. Marts 2015 17

Page 18: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Export cables

To calculate the number of 33 kV export cables there’s

assumed an ampacity of approximately 36 MW each cable,

while the assumed ampacity of a 60 kV cable is approximately

75 MW. At the 50 kV level the expected ampacity is

approximately 58 MW each cable.

The wind turbines must be able to deliver and consume

reactive power corresponding to power factor 0,95.

To calculate the costs onshore the export cables have been

based on a 630 mm2 Al-PEX buried in a close trifoil formation

in its own trench.

The EIA is based on 3,5 meters between the trenches (C-C).

5. Marts 2015 18

Page 19: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

33 kV substation onshore It is assumed the wind farm is connected in the POC through a

33 kV circuit-breaker switchgear (gas insulated switchgear) if

the voltage of the export cables is 33 kV.

The switchgear in the calculation of costs is based on a single-

busbar with circuit-breakers towards the export cables and

transformer, and a bus-sectionalizer to split up the busbar

when the wind farm is larger than 100 MW.

5. Marts 2015 19

Switchgear Ir [kA] Pr [MW]

Busbar 4,00 217

CB – Export cables 1,25 67

CB – Transformer 2,50 135

CB – bus-sectionalizer 2,50 135

Page 20: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 1:

• New substation in the areas marked in the EIA either 132-

150 kV or 50-60 kV with the necessary XX/33 kV

transformer

• 33 kV export cables from shore to POC in the new substation

• 33 kV switchgear in its own building

• Connection from existing grid (50, 60, 132 or 150 kV

underground cable)

• Acquisition of building plot

• NPV of reinforcements in the transmission grid

• SC 1 is not applicable on “Bornholm”

5. Marts 2015 20

Page 21: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs – SC1a and SC1b

5. Marts 2015 21

Page 22: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 2:

• 33 kV export cables from shore to POC

• POC is in existing 132-150 kV substations or where

permission is granted to build a new substation in the areas

marked in the EIA

• 33 kV switchgear in its own building

• New 132-150/33 kV transformer connected to the existing

substation

• NPV of reinforcements in the transmission grid

• SC 2 is not applicable on “Sejerø Bugt”

5. Marts 2015 22

Page 23: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs – SC2 and SC3

5. Marts 2015 23

Skalering 185 %

Eksisterende station (eksempel)

Udendørsxxx/ 33 kV trf.

Separat GIS bygning

Stationsudvidelse

Strandkant

33 kV kabler til vindmøller

Page 24: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd om billeder: Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation Brug billeder i den rigtige opløsning (fx 96dpi til PowerPoint) Brug hellere ét godt billede end mange. Brug evt. billeder til opdeling af din præsentation, når du går fra et emne til et andet.

5. Marts 2015 24 Photo of offshore wind farm Samsø, by Sweco Architects A/S

Page 25: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 3:

• 33 kV export cables from shore to POC

• POC is in existing 50-60 kV substation located on a 132-150

kV substation or where permission is granted to build a new

substation in the areas marked in the EIA

• 33 kV switchgear in its own building

• One or two 50-60/33 kV transformers connected to the

existing substation

• NPV of reinforcements in the transmission grid

5. Marts 2015 25

Page 26: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 3:

• SC 3 is based on connecting 50 MW up to 100 MW in

“Vesterhav Syd”, “Vesterhav Nord” and “Sæby” while only 50

MW is connected in “Sejerø Bugt” and “Bornholm”

• SC 3 is not applicable on “Smålandsfarvandet” due to space

limitations near the 50 kV substation

5. Marts 2015 26

Page 27: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 4:

• 50-60 kV export cables from shore to POC

• POC is in existing 50-60 kV substation located on a 132-150

kV substation or where permission is granted to build a new

substation in the areas marked in the EIA

• Connection of the export cables in the existing substation

• NPV of reinforcements in the transmission grid

5. Marts 2015 27

Page 28: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Construction costs

Standard concept 4:

• SC 4 is based on connecting 50 MW up to 100 MW in

“Vesterhav Syd”, “Vesterhav Nord”, “Sæby” and “Sejerø

Bugt” while only 50 MW is connected on “Bornholm”

• It is only possible to connect “Smålandsfarvandet” to one 50

kV circuit-breaker in the nearby substation

5. Marts 2015 28

Page 29: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Technical and socio-economic analysis

• Vesterhav Syd

• Vesterhav Nord

• Sæby

• Sejerø Bugt

• Smålandsfarvandet

• Bornholm

5. Marts 2015 29

Page 30: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Vælg en kort og enkel overskrift. En kombination af tekst og billeder/diagrammer eller faktabokse gør præsentationen mere dynamisk. Brug de foruddefinerede Energinet.dk farver i stedet for standardfarver. Undgå for mange effekter. Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation

Vesterhav Syd

5. Marts 2015 30

Page 31: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Vesterhav Syd

• POC in “Holmsland” or “Tyvmose” is no longer an option due

to the Danish Nature Agency that has prohibited new

substations of any kind in that area

• The nearest POC is “Søndervig” (7,3/9,8 km from shore)

• Large investments in the 150 kV grid

5. Marts 2015 31

50 MW M. DKK

100 MW M. DKK

150 MW M. DKK

200 MW M. DKK

SC 1a 125 209 258 283

SC 1b 78 194

SC 2 116 240 367 431

SC 3 110 240

SC 4 56 160

Page 32: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Vælg en kort og enkel overskrift. En kombination af tekst og billeder/diagrammer eller faktabokse gør præsentationen mere dynamisk. Brug de foruddefinerede Energinet.dk farver i stedet for standardfarver. Undgå for mange effekter. Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation

Vesterhav Nord

5. Marts 2015 32

Page 33: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Vesterhav Nord

• POC is either “Ferring”, “Vejlby” or “Lomborg”

• “Ferring” is the socio-economic choice

• Large investments in the 150 kV grid

5. Marts 2015 33

50 MW M. DKK

100 MW M. DKK

150 MW M. DKK

200 MW M. DKK

SC 1a 148 163 195 206

SC 1b 111 151

SC 2 120 167 234 268

SC 3 126 181

SC 4 96 127

Page 34: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Sæby

5. Marts 2015 34

Page 35: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Sæby

• POC is either “Solsbæk”, “Dybvad”, “Haldbjerg”, or

“Starbakke”

• “Solsbæk” is the socio-economic choice

• No further investments in the 150 kV grid

5. Marts 2015 35

50 MW M. DKK

100 MW M. DKK

150 MW M. DKK

200 MW M. DKK

SC 1a 94 108 126 137

SC 1b 43 79

SC 2 66 110 173 205

SC 3 58 107

SC 4 28 55

Page 36: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Sejerø Bugt

5. Marts 2015 36

Page 37: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Sejerø Bugt

• POC is either “Ågerup” or “Røsnæs”

• “Røsnæs” is the socio-economic choice up to 100 MW while

“Ågerup” is the choice above 100 MW

• No further investments in the 132 kV grid

5. Marts 2015 37

50 MW M. DKK

100 MW M. DKK

150 MW M. DKK

200 MW M. DKK

SC 1a 114 136 173 187

SC 1b

SC 2

SC 3 44

SC 4 39

Page 38: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Vælg en kort og enkel overskrift. En kombination af tekst og billeder/diagrammer eller faktabokse gør præsentationen mere dynamisk. Brug de foruddefinerede Energinet.dk farver i stedet for standardfarver. Undgå for mange effekter. Du kan finde billeder og grafiske elementer i Energinet.dk’s billeddatabase (Cumulus) på InSite under Værktøjer – Kommunikation

Smålandsfarvandet

5. Marts 2015 38

Page 39: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Smålandsfarvandet

• POC is either “Klintevej” or “Stigsnæsværket”

• “Klintevej” is the socio-economic choice

• No further investments in the 132 kV grid

5. Marts 2015 39

50 MW M. DKK

100 MW M. DKK

150 MW M. DKK

200 MW M. DKK

SC 1a 63 82 105 129

SC 1b 34 61

SC 2 37 59 91 118

SC 3

SC 4 15 27

Page 40: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Bornholm

• POC is “Rønne Syd”

• No further investments

in the 60 kV grid

5. Marts 2015 40

50 MW M. DKK

SC 3 25

SC 4 8

Page 41: Grid connection of near shore wind Kommunikation farms · cables are included in the total cost of connectivity. The grid losses are included from the edge of the wind farms in the

Gode råd: Modtageren vil høre din præsentation, ikke læse slides. Brug notefeltet som hjælp til at huske, hvad du vil sige. Har du behov for, at modtageren skal huske vigtig information, så lav faktaark og del ud.

Questions?

5. Marts 2015 41