SN Section A - Highlights of Power Sector Page1 Electricity Generation for Dec. 2014 & during April, 14 to Dec. 2014 12 Generating Capacity Addition for Dec. 2014 & during April, 14 to Dec. 2014 23 List of Projects Commissioned in Dec. 2014 34 All India Installed Capacity (MW) Region-wise as on 31.12.2014 35 All India Installed Capacity (MW) Sector-wise as on 31.12.2014 46 Transmission Lines Added during Dec. 2014 and April, 14 to Dec. 14 57 Transformation Capacity Addition During Dec. 2014 and April, 14 to Dec. 14 68 Power Supply Position (Demand & Availabilty) in Dec. 2014 79 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Dec. 14 and for the last One Year 1011 T & D and AT & C Losses (%)12 All India Village Electrification & Pumpsets Energisation13 Average cost of Power & Average Realisation14 All India per Capita Consumption of Electricity KWh15 All India Coal consumption for Power Generation
1 Capacity Addition Targets and Achievements in 12th Plan 122 Capacity Addition Targets & Achievements during Dec. 2014 and April, 2014 to Dec. 2014 133 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Dec. 2014 and April, 2014 to Dec. 2014
2 List of Transmission lines commissioned/Ready for commissioning in Dec 2014
1 Programme and Achievements of Sub-Stations in Dec 2014 and during April, 2014 to Dec. 2014
2 List of Sub Stations commissioned/Ready for commissioning in Dec. 2014
1 Electricity Generation Targets and Achievements for 2014-15 22
1 Power Supply Position (Provisional) for Dec. 14 232 Peak Demand and Peak Met (Provisional) for Dec. 14 243 Power Supply Position (Revised) for November, 2014 . 254 Peak Demand and Peak Met (Revised) for November, 2014 265 Notified Power cuts / Restrictions on Industries during Dec. 2014 276 Power Supply to Agricultural Sector during Dec2014 28
1 Growth of Installed Capacity since 6th Plan 292 Growth of Transmission Sector since 6th Plan 303 All India Yearly Coal consumption for Power Generation (Utilities)4 All India Annual Per Capita Consumption of Electricity since 20065 Average cost of power supply & Average realisation (Paisa/kwh)6 Growth of Rural Electrification & Pump Sets Energisation7 Status of Hydro Schemes Cleared by the CEA during April, 14 to Dec. 14
1 Rate of sale of power for the year 2012-2013 33-41
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
Section H - Rate of sale of power for the year 2012-2013
Executive Summary for the Month of December 2014
32
11
20
21
-
SN Contents Page1 Electricity Generation for Dec. 2014 & during April '14 to Dec. 2014 12 Generating Capacity Addition for Dec. 2014 & during April '14 to Dec. 2014 23 List of Projects Commissioned in Dec. 2014 34 All India Installed Capacity (MW) Region-wise as on 31.12.2014 35 All India Installed Capacity (MW) Sector-wise as on 31.12.2014 46 Transmission Lines Added during Dec. '14 and April '14 to Dec. '14 57 Transformation Capacity Addition During Dec. '14 and April '14 to Dec. '14 68 Power Supply Position (Demand & Availabilty) in Dec. 2014 79 Peak Shortage of Power Supply (MW) in Different Regions 8-910 All India PLF Sector-wise for Dec. 14 and for the last One Year 1011 T & D and AT & C Losses (%)12 All India Village Electrification & Pumpsets Energisation13 Average cost of Power & Average Realisation14 All India per Capita Consumption of Electricity KWh15 All India Coal consumption for Power Generation
Section A - Highlights of Power Sector
11
-
AchievementDec-14
Thermal 76.137 6.35Hydro 7.094 -12.78Nuclear 2.596 -15.69Bhutan Import 0.168 17.48All India 85.995 3.68
TypeThermalHydroNuclearBhutan ImportAll India
1
1. Electricity Generation for Dec. 2014 (BU)
All India Electricity Generation for Dec. 2014
Electricity Generation During April to Dec. 2014 (BU)
8.133 7.31171.591
Dec-14
0.21
Type Achievement
75.639
% Change w.r.t.
2013
82.946 86.324
3.1640.143
Dec-13
106.736
9.92793.725722.1105.435
-3.64
Targets
3.079
April'13 - Dec '13 Apr '14 - Dec '14
110.76325.107
% Change
All India Electricity Generation During April '13 to Dec '13 & April '14 to Dec '14
657.055
25.037
13.13
4.897 -9.90-0.28
580.805
82.946
85.995
81.000
82.000
83.000
84.000
85.000
86.000
87.000
BU
Dec. '13" Dec '14"
722.110
793.725
680.000
700.000
720.000
740.000
760.000
780.000
800.000
BU
Apr '13 to Dec '13 Apr '14 to Dec '14
-
Achievement Targets AchievementDec-13
Thermal 1765 1460 600 -66Hydro 0 25 68.67 NANuclear 0 0 0 NAAll India 1765 1485 668.67 -62
Apr.'13-Dec.'13 Apr.'14- Dec.'14 % ChangeThermal 8326 10274.4 23Hydro 402 336.01 -16Nuclear 0 0 NAAll India 8728 10610.41 22
2
2. Generating Capacity Addition for Dec. 2014 (MW)
Generating Capacity Addition during April '13 to Dec '13 & April '14 to Dec '14 (MW)
% Change w.r.t. 2013Type Dec-14
1765
668.67
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1Dec.'13 Dec.'14
8728
10610.41
0
2000
4000
6000
8000
10000
12000
1Apr '13 to Dec '13 Apr '14 to Dec '14
-
(i) Thermal
(ii) Hydro
(iii)
Region Nuclear Hydro RES Grand TotalCoal Gas Diesel Total
Northern 39431.00 5331.26 12.99 44775.25 1620.00 16666.78 5935.77 68997.80Western 60169.51 10915.41 17.48 71102.40 1840.00 7447.50 11271.07 91660.97Southern 27982.50 4962.78 939.32 33884.60 1320.00 11398.03 13784.67 60387.30Eastern 26527.88 190.00 17.20 26735.08 0.00 4113.12 432.86 31281.06North-East 60.00 1571.80 142.74 1774.54 0.00 1242.00 256.67 3273.21Islands 0.00 0.00 70.02 70.02 0.00 0.00 11.10 81.12ALL INDIA 154170.89 22971.25 1199.75 178341.89 4780.00 40867.43 31692.14 255681.46
3
1. Mutiara , TPP , Unit-I (600 MW) in TN commissioned on Full Load on 02.12.2014 by Coastal Energen
3. List of Projects Commissioned During December 2014
1. Rampur , HEP, Unit-VI (68.67 MW) in HP commissioned on Full Load on 04.12.2014 by SJVNL
NuclearNil
Note: Captive Genaration is not included in the total
THERMAL4. All India Installed Capacity (MW) as on 31-12-2014 Region -wise
178341.89
4780.00
40867.43 31692.14
255681.46
40726
0.00
50000.00
100000.00
150000.00
200000.00
250000.00
300000.00
Thermal Nuclear Hydro RES Total Captive
Total 255681.46 MW
Thermal Nuclear Hydro RES Total Captive
-
SectorCoal Gas Diesel Total
Central 46525.01 7428.83 0.00 53953.84 4780.00 10691.43 0.00 69425.27State 55890.50 6974.42 602.61 63467.53 0.00 27482.00 3803.67 94753.20Private 51755.38 8568.00 597.14 60920.52 0.00 2694.00 27888.47 91502.99All India 154170.89 22971.25 1199.75 178341.89 4780.00 40867.43 31692.14 255681.46
Central 69425.27State 94753.20Private 91502.99
4
Grand TotalTHERMAL
Nuclear Hydro RES
5. All India Installed Capacity (MW) as on 31-12-2014 (Sector-wise)
Central, 69425.27, 27%
State, 94753.20, 37%
Private, 91502.99, 36%
All India Installed Capacity(MW) as on 31-12-2014 (Sector-Wise)
CentralStatePrivate
-
Voltage Level+/- 500 KV HVDC765 KV400 KV220 KVAll India
Voltage Level+/- 500 KV HVDC765 KV400 KV220 KVAll India
5
Dec. 20130
Apr '14 - Dec '140
6671171
0312
6. Transmission Lines Added during Dec 2014 (ckms)
2975
352664
3572195
2216
Transmission Lines Added during April 13 to Dec.13 & April 14 to Dec. 14 (ckms)
Dec. 20140
9815
0Apr '13 - Dec '13
519670853068
15349
4624
9815
15349
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
ckm
s
April'13 to Dec '13 April'14 to Dec '14
2195
664
0
500
1000
1500
2000
2500
1
ckm
Dec-13 Dec-14
-
Voltage Level+/- 500 KV HVDC765 KV400 KV220 KVAll India
Voltage Level+/- 500 KV HVDC765 KV400 KV220 KVAll India
6
All India Transformation Capacity Addition during April' 13 to Dec '13 & April' 14 to Dec '14
41799
020500127908509
28515
1750043356680
0
Dec'13 Dec'14
April' 13 to Dec '13 April '14 to Dec '14
2335
00
500450
7. Transformation Capacity Addition during Dec '2014 (MVA)
950
01500315520
2335
950
0
500
1000
1500
2000
2500
MVA
Transformation Capacity Addition during Dec. 2014
Dec. '13 Dec. '14
28515
41799
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
1
MVA
April '13 to Dec'13 April '14 to Dec'14
-
Dec.13 Dec.14 Dec.13 Dec.14 Dec.13 Dec.14Northern 24889 26494 23151 24802 -7.0 -6.4Western 25765 26859 25434 26782 -1.3 -0.3Southern 22697 22891 21731 22261 -4.3 -2.8Eastern 8189 9411 8066 9241 -1.5 -1.8North Eastern 1060 1205 991 1012 -6.5 -16.0All India 82600 86860 79373 84098 -3.9 -3.2
Dec.13 Dec.14 Dec.13 Dec.14 Dec.13 Dec.14
Northern 39097 42746 36717 40469 -6.1 -5.3
Western 41335 43223 40304 43041 -2.5 -0.4
Southern 35133 35668 33541 34137 -4.5 -4.3
Eastern 13697 15382 13501 15123 -1.4 -1.7
North Eastern 2009 2460 1890 2170 -5.9 -11.8
All India 131271 139479 125953 134940 -4.1 -3.3
7
Peak Demand / Peak Met in Dec. 2014
8. Power Supply Position (Demand & Availability) in Dec. 2014
PEAK Demand Peak Met
Demand Availability
Energy (MU)Region Deficit (%)
Deficit (%)RegionPower (MW)
-
Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP UtrakhandNov.13 0 4 0 102 493 0 32 270 75Nov.14 0 0 0 20 511 0 0 1660 0
Chatisgarh Gujarat MP MaharashtraDaman & DiuDadar Nagar Haveli GoaNov.13 373 0 0 846 25 0 2Nov.14 99 0 38 166 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 'Nov.13 277 0 860 193 1000 6 0
14-Nov 67 239 410 117 952 2 0
8
9. Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 20
511
0 0
1660
00 4 0 102
493
0 32
270
75
0
400
800
1200
1600
2000C
hand
igar
h
Del
hi
Har
yana HP
J&K
Punj
ab
Raj
asth
an UP
Utra
khan
d
MW
Northern States (MW)Dec' 14 Dec' 13
99
0 38
166
0 0 2
373
0 0
846
25 0 2
0100200300400500600700800900
Cha
tisga
rh
Guj
arat MP
Mah
aras
htra
Dam
an &
Diu
Dad
ar N
agar
Hav
eli G
oa
MW
Western States (MW) Dec' 14 Dec' 13
67
239 41
0
117
952
2 0
277
0
860
193
1000
6
0
1000
2000
AP
Tele
ngan
a
Karn
atak
a
Kera
la
Tam
il N
adu
Pudu
cher
ry
Laks
hyad
eep
MW
Southern States (MW) Dec' 14 Dec' '13
-
Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N IslandNov.13 150 10 10 10 30 0 8
14-Nov 200 80 18 30 15 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland TripuraNov '13 1 88 1 0 1 1 3Nov.14 8 246 1 3 4 2 40
9
200
80
18 30
15
0 8
150
10 10 10
30
0 8
0
50
100
150
200
250
Biha
r
DVC
Jhar
khan
d
Odi
sha
Wes
tBe
ngal
Sikk
im
A&N
Isla
nd
MW
Eastern States (MW) Dec' 14 Dec' 13
8
246
1 3 4 2
40
1
88
1 0 1 1 3
0
50
100
150
200
250
300
Arun
acha
l
Assa
m
Man
ipur
Meg
hala
ya
Miz
oram
Nag
alan
d
Trip
ura
MW
North-Eastern States (MW) Dec' 14 Dec' 13
-
Sector Dec '13 Dec '14Central 80.67 74.42State 62.75 60.71Private 63.61 63.87ALL INDIA 68.99 65.83
Month 2013-14 2014-15April 69.97 69.38May 71.55 68.15June 63.40 68.01July 60.86 64.87August 55.85 60.83September 64.6 60.86October 61.68 65.93November 65.62 66.77December 68.99 65.83January 69.82February 68.44March 66.58
* For Coal and Lignite based Power Plants
10
%PLF
All India PLF Month-wise
10. All India Plant Load Factor* Sector-wise for Dec '13 and Dec '14
80.6
7
62.7
5
63.6
1
68.9
9
74.4
2
60.7
1
63.8
7
65.8
3
020406080
100
Central State Private ALL INDIA
% P
LF
Sector-Wise Plant Load Factor for December 2013 and December 2014
Dec '13 Dec '14
69.9
7
71.5
5
63.4
0
60.8
6
55.8
5
64.6
61.6
8
65.6
2
68.9
9
69.8
2
68.4
4
66.5
8
69.3
8
68.1
5
68.0
1
64.8
7
60.8
3
60.8
6
65.9
3
66.7
7
65.8
3
0
20
40
60
80
April
May
June July
Augu
st
Sept
embe
r
Oct
ober
Nov
embe
r
Dec
embe
r
Janu
ary
Febr
uary
Mar
chAll India PLF Month-wise
2013-14 2014-15
-
2010-11 2011-12 2012-13T&D Losses 23.97 23.65 23.04 (P)
AT&C Losses 26.04 27 25.38 (P)
Note: As per PFC for utilities selling directly to consumers P: Provisional
Total Number of Villages
597464Pump sets Energised as on
31-03-201419118034
Note: From the year 2004-05 onwards Definition of Village Electrification:-A village would be declared Electrified if
Including Agriculture
Only Agriculture
2010-11 301 115.12Source:- PFC Reports on the performance of State Power Utilities
2012-13 914.41
# (Gross Generation+Net Import) / Mid Year Population,
2013-14 489.4
11
Pump sets Energised as on 30-11-2014
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained.
ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and
Villiages Electrified (Nos.) as on 30-11-2014
572586
% Villages electrified
cost of supply (paise/unit)Year
11. T& D and AT &C Losses (%)
12. All India Village Electrification & Pumpsets Energised as on 30-11-2014
13. Average cost of Power & Average Realisation
95.84
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer mat not be necessary)
15. All India Coal consumption for Power Generation (Million Tonnes)
378
14. All India per capita consumption of Electricity( KWh) #
Realization(paise/unit)
iii) The number of households electrified should be at least 10% of the total number of households in the village
19173303
-
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets & Achievements during Dec.2014 and April 2014 to Dec. 2014 13
3 Installed Capacity in various Regions including their shares. 14-19
Section B - Capacity Addition
-
(i) Targets(MW)
Type/Sector Central State Private TotalThermal 14,878.00 13,922.00 43,540.00 72,340.00Hydro 6,004.00 1,608.00 3,285.00 10,897.00Nuclear 5,300.00 0.00 0.00 5,300.00Total 26,182.00 15,530.00 46,825.00 88,537.00
(ii) Achievements upto December 2014 during the 12th Plan (MW)
Type/Sector Central State Private TotalThermal 7,646.60 9,909.10 29,607.50 47,163.20Hydro 1,624.02 102.00 169.00 1,895.02Nuclear 0.00 0.00 0.00 0.00Total 9,270.62 10,011.10 29,776.50 49,058.22Acievement % 35.41 64.46 63.59 55.41
1. Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Dec '2014
72,3
40.0
0
10,8
97.0
0
5,30
0.00
47,1
63.2
0
1,89
5.02
0
0.0010,000.0020,000.0030,000.0040,000.0050,000.0060,000.0070,000.0080,000.0090,000.00
Thermal Hydro Nuclear
12th Plan Target 88,537 MW, Achieved so far 49058.22 MW
Target Achievement
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 135.00 2050.40 0.00 2185.40 0.00 0.00 0.00 2185.40Private 371.25 108.00 0.00 479.25 0.00 0.00 21.14 500.39Central 4421.37 207.61 0.00 4628.98 122.08 762.64 0.00 5513.70Sub-Total 4927.62 2366.01 0.00 7293.63 122.08 762.64 21.14 8199.49State 3160.00 25.00 3.92 3188.92 0.00 884.51 70.10 4143.53Private 2091.25 0.00 0.00 2091.25 0.00 0.00 55.60 2146.85Central 1202.03 535.29 0.00 1737.32 109.16 531.63 0.00 2378.11Sub-Total 6453.28 560.29 3.92 7017.49 109.16 1416.14 125.70 8668.49State 0.00 0.00 0.13 0.13 0.00 393.60 638.91 1032.64Private 0.00 0.00 0.00 0.00 0.00 1748.00 0.00 1748.00Central 152.02 61.88 0.00 213.90 34.08 1064.94 0.00 1312.92Sub-Total 152.02 61.88 0.13 214.03 34.08 3206.54 638.91 4093.56State 0.00 175.00 8.94 183.94 0.00 780.00 147.53 1111.47Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 329.32 129.14 0.00 458.46 77.00 955.45 0.00 1490.91Sub-Total 329.32 304.14 8.94 642.40 77.00 1735.45 147.53 2602.38State 2630.00 25.00 0.00 2655.00 0.00 2230.23 156.20 5041.43Private 3055.00 0.00 0.00 3055.00 0.00 0.00 166.60 3221.60Central 660.88 263.92 0.00 924.80 208.04 859.85 0.00 1992.69Sub-Total 6345.88 288.92 0.00 6634.80 208.04 3090.08 322.80 10255.72State 4590.00 603.80 0.00 5193.80 0.00 987.96 23.85 6205.61Private 3130.00 0.00 0.00 3130.00 0.00 0.00 3616.30 6746.30Central 1014.72 221.23 0.00 1235.95 573.00 655.73 0.00 2464.68Sub-Total 8734.72 825.03 0.00 9559.75 573.00 1643.69 3640.15 15416.59State 4923.00 0.00 0.00 4923.00 0.00 524.10 25.10 5472.20Private 3262.50 0.00 0.00 3262.50 0.00 0.00 802.58 4065.08Central 2909.95 549.97 0.00 3459.92 335.72 1509.45 0.00 5305.09Sub-Total 11095.45 549.97 0.00 11645.42 335.72 2033.55 827.68 14842.37State 0.00 0.00 0.00 0.00 0.00 1252.15 174.81 1426.96Private 82.50 0.00 0.00 82.50 0.00 400.00 35.05 517.55Central 300.50 69.35 0.00 369.85 22.28 421.44 0.00 813.57Sub-Total 383.00 69.35 0.00 452.35 22.28 2073.59 209.86 2758.08State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00Central 32.54 15.32 0.00 47.86 8.84 56.40 0.00 113.10
Sub-Total 32.54 15.32 0.00 47.86 8.84 56.40 2.00 115.10977.19 290.35 0.00 1267.54 129.80 648.70 0.00 2046.04
State 15438.00 2879.20 12.99 18330.19 0.00 7052.55 1236.50 26619.24Private 11992.50 108.00 0.00 12100.50 0.00 2148.00 4699.27 18947.77Central 12000.50 2344.06 0.00 14344.56 1620.00 7466.23 0.00 23430.79
Grand Total 39431.00 5331.26 12.99 44775.25 1620.00 16666.78 5935.77 68997.80
Total (Northern Region)
Punjab
Rajasthan
Uttar Pradesh
Uttrakhnad
Chandigarh
Central - Unallocated
Hydro (Renewable)
RES (MNRE)
Delhi
Haryana
Himachal Pradesh
Jammu & Kashmir
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05Private 0.00 48.00 0.00 48.00 0.00 0.00 0.00 48.00Central 326.17 0.00 0.00 326.17 25.80 0.00 0.00 351.97Sub-Total 326.17 48.00 0.00 374.17 25.80 0.00 0.05 400.02
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 36.71 4.20 0.00 40.91 7.38 0.00 0.00 48.29Sub-Total 36.71 4.20 0.00 40.91 7.38 0.00 0.00 48.29
Gujarat State * 4470.00 2321.82 17.28 6809.10 0.00 772.00 15.60 7596.70Private 8620.00 4160.00 0.20 12780.20 0.00 0.00 4414.60 17194.80Central 2648.27 424.27 0.00 3072.54 559.32 0.00 0.00 3631.86Sub-Total 15738.27 6906.09 17.48 22661.84 559.32 772.00 4430.20 28423.36
State 4320.00 0.00 0.00 4320.00 0.00 1703.66 86.16 6109.82Private 3042.50 0.00 0.00 3042.50 0.00 0.00 800.47 3842.97Central 2256.39 257.18 0.00 2513.57 273.24 1520.00 0.00 4306.81Sub-Total 9618.89 257.18 0.00 9876.07 273.24 3223.66 886.63 14259.60
State 2780.00 0.00 0.00 2780.00 0.00 120.00 52.00 2952.00Private 5813.00 0.00 0.00 5813.00 0.00 0.00 272.00 6085.00Central 1490.49 0.00 0.00 1490.49 47.52 0.00 0.00 1538.01Sub-Total 10083.49 0.00 0.00 10083.49 47.52 120.00 324.00 10575.01State 8400.00 672.00 0.00 9072.00 0.00 2884.84 327.43 12284.27Private 10986.00 180.00 0.00 11166.00 0.00 447.00 5302.76 16915.76Central 3313.27 2623.93 0.00 5937.20 690.14 0.00 0.00 6627.34Sub-Total 22699.27 3475.93 0.00 26175.20 690.14 3331.84 5630.19 35827.37State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93Sub-Total 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93
1622.35 196.91 0.00 1819.26 228.14 0.00 0.00 2047.40State 19970.00 2993.82 17.28 22981.10 0.00 5480.50 481.24 28942.84Private 28461.50 4388.00 0.20 32849.70 0.00 447.00 10789.83 44086.53Central 11738.01 3533.59 0.00 15271.60 1840.00 1520.00 0.00 18631.60Grand Total 60169.51 10915.41 17.48 71102.40 1840.00 7447.50 11271.07 91660.97
Central - Unallocated
Total (Western Region)
Goa
Daman & Diu
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra & Nagar Naveli
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 5892.50 0.00 0.00 5892.50 0.00 3734.53 221.03 9848.06Private 750.00 3370.40 36.80 4157.20 0.00 0.00 1309.45 5466.65Central 2940.58 0.00 0.00 2940.58 275.78 0.00 0.00 3216.36Sub-Total 9583.08 3370.40 36.80 12990.28 275.78 3734.53 1530.48 18531.07
State 2720.00 0.00 127.92 2847.92 0.00 3599.80 1031.66 7479.38Private 2060.00 0.00 106.50 2166.50 0.00 0.00 2953.48 5119.98Central 1415.56 0.00 0.00 1415.56 254.86 0.00 0.00 1670.42Sub-Total 6195.56 0.00 234.42 6429.98 254.86 3599.80 3985.13 14269.77
State 0.00 0.00 234.60 234.60 0.00 1881.50 158.42 2274.52Private 0.00 174.00 21.84 195.84 0.00 0.00 35.23 231.07Central 931.19 359.58 0.00 1290.77 95.60 0.00 0.00 1386.37Sub-Total 931.19 533.58 256.44 1721.21 95.60 1881.50 193.65 3891.96
State 4770.00 523.20 0.00 5293.20 0.00 2182.20 123.05 7598.45Private 1150.00 503.10 411.66 2064.76 0.00 0.00 7952.33 10017.09Central 3653.10 0.00 0.00 3653.10 524.00 0.00 0.00 4177.10Sub-Total 9573.10 1026.30 411.66 11011.06 524.00 2182.20 8075.38 21792.64
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17Sub-Total 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17
State 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50Private 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03Central 232.32 0.00 0.00 232.32 19.28 0.00 0.00 251.60Sub-Total 232.32 32.50 0.00 264.82 19.28 0.00 0.03 284.13
1367.08 0.00 0.00 1367.08 150.48 0.00 0.00 1517.56State 13382.50 555.70 362.52 14300.72 0.00 11398.03 1534.15 27232.90Private 3960.00 4047.50 576.80 8584.30 0.00 0.00 12250.52 20834.82Central 10640.00 359.58 0.00 10999.58 1320.00 0.00 0.00 12319.58Grand Total 27982.50 4962.78 939.32 33884.60 1320.00 11398.03 13784.67 60387.30
Central - Unallocated
Total (Southern Region)
Andhra Pradesh
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 210.00 0.00 0.00 210.00 0.00 0.00 70.70 280.70Private 0.00 0.00 0.00 0.00 0.00 0.00 43.42 43.42Central 1744.70 0.00 0.00 1744.70 0.00 129.43 0.00 1874.13Sub-Total 1954.70 0.00 0.00 1954.70 0.00 129.43 114.12 2198.25
State 1190.00 0.00 0.00 1190.00 0.00 130.00 4.05 1324.05Private 900.00 0.00 0.00 900.00 0.00 0.00 16.00 916.00Central 268.88 0.00 0.00 268.88 0.00 70.93 0.00 339.81Sub-Total 2358.88 0.00 0.00 2358.88 0.00 200.93 20.05 2579.86
State 5220.00 100.00 12.06 5332.06 0.00 977.00 98.40 6407.46Private 1341.38 0.00 0.14 1341.52 0.00 0.00 33.05 1374.57Central 905.49 0.00 0.00 905.49 0.00 271.30 0.00 1176.79Sub-Total 7466.87 100.00 12.20 7579.07 0.00 1248.30 131.45 8958.82
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 1050.00 0.00 0.00 1050.00 0.00 0.00 0.00 1050.00Central 6105.60 90.00 0.00 6195.60 0.00 193.26 0.00 6388.86Sub-Total 7155.60 90.00 0.00 7245.60 0.00 193.26 0.00 7438.86
State 420.00 0.00 0.00 420.00 0.00 2061.92 64.63 2546.55Private 4050.00 0.00 0.00 4050.00 0.00 0.00 50.50 4100.50Central 1585.06 0.00 0.00 1585.06 0.00 105.01 0.00 1690.07Sub-Total 6055.06 0.00 0.00 6055.06 0.00 2166.93 115.13 8337.12
State 0.00 0.00 5.00 5.00 0.00 0.00 52.11 57.11Private 0.00 0.00 0.00 0.00 0.00 99.00 0.00 99.00Central 82.61 0.00 0.00 82.61 0.00 75.27 0.00 157.88Sub-Total 82.61 0.00 5.00 87.61 0.00 174.27 52.11 313.99
1454.16 0.00 0.00 1454.16 0.00 0.00 0.00 1454.16State 7040.00 100.00 17.06 7157.06 0.00 3168.92 289.89 10615.87Private 7341.38 0.00 0.14 7341.52 0.00 99.00 142.97 7583.49Central 12146.50 90.00 0.00 12236.50 0.00 845.20 0.00 13081.70Grand Total 26527.88 190.00 17.20 26735.08 0.00 4113.12 432.86 31281.06
Sikkim
Central - Unallocated
Total (Eastern Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 60.00 276.20 20.69 356.89 0.00 100.00 34.11 491.00Private 0.00 24.50 0.00 24.50 0.00 0.00 0.00 24.50Central 0.00 417.92 0.00 417.92 0.00 329.72 0.00 747.64Sub-Total 60.00 718.62 20.69 799.31 0.00 429.72 34.11 1263.14State 0.00 0.00 15.88 15.88 0.00 0.00 103.90 119.78Private 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03Central 0.00 43.06 0.00 43.06 0.00 97.57 0.00 140.63Sub-Total 0.00 43.06 15.88 58.94 0.00 97.57 103.93 260.44State 0.00 0.00 2.05 2.05 0.00 282.00 31.03 315.08Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 105.14 0.00 105.14 0.00 74.58 0.00 179.72Sub-Total 0.00 105.14 2.05 107.19 0.00 356.58 31.03 494.80State 0.00 169.50 4.85 174.35 0.00 0.00 16.01 190.36Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 278.42 0.00 278.42 0.00 62.37 0.00 340.79Sub-Total 0.00 447.92 4.85 452.77 0.00 62.37 16.01 531.15State 0.00 0.00 45.41 45.41 0.00 0.00 5.45 50.86Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 67.98 0.00 67.98 0.00 80.98 0.00 148.96Sub-Total 0.00 67.98 45.41 113.39 0.00 80.98 5.45 199.82State 0.00 0.00 2.00 2.00 0.00 0.00 29.67 31.67Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 46.35 0.00 46.35 0.00 53.32 0.00 99.67Sub-Total 0.00 46.35 2.00 48.35 0.00 53.32 29.67 131.34State 0.00 0.00 51.86 51.86 0.00 0.00 36.47 88.33Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 38.29 0.00 38.29 0.00 34.31 0.00 72.60Sub-Total 0.00 38.29 51.86 90.15 0.00 34.31 36.47 160.93
0.00 104.44 0.00 104.44 0.00 127.15 0.00 231.59State 60.00 445.70 142.74 648.44 0.00 382.00 256.64 1287.08Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53Central 0.00 1101.60 0.00 1101.60 0.00 860.00 0.00 1961.60Grand Total 60.00 1571.80 142.74 1774.54 0.00 1242.00 256.67 3273.21
Mizoram
Central - Unallocated
Total (North- Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION
-
(As on 31.12.2014)
Coal Gas Diesel TotalState 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30Private 0.00 0.00 20.00 20.00 0.00 0.00 5.10 25.10Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub-Total 0.00 0.00 60.05 60.05 0.00 0.00 10.35 70.40State 0.00 0.00 9.97 9.97 0.00 0.00 0.00 9.97Private 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.75Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub-Total 0.00 0.00 9.97 9.97 0.00 0.00 0.75 10.72State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27Private 0.00 0.00 20.00 20.00 0.00 0.00 5.85 25.85Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Grand Total 0.00 0.00 70.02 70.02 0.00 0.00 11.10 81.12
RES (MNRE)
Andaman & Nicobar
lakshadweep
Total (Islands)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
-
Coal Gas Diesel TotalState 15438.00 2879.20 12.99 18330.19 0.00 7052.55 1236.50 26619.24Private 11992.50 108.00 0.00 12100.50 0.00 2148.00 4699.27 18947.77Central 12000.50 2344.06 0.00 14344.56 1620.00 7466.23 0.00 23430.79Sub Total 39431.00 5331.26 12.99 44775.25 1620.00 16666.78 5935.77 68997.80State 19970.00 2993.82 17.28 22981.10 0.00 5480.50 481.24 28942.84Private 28461.50 4388.00 0.20 32849.70 0.00 447.00 10789.83 44086.53Central 11738.01 3533.59 0.00 15271.60 1840.00 1520.00 0.00 18631.60Sub Total 60169.51 10915.41 17.48 71102.40 1840.00 7447.50 11271.07 91660.97State 13382.50 555.70 362.52 14300.72 0.00 11398.03 1534.15 27232.90Private 3960.00 4047.50 576.80 8584.30 0.00 0.00 12250.52 20834.82Central 10640.00 359.58 0.00 10999.58 1320.00 0.00 0.00 12319.58Sub Total 27982.50 4962.78 939.32 33884.60 1320.00 11398.03 13784.67 60387.30State 7040.00 100.00 17.06 7157.06 0.00 3168.92 289.89 10615.87Private 7341.38 0.00 0.14 7341.52 0.00 99.00 142.97 7583.49Central 12146.50 90.00 0.00 12236.50 0.00 845.20 0.00 13081.70Sub Total 26527.88 190.00 17.20 26735.08 0.00 4113.12 432.86 31281.06State 60.00 445.70 142.74 648.44 0.00 382.00 256.64 1287.08Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53Central 0.00 1101.60 0.00 1101.60 0.00 860.00 0.00 1961.60Sub Total 60.00 1571.80 142.74 1774.54 0.00 1242.00 256.67 3273.21State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27Private 0.00 0.00 20.00 20.00 0.00 0.00 5.85 25.85Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub Total 0.00 0.00 70.02 70.02 0.00 0.00 11.10 81.12State 55890.50 6974.42 602.61 63467.53 0.00 27482.00 3803.67 94753.20Private 51755.38 8568.00 597.14 60920.52 0.00 2694.00 27888.47 91502.99Central 46525.01 7428.83 0.00 53953.84 4780.00 10691.43 0.00 69425.27Total 154170.89 22971.25 1199.75 178341.89 4780.00 40867.43 31692.14 255681.45
Figures at decimal may not tally due to rounding off r
Note : - 1.RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNER) as on : 31.03.2014
*Break up of RES all India is given below (in MW) :Total Capacity
3803.68 21136.40 2631.93 31692.142.The installed capacity in respect of Old Talcher TPS and Bairasul HEP stations is reduced to 460 MW and180 MW
from 470 MW and 198 MW as earlier respectively.
3. Sasan (5x660 MW = 3300 MW ) has been divided among the state Delhi (11.25 %), Haryana (11.25 %), Punjab (15 %), Rajasthan (10 %), Uttar Pradesh (12.5 %), Uttarakhand ( 2.5 %) and Madhya Pradesh (37.5 %)
4013.55 106.58
ALL INDIA
Abbreviation:- SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
Small Hydro Power Wind Power Bio-Power Solar PowerBM Power/Cogen. Waste to Energy
Northern Region
Western Region
Southern Region
Eastern Region
North Eastern Region
Islands
(UTILITIES)
Region Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable)
RES (MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS LOCATED IN THE REGIONS OF MAIN LAND AND ISLANDS
(As on 31.12.2014)
-
(MW)Deviation
Target* Achievement Target* Achievement (+) / (-)Central 2818.3 0 0 1738.3 963.3 -775State 6770 500 0 3960 2676.1 -1283.9Pvt. 5400 960 600 5345 6635 1290Total 14988.3 1460 600 11043.3 10274.4 -768.9Central 336 25 68.67 481 336.01 -144.99State 210 0 0 0 0 0Pvt. 296 0 0 0 0 0Total 842 25 68.67 481 336.01 -144.99
Nuclear Central 2000 0 0 0 0 0Central 5154.3 25 68.67 2219.3 1299.31 -919.99State 6980 500 0 3960 2676.1 -1283.9Pvt. 5696 960 600 5345 6635 1290Total 17830.3 1485 668.67 11524.3 10610.41 -913.89
13
Thermal
Hydro
All India
Capacity Addition Targets/Achievements during the Month of Dec. 2014
2. Capacity Addition Targets / Achievements during December 2014 & April 2014 to Dec. 2014
December-14 Apr '14-Dec.'14Schemes Sector Target 2014-15
1104
3.3
481
0
1152
4.3
1027
4.4
336.
01
0
1061
0.41
02000400060008000
100001200014000160001800020000
Thermal Hydro Nuclear Total
MW
Targets and Achievements during April '14 to Dec '14 TargetAchievement
1460
25 0
1485
600
68.6
7
0
668.
67
0100020003000400050006000700080009000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Dec '2014 TargetAchievement
-
(As on 30.09.2014)
Coal Gas Diesel TotalState 135.00 2050.40 0.00 2185.40 0.00 0.00 0.00 2185.40Private 371.25 108.00 0.00 479.25 0.00 0.00 21.14 500.39Central 4421.37 207.61 0.00 4628.98 122.08 762.64 0.00 5513.70Sub-Total 4927.62 2366.01 0.00 7293.63 122.08 762.64 21.14 8199.49State 3160.00 25.00 3.92 3188.92 0.00 884.51 70.10 4143.53Private 2091.25 0.00 0.00 2091.25 0.00 0.00 55.60 2146.85Central 1202.03 535.29 0.00 1737.32 109.16 528.78 0.00 2375.26Sub-Total 6453.28 560.29 3.92 7017.49 109.16 1413.29 125.70 8665.64State 0.00 0.00 0.13 0.13 0.00 393.60 638.91 1032.64Private 0.00 0.00 0.00 0.00 0.00 1748.00 0.00 1748.00Central 152.02 61.88 0.00 213.90 34.08 1036.16 0.00 1284.14Sub-Total 152.02 61.88 0.13 214.03 34.08 3177.76 638.91 4064.78State 0.00 175.00 8.94 183.94 0.00 780.00 147.53 1111.47Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 329.32 129.14 0.00 458.46 77.00 950.56 0.00 1486.02Sub-Total 329.32 304.14 8.94 642.40 77.00 1730.56 147.53 2597.49State 2630.00 25.00 0.00 2655.00 0.00 2230.23 156.20 5041.43Private 3055.00 0.00 0.00 3055.00 0.00 0.00 166.60 3221.60Central 660.88 263.92 0.00 924.80 208.04 855.99 0.00 1988.83Sub-Total 6345.88 288.92 0.00 6634.80 208.04 3086.22 322.80 10251.86State 4640.00 603.80 0.00 5243.80 0.00 987.96 23.85 6255.61Private 3130.00 0.00 0.00 3130.00 0.00 0.00 3616.30 6746.30Central 1014.72 221.23 0.00 1235.95 573.00 650.43 0.00 2459.38Sub-Total 8784.72 825.03 0.00 9609.75 573.00 1638.39 3640.15 15461.29State 4923.00 0.00 0.00 4923.00 0.00 524.10 25.10 5472.20Private 3262.50 0.00 0.00 3262.50 0.00 0.00 802.58 4065.08Central 2909.95 549.97 0.00 3459.92 335.72 1500.00 0.00 5295.64Sub-Total 11095.45 549.97 0.00 11645.42 335.72 2024.10 827.68 14832.92State 0.00 0.00 0.00 0.00 0.00 1252.15 174.81 1426.96Private 82.50 0.00 0.00 82.50 0.00 400.00 35.05 517.55Central 300.50 69.35 0.00 369.85 22.28 414.17 0.00 806.30Sub-Total 383.00 69.35 0.00 452.35 22.28 2066.32 209.86 2750.81State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00Central 32.54 15.32 0.00 47.86 8.84 56.40 0.00 113.10
Sub-Total 32.54 15.32 0.00 47.86 8.84 56.40 2.00 115.10977.19 290.35 0.00 1267.54 129.80 642.43 0.00 2039.77
State 15488.00 2879.20 12.99 18380.19 0.00 7052.55 1236.50 26669.24Private 11992.50 108.00 0.00 12100.50 0.00 2148.00 4699.27 18947.77Central 12000.50 2344.06 0.00 14344.56 1620.00 7397.56 0.00 23362.12
Grand Total 39481.00 5331.26 12.99 44825.25 1620.00 16598.11 5935.77 68979.1314
Chandigarh
Central - Unallocated
Total (Northern Region)
Punjab
Rajasthan
Uttar Pradesh
Uttrakhnad
Himachal Pradesh
Jammu & Kashmir
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakupGrand TotalHydro
(Renewable) RES (MNRE)
Delhi
Haryana
ThermalNuclear
-
(As on 30.09.2014)
Coal Gas Diesel TotalState 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05Private 0.00 48.00 0.00 48.00 0.00 0.00 0.00 48.00Central 326.17 0.00 0.00 326.17 25.80 0.00 0.00 351.97Sub-Total 326.17 48.00 0.00 374.17 25.80 0.00 0.05 400.02
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 36.71 4.20 0.00 40.91 7.38 0.00 0.00 48.29Sub-Total 36.71 4.20 0.00 40.91 7.38 0.00 0.00 48.29
Gujarat State * 4470.00 2321.82 17.28 6809.10 0.00 772.00 15.60 7596.70Private 8620.00 4160.00 0.20 12780.20 0.00 0.00 4414.60 17194.80Central 2648.27 424.27 0.00 3072.54 559.32 0.00 0.00 3631.86Sub-Total 15738.27 6906.09 17.48 22661.84 559.32 772.00 4430.20 28423.36
State 3670.00 0.00 0.00 3670.00 0.00 1703.66 86.16 5459.82Private 3042.50 0.00 0.00 3042.50 0.00 0.00 800.47 3842.97Central 2256.39 257.18 0.00 2513.57 273.24 1520.00 0.00 4306.81Sub-Total 8968.89 257.18 0.00 9226.07 273.24 3223.66 886.63 13609.60
State 2780.00 0.00 0.00 2780.00 0.00 120.00 52.00 2952.00Private 5813.00 0.00 0.00 5813.00 0.00 0.00 272.00 6085.00Central 1490.49 0.00 0.00 1490.49 47.52 0.00 0.00 1538.01Sub-Total 10083.49 0.00 0.00 10083.49 47.52 120.00 324.00 10575.01State 8400.00 672.00 0.00 9072.00 0.00 2884.84 327.43 12284.27Private 10986.00 180.00 0.00 11166.00 0.00 447.00 5302.76 16915.76Central 3313.27 2623.93 0.00 5937.20 690.14 0.00 0.00 6627.34Sub-Total 22699.27 3475.93 0.00 26175.20 690.14 3331.84 5630.19 35827.37State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93Sub-Total 44.37 27.10 0.00 71.47 8.46 0.00 0.00 79.93
1622.35 196.91 0.00 1819.26 228.14 0.00 0.00 2047.40State 19320.00 2993.82 17.28 22331.10 0.00 5480.50 481.24 28292.84Private 28461.50 4388.00 0.20 32849.70 0.00 447.00 10789.83 44086.53Central 11738.01 3533.59 0.00 15271.60 1840.00 1520.00 0.00 18631.60Grand Total 59519.51 10915.41 17.48 70452.40 1840.00 7447.50 11271.07 91010.97
15
Goa
Daman & Diu
Madhya Pradesh
Chhattisgarh
Maharashtra
Dadra & Nagar Naveli
Central - Unallocated
Total (Western Region)
Modewise breakupGrand TotalThermal
Nuclear Hydro (Renewable) RES (MNRE)State Ownership/ Sector
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
-
(As on 30.09.2014)
Coal Gas Diesel TotalState 5892.50 0.00 0.00 5892.50 0.00 3734.53 221.03 9848.06Private 750.00 3370.40 36.80 4157.20 0.00 0.00 1309.45 5466.65Central 2940.58 0.00 0.00 2940.58 275.78 0.00 0.00 3216.36Sub-Total 9583.08 3370.40 36.80 12990.28 275.78 3734.53 1530.48 18531.07
State 2720.00 0.00 127.92 2847.92 0.00 3599.80 1031.66 7479.38Private 2060.00 0.00 106.50 2166.50 0.00 0.00 2953.48 5119.98Central 1415.56 0.00 0.00 1415.56 254.86 0.00 0.00 1670.42Sub-Total 6195.56 0.00 234.42 6429.98 254.86 3599.80 3985.13 14269.77
State 0.00 0.00 234.60 234.60 0.00 1881.50 158.42 2274.52Private 0.00 174.00 21.84 195.84 0.00 0.00 35.23 231.07Central 931.19 359.58 0.00 1290.77 95.60 0.00 0.00 1386.37Sub-Total 931.19 533.58 256.44 1721.21 95.60 1881.50 193.65 3891.96
State 4770.00 523.20 0.00 5293.20 0.00 2182.20 123.05 7598.45Private 550.00 503.10 411.66 1464.76 0.00 0.00 7952.33 9417.09Central 3653.10 0.00 0.00 3653.10 524.00 0.00 0.00 4177.10Sub-Total 8973.10 1026.30 411.66 10411.06 524.00 2182.20 8075.38 21192.64
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17Sub-Total 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17
State 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50Private 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03Central 232.32 0.00 0.00 232.32 19.28 0.00 0.00 251.60Sub-Total 232.32 32.50 0.00 264.82 19.28 0.00 0.03 284.13
1367.08 0.00 0.00 1367.08 150.48 0.00 0.00 1517.56State 13382.50 555.70 362.52 14300.72 0.00 11398.03 1534.15 27232.90Private 3360.00 4047.50 576.80 7984.30 0.00 0.00 12250.52 20234.82Central 10640.00 359.58 0.00 10999.58 1320.00 0.00 0.00 12319.58Grand Total 27382.50 4962.78 939.32 33284.60 1320.00 11398.03 13784.67 59787.30
16
Andhra Pradesh
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
Total (Southern
Region)
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakupGrand TotalThermal
Nuclear Hydro (Renewable) RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION
-
(As on 30.09.2014)
Coal Gas Diesel TotalState 210.00 0.00 0.00 210.00 0.00 0.00 70.70 280.70Private 0.00 0.00 0.00 0.00 0.00 0.00 43.42 43.42Central 1744.70 0.00 0.00 1744.70 0.00 129.43 0.00 1874.13Sub-Total 1954.70 0.00 0.00 1954.70 0.00 129.43 114.12 2198.25
State 1190.00 0.00 0.00 1190.00 0.00 130.00 4.05 1324.05Private 900.00 0.00 0.00 900.00 0.00 0.00 16.00 916.00Central 268.88 0.00 0.00 268.88 0.00 70.93 0.00 339.81Sub-Total 2358.88 0.00 0.00 2358.88 0.00 200.93 20.05 2579.86
State 5220.00 100.00 12.06 5332.06 0.00 977.00 98.40 6407.46Private 1341.38 0.00 0.14 1341.52 0.00 0.00 33.05 1374.57Central 905.49 0.00 0.00 905.49 0.00 271.30 0.00 1176.79Sub-Total 7466.87 100.00 12.20 7579.07 0.00 1248.30 131.45 8958.82
State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Private 1050.00 0.00 0.00 1050.00 0.00 0.00 0.00 1050.00Central 6105.60 90.00 0.00 6195.60 0.00 193.26 0.00 6388.86Sub-Total 7155.60 90.00 0.00 7245.60 0.00 193.26 0.00 7438.86
State 420.00 0.00 0.00 420.00 0.00 2061.92 64.63 2546.55Private 4050.00 0.00 0.00 4050.00 0.00 0.00 50.50 4100.50Central 1585.06 0.00 0.00 1585.06 0.00 105.01 0.00 1690.07Sub-Total 6055.06 0.00 0.00 6055.06 0.00 2166.93 115.13 8337.12
State 0.00 0.00 5.00 5.00 0.00 0.00 52.11 57.11Private 0.00 0.00 0.00 0.00 0.00 99.00 0.00 99.00Central 82.61 0.00 0.00 82.61 0.00 75.27 0.00 157.88Sub-Total 82.61 0.00 5.00 87.61 0.00 174.27 52.11 313.99
1454.16 0.00 0.00 1454.16 0.00 0.00 0.00 1454.16State 7040.00 100.00 17.06 7157.06 0.00 3168.92 289.89 10615.87Private 7341.38 0.00 0.14 7341.52 0.00 99.00 142.97 7583.49Central 12146.50 90.00 0.00 12236.50 0.00 845.20 0.00 13081.70Grand Total 26527.88 190.00 17.20 26735.08 0.00 4113.12 432.86 31281.06
17
Total (Eastern Region)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermalNuclear Hydro (Renewable) RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION
-
(As on 30.09.2014)
Coal Gas Diesel TotalState 60.00 276.20 20.69 356.89 0.00 100.00 34.11 491.00Private 0.00 24.50 0.00 24.50 0.00 0.00 0.00 24.50Central 0.00 297.82 0.00 297.82 0.00 329.72 0.00 627.54Sub-Total 60.00 598.52 20.69 679.21 0.00 429.72 34.11 1143.04State 0.00 0.00 15.88 15.88 0.00 0.00 103.90 119.78Private 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.03Central 0.00 32.05 0.00 32.05 0.00 97.57 0.00 129.62Sub-Total 0.00 32.05 15.88 47.93 0.00 97.57 103.93 249.43State 0.00 0.00 2.05 2.05 0.00 282.00 31.03 315.08Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 65.61 0.00 65.61 0.00 74.58 0.00 140.19Sub-Total 0.00 65.61 2.05 67.66 0.00 356.58 31.03 455.27State 0.00 169.50 4.85 174.35 0.00 0.00 16.01 190.36Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 180.34 0.00 180.34 0.00 62.37 0.00 242.71Sub-Total 0.00 349.84 4.85 354.69 0.00 62.37 16.01 433.07State 0.00 0.00 45.41 45.41 0.00 0.00 5.45 50.86Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 46.96 0.00 46.96 0.00 80.98 0.00 127.94Sub-Total 0.00 46.96 45.41 92.37 0.00 80.98 5.45 178.80State 0.00 0.00 2.00 2.00 0.00 0.00 29.67 31.67Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 32.84 0.00 32.84 0.00 53.32 0.00 86.16Sub-Total 0.00 32.84 2.00 34.84 0.00 53.32 29.67 117.83State 0.00 0.00 51.86 51.86 0.00 0.00 36.47 88.33Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 27.28 0.00 27.28 0.00 34.31 0.00 61.59Sub-Total 0.00 27.28 51.86 79.14 0.00 34.31 36.47 149.92
0.00 55.40 0.00 55.40 0.00 127.15 0.00 182.55State 60.00 445.70 142.74 648.44 0.00 382.00 256.64 1287.08Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53Central 0.00 738.30 0.00 738.30 0.00 860.00 0.00 1598.30Grand Total 60.00 1208.50 142.74 1411.24 0.00 1242.00 256.67 2909.91
(As on 30.09.2014)
Coal Gas Diesel TotalState 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30Private 0.00 0.00 20.00 20.00 0.00 0.00 5.10 25.10Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub-Total 0.00 0.00 60.05 60.05 0.00 0.00 10.35 70.40State 0.00 0.00 9.97 9.97 0.00 0.00 0.00 9.97Private 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.75Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub-Total 0.00 0.00 9.97 9.97 0.00 0.00 0.75 10.72State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27Private 0.00 0.00 20.00 20.00 0.00 0.00 5.85 25.85Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Grand Total 0.00 0.00 70.02 70.02 0.00 0.00 11.10 81.12
18
RES (MNRE)
Andaman & Nicobar
lakshadweep
Total (Islands)
ThermalNuclear Hydro (Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand Total
Central - Unallocated
Total (North- Eastern Region)
Assam
Arunachal Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Mizoram
INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES
State Ownership/ Sector
Modewise breakup
Grand TotalThermal Nuclear Hydro (Renewable) RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION
-
Coal Gas Diesel TotalState 15488.00 2879.20 12.99 18380.19 0.00 7052.55 1236.50 26669.24Private 11992.50 108.00 0.00 12100.50 0.00 2148.00 4699.27 18947.77Central 12000.50 2344.06 0.00 14344.56 1620.00 7397.56 0.00 23362.12Sub Total 39481.00 5331.26 12.99 44825.25 1620.00 16598.11 5935.77 68979.13State 19320.00 2993.82 17.28 22331.10 0.00 5480.50 481.24 28292.84Private 28461.50 4388.00 0.20 32849.70 0.00 447.00 10789.83 44086.53Central 11738.01 3533.59 0.00 15271.60 1840.00 1520.00 0.00 18631.60Sub Total 59519.51 10915.41 17.48 70452.40 1840.00 7447.50 11271.07 91010.97State 13382.50 555.70 362.52 14300.72 0.00 11398.03 1534.15 27232.90Private 3360.00 4047.50 576.80 7984.30 0.00 0.00 12250.52 20234.82Central 10640.00 359.58 0.00 10999.58 1320.00 0.00 0.00 12319.58Sub Total 27382.50 4962.78 939.32 33284.60 1320.00 11398.03 13784.67 59787.30State 7040.00 100.00 17.06 7157.06 0.00 3168.92 289.89 10615.87Private 7341.38 0.00 0.14 7341.52 0.00 99.00 142.97 7583.49Central 12146.50 90.00 0.00 12236.50 0.00 845.20 0.00 13081.70Sub Total 26527.88 190.00 17.20 26735.08 0.00 4113.12 432.86 31281.06State 60.00 445.70 142.74 648.44 0.00 382.00 256.64 1287.08Private 0.00 24.50 0.00 24.50 0.00 0.00 0.03 24.53Central 0.00 738.30 0.00 738.30 0.00 860.00 0.00 1598.30
Sub Total 60.00 1208.50 142.74 1411.24 0.00 1242.00 256.67 2909.91
State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27
Private 0.00 0.00 20.00 20.00 0.00 0.00 5.85 25.85Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub Total 0.00 0.00 70.02 70.02 0.00 0.00 11.10 81.12State 55290.50 6974.42 602.61 62867.53 0.00 27482.00 3803.67 94153.20Private 51155.38 8568.00 597.14 60320.52 0.00 2694.00 27888.47 90902.99Central 46525.01 7065.53 0.00 53590.54 4780.00 10622.76 0.00 68993.30Total 152970.89 22607.95 1199.75 176778.59 4780.00 40798.76 31692.14 254049.48
Figures at decimal may not tally due to rounding off r
Note : - 1.RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNER) as on 31.03.2014
*Break up of RES all India is given below (in MW) :Total Capacity
3803.68 21136.40 2631.93 31692.142.The installed capacity in respect of Old Talcher TPS and Bairasul HEP stations is reduced to 460 MW and180 MW from 470 MW and 198 MW as earlier respectively.3. Sasan (5x660 MW = 3300 MW ) has been divided among the state Delhi (11.25 %), Haryana (11.25 %), Punjab (15 %), Rajasthan (10 %), Uttar Pradesh (12.5 %), Uttarakhand ( 2.5 %) and Madhya Pradesh (37.5 %)
19
ALL INDIA
Abbreviation:-SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
Small Hydro PowerWind Power Bio-Power
Solar PowerBM Power/Cogen. Waste to Energy
Nuclear Hydro (Renewable) RES (MNRE)
4013.55 106.58
Southern Region
Eastern Region
North Eastern Region
Islands
Northern Region
Western Region
(UTILITIES)
Region Ownership/ Sector
Modewise breakupGrand TotalThermal
(As on 30.09.2014)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
LOCATED IN THE REGIONS OF MAIN LAND AND ISLANDS
-
SN Contents Page
1 Programme and Achievementsof Transmission Lines in December' 14 and during April 2014 to December 2014
2 List of Transmission Lines Commissioned/Ready for commissioning during December-14
Section C - Transmission Lines
20
-
Programme 2014-15 Programme Achievement Programme Achievement
Central Sector 0 0 0 0 0State Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 0 0 0 0 0JV/Private Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 4088 1680 0 2770 4398State Sector 0 0 0 0 3JV/Private Sector 2463 0 0 1703 795
Total 6551 1680 0 4473 5196
Central Sector 2955 1029 252 2113 2598State Sector 4367 0 0 3930 3205JV/Private Sector 1442 0 60 1442 1282
Total 8764 1029 312 7485 7085
Central Sector 381 0 0 0 74State Sector 5186 975 352 4141 2974JV/Private Sector 0 0 0 0 20
Total 5567 975 352 4141 3068Grand Total 20882 3684 664 16099 15349
Voltage Level(kV)
Name of the Transmission Line
Type Executing Agency
Line Length (CKM)
CENTRAL Sector:400 Bokaro TPS Extn. - Koderma TPS D/C PGCIL 200400 Sagardighii - Baharampur D/C PGCIL 52
PVT Sector400 Kamalanga (GMR) - Angul pooling station D/C GMR ENERG 60
STATE Sector:220 220 kV Apta - Kalwa line at Loc. No 647 & 652 & 220 kV
Kalwa - Taloja at Loc. No 652 to 654 for Metra RailS/C MSETCL 4
220 Chandan - Dechu D/C RVPNL 202220 Khadaki (VSNL - Dighi) - Theur - II line from Lonikand - I
to Lonikand - II S/SS/C MSETCL 1
220 LILO of Hinjewadi - Infosys line at Pagasus D/C MSETCL 6220 LILO of Kolhapur II - Mumewadi at Ghorpade D/C MSETCL 7220 LILO of Morbi - Lalpar at Sartanpar D/C on M/C GETCO 17220 LILO of Tappar - Nani Khakhar at Mokha D/C GETCO 21220 Mendhasal - Bidanasi D/C OPTCL 62220 Sarna - Sujanpur line D/C PSTCL 9220 Tap on 220 kV Bhigwan - Kurkumbh at 220 kV Shisuphal S/C MSETCL 5
220 Tarapur - Boisar line S/C MSETCL 1220 Tarapur - Borivali line S/C MSETCL 1220 LILO of 2nd Ckt of Patiala - Patran at Rajila D/C PSTCL 12220 Shifting & hieght raising of 220 kV Kalwa - Taloja & 220
kV Kalwa - Apta line Loc. 652-653-654 for Metro rail Depot and Loc. No 647 to 652 metro rail at Panchananda
S/C MSETCL 4
20
400 kV
220kV
2 List of Transmission Line Commissioned/Ready for commissioning During December-14
1. Programme and Achievementsof Transmission Lines in Dec. '14 and during up to December '14
+/- 800 kV HVDC
+/- 500 kV HVDC
765 kV
April' 14 to December' 14December' 14(Figs. in ckms)
Voltage Level /Sector
-
SN Contents Page
1 Programme and Achievements of Sub- Stations in Dec '2014 and during April 2014 to Dec '2014
2 List of Sub Stations commissioned/ready for commisssioning in Dec '2014
Section D - Sub Stations
21
-
Programme
2014-15 Programme Achievement Achievement
Central Sector 0 0 0 0State Sector 0 0 0 0JV/Private Sector 0 0 0 0
Total 0 0 0 0
Central Sector 18000 6000 0 13500State Sector 1500 0 0 1000JV/Private Sector 10500 0 0 6000
Total 30000 6000 0 20500
Central Sector 4565 630 500 6165State Sector 4775 1000 0 6625JV/Private Sector 0 0 0 0
Total 9340 1630 500 12790
Central Sector 0 0 0 460State Sector 8531 1310 450 8049JV/Private Sector 0 0 0 0
Total 8531 1310 450 8509Grand Total 47871 8940 950 41799
Name of Sub-Station Type
Capacity Added(MW/MVA)
Boisor (Aug.) S/S 400/220 500
Coimbatore (Addil Trans.) 230/110 100
Manglore SEZ SS 220/110 200
Nawada S/S 220/66 100
Shirsuphal S/S 220/33 50
21
1. Programme & Achievement of sub- stations in December '2014 and during April '14 to December '14
STATE Sector:
As on 31-Dec-2014
2. List of Sub-Stations Commissioned/Ready for commissioning During December-14
+/- 500 kV HVDC
220 kV
4565
(Fig. in MVA)
Voltage Level /Sector
MSETCL
TANTRANSCO
220 KPTCL
230
220
220 HVPNL
Apr 2014 - December'14
Programme
December'14
765 kV150001500
0000
9025
4460
PGCIL
10500
60010
27000
0
400 kV
400
CENTRAL Sector:
Voltage Level(kV) Executing Agency
0
600142026
-
SN Contents Page1 Electricity Generation Targets and Achievements for 2014-15 22
Section E - Electricity Generation
-
Programme Achievement* % Ach. Programme Achievement* % Ach.
Central Sector 3,10,289.00 27,423.00 26,399.39 96.27 2,28,859.00 2,29,068.08 100.09State Sector 3,02,656.00 26,520.00 25,693.82 96.88 2,22,575.00 2,23,356.83 100.35Pvt.IPP Sector 2,23,119.00 19,971.00 22,482.76 112.58 1,63,764.00 1,87,469.56 114.48Pvt.UTL Sector 22,539.00 1,725.00 1,561.43 90.52 17,451.00 17,161.04 98.34
Total 8,58,603.00 75,639.00 76,137.40 100.66 6,32,649.00 6,57,055.51 103.86
Central Sector 47,828.00 2,472.17 2,379.11 96.24 40,271.62 43,052.82 106.91State Sector 65,142.00 4,436.00 4,320.32 97.39 51,917.50 53,945.51 103.91Pvt.IPP Sector 9,907.00 286.00 272.83 95.40 8,976.00 8,632.68 96.18Pvt.UTL Sector 1,420.00 117.00 121.80 104.10 1,068.00 1,105.31 103.49
Total 1,24,297.00 7,311.17 7,094.06 97.03 1,02,233.12 1,06,736.32 104.40
Central Sector 35,300.00 3,164.00 2,596.23 82.06 26,133.00 25,036.93 95.81Total 35,300.00 3,164.00 2,596.23 82.06 26,133.00 25,036.93 95.81
Bhutan Import 4,800.00 210.00 168.49 80.23 4,372.00 4,896.54 112.00
Central Sector 3,93,417.00 33,059.17 31,374.73 94.90 2,95,263.62 2,97,157.83 100.64State Sector 3,67,798.00 30,956.00 30,014.14 96.96 2,74,492.50 2,77,302.34 101.02Pvt. Sector 2,56,985.00 22,099.00 24,438.82 110.59 1,91,259.00 2,14,368.59 112.08
Total 10,23,000.00 86,324.17 85,996.18 99.62 7,65,387.12 7,93,725.30 103.70* Provisional based on actual-cum-Assesment
1. Electricity Generation (MU) Targets and Achievememts for 2014-15
All India Energy Generation During April to December '14 (MU)
Target (2014-15)
22
April '14 to - December '14Sector
Hydro
Thermal
Nuclear
December '14
632649
102233
26133
765387
657056
106736
25037
793725
0
100000
200000
300000
400000
500000
600000
700000
800000
900000
Thermal Hydro Nuclear Total
ProgrammeAchievement
-
SN Contents Page1 Power Supply Position (Provisional) for December '14 and April '14 to December '14 232 Peak Demand and Peak Met (Provisional) for December'14 and April'14 to December'14 243 Power Supply Position (Revised) for November '14 254 Peak Demand and Peak Met (Revised) for November '14 265 Notified Power cuts / Restrictions on Industries during December '2014 276 Power Supply to Agricultural Sector during December '2014 28
Section F - Power supply position
-
/ Figures in MU net
(-) (-)
/ System Requirement Availability Requirement Availability / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) / Chandigarh 115 115 0 0.0 1,291 1,291 0 0.0
/ Delhi 1,926 1,920 -6 -0.3 23,516 23,403 -113 -0.5 / Haryana 3,572 3,527 -45 -1.3 36,999 36,820 -179 -0.5
/ Himachal Pradesh 762 754 -8 -1.0 6,657 6,587 -70 -1.1 / Jammu & Kashmir 1,616 1,293 -323 -20.0 11,941 9,556 -2,385 -20.0 / Punjab 3,004 3,004 0 0.0 40,143 39,660 -483 -1.2
/ Rajasthan 6,198 6,198 0 0.0 49,421 49,014 -407 -0.8
/ Uttar Pradesh 8,269 6,977 -1,292 -15.6 80,535 67,348 -13,187 -16.4 / Uttarakhand 1,032 1,014 -18 -1.7 9,384 9,073 -311 -3.3 / Northern Region 26,494 24,802 -1,692 -6.4 259,887 242,752 -17,135 -6.6 / Chhattisgarh 1,695 1,678 -17 -1.0 15,813 15,621 -192 -1.2 / Gujarat 8,057 8,056 -1 0.0 72,944 72,920 -24 0.0 / Madhya Pradesh 4,870 4,869 -1 0.0 40,501 40,208 -293 -0.7 / Maharashtra 11,240 11,182 -58 -0.5 104,187 102,675 -1,512 -1.5 / Daman & Diu 166 166 0 0.0 1,580 1,580 0 0.0 / Dadra & Nagar Haveli 471 471 0 0.0 4,052 4,050 -2 0.0 / Goa 360 360 0 0.0 3,100 3,064 -36 -1.2 / Western Region 26,859 26,782 -77 -0.3 242,177 240,118 -2,059 -0.9 / Andhra Pradesh 4,077 4,066 -11 -0.3 46,486 43,616 -2,870 -6.2 / Telangana 3,983 3,881 -102 -2.6 30,268 27,869 -2,399 -7.9 / Karnataka 5,402 5,222 -180 -3.3 45,595 43,323 -2,272 -5.0 / Kerala 1,838 1,819 -19 -1.0 16,660 16,376 -284 -1.7 / Tamil Nadu 7,414 7,096 -318 -4.3 71,754 69,536 -2,218 -3.1 / Puducherry 177 177 0 0.0 1,833 1,807 -26 -1.4 / Lakshadweep # 4 4 0 0 36 36 0 0 / Southern Region 22,891 22,261 -630 -2.8 212,596 202,527 -10,069 -4.7 / Bihar 1,613 1,557 -56 -3.5 14,044 13,631 -413 -2.9 / DVC 2,250 2,195 -55 -2.4 14,579 14,179 -400 -2.7 / Jharkhand 647 628 -19 -2.9 5,735 5,585 -150 -2.6 / Odisha 1,605 1,583 -22 -1.4 19,891 19,524 -367 -1.8
/ West Bengal 3,263 3,245 -18 -0.6 36,468 36,262 -206 -0.6
/ Sikkim 33 33 0 0.0 298 298 0 0.0
- / Andaman- Nicobar # 20 15 -5 -25 180 135 -45 -25.0
/ Eastern Region 9,411 9,241 -170 -1.8 91,015 89,479 -1,536 -1.7
/ Arunachal Pradesh 65 57 -8 -12.3 521 459 -62 -11.9
/ Assam 680 567 -113 -16.6 6,599 5,968 -631 -9.6 / Manipur 65 65 0 0.0 520 500 -20 -3.8 / Meghalaya 175 159 -16 -9.1 1,393 1,174 -219 -15.7 / Mizoram 40 39 -1 -2.5 341 317 -24 -7.0 / Nagaland 60 44 -16 -26.7 501 462 -39 -7.8 / Tripura 120 81 -39 -32.5 956 802 -154 -16.1
- / North-Eastern Region 1,205 1,012 -193 -16.0 10,831 9,682 -1,149 -10.6
/ All India 86,860 84,098 -2,762 -3.2 816,506 784,558 -31,948 -3.9# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.
23
NOTE: Cumulative figures for Andhra Pradesh includes the figures of undivided Andhra Pradesh ( including Telangana area) for the period Apr-May,2014. Cumulative figures of Telangana are w.e.f. Jun 2014 due to bifurcation of Andhra Pradesh into Andhra Prad
/State
() / Power Supply Position (Provisional)
Surplus / Deficit (-) Surplus / Deficit (-)
, 2014 / December,2014 ,2014 -, 2014/ April,2014 to December,2014
-
/ System Peak Demand Peak Met Peak Demand Peak Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) / Chandigarh 223 223 0 0.0 367 367 0 0.0
/ Delhi 4,271 4,271 0 0.0 6,006 5,925 -81 -1.3
/ Haryana 6,480 6,480 0 0.0 9,152 9,152 0 0.0
/ Himachal Pradesh 1,417 1,397 -20 -1.4 1,417 1,403 -14 -1.0
/ Jammu & Kashmir 2,554 2,043 -511 -20.0 2,554 2,043 -511 -20.0
/ Punjab 5,837 5,837 0 0.0 11,534 10,023 -1,511 -13.1
/ Rajasthan 10,642 10,642 0 0.0 10,642 10,642 0 0.0
/ Uttar Pradesh 13,439 11,779 -1,660 -12.4 15,670 13,003 -2,667 -17.0
/ Uttarakhand 1,873 1,873 0 0.0 1,883 1,873 -10 -0.5
/ Northern Region 42,746 40,469 -2,277 -5.3 51,977 47,642 -4,335 -8.3
/ Chhattisgarh 3,185 3,086 -99 -3.1 3,480 3,350 -130 -3.7
/ Gujarat 11,846 11,846 0 0.0 13,603 13,499 -104 -0.8
/ Madhya Pradesh 9,763 9,725 -38 -0.4 9,763 9,725 -38 -0.4
/ Maharashtra 18,862 18,696 -166 -0.9 20,147 19,654 -493 -2.4
/ Daman & Diu 297 297 0 0.0 297 297 0 0.0
/ Dadra & Nagar Haveli 688 688 0 0.0 688 688 0 0.0
/ Goa 453 451 -2 -0.4 501 489 -12 -2.4
/ Western Region 43,223 43,041 -182 -0.4 44,166 43,041 -1,125 -2.5
/ Andhra Pradesh 6,043 5,976 -67 -1.1 7,144 6,549 -595 -8.3
/ Telangana 6,684 6,445 -239 -3.6 7,884 6,648 -1,236 -15.7
/ Karnataka 9,377 8,967 -410 -4.4 10,001 9,503 -498 -5.0
/ Kerala 3,507 3,390 -117 -3.3 3,760 3,495 -265 -7.0
/ Tamil Nadu 12,286 11,334 -952 -7.7 13,663 13,498 -165 -1.2
/ Puducherry 311 309 -2 -0.6 389 348 -41 -10.5
/ Lakshadweep # 8 8 0 0 8 8 0 0
/ Southern Region 35,668 34,137 -1,531 -4.3 39,094 35,698 -3,396 -8.7
/ Bihar 2,758 2,558 -200 -7.3 2,992 2,792 -200 -6.7
/ DVC 2,235 2,155 -80 -3.6 2,653 2,590 -63 -2.4
/ Jharkhand 1,049 1,031 -18 -1.7 1,075 1,055 -20 -1.9
/ Odisha 3,593 3,563 -30 -0.8 3,814 3,764 -50 -1.3
/ West Bengal 6,328 6,313 -15 -0.2 7,544 7,524 -20 -0.3
/ Sikkim 78 78 0 0.0 82 82 0 0.0
- / Andaman- Nicobar # 40 32 -8 -20 40 32 -8 -20
/ Eastern Region 15,382 15,123 -259 -1.7 16,909 16,609 -300 -1.8
/ Arunachal Pradesh 125 117 -8 -6.4 139 126 -13 -9.4
/ Assam 1,450 1,204 -246 -17.0 1,450 1,257 -193 -13.3
/ Manipur 140 139 -1 -0.7 141 139 -2 -1.4
/ Meghalaya 370 367 -3 -0.8 370 367 -3 -0.8
/ Mizoram 90 86 -4 -4.4 90 86 -4 -4.4
/ Nagaland 125 123 -2 -1.6 140 123 -17 -12.1
/ Tripura 250 210 -40 -16.0 310 266 -44 -14.2
- / North-Eastern Region 2,460 2,170 -290 -11.8 2,528 2,170 -358 -14.2
/ All India 139,479 134,940 -4,539 -3.3 148,166 141,160 -7,006 -4.7
# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability
24NOTE: Cumulative figures of Andhra Pradesh and Telangana are w.e.f. Jun 2014 due to bifurcation of Andhra Pradesh into Andhra Pradesh and Telangana w.e.f. June, 2014..
, 2014 / December,2014 ,2014 -, 2014/ April,2014 to December,2014
Surplus / Deficit (-) Surplus / Deficit (-)
() / Peak Demand and Peak Met (Provisional)
/ (-) / (-) /State
/ Figures in MW net
-
/ Figures in MU net
(-) (-)
/ System Requirement Availability Requirement Availability / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) / Chandigarh 99 99 0 0.0 1,176 1,176 0 0.0
/ Delhi 1,746 1,744 -2 -0.1 21,590 21,483 -107 -0.5 / Haryana 3,190 3,188 -2 -0.1 33,427 33,293 -134 -0.4
/ Himachal Pradesh 721 718 -3 -0.4 5,895 5,833 -62 -1.1 / Jammu & Kashmir 1,445 1,156 -289 -20.0 10,325 8,263 -2,062 -20.0 / Punjab 2,866 2,863 -3 -0.1 37,139 36,656 -483 -1.3
/ Rajasthan 5,798 5,798 0 0.0 43,223 42,816 -407 -0.9
/ Uttar Pradesh 7,983 6,619 -1,364 -17.1 72,266 60,371 -11,895 -16.5 / Uttarakhand 969 938 -31 -3.2 8,352 8,059 -293 -3.5 / Northern Region 24,817 23,123 -1,694 -6.8 233,393 217,950 -15,443 -6.6 / Chhattisgarh 1,710 1,706 -4 -0.2 14,118 13,943 -175 -1.2 / Gujarat 8,401 8,401 0 0.0 64,887 64,864 -23 0.0 / Madhya Pradesh 4,972 4,971 -1 0.0 35,631 35,339 -292 -0.8 / Maharashtra 12,580 12,417 -163 -1.3 92,947 91,493 -1,454 -1.6 / Daman & Diu 169 169 0 0.0 1,414 1,414 0 0.0 / Dadra & Nagar Haveli 441 441 0 0.0 3,581 3,579 -2 -0.1 / Goa 293 292 -1 -0.3 2,740 2,704 -36 -1.3 / Western Region 28,566 28,397 -169 -0.6 215,318 213,336 -1,982 -0.9 / Andhra Pradesh 3,881 3,820 -61 -1.6 42,409 39,550 -2,859 -6.7 / Telangana 3,912 3,725 -187 -4.8 26,285 23,988 -2,297 -8.7 / Karnataka 4,939 4,738 -201 -4.1 40,193 38,101 -2,092 -5.2 / Kerala 1,866 1,843 -23 -1.2 14,822 14,557 -265 -1.8 / Tamil Nadu 7,003 6,689 -314 -4.5 64,340 62,440 -1,900 -3.0 / Puducherry 177 177 0 0.0 1,656 1,630 -26 -1.6 / Lakshadweep # 4 4 0 0 32 32 0 0 / Southern Region 21,778 20,992 -786 -3.6 189,705 180,266 -9,439 -5.0 / Bihar 1,664 1,608 -56 -3.4 12,431 12,074 -357 -2.9 / DVC 1,457 1,423 -34 -2.3 12,329 11,984 -345 -2.8 / Jharkhand 621 617 -4 -0.6 5,088 4,957 -131 -2.6 / Odisha 2,088 2,051 -37 -1.8 18,286 17,941 -345 -1.9
/ West Bengal 3,274 3,259 -15 -0.5 33,205 33,017 -188 -0.6
/ Sikkim 35 35 0 0.0 265 265 0 0.0
- / Andaman- Nicobar # 20 15 -5 -25 160 120 -40 -25.0
/ Eastern Region 9,139 8,993 -146 -1.6 81,604 80,238 -1,366 -1.7
/ Arunachal Pradesh 65 54 -11 -16.9 456 402 -54 -11.8
/ Assam 660 634 -26 -3.9 5,919 5,401 -518 -8.8 / Manipur 70 67 -3 -4.3 455 435 -20 -4.4 / Meghalaya 175 140 -35 -20.0 1,218 1,015 -203 -16.7 / Mizoram 43 37 -6 -14.0 301 278 -23 -7.6 / Nagaland 65 62 -3 -4.6 441 418 -23 -5.2 / Tripura 110 79 -31 -28.2 836 721 -115 -13.8
- / North-Eastern Region 1,188 1,073 -115 -9.7 9,626 8,670 -956 -9.9
/ All India 85,488 82,578 -2,910 -3.4 729,646 700,460 -29,186 -4.0# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability.
25
NOTE: Cumulative figures for Andhra Pradesh includes the figures of undivided Andhra Pradesh ( including Telangana area) for the period Apr-May,2014. Cumulative figures of Telangana are w.e.f. Jun 2014 due to bifurcation of Andhra Pradesh into Andhra Prad
/State
() / Power Supply Position (Revised)
Surplus / Deficit (-) Surplus / Deficit (-)
, 2014 / November,2014 ,2014 -, 2014/ April,2014 to November,2014
-
/ System Peak Demand Peak Met Peak Demand Peak Met
/ Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) / Chandigarh 190 190 0 0.0 367 367 0 0.0
/ Delhi 3,408 3,408 0 0.0 6,006 5,925 -81 -1.3
/ Haryana 6,345 6,340 -5 -0.1 9,152 9,152 0 0.0
/ Himachal Pradesh 1,403 1,403 0 0.0 1,403 1,403 0 0.0 / Jammu & Kashmir 2,455 1,964 -491 -20.0 2,521 2,017 -504 -20.0
/ Punjab 5,626 5,626 0 0.0 11,534 10,023 -1,511 -13.1
/ Rajasthan 9,525 9,525 0 0.0 10,188 10,077 -111 -1.1
/ Uttar Pradesh 12,744 10,694 -2,050 -16.1 15,670 13,003 -2,667 -17.0
/ Uttarakhand 1,828 1,748 -80 -4.4 1,883 1,833 -50 -2.7
/ Northern Region 40,595 39,070 -1,525 -3.8 51,977 47,642 -4,335 -8.3
/ Chhattisgarh 3,133 2,923 -210 -6.7 3,480 3,350 -130 -3.7
/ Gujarat 12,815 12,815 0 0.0 13,603 13,499 -104 -0.8
/ Madhya Pradesh 9,477 9,477 0 0.0 9,477 9,477 0 0.0
/ Maharashtra 19,906 19,045 -861 -4.3 20,147 19,654 -493 -2.4
/ Daman & Diu 297 297 0 0.0 297 297 0 0.0
/ Dadra & Nagar Haveli 635 635 0 0.0 679 679 0 0.0
/ Goa 422 421 -1 -0.2 501 489 -12 -2.4
/ Western Region 43,293 42,462 -831 -1.9 44,166 42,757 -1,409 -3.2
/ Andhra Pradesh 6,128 6,030 -98 -1.6 7,144 6,549 -595 -8.3
/ Telangana 6,389 5,964 -425 -6.7 7,884 6,648 -1,236 -15.7
/ Karnataka 8,818 7,955 -863 -9.8 10,001 9,503 -498 -5.0
/ Kerala 3,513 3,342 -171 -4.9 3,760 3,495 -265 -7.0
/ Tamil Nadu 12,220 11,083 -1,137 -9.3 13,663 13,498 -165 -1.2
/ Puducherry 318 317 -1 -0.3 389 348 -41 -10.5
/ Lakshadweep # 8 8 0 0 8 8 0 0
/ Southern Region 34,953 33,003 -1,950 -5.6 39,094 35,698 -3,396 -8.7
/ Bihar 2,904 2,754 -150 -5.2 2,992 2,792 -200 -6.7
/ DVC 2,523 2,483 -40 -1.6 2,653 2,590 -63 -2.4
/ Jharkhand 1,065 1,055 -10 -0.9 1,075 1,055 -20 -1.9
/ Odisha 3,670 3,620 -50 -1.4 3,814 3,764 -50 -1.3
/ West Bengal 6,310 6,290 -20 -0.3 7,544 7,524 -20 -0.3
/ Sikkim 78 78 0 0.0 82 82 0 0.0
- / Andaman- Nicobar # 40 32 -8 -20 40 32 -8 -20
/ Eastern Region 15,869 15,684 -185 -1.2 16,909 16,609 -300 -1.8
/ Arunachal Pradesh 125 116 -9 -7.2 139 126 -13 -9.4
/ Assam 1,435 1,250 -185 -12.9 1,435 1,257 -178 -12.4
/ Manipur 140 138 -2 -1.4 141 138 -3 -2.1
/ Meghalaya 350 338 -12 -3.4 350 338 -12 -3.4
/ Mizoram 90 80 -10 -11.1 90 82 -8 -8.9
/ Nagaland 120 115 -5 -4.2 140 118 -22 -15.7
/ Tripura 270 222 -48 -17.8 310 266 -44 -14.2
- / North-Eastern Region 2,525 2,125 -400 -15.8 2,528 2,141 -387 -15.3
/ All India 137,235 132,344 -4,891 -3.6 148,166 141,160 -7,006 -4.7
# Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability
26NOTE: Cumulative figures of Andhra Pradesh and Telangana are w.e.f. Jun 2014 due to bifurcation of Andhra Pradesh into Andhra Pradesh and Telangana w.e.f. June, 2014..
, 2014 / November,2014 ,2014 -, 2014/ April,2014 to November,2014
Surplus / Deficit (-) Surplus / Deficit (-)
() / Peak Demand and Peak Met (Revised)
/ (-) / (-) /State
/ Figures in MW net
-
/ / State/ Region
/ Northern Region
/ Chandigarh*
/ Delhi
/ Haryana
/ Himachal Pradesh
/ Jammu & Kashmir*
/ Punjab
/ Rajasthan
/ Uttar Pradesh
/ Uttarakhand
/ Western Region
/ Chhattisgarh
/ Gujarat
/ Madhya Pradesh
/ Maharashtra
/ Goa
/ Southern Region
/ Andhra Pradesh
/ Telangana
/ Karnataka
/ Kerala
/ Tamil Nadu
/ Puducherry No Restrictions
/ Bihar
/ Jharkhand
/ Odisha
/ West Bengal
27
Three Phase Supply : 7:21 hrs/day (Average) Single phase Supply : 24:00 hrs/day (Average)
, 2014 / Power Supply to Agricultural Sector during December,2014
Three Phase Supply : 9 hrs/day (Average) Single phase Supply : 18 hrs/day (Average)
There is no agricultural load in Delhi.
Three Phase Supply :08:35 hrs/day (Average)
HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply : 18 hrs/day
Three Phase Supply : 6.45 hrs/day (Average) Single phase Supply( FRP/Non FRP Feeders) : 24.00 hrs/day (Average)
/ / / / Average Hours of Supply
/ Eastern Region
About 23 hrs
No Restrictions
Three Phase Supply : 9 hrs/day is ensured (6 hrs during day time and 3 hrs during night time)
About 18 hrs
About 20 hrs
Three Phase Supply(Mixed) : 23:03 hrs /day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture. Single Phase supply during rest of 16 hours. Jyotigram Yojana 24 hrs.
* Data not received .
24 hrs
Three Phase Supply : 6 hrs/day Single Phase Supply : 6 - 12 hrs/day
Three Phase Supply : 11:00 hrs/day (Average) Single phase Supply : 11:37 hrs/day (Average)
Three Phase Supply : 21:08 hrs/day (Average) Single phase Supply : 21:08 hrs/day (Average)
Three Phase Supply : 07 hrs/day .
No restriction
Three Phase Supply : 07 hrs/day .
-
/ / State/ Region / / / / Energy Cut / / / / Demand cut
/ Northern Region
/ Chandigarh*
/ Delhi NIL NIL
/ Haryana NIL NIL
/ HimachalPradesh
NIL NIL
/ Jammu & Kashmir*
/ Punjab NIL NIL
/ Rajasthan NIL NIL
/ Uttar Pradesh NIL NIL
/ Uttarakhand 0.403 MU/day on HT/LT industries . 140 MW cut on HT/LT industries.
/ Western Region
/ Chhattisgarh NIL NIL
/ Gujarat
/ Madhya Pradesh NIL NIL
/ Maharashtra NIL NIL
/ Goa NIL NIL
/ Southern Region
/ Andhra Pradesh
/ Telangana
/ Karnataka
/ Kerala
/ Tamil Nadu
/ Puducherry
/ Eastern Region
/ Bihar
/ Jharkhand
/ Odisha
/ West Bengal
28
, 2014 / Notified Power Cuts/Restrictions on Industries during December,2014
20% Cut on base Demand and Energy Consumption in respect of HT industrial and commercial consumers during day
time. 90 % cut on base Demand (1800 hrs to 2200 hrs) had been imposed.
; However, there was load shedding of upto 1941 MW (313.15 MU for
Nil; However, there was load shedding of upto 312 MW (8.71 MU for the month).
Nil; However, there was load shedding up to 1250 MW during peak hours (177.08 MU for the month).
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday, then they will
have to be staggered on notified day only and cannot avail as per their choice. All industries are required to keep their
recess
Nil; However, there was load shedding up to 175 MW during peak hours (18.48 MU for the month).
Nil; However, there was load shedding of upto 367 MW (99.73 MU for the month).
* Data not received .
Nil; However, there was load shedding up to 15 MW during peak hours (0.035 MU for the month)
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
-
SN Contents Page1 Growth of Installed Capacity since 6th Plan 292 Growth of Transmission Sector since 6th Plan 303 All India Yearly Coal consumption for Power Generation (Utilities)4 All India Annual Per Capita Consumption of Electricity since -20065 Average cost of power supply & Average realisation (Paisa/kwh)6 Growth of Rural Electrification & Pump Sets Energisation7 Status of Hydro Schemes Cleared by the CEA during April '14 to December '14
Section G - Growth of Power Sector
31
32
-
(In MW)
Coal Gas Diesel TotalEnd of 6th Plan 26310.83 541.50 177.37 27029.70 1095 14460.02 0 42584.72End of 7th Plan 41237.48 2343.00 165.09 43745.57 1565 18307.63 18.14 63636.34End of 8th Plan 54154.48 6561.90 293.9 61010.28 2225 21658.08 902.01 85795.37End of 9th Plan 62130.88 11163.10 1134.83 74428.81 2720 26268.76 1628.39 105045.96End of 10th Plan 71121.38 13691.71 1201.75 86014.84 3900 34653.77 7760.6 132329.21End of 11th Plan 112022.38 18381.05 1199.75 131603.18 4780 38990.4 24503.45 199877.03End of December '14 154170.89 22971.25 1199.75 178341.89 4780 40867.43 31692.14 255681.46Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on 31-03-13) = 40, 726 MW
Coal Gas Diesel Nuclear Hydro Res Total154170.89 22971.25 1199.75 4780.00 40867.4 31692.14 229251.74
29
1. Growth of Installed Capacity Since 6th Plan
All India Generating Installed Capacity ( MW ) (As on 31-12-2014 )
RES (MNRE) TotalPlan / Year NuclearThermal
Hydro
Coal Gas Diesel Nuclear Hydro Res
-
Transmission System Type
Voltage (KV) level
UnitAch. At the end of 6th Plan
Ach. At the end of 7th Plan
Ach. At the end of 8th Plan (as
on 31.3.1997)
Ach. At the end of 9th Plan (as
on 31.3.2002)
Ach. as on 31.03.2007
(End of 10th Plan)
Ach. as on 31.03.2012
(End of 11th Plan)
Ach. as on 31.12.2014
Target 31.03.2017
(End of 12th Plan)
765 ckm 0 0 0 1160 2184 5250 16292 32250
400 ckm 6029 19824 36142 49378 75722 106819 133042 144819
220 ckm 46005 59631 79600 96993 114629 135980 147919 170980
Total ckm 52034 79455 115742 147531 192535 248049 297253 348049
HVDC ckm 0 0 1634 4738 5872 9432 9432 16872
Total (AC+HVDC) ckm 52034 79455 117376 152269 198407 257481 306685 364921
765 MVA 0 0 0 0 0 25,000 103500 174000
400 MVA 9330 21580 40865 60380 92942 1,51,027 190242 196027
220 MVA 37291 53742 84177 116363 156497 2,23,774 265103 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 558845 669801
HVDC MW 0 0 0 5200 8200 9750 13500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 572345 692301
Inter-regional transmission
CapacityMW 14050 27750 44850 65550
30
AC Transmission lines
AC Substations Transformation
Capacity
* Inter-regional transmission Capacity at the end of 12th Plan excludes 600 MW of 132 / 110 kV lines operated in radial mode time to time
2. Growth of Transmission Sector Since 6th Plan
-
2004-05 278.002005-06 281.002006-07 302.002007-08 330.002008-09 355.002009-10 367.002010-11 387.002011-12 417.562012-13 454.602013-14 489.40
Year2005-062006-072007-082008-092009-102010-112011-122012-13
2004-05 254 209 75.682005-06 260 221 76.362006-07 276 227 74.232007-08 293 239 77.272008-09 340 263 87.132009-10 355 268 88.702010-11 378 301 115.12
Source:- PFC Reports on the performance of State Power Utilities31
914.41 # (GrossGen.+ Net Import) / Mid year population
5. Average cost of power supply & average realization ( paise/KWH )
Yearcost of supply
(paise/unit)
Realization(paise/unit)
Including Agriculture Only Agriculture
818.8883.63
Per Capita Consumption ( kWh)#631.4671.9717.1
3. All India yearly Coal Consumption for Power Generation (Utilities)
YEAR Coal Consumption Million Tonnes
4. All India Annual per Capita consumption of Electricity Since 2006
733.5778.6
-
Commulative upto 30-11-2014
Sl. No
Name of Scheme State Executing Agency
Installed Capacity Cost
Date of Clearance
32
7.Status of Hydro Schemes Cleared by the CEA during April 2014 to December 2014
6. Growth Of Rural Electrification & Pumpsets Energisation.Plan Year
9th Plan2002-03
134092626
4111
27802093
2003-042004-05
27813884
Pump Sets Energised Villages Electricfied (Nos.)
297594311060
3207
316074
01.04.11 to 31.03.12
01.04.07 to 31.03.0801.04.08 to 31.03.0901.04.09 to 31.03.1001.04.10 to 31.03.11
5743
9769
1997-981998-991999-002000-012001-02
284064367244
1218
Cumu. upto End of 10th Plan
2005-062006-07
1263222594
10th Plan611750
1576036
44517482864 # 15455554
2314176
651095322968331020397343
Nil
412667
# No. of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification since 2004-05
65291374575 296361511th Plan
Cumu. upto End of 11th 572586 19173303557439 18423975
499150557976840909
86293726
46708
-
SN Contents Page1 Rate of sale of power for the year 2012-2013 33 - 41
RATE OF SALE OF POWER FOR THE YEAR 2012-2013
-
Name of Utility/Power Station UTILITY
Energy Source-Coal/Gas/
Naptha/LSHS/Diesel/Hydro
Net Gen (Mkwh).
Rate of Sale of Power
(Paise/Kwh)
NORTHERN REGIONCENTRAL SECTOR
BHAKRA (RB+LB) +GANGUWAL+KOTLA BBMB HYDRO-HYDRO 5910.72 28.84DEHAR H P S BBMB HYDRO-HYDRO 3156.78 57.96PONG H P S BBMB HYDRO-HYDRO 1805.34 15.31BAIRA SIUL HPS NHPC LTD. HYDRO-HYDRO 707.63 174.70CHAMERA- I HPS NHPC LTD. HYDRO-HYDRO 2443.96 161.90CHAMERA- II HPS NHPC LTD. HYDRO-HYDRO 1430.27 331.20CHAMERA- IIi HPS NHPC LTD. HYDRO-HYDRO 711.07 445.80DHAULI GANGA HPS NHPC LTD. HYDRO-HYDRO 1122.37 340.70CHUTAK NHPC LTD. HYDRO-HYDRO 24.92 1564.90DULHASTI HPS NHPC LTD. HYDRO-HYDRO 2022.14 617.80SALAL HPS NHPC LTD. HYDRO-HYDRO 3286.05 217.50TANAKPUR HPS NHPC LTD. HYDRO-HYDRO 474.09 228.20URI HPS NHPC LTD. HYDRO-HYDRO 2964.49 232.20SEWA - II NHPC LTD. HYDRO-HYDRO 477.14 486.20ANTA CCPP NTPC LTD. THERMAL-GAS 2125.08 477.00AURAIYA CCPP NTPC LTD. THERMAL-GAS 2692.70 603.00BADARPUR TPS NTPC LTD. THERMAL-COAL 4181.14 462.00DADRI (NCTPP) NTPC LTD. THERMAL-COAL 5811.93 392.00DADRI (NCTPP) NTPC LTD. THERMAL-COAL 6405.53 455.00DADRI CCPP NTPC LTD. THERMAL-GAS 4311.51 518.00FARIDABAD CCPP NTPC LTD. THERMAL-GAS 2344.44 530.00RIHAND STPS I NTPC LTD. THERMAL-COAL 6381.66 204.00RIHAND STPS ii NTPC LTD. THERMAL-COAL 7981.99 208.00RIHAND STPS III NTPC LTD. THERMAL-COAL 889.20 315.00SINGRAULI STPS NTPC LTD. THERMAL-COAL 15035.84 164.00TANDA TPS NTPC LTD. THERMAL-COAL 2835.27 340.00F. G. UNCHAHAR TPS I NTPC LTD. THERMAL-COAL 3124.88 342.00F. G. UNCHAHAR TPS II NTPC LTD. THERMAL-COAL 3109.86 375.00F. G. UNCHAHAR TPS III NTPC LTD. THERMAL-COAL 1576.54 390.00NARORA A.P.S. 1 & 2 NPCIL NUCLEAR-NUCLEAR 2203.02 247.08RAJASTHAN A.P.S. NPCIL NUCLEAR-NUCLEAR 8015.10 301.99NJHPS SJVNL HYDRO-HYDRO 6728.52 194.10TEHRI HPP THDC HYDRO-HYDRO 3085.51 558.00KOTESHWAR HEP THDC HYDRO-HYDRO 1152.86 550.00NEYVELI BARSINGSAR NEYVELI LIGNITE CORP. LTD. THERMAL-LIG 1118.40 403.07
STATE SECTORPANIPAT TPS HPGCL THERMAL-COAL 7994.65 347.26DCRTPP (UNIT 1 TO 2) , Y. NAGAR HPGCL THERMAL-COAL 862.53 315.40RGTPP (UNIT 1TO 2), KHEDAR, HISSAR HPGCL THERMAL-COAL 4696.61 327.40WYC HYDEL STATION & KAKROI HYDEL PLANT HPGCL HYDRO-HYDRO 245.46 116.87GIRI POWER HOUSE HPSEB HYDRO-HYDRO 190.00 520.00ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 60.00 520.00GUMMA POWER HOUSE HPSEB HYDRO-HYDRO 4.00 520.00BHABA POWER HOUSE/SANJAY P HOUSE HPSEB HYDRO-HYDRO 364.00 520.00GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 62.00 520.00BASSI POWER HOUSE HPSEB HYDRO-HYDRO 246.00 520.00BINWA POWER HOUSE HPSEB HYDRO-HYDRO 29.00 520.00GAJ POWER HOUSE HPSEB HYDRO-HYDRO 34.00 520.00BANER POWER HOUSE HPSEB HYDRO-HYDRO 38.00 520.00
P-33
RATE OF SALE OF POWER FOR THE YEAR 2012-2013
-
Name of Utility/Power Station UTILITY
Energy Source-Coal/Gas/
Naptha/LSHS/Diesel/Hydro
Net Gen (Mkwh).
Rate of Sale of Power
(Paise/Kwh)
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 10.00 520.00THIROT POWER HOUSE HPSEB HYDRO-HYDRO 13.00 520.00KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 41.00 520.00LARJI POWER HOUSE HPSEB HYDRO-HYDRO 573.00 520.00NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 6.00 520.00CHABA POWER HOUSE HPSEB HYDRO-HYDRO 8.00 520.00RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 1.00 520.00RONGTONG POWER HOUSE HPSEB HYDRO-HYDRO 1.00 520.00CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 1.00 520.00SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 3.00 520.00BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 10.00 520.00GAS TURBINE POWER STATION IPGCL THERMAL-GAS 1269.77 396.60RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 687.84 482.60PPS-I PPCL THERMAL-COAL 2444.29 314.60PPS-III PPCL THERMAL-GAS 1363.10 426.30LOWER JHELUM J&KPDD HYDRO-HYDRO 552.09 69.00UPPER SINDH -I SUMBAL KANGAN J&KPDD HYDRO-HYDRO 81.55 70.00UPPER SINDH -II KANGAN J&KPDD HYDRO-HYDRO 305.77 99.00GANDHARBAL J&KPDD HYDRO-HYDRO 21.41 50.00BAGLLIHAR HEP J&KPDD HYDRO-HYDRO 2807.40 351.00KARNAH MPH J&KPDD HYDRO-HYDRO 4.33 291.00CHENANI I J&KPDD HYDRO-HYDRO 88.77 81.00CHENANI II J&KPDD HYDRO-HYDRO 7.95 102.00CHENANI III UDHAMPUR J&KPDD HYDRO-HYDRO 19.66 156.00SEWA-III J&KPDD HYDRO-HYDRO 11.60 216.00IQBAL MHP KARGIL J&KPDD HYDRO-HYDRO 6.28 183.00HUNDER MHP J&KPDD HYDRO-HYDRO 0.65 258.00SUMOOR J&KPDD HYDRO-HYDRO 0.13 336.00BAZGO MHP J&KPDD HYDRO-HYDRO 0.46 326.00IGO MERCELLONG J&KPDD HYDRO-HYDRO 8.34 486.00PAHALGAM MHP J&KPDD HYDRO-HYDRO 7.70 561.00MARPACHOO J&KPDD HYDRO-HYDRO 1.18 505.00HAFTAL J&KPDD HYDRO-HYDRO 1.86 490.00BADERWAH POWER HOUSE J&KPDD HYDRO-HYDRO 1.73 161.00STAKNA J&KPDD HYDRO-HYDRO 2.50 245.00G.N.D.T.PLANT BATHINDA PSEB THERMAL-COAL 1326.53 441.00G.G.S.S.T.PLANT ROPAR PSEB THERMAL-COAL 8406.72 441.00G.H.T.PLANT LEHRA MOHABAT PSEB THERMAL-COAL 6643.08 441.00SHANAN POWER HOUSE JOGINDER NGR PSEB HYDRO-HYDRO 439.28 441.00U.B.D.C.PATHANKOT / MALIKPUR PSEB HYDRO-HYDRO 318.44 441.00ASHP ANANDPUR SAHIB PSEB HYDRO-HYDRO 639.50 441.00MUKERIAN HYDEL TALWARA PSEB HYDRO-HYDRO 1420.81 441.00RANJIT SAGAR Dam(R.S.D) SHAPUR KANDI. PSEB HYDRO-HYDRO 1428.48 441.00KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 8815.99 397.80SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 9613.85 409.80CHHABRA TPS RRVUNL THERMAL-COAL 2611.60 289.60RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 490.52 358.90DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-R-LNG 1123.31 399.40MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 202.75 69.10MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 17.30 378.00GIRAL -II RRVUNL HYDRO-HYDRO 166.63 247.10KHARA HPS UPJVNL HYDRO-HYDRO 374.66 71.00MATATILLA HPS UPJVNL HYDRO-HYDRO 118.26 51.00OBRA HPS UPJVNL HYDRO-HYDRO 313.72 44.00RIHAND/PIPRA HPS UPJVNL HYDRO-HYDRO 771.27 48.00U.G.CANAL HPS UPJVNL HYDRO-HYDRO 21.14 202.00ANPARA A TPS UPRVUNL THERMAL-COAL 2977.06 184.00ANPARA B TPS UPRVUNL THERMAL-COAL 6716.79 240.00
P-34
-
Name of Utility/Power Station UTILITY
Energy Source-Coal/Gas/
Naptha/LSHS/Diesel/Hydro
Net Gen (Mkwh).
Rate of Sale of Power
(Paise/Kwh)
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 189.65 526.00HARDUAGANJ EXTN. TPS UPRVUNL THERMAL-COAL 876.93 401.00OBRA A TPS UPRVUNL THERMAL-COAL 451.82 287.00OBRA B TPS UPRVUNL THERMAL-COAL 3141.13 235.00PANKI TPS UPRVUNL THERMAL-COAL 751.02 443.00PARICHHA TPS UPRVUNL THERMAL-COAL 310.11 392.00PARICHHA EXTN.TPS UPRVUNL THERMAL-COAL 2331.69 396.00PARICHHA EXTN. ST. 2 TPS UPRVUNL THERMAL-COAL 1146.74 407.00CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 341.90