lll'(d '1"1 (Cfll ( Government of India
ftl <:<I (1 oR ;j I (01 <I ,., Ministry of Power ~~ fl4 f4 ?J)d '1"1 ~ Rl
Northern Regional Power Committee
~: 09.06.2017
Wn"if: Sl"''l&l"' flii.-cP~ \3qf!~Rl ~~I To: Members of OCC
Subject: Prop.osed outage programme of Transmission Assets for consideration in1361h
OCC Meeting-Reg.
\3".~.-Rf.B". ~ ~- 05.06.2017 ~ f!ii;8&1Cfl ~~~if, \3<:"q 1~'1 cf;qf.i<:j'f ID"<T \3<:"q I ~'1 ~ ~ rn=t13fUT ~ CfiT S1fa1Rla ~ Cflllf9flii \3".~.-Rf.B". cf;T ~Gifll'tiC: tR: ~a-~ 1 ~ ~ Cflllf9flii 14.06.2017 eFT 10:30 ~it Rl~ltl Cfliibf?i41 ~ ~ Sl"''l&l"' fliirq4 \3qf!fl!Rl cf;T f.tmfur 136cff ~if~ ID"<T ~-~l<T ~ ~ I
This is with reference to the NRPC letter of even no. dated 05.06.2017. The outage program of Generating Units and Transmission Lines proposed by Generating companies and Transmission Licensee's has been uploaded on NPRC's web-site. This proposed outage programme is for consideration/approval of the OCC in its 1361
h
meeting scheduled to be held on 14.06.2017 at 10:30 hrs through video conferencing.
~?:5'1'1 \_ - o9 .c b.::~;<N~
(~~)
~merur ~( S1 "''I r1 'i)
2
PROPOSED OUTAGE OF GENERATING UNITS FOR THE 136th OCC MEETING ANNEXURE 1
NTPC-NR
Station/Unit/Capacity Period Remarks
From To Schedule O/H Days
Singrauli/U#2/200 MW 01.07.17 25.07.17 25 Boiler O/H+ Expansion bellow replacement+ ESP R&M.
Rihand/U#6/500 MW 03.07.17 01.08.17 30 Boiler over haul, Inspection of LPT blades+ Turbine Governing system over haul.
Unchahar/U#4/210 MW 01.07.17 25.07.17 25 Boiler Over haul
Tanda/ U#3/110 MW 01.07.17 25.07.17 25 Boiler Over haul
PROPOSED OUTAGE OF INTER REGIONAL TRANSMISSION LINES FOR THE 136th OCC MEETING ANNEXURE 2A
Sno Request By Element Name Owner Name Mode Reasons
From Date From Time To Date To
Time Remarks Request Detail
1 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-1(765 kv) Rajasthan Daily Stability test for spare
reactors. 12-7-2017 9:00 12-7-17 20:00 -
2 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-2(765 kv) Rajasthan Daily Stability test for spare
reactors. 19-07-17 9:00 19-07-17 20:00 -
3 SLDC_RAJASTHAN
[ RAJASTHAN ] Kota-Badod(220 kV) Rajasthan Daily
To carry out the annual bay
maintenance of the bay equipment. 20-07-17 7:00 20-07-17 18:00 -
4 POWERGRID
[ DELHI ] 765 kV S/C Bhiwani-
Jaipur-I (PG) Line(765 kV) Powergrid Daily
Commissioning of CSD for Line Reactor
& NGR Bypass scheme at Bhiwani 10-07-17 8:00 10-07-17 13:00 -
5 POWERGRID
[ DELHI ] 765 kV S/C Bhiwani-
Jaipur-I (PG) Line(765 kV) Powergrid Daily
Commissioning of CSD for Line Reactor
& NGR Bypass scheme at Bhiwani 11-07-17 8:00 11-07-17 13:00
-
6 POWERGRID
[ DELHI ] Balia-Patna Ckt-3(400 kV) Powergrid Daily
As informed by ER-1 applied for polymer insulator installation
by replacing disc insulator. During this opportunity S/D , NR-
III will also replace disc insulator by
polymer 01-07-17 7:00 04-07-17 18:00
7 SLDC_ UTTAR
PRADESH
500KV DC Dadri Dankaur Earth Electrode line
(Both Ckt.) UP Daily
For stringing (crossing) of 400KV Jahangirpur Greater
Noida lineS/D is being applied as due to
ROW problem it may not be possible to
avail already applied S/D during June-17. 1-7-17 7:00 2-7-17 19:00
8 SLDC_ UTTAR
PRADESH 765KV Unnao-Anpara C
Line UP Daily
For Routine Protection Testing of
Anpara 'C' line 5-7-17 8:00 5-7-17 18:00
9 SLDC_ UTTAR
PRADESH 765 kV Bara- MainpuriCkt-II UP Daily
For Maintenance after first charging of 765
kV line with tightening/ replacement etc. 5-7-17 8:00 6-7-17 18:00
10 POWERGRID
[ DELHI ] 765KV LUCKNOW-BAREILLY(765 kV) Powergrid Daily
For taking of line reactor out of service
for AMP work at 765KV Bareilly
Outage required for one hour each in the morning at 9:00Hrs
and 17:00Hrs respectively 11-7-17 9:00 11-7-17 18:00
11 POWERGRID
[ DELHI ] Balia-Bhiwadi Pole 2(500
kV) Powergrid Continuous
Diversion work by Bhiwadi due to
Railway DFCC project 01-7-2017 8:00 15-7-17 18:00
12 POWERGRID
[ DELHI ] Balia-Bhiwadi Pole 1(500
kV) Powergrid Continuous
Diversion work by Bhiwadi due to
Railway DFCC project 01-7-2017 8:00 15-7-17 18:00
13 POWERGRID
[ DELHI ] Meerut-Bhiwani(PG)(765
kV) Powergrid Daily
Line AMP,Tightening of Jumper, Spacers & other equipment AMP
at Bhiwani 03-07-17 8:00 03-07-17 18:00
14 POWERGRID [ DELHI ] Agra-Jatikala(765 kV) Powergrid Daily
Jumper tightening and other line
maintenance work. 01-07-17 8:00 01-07-17 18:00
15 POWERGRID
[ DELHI ] Agra-Meerut(765 kV) Powergrid Daily
Jumper modification at Meerut and other maintenance work. 03-07-17 8:00 04-07-17 18:00
16 POWERGRID
[ DELHI ] Balia-Patna Ckt-4(400 kV) Powergrid Daily
As informed by ER-1 applied for polymer insulator installation
by replacing disc insulator. During this opportunity S/D , NR-
III will also replace disc insulator 05-07-17 7:00 08-07-17 18:00 -
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE 136th OCC MEETING ANNEXURE 2B
Request By Element Name Owner Name Mode Reasons From Date From
Time To Date To Time Remarks
Request Detail
1 NTPC [ DELHI ]
Koldam(NTPC)-Banala(PKTCL)
(400 kV)
Parbati-Koldam
Transmission Co. ltd. Daily
To carryout DGA of 400kV CT after First Charging of 400kV
Switchyard 6-7-17 09:00 6-7-17 13:00
2 NTPC [ DELHI ] Koldam(NTPC)-
Nallagarh(PG)(400 kV) Powergrid Daily
To carryout DGA of 400kV CT after First Charging of 400kV
Switchyard 5-7-17 14:00 05-7-17 18:00
3 NTPC [ DELHI ]
Koldam(NTPC)-Ludhiana(PKTCL)
2(400 kV)
Parbati-Koldam
Transmission Co. ltd. Daily
To carryout DGA of 400kV CT after First Charging of 400kV
Switchyard 5-7-17 09:00 5-7-17 13:00
4 NTPC [ DELHI ]
Koldam(NTPC)-Ludhiana(PKTCL)
1(400 kV)
Parbati-Koldam
Transmission Co. ltd. Daily
To carryout DGA of 400kV CT after First Charging of 400kV
Switchyard 4-7-17 09:00 4-7-17 13:00
5 NTPC [ DELHI ]
Sultanpur(UP)-Tanda(NTPC) 1
(220 kV) Uttar Pradesh Daily
Bay Equipment Maintenance and Testing. (Shutdown
required in 220 KV Tanda - New Tanda line which is LILO-ed at New Tanda from Sultanpur -
Tanda - 1 line) 12-717 08:00 13-7-17 18:00
6 SLDC_UP
[UTTAR PRADESH] Obra-Sultanpur(400
kV) Uttar Pradesh Daily
Replacement of disc insulator by polymer insulator and
Lopping & Chopping of tree branches and Other M&R
Works. 5-7-17 08:00 7-7-17 18:00
7 SLDC_UP
[UTTAR PRADESH] Azamgarh-Sultanpur
(400 kV) Uttar Pradesh Daily Maintenance work 8-7-17 08:00 10-7-17 18:00
8 SLDC_UP
[UTTAR PRADESH] Balia(PG)-Mau(UP) 1
(220 kV) Powergrid Continuous General maintenance and
testing of bay. 9-7-17 08:00 9-7-17 18:00
9 SLDC_UP
[UTTAR PRADESH] Lucknow(PG)-
Lucknow(UP)(400 kV) Powergrid Daily Tree cutting, Jumper tightening,
repairing of jumper 9-7-17 08:00 9-7-17 18:00
10 SLDC_UP
[UTTAR PRADESH] Lucknow-Unnao
(400 kV) Uttar Pradesh Daily Tree cutting, Jumper tightening,
repairing of jumper 10-7-17 08:00 10-7-17 18:00
11 SLDC_UP
[UTTAR PRADESH] Balia(PG)-Mau(UP) 2
(400 kV) Powergrid Continuous General maintenance and
testing of bay. 11-7-17 08:00 11-7-17 18:00
12 SLDC_UP
[UTTAR PRADESH] Lucknow(PG)-
Sultanpur(UP)(400 kV) Uttar Pradesh Daily Maintenance work 11-7-17 08:00 12-7-17 18:00
13 SLDC_UP
[UTTAR PRADESH] Agra-Unnao(400 kV) Uttar Pradesh Continuous
For replacement of old porcelain insulator by new
polymer insulator & repairing maintenance work. 1-7-17 08:00 09-7-17 18:00
14 SLDC_UP
[UTTAR PRADESH]
Sultanpur(UP)-Tanda(NTPC) 1
(220 kV) Uttar Pradesh Daily Maintenance work 13-7-17 08:00 16-7-17 18:00
15 SLDC_UP
[UTTAR PRADESH] Napp(NPC)-
Simbholi(UP)(220 kV) Uttar Pradesh Daily Line maintenance & looping and
chopping of tree branches. 14-7-17 08:00 15-7-17 18:00
16 SLDC_UP
[UTTAR PRADESH]
Muradnagar-Muzaffarnagar
(400 kV) Uttar Pradesh Continuous Replacement of CT, CVT and B
Bus pantograph isolator 14-7-17 08:00 16-7-17 18:00
17 SLDC_UP
[UTTAR PRADESH] Azamgarh-Mau
(400 kV) Uttar Pradesh Continuous General maintenance and
testing at 400 kV Kasara Mau 17-7-17 08:00 17-7-17 18:00
18 SLDC_UP
[UTTAR PRADESH]
Rai Bareilly(PG)-Unchahar(NTPC)
1(220 kV) Uttar Pradesh Daily Maintenance work 17-7-17 08:00 18-7-17 18:00
19 SLDC_UP
[UTTAR PRADESH]
Rai Bareilly(PG)-Unchahar(NTPC)
2(220 kV) Uttar Pradesh Daily Maintenance work 19-7-17 08:00 20-7-17 18:00
20 SLDC_UP
[UTTAR PRADESH] 400 kV Bara – Rewa
Road Ckt- II Uttar Pradesh Continuous
For LILO of 400 kV Rewa Road – Bara Ckt-I & II at 400 kV Meja
TPS 1-7-17 08:00 2-7-17 18:00
21 SLDC_UP
[UTTAR PRADESH] 400 kV Bara – Rewa
Road Ckt- I Uttar Pradesh Continuous
For LILO of 400 kV Rewa Road – Bara Ckt-I & II at 400 kV Meja
TPS 3-7-17 08:00 4-7-17 18:00
22 SLDC_UP
[UTTAR PRADESH] 400 kV Mainpuri (PG)
– Parichcha Uttar Pradesh Continuous
For LILO of 400 kV Mainpuri (PG) – OraiCkt-II at 400 kV Sw.
Yd at 765 MNP SS (SEUPPTCL) 4-7-17 08:00 5-7-17 18:00
23 SLDC_UP
[UTTAR PRADESH]
400KV Muradnagar-Aligarh line
Uttar Pradesh Daily Line maintenance and looping and chopping of tree branches. 11-7-17 08:00 12-7-17 18:00
24 SLDC_UP [UTTAR PRADESH]
400 KV Panki-Aligarh line Uttar Pradesh Continuous
1. For Diversion of line due to construction of NTPC plant in
Bilhoure between LNO 92 to 04 & General maintenance. No
supply loss. 2. For opening of line reactor & other maintenance work for 03
hours. 3 F ki b i
4-7-17 08:00 10-7-17 18:00
25 SLDC_UP [UTTAR PRADESH]
400KV Fatehabad(765)-Agra-I
line Uttar Pradesh Continuous
For replacement of damage jumper & fixing of pilot string copper bond, bull dog clamp and other line maintenance
k
28-7-17 08:00 31-7-17 18:00
26
SLDC_UP [UTTAR PRADESH]
Anpara-Sarnath 2 (400 kV) Uttar Pradesh Continuous General maintenance. 23-7-17 08:00 23-7-17 18:00
27 SLDC_UP
[UTTAR PRADESH] Azamgarh-Sarnath 1
(400 kV) Uttar Pradesh Continuous General maintenance. 24-7-17 08:00 24-7-17 18:00
28 SLDC_UP
[UTTAR PRADESH] Anpara-Sarnath 2
(400 kV) Uttar Pradesh Continuous General maintenance. 26-7-17 08:00 26-7-17 18:00
29 SLDC_UP
[UTTAR PRADESH]
Khodri(UPCL)-Saharnpur(UPPCL)-2
(220 kV) Uttar Pradesh Daily
For carryout maintenance works and looping/chopping of trees
laying in the corridor. 10-7-17 08:00 12-7-17 18:00
30 SLDC_UP
[UTTAR PRADESH] Khodri-Saharnpur ckt2
(400 kV) Uttar Pradesh Daily
For carryout maintenance works and looping/chopping of trees
laying in the corridor. 16-7-17 08:00 18-7-17 18:00
31 SLDC_UP
[UTTAR PRADESH] Mainpuri-Orai(220 kV) Uttar Pradesh Continuous
For LILO of Mainpuri (PG) OraiCkt-I at 765 kV MNP SS
(SEUPPTCL) 01-7-17 09:00 02-7-17 15:00
32 BBMB
(CHANDIGARGH) 400 KV Panchkula-
Panipat Line BBMB DAILY Replacement of earth wire fron
TL No. 767 to 770 03-7-17 08:00 4.7.17 17:00
33 BBMB (CHANDIGARGH)
220 KV Hisar-Sangrur Ckt-I & II BBMB Continuous
Shifting/raising of height between TL 314-315, 360-361 & 373-374 due to four laining of Kaithal-Rajsthan Border Road NH-152/65 & Shifting/raising of height between TL 230-231 due
toelectrification of Rohtak- Bhatinda Section of Railway.
19.6.17 8.00 4.7.17 17:00
34 BBMB
(CHANDIGARGH) 220 KV Sangur-Jamalpur Ckt. I BBMB Continuous
Overhauling of 220, 245KV SF-6 breaker ABB make installed at
220 KV S/s, BBMB, Sangrur. 19.6.17 8:00 24.6 17:00
35 BBMB
(CHANDIGARGH) 220 KV Sangur-Jamalpur Ckt. II BBMB
Continuous Overhauling of 220, 245KV SF-6 breaker ABB make installed at
220 KV S/s, BBMB, Sangrur. 26.6.17 8:00 1.7.16 17:00
36 BBMB
[ CHANDIGARGH ] Panipat-Narela 1(220
kV) BBMB Daily
Replacement of conventional Disc insulator with polymer
insulator. 11-7-17 08:00 22-7-17 17:00
37 BBMB
[ CHANDIGARGH ] Panipat-Dhulkote
1(220 kV) BBMB Daily
Replacement of conventional disc insulator with polymer
insulator. 01-7-17 08:00 10-7-17 17:00
38 BBMB
[ CHANDIGARGH ] Panipat-Kurukshetra
(220 kV) BBMB Daily
Replacement of conventional disc insulator with polymer
insulator. 24-7-17 08:00 31-7-17 17:00
39 BBMB
[ CHANDIGARGH ]
Ballabhgarh(BBMB)-Ch.Dadri(BBMB)
(220 kV) BBMB Continuous
For Shifting/Raising the Height of Towers due to electrification
and doubling of Rewari-Manheru railway line by
RRVNL. 6-7-17 08:00 20-7-17 17:00
40 BBMB
[ CHANDIGARGH ]
Ch.Dadri(BBMB)-Samaypur(BBMB)
(220 kV) BBMB Continuous
For Shifting/Raising the Height of Towers due to electrification
and doubling of Rewari-Manheru railway line by
RRVNL. 6-7-17 08:00 20-7-17 17:00
41 BBMB
[ CHANDIGARGH ]
Charkhi Dadri(BBMB)-Mohindergarh(HVPNL)
1(220 kV) Haryana Daily For testing of Tan delta of
equipments 03-7-17 08:00 03-7-17 17:00
42 BBMB
[ CHANDIGARGH ]
Badshahpur(HVPNL)-Samaypur(BBMB) 1
(220 kV) Haryana Daily Half yearly maintenance. 04-7-17 08:00 04-7-17 17:00
43 BBMB
[ CHANDIGARGH ]
Badshahpur(HVPNL)-Samaypur(BBMB) 2
(220 kV) BBMB Daily Half yearly maintenance. 05-7-17 08:00 05-7-17 17:00
44 SLDC_HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Jhajjar(APCPL) 2
(400 kV) Haryana Daily
For OPGW rectification work B/w T.No-121 to 123 & Gen. Maintenance work at S/Stn 04-7-17 08:00 04-7-17 17:00
45 SLDC_HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Jhajjar(APCPL) 2
(400 kV) Haryana Daily
For OPGW rectification work B/w T.No-99 to 101 & Gen. Maintenance work at S/Stn 05-7-17 08:00 05-7-17 17:00
46
SLDC_HARYANA [ HARYANA ]
Daultabad-Dhanonda ckt-1(400 kV) Haryana Daily
For tree cutting, Gen. Maintenance of line & Tie bay at 7-7-17 08:00 7-7-17 17:00
S/Stn
47 SLDC_HARYANA
[ HARYANA ] Jhajjar CLP-Kabulpur
1 (400 kV) Haryana Daily For attending hop spot in line
isolator 7-7-17 08:00 7-7-17 13:00
48 SLDC_HARYANA
[ HARYANA ] Dipalpur-Kabulpur 2
(400 kV) Haryana Daily For attending hop spot in line
isolator 10-7-17 08:00 10-7-17 13:00
49 SLDC_HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Jhajjar(APCPL) 1
(400 kV) Haryana Daily
For tree cutting, Gen Maintenance of line & Tie bay at
S/Stn 10-7-17 08:00 10-7-17 17:00
50 SLDC_HARYANA
[ HARYANA ] Daultabad-Dhanonda
ckt-2(400 kV) Haryana Daily
For tree cutting, Gen Maintenance. of line & Tie bay
at S/Stn 12-7-17 08:00 12-7-17 17:00
51 SLDC_HARYANA
[ HARYANA ]
400kV G.Noida(UP)-Nawada(HVPNL)
(400 kV) Powergrid Daily
Tightening of 400KV Nawada-G.Noida BPI & Bus and Gen.
Maintenance. 13-7-17 6:00 13-7-17 11:00
52 SLDC_HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Gurgaon(PG) -1
(400 kV) Haryana Daily
For tree cutting, Gen Maintenance. of line and Tie
bay at S/Stn. 18-7-17 08:00 18-7-17 17:00
53 SLDC_HARYANA
[ HARYANA ]
Daultabad(HVPNL)-Gurgaon(PG) -2
(400 kV) Haryana Daily
For tree cutting, Gen. Maintenance. of line and Tie
bay at S/Stn 19-7-17 08:00 19-7-17 17:00
54 SLDC_HARYANA
[ HARYANA ]
400kV Ballabgarh(PG)-Nawada(HVPNL)
(400 kV) Powergrid Daily
Tightening of 400KV Nawada- Ballabgarh BPI & Bus and Gen.
Maintenance 20-7-17 6:00 20-7-17 11:00
55 SLDC_RAJASTHAN
[ RAJASTHAN ]
Anta(RVPNL)-Kalisindh(RVPNL) 1
(400 kV) Rajasthan Continuous
For Erection of Tower at Loc No 09 & Stringing between Loc No 01 to 50 (old No) & 09 to 56 (old No) of 400 KV D/C Quad Moose Kalisindh TPS to Anta Line for shifting of line Near Kolana Air Strip between Loc No 50 to 56 7-7-17 08:00 14-7-17 18:00 -
56 SLDC_RAJASTHAN
[ RAJASTHAN ]
Anta(RVPNL)-Kalisindh(RVPNL) 2
(400 kV) Rajasthan Continuous
For Erection of Tower at Loc No 09 & Stringing between Loc No 01 to 50 (old No) & 09 to 56 (old No) of 400 KV D/C Quad Moose Kalisindh TPS to Anta Line for shifting of line Near Kolana Air Strip between Loc No 50 to 56 7-7-17 08:00 14-7-17 18:00 -
57 SLDC_RAJASTHAN
[ RAJASTHAN ] Chabra-Hindaun II
(400 kV) Rajasthan Continuous For opening of Jumper at
Location No. 67 10-7-17 08:00 11-7-17 18:00 -
58 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (A )-KOTA-1
D/C(220 kV) Rajasthan Continuous
FOR REPLACEMENT OF SEVERELY DETORIATED
BUS CONDUCTOR & Clamp connector OF 220 KV BUS B
and annual bay maintenance of the equipments 13-7-17 7:00 13-7-17 18:00 -
59 SLDC_RAJASTHAN
[ RAJASTHAN ] Akal-Jodhpur II
(400 kV) Rajasthan Continuous Quarterly Maintenance 12-7-17 10:00 12-7-17 18:00 -
60 SLDC_RAJASTHAN
[ RAJASTHAN ] Heerapura-Hindaun II
(400 kV) Rajasthan Continuous 2nd Quarterly maintenance of 400 KV side bay Equipments 04-7-17 10:00 04-7-17 17:00 -
63 SLDC_RAJASTHAN
[ RAJASTHAN ] Hindaun- Alwar
(400 kV) Rajasthan Continuous Quarterly maintenance 7-7-17 10:00 7-7-17 17:00 -
64 SLDC_RAJASTHAN
[ RAJASTHAN ] Akal-Barmer 1(400 kV) Rajasthan Continuous Quarterly maintenance 20-7-17 10:00 20-7-17 18:00 -
65 SLDC_RAJASTHAN
[ RAJASTHAN ] Bikaner-Didwana
1(400 kV) Rajasthan Continuous Routine bay maintenance 7-7-17 09:00 7-7-17 17:00 -
66 SLDC_RAJASTHAN
[ RAJASTHAN ] Anta-Lalsot(220 kV) Rajasthan Continuous Half yearly maintenance 13-7-17 08:00 13-7-17 11:00 -
67 SLDC_RAJASTHAN
[ RAJASTHAN ] Ratangarh(RVPNL)-Sikar(PG) 4(220 kV) Rajasthan Continuous Testing of relays of this bay 05-7-17 09:00 05-7-17 20:00 -
68 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (A )-
DEBARI(220 kV) Rajasthan Continuous For Line maintenance 13-7-17 09:00 13-7-17 18:00
69 POWERGRID [ DELHI ]
Kanpur(PG)-Singrauli(NTPC)
(400 kV) Powergrid Daily For Stringing of section AP 79/0
- AP 80/0 at Allahabad 20-6-17 08:00 20-6-17 18:00
70
POWERGRID [ DELHI ]
Agra(PG)-Auraiya(NTPC) 1
(400 kV)
Powergrid Continuous Retrofitting of C&P of Auriya-1 at Agra HVDC
02-7-17 8:00 05-7-17 18:00
71 POWERGRID [ DELHI ]
Agra-Fatehpur (400 kV) Powergrid Daily
Retro fitment of 710 89A 89B Auxiliary Bus Isolators ,taken Y phase of the LT out of service
and R phase taken into the service at Fatehpur, S/C(Line-2)
22-6-17 9:30 22-6-17 18:00
72 POWERGRID [ DELHI ]
Agra-Fatehpur (400 kV) Powergrid Continuous
For Diversion work due to DFCC work. At Agra HVDC ,
S/C(Line-2) 05-7-17 9:00 05-7-17 18:00
73 POWERGRID [ DELHI ]
Agra-Bhiwadi 1 (400 kV)
Powergrid Daily For Switchyard 04-7-17 9:00 04-7-17 18:00
74 POWERGRID [ DELHI ]
400KV LUCKNOW-SHAHJHNPR-II
(400 kV) Powergrid Daily
For recification / replacement of long twin moose jumpers in all three phases at location no. 14
15-6-17 8:30 16-6-17 18:00
75 POWERGRID [ DELHI ]
Fatehpur-Singrauli(220 kV)
Powergrid Daily For Stringing of section AP 79/0 - AP 80/0 at Allahabad
20-6-17 8:00 20-6-17 18:00
76 POWERGRID [ DELHI ]
Hiranagar(JK)-Sarna(PSEB)(220 kV) Powergrid Daily
For Diversion of highly vulnerable T. No. 66 on new
tower. Foundation od this tower severly got damaged by change of river flow. Dismatelling of old tower and de-stringing. Erection of new tower & stringing in span
65-66-67.
10-7-17 9:00 15-7-17 18:00
77 POWERGRID [ DELHI ]
Fatehabad-Moga (400 kV)
Powergrid Daily For AMP Works. 13-7-17 9:00 13-7-17 17:15
78 POWERGRID [ DELHI ]
Kishenpur-New Wanpoh - 1 (220 kV) Powergrid Daily
For replacement of damaged conductor in three spans of Pir
Panjal Area.
01-7-17 9:00 03-7-17 18:00
79 POWERGRID [ DELHI ]
Salal(NHPC)-Kishenpur(PG) 3
(220 kV) Powergrid Daily
For replacement of broken insulators and repair to damaged conductor.
19-7-17 9:00 19-7-17 17:00
80 POWERGRID [ DELHI ]
Chamera pool-Jalandhar 1(400 kV) Powergrid Daily
For Replacement/Installation of broken spacer in span 52-53
(719 m).
04-7-17 11:00 04-7-17 14:00
81 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .
03-7-17 8:00 03-7-17 18:00
82 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.
04-7-17 8:00 04-7-17 18:00
83 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.
09-7-17 8:00 09-7-17 18:00
84 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.
10-7-17 8:00 10-7-17 18:00
85 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.
15-7-17 8:00 15-7-17 18:00
86 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.
16-7-17 8:00 16-7-17 18:00
87 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .
21-7-17 8:00 21-7-17 18:00
88 POWERGRID [ DELHI ]
Jalandhar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .
22-7-17 8:00 22-7-17 18:00
89 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
6-7-17 8:00 6-7-17 18:00
90 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
7-7-17 8:00 7-7-17 18:00
91 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
12-7-17 8:00 12-7-17 18:00
92 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
13-7-17 8:00 13-7-17 18:00
93 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
18-7-17 8:00 18-7-17 18:00
94 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
19-7-17 8:00 19-7-17 18:00
95 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
24-7-17 8:00 24-7-17 18:00
96 POWERGRID [ DELHI ]
Nakodar - Kurukshetra(400 kV) Powergrid Daily
For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line
25-7-17 8:00 25-7-17 18:00
97 POWERGRID [ DELHI ]
Bhiwani(PGCIL)-Mohindergarh(Adani)-
1(400 kV)
Adani Power Limited Daily AMP and bay equipment jumper
tightening at Bhiwani end. 03-7-17 8:00 04-7-17 18:00
98 POWERGRID [ DELHI ]
Bhiwani(PGCIL)-Mohindergarh(Adani)-
2(400 kV)
Adani Power Limited Daily AMP and bay equipment jumper
tightening at Bhiwani end. 04-7-17 8:00 04-7-17 18:00
99 POWERGRID [ DELHI ]
Agra(PG)-Agra(UP) 1(400 kV) Powergrid Daily
Stringing of OPGW in LILO portion of Fatehabad(UP)-
Agra(UP)-2 line under ULDC project. Reapplied as
discussed in 135th OCC.
19-6-17 8:00 24-6-17 18:00
100 POWERGRID [ DELHI ]
Manesar-Neemrana 1(220 kV) Powergrid Daily
S/D for jumper tightening and providing pilot string on the
tension towers
03-7-17 8:00 03-7-17 18:00
101 POWERGRID [ DELHI ]
Manesar-Neemrana 2(400 kV) Powergrid Daily
S/D for jumper tightening and providing pilot string on the
tension towers 04-7-17 8:00 04-7-17 18:00
102 POWERGRID [ DELHI ]
Ballabgarh-Mainpuri 1(400 kV) Powergrid Continuous
For Line diversion work under DFCC. During S/D, 02 Nos
tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up.
Rescheduled-135OCC
08-7-17 8:00 17-7-17 18:00
103 POWERGRID [ DELHI ]
Ballabgarh-Mainpuri 2(400 kV) Powergrid Continuous
For Line diversion work under DFCC. During S/D, 02 Nos
tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up.
Rescheduled-135OCC
08-7-17 8:00 17-7-17 18:00
104 POWERGRID [ DELHI ]
Agra-Ballabgarh (400 kV) Powergrid Continuous
For Line diversion work under DFCC. During S/D, 02 Nos
tower to be erected out of 03 Nos tower after that stringing of the new section shall be taken
up.
01-7-17 8:00 7-7-17 18:00
105 POWERGRID [ DELHI ]
Ballabgarh-Kanpur 1(400 kV) Powergrid Continuous
For Line diversion work under DFCC. During S/D, 02 Nos
tower to be erected out of 04 Nos tower after that stringing of the new section shall be taken
up.
25-7-17 8:00 31-7-17 18:00
16 POWERGRID [ DELHI ]
Bhinmal-Kankroli(400 kV) Powergrid Daily
End to End testing of PLCC link after retrofitting and Dropper
replacement work of wave trap 14-7-17 8:00 14-7-17 18:00
17 POWERGRID [ DELHI ]
Bawana(GT)-Bhiwani (PG) (400 kV) Delhi Daily
Alternate day S/D for fixing CC Ring Grading Ring/ Arcing
Horn, check nut in jumpers & other AMP.
10-7-17 8:00 16-7-17 18:00
108 POWERGRID [ DELHI ]
Bahadurgarh(PG)-Bawana(GT)(400 kV) Powergrid Daily
Alternate day S/D for fixing CC Ring Grading Ring/ Arcing Horn ,check nut in jumpers & other
AMP.
11-7-17 8:00 13-7-17 18:00
109 POWERGRID [ DELHI ]
Bahadurgarh - Kabulpur(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP.
15-7-17 8:00 15-7-17 18:00
110 POWERGRID [ DELHI ]
Bahadurgarh - Kabulpur(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP. 18-7-17 8:00 18-7-17 18:00
111 POWERGRID [ DELHI ]
Bhiwani(BBMB)-Bhiwani(PG)(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP. 19-7-17 8:00 19-7-17 18:00
112 POWERGRID [ DELHI ]
Bhiwani(BBMB)-Hisar(PG)(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP.
20-7-17 8:00 20-7-17 18:00
113 POWERGRID [ DELHI ]
Bahadurgarh-Sonepat 1(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP. 21-7-17 8:00 21-7-17 18:00
114 POWERGRID [ DELHI ]
Bahadurgarh-Sonepat 2(400 kV) Powergrid Daily
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in
jumpers & other AMP. 22-7-17 8:00 22-7-17 18:00
115 POWERGRID [ DELHI ]
Neemrana-Sikar 1(400 kV) Powergrid Daily
Line maintenance, jumper tightening spacer & Bird guard
fixing. 05-7-17 8:00 6-7-17 18:00
116 POWERGRID [ DELHI ]
Neemrana-Sikar 2(400 kV) Powergrid Daily
Line maintenance, jumper tightening spacer & Bird guard
fixing. 7-7-17 8:00 08-7-17 18:00
117 POWERGRID [ DELHI ]
Agra-Kanpur(400 kV) Powergrid Continuous Retrofitting of C&P of Kanpur at AGRA HVDC
08-7-17 8:00 11-7-17 18:00
118 POWERGRID [ DELHI ]
Dhauliganga(NHPC)-Pithorgarh(PG)(220
kV)
Powergrid Daily For AMP Work at Pithoragarh 10-7-17 9:00 10-7-17 18:00
119 POWERGRID 400KV Moga(PG)-Hisar(PG) Line-2
POWERGRID Daily For AMP Works. 21.7.2017 9:00 21.7.2017 17:30
120 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-I (400 kV)
PSTCL Daily General Maintenance 03.7.17 10.00 03.7.17 16.00
121 SLDC_PUNJAB Kangra-Pathankot Ckt-I (132 kV) PSTCL Daily
Disc cleaning & Jumper tightening
05.7.17 10.00 05.7.17 16.00
122 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-II (400 kV)
PSTCL Daily General Maintenance 05.7.17 10.00 05.7.17 16.00
123 SLDC_PUNJAB Kangra-Pathankot Ckt-II (132 kV)
PSTCL Daily Disc cleaning & Jumper tightening
7.7.17 10.00 7.7.17 16.00
124 SLDC_PUNJAB Kangra-Pathankot Ckt-I (132 kV)
PSTCL Daily Disc cleaning & Jumper tightening and other
t t b d
10.7.17 10.00 10.7.17 16.00
125 SLDC_PUNJAB Moga-Nakodar (400kV)
PSTCL Daily General Maintenance 11.7.17 10.00 11.7.17 16.00
126 SLDC_PUNJAB Shanan-Kangra Ckt-I (132kV)
PSTCL Daily Disc cleaning & Jumper tightening and other
t t b d
13.7.17 10.00 13.7.17 16.00
127 SLDC_PUNJAB Shanan-Kangra Ckt-II (132kV)
PSTCL Daily Maintenance of line 14.7.17 10.00 14.7.17 16.00
128 SLDC_PUNJAB Talwandi Sabo – Nakodar (400 kV)
PSTCL Daily General Maintenance 17.7.17 10.00 17.7.17 16.00
129 SLDC_PUNJAB Nakodar-Makhu Ckt-I (400 kV)
PSTCL Daily General Maintenance 19.7.17 10.00 19.7.17 16.00
130 SLDC_PUNJAB Shanan-Kangra Ckt-I (132kV)
PSTCL Daily Maintenance of line 21.7.17 10.00 21.7.17 16.00
131 SLDC_PUNJAB Talwandi Sabo – Mukatsar I (400 kV)
PSTCL Daily General maintenance, Jumper tightening and Tree Cutting
21/7/17 16.00 21/7/17 22.00
132 SLDC_PUNJAB Hamirpur-Chohal (132kV)
PSTCL Daily Tightening of Jumpers of Dead end Towers, Disc Cleaning &
21.7.17 9.00 21.7.17 17.00
133 SLDC_PUNJAB Talwandi Sabo – Mukatsar II (400 kV)
PSTCL Daily General maintenance, Jumper tightening and Tree Cutting
22/7/17 17.00 22/7/17 23.00
134 SLDC_PUNJAB Nakodar-Makhu Ckt-II (400 kV)
PSTCL Daily General Maintenance 24.7.17 10.00 24.7.17 16.00
135 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-II (400 kV)
PSTCL Daily General Maintenance 26.7.17 10.00 26.7.17 16.00
136 SLDC_PUNJAB Talwandi Sabo – Mukatsar I (400 kV)
PSTCL Daily General maintenance, Jumper tightening and Tree Cutting
26/7/17 18.00 26/7/17 0.00
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR 136TH OCC MEETING ANNEXURE 3A POWER GRID NR 2 S.N. Details of Transmission Element Category
of element
DURATION Daily/ Continuo
us
Reason Voltage level (KV)
NAME OF THE ELEMENT AND SUBSTATION
FROM TO DATE TIME DATE TIME
X-2 For construction activity
1 800K V Champa Kurukshetra HVDC Pole-I
A 22.6.17 9:00 24.06.17 18:00 Daily To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at Kurukshetra.
2 800 KV Champa Kurukshetra HVDC Pole-I
A 05.7.17 9:00 7.07.17 18:00 Daily To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at Kurukshetra.
X-3 For O&M activity
1 765KV Meerut-Moga A 27.7.17 09:00 27.07.17 17:30 Daily For AMP Works.
Name of Transmission Utility/licensee : Uttar Pradesh Power Transmission Corporation Limited
Sl. No.
Detail of Transmission element
Code
Category to which
transmission element belong
(A/B/C/D)
Date Timings
Reason Remark Voltage level
Name of Transmission
Elements From To From To
1 2 3 4 5 6 7 8 9 10 11
1 765/400 KV
765KV MAIN BUS-I Unnao
A 26.6.17 27.6.17 08:00 18.00
Daily basis for erection & commissioning of new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power flow remain intact through 765 KV Main Bus-II only
Daily basis
2
765 KV 765 kV MNP SS SD of Bus -II
A 5.07.17 5.07.17 08:00 18:00 765 kV Bus-II extension upto Dia 3 & 4 for charging 3*80 MVAR Reactor in Dia-4
Daily basis
3
765 kV 765 kV MNP SS SD of Bus -I
A 6.07.17 6.07.17 08:00 18:00
765 kV Bus-I extension upto Dia 3 & 4 for Charging of 765 kV Greater Noida in Dia-4
Daily basis
4 765/ 400 KV
765KV MAIN BUS-I Unnao
A 13.7.17 14.7.17 08:00 18.00
Daily basis for erection & commissioning of new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power flow remain intact through 765 KV Main Bus-II only
Daily basis
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
S.No. Details of Transmission element Date Timings Type of Shutdown Purpose Remarks
Voltage Level Name From To From To Daily/Continuous
Basis
1 765 KV 400/765 KV ,3X500 MVA ICT Bank -III at 765kV GSS Anta
03.07.2017 05.07.2017 09.00 Hrs.
20.00 Hrs. Continuous
Synchronisation of 400/765 KV ICT
Bank-III with spare ICT
2 765 KV 400/765 KV ,3X500 MVA ICT Bank -II at 765kV GSS Anta
06.07.2017 08.07.2017 09.00 Hrs.
20.00 Hrs. Continuous
Synchronisation of 400/765 KV ICT
Bank-II with spare ICT
3 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - I at 765kV GSS Anta
10.07.2017 12.07.2017 09.00 Hrs.
20.00 Hrs. Continuous
For synchronisation
and commissioning of
765 KV Anta-Phagi ckt-I Line
Reactor Bank with spare Reactor
4 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - II at 765kV GSS Anta
17.07.2017 19.07.2017 09.00 Hrs.
20.00 Hrs. Continuous
For synchronisation
and commissioning of
765 KV Anta-Phagi ckt-I I Line Reactor Bank with
spare Reactor
5 765 KV 400/765 KV ,3X500 MVA ICT Bank -I at 765kV GSS Anta
20.07.2017 20.07.2017 09.00 Hrs.
20.00 Hrs. Continuous
RPH 2 relay, 02 nos
commissioning
6 765KV 800 KV CB (706-52B) of Phagi- Anta-1 line at 765kV GSS Phagi
04.07.2017 05.07.2017 9.00Hrs. 18.00Hrs Daily
1. Measurement of tan-delta of CTs 2.
Maintenance of CB & CTs. 3. Tightening of
clamps & connectors.
7 765KV 3X 500 MVA ICT-1 at 765kV GSS Phagi 12.07.2017 13.07.2017 9.00
Hrs. 18.00Hrs. Daily
1. To replace the damaged
conductors of dropper of quad
Bull from high bus to switching
isolator (701-89BT-R). 2. Tightening of
clamps & connectors. 3. To check the tripping
of CBs through main & auxiliary
protection.
8 765KV
800 KV Tie CB (707-52T) of Phagi- Anta-2 line at 765kV GSS Phagi
17.07.2017 18.07.2017 9.00Hrs. 18.00Hr. Daily
1 .Measurement of tan-delta of CTs 2.
Maintenance of CB & CTs. 3. Tightening of
clamps & connectors.
9 765KV 3 X 500 MVA ICT-2 at 765kV GSS Phagi 20.7.2017 21.07.2017 9.00Hrs. 18.00Hr. Daily
1. To check the air leakage from air
cell of R-Phase Tr. as the air has
been observed in the conservator
tank. 2. To check the tripping of CBs through Main &
auxiliary protection.
3. Measurement of Tan-delta of Bushings.
10 765KV 800 KV CB (702-52B) of ICT-2 at 765kV GSS Phagi
25.07.2017 26.07.2017 9.00Hrs. 18.00Hrs Daily
1 .For the measurement of
Tan-delta of Current
transformers. 2. Tightening of
clamps & connectors
.3. Maintenance of CB.
11 765KV 765 KV Bus-B at 765kV GSS Phagi 28.07.2017 28.07.2017 9.00Hrs. 19.00Hrs Daily
For the tightening of clamps &
connectors of droppers from Main Bus to isolators of
different 765KV Bays connected to
Main Bus-B.
PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE 136th OCC MEETING ANNEXURE 3 B HVPNL
Sr. No.
Details of Transmission
element Name of
S/Stn
Name of transmission
elements
Category to which
transmission element belong
(A/B/C/D)
Date Daily basis
Timings
Purpose/ Reasons
Voltage level From To From (Hrs.)
To (Hrs.)
1 400kV 400kV Nawada
400/220 kV, 315 MVA ICT-1, TIE-1 & Bus-
2
A 06.07.17 06.07.17 D 06:00 11:00 For General maintenance
of T/F and allied equipments
2 400kV 400kV D/Bad ICT-1 A 13.07.17 13.07.17 D 08:00 17:00 For General maintenance
3 400kV 400kV K/Pur
400/220 kV, 315 MVA ICT-2 A 14.07.17 14-07-2017 D 8:00
Hrs 17:00 Hrs
For Yearly Maintenance & Testing.
4 400kV 400kV D/Bad ICT-2 A 14.07.17 14.07.17 D 08:00 17:00 For General Maintenance
5 400kV 400kV D/Bad ICT-3 A 17.07.17 17.07.17 D 08:00 17:00 For General maintenance
6 400kV 400kV D/Bad
400KV Bus-Bar I A 24.07.17 24.07.17 D 08:00 17:00
Nut & Bolts tightening of bus isolators and attending
hot points
7 400kV 400kV D/Bad
400KV Bus-Bar II A 25.07.17 25.07.17 D 08:00 17:00
Nut & Bolts tightening of bus isolators and attending
hot points
8 400kV 400kV Nawada
400/220 kV, 250 MVA ICT-II, TIE-II & Bus-
II
A 27.07.17 27.07.17 D 06:00 11:00 For General maintenance
of T/F and allied equipments
BBMB
Sr. No.
Element Name Owner Name
Mode (Daily/Conti.)
Reasons From To
Date Time Date Time 3 220/33 KV 60 MVA Transformer
T-2 at Panipat BBMB Continuous basis For dehydration of transformer oil due to low
BDV 05.07.2017 8.00 06.07.2017 17.00
5 220/132 KV 100 MVA Transformer T-1 at Ch. Dadri
HVPNL Daily basis For testing of tan delta of equipments 06.07.2017 8.00 06.07.2017 17.00
6 220/132 KV 100 MVA Transformer T-2 at Chd. Dadri
HVPNL Daily basis For replacement of 220kV isolators 10.07.2017 8.00 12.07.2017 17.00
Name of Transmission Utility/licensee : Uttar Pradesh Power Transmission Corporation Limited
Sl. No.
Detail of Transmission element Date Timings
Reason Remark Voltage level Name of Transmission Elements From To From To
1 400kV 500 MVA ICT at 400kV S/S Azamgarh. 01.07.17 01.07.17 08:00 18:00 Replacement of Isolator. Continuous basis
2 400KV 400/220KV 240MVA ICT-II at Sultanpur 01.07.17 01.07.17 08:00 18.00 For Bay maintenance Daily basis
3 400KV 400/220KV 240MVA ICT-III at Sultanpur 03.07.17 03.07.17 08:00 18.00 For Bay maintenance and jumper tightness
of 220KV bay Daily basis
4 400 KV 400 KV MAIN BUS-I ALONG WITH 400 KV BUS COUPLER Sarojaninagar Lucknow
03.07.17 17.07.17 09:00 16:00
FOR RETROFITTING WORK OF BUS-I PANTOGRAPH ISOLATOR OF FOLLOWING BAYS:- (1) 400 KV SAROJINI NAGAR-UNNAO LINE (03.07.17 to 10.07.17) (2) 315 MVA 400/220 kV ICT-I (11.07.17 to 17.07.17)
Continuous basis
5 400kV 315 MVA ICT - I at 400kV S/S Azamgarh. 05.07.17 05.07.17 08:00 18:00 Replacement of Isolator. Continuous basis
10 400kV 315MVA ICT-I at 400KV sub-station, Muradnagar-I 06.07.17 08.07.17 08:00 18:00 Replacement of HV CT, HV side standard
isolator and HV side LA. Continuous basis.
11 400kV 500 MVA ICT at 400kV S/SAzamgarh. 07.07.17 07.07.17 08:00 18:00 Replacement of Isolator. Continuous basis
12 400KV 240MVA 400/220KV ICT-I at 400KV S/S Panki 08.07.17 08.07.17 08:00 18:00 For routine maintenance work. Daily basis
13 400KV 50MVAR line reactor at 400KV S/S Panki 09.07.17 13.07.17 09:00 12:00 For centrifuging of t/f oil Continuous basis
15 400kV 200 MVA T/F - I Bay at 400 kV S/S Kasara Mau 13.07.17 13.07.17 08:00 18:00 General maintenance and testing of bay. Continuous basis
16 400kV 400KV A Bus at 400KV Sub-station, Muradnagar-I 13.07.17 13.07.17 08:00 18:00 Replacement of R phase CVT Daily Basis
17 400KV 315 MVA ICT II alongwith 220KV Main Bus I & II Bareilly 14.07.17 14.07.17 08:00 Hrs. 18:00 Hrs. For Replacement of damaged Jack Bus. Daily basis
18 400kV 200 MVA T/F - II Bay at 400 kV S/S Kasara Mau 15.07.17 15.07.17 08:00 18:00 General maintenance and testing of bay. Continuous basis
19 400kV 315MVA ICT-II at 400KV Sub-station, Greater Noida 16.07.17 16.07.17 07:00 11:00 For general maintenance of T/F & its bay Daily Basis
20 400KV 400KV Bareilly - Unnao Ckt. I Main Breaker Bareilly 16.07.17 20.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis
21 400 KV Main Circuit Breaker of 400/220 KV 315 MVA ICT-I at Unnao end 17.07.17 24.07.17 08:00 18.00
Major Overhauling of Main Circuit Breaker of 400/220 KV 315 MVA ICT-I at Unnao end. (400/220 KV 315 MVA ICT-I remain charged through 400 KV TBC)
Continuous basis
22 400 KV 400KV Fatehabad-(765KV UP)Muradnagar line 17.07.17 27.07.17 08:00 18:00
For replacement of damage jumper & fixing of pilot string copper bond, bull dog clamp and other line maintenance work.
Daily basis
23 400kV 240MVA ICT-I at 400KV sub-station, Muradnagar-II 18.07.17 18.07.17 10:00 14:00 Tightening of Bay Daily Basis
24 400kV 400 kV Main Bus - I at 400 kV S/s Sarnath 18.07.17 30.07.17 08:00 18:00 General maintenance & strengthening of
Main Bus - I
Continuous basis. Load will be fed through Main Bus-II.
25 400kV 240MVA ICT-II at 400KV sub-station, Muradnagar-II 19.07.17 19.07.17 10:00 14:00 Tightening of Bay Daily Basis
26 400KV 400/220KV 240MVA ICT-I at Sultanpur 20.07.17 21.07.17 08:00 18.00 220KV side jumpers replacement Daily basis
27 400kV 500 MVA T/F - II Bay at 400 kV S/S Sarnath 20.07.17 22.07.17 08:00 18:00 Commissioning of new Aircell by M/s ABB
Engineer.
Continuous basis. Load will be fed through 315 MVA T/F - I & III.
28 400KV 400KV Bareilly - Unnao Ckt. II Main Breaker Bareilly 21.07.17 25.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis
29 400kV 400 kV Sarnath - Varanasi - II Line at 400 kV S/S Sarnath 25.07.17 25.07.17 08:00 18:00 General maintenance. Continuous basis
30 400 KV 315 MVA ICT-I Sarojaninagar Lucknow
25.07.17 25.07.17 09:00 16:00
RETROFITTING OF LINE ISOLATOR (SHUTDOWN IS REQUIRED FOR DISCONNECTION OF PIPE BUS BETWEEN LINE ISOLATOR & TRANSFER BUS ISOLATOR). AFTER DISCONNECTION OF PIPE BUS, ICT-I WILL BE CHARGED FROM TRANSFER BUS.
Daily basis.
29.07.17 29.07.17 09:00 16:00
RECONNECTION OF PIPE BUS BETWEEN LINE ISOLATOR & TRANSFER BUS ISOLATOR AFTER RETROFITTING OF LINE ISOLATOR.
Daily basis.
31 400KV 315 MVA ICT - I Main Breaker Bareilly 26.07.17 27.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis
32 400kV 315 MVA T/F - I Bay at 400 kV S/S Sarnath 27.07.17 27.07.17 08:00 18:00 General maintenance. Continuous basis
33 400kV 400 kV Sarnath - Varanasi - I Line at 400 kV S/S Sarnath 28.07.17 28.07.17 08:00 18:00 General maintenance. Continuous basis
34 400KV 315 MVA ICT - II Main Breaker Bareilly 28.07.17 29.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker Continuous basis
35 400kV 315 MVA T/F - III Bay at 400 kV S/S Sarnath 29.07.17 30.07.17 08:00 18:00 Attending oil seepage by M/s EMCO
Engineer
Continuous basis. Load will be fed through 315 MVA T/F -I & 500 MVA T/F.
36 400KV 315 MVA ICT - III Main Breaker Bareilly 30.07.17 31.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis
DTL
Sr. No. Element Name Owner Name
Mode (Daily/Conti.)
Reasons From To
Date Time Date Time 1. 315MVA ICT-1
at Bawana
DTL Daily Shutdown requried for completion of errection of HVW system on 315MVA ICT-I. 50% work of errection of HVW system has been completed. Shutdown was taken for 5-6 days as approved earlier in 135th Meeting of OCC of NRPC. ICT would be charged daily after 13:00 Hrs on daily basis from 15.05.2017 and during shutdown of transformer No-1 the load has been meet through ICT 2,3,4,5,6
18.06.2017
07:00
30.06.2017
13:00
PATRAN TRANSMISSION COMPANY LIMITED
No.
Details of Transmission element Category to which transmission element belong (A/B/C/D)
Date Timings
Purpose/ Reasons Voltage
level Name of
S/Stn
Name of transmission
elements From To
Daily basis
From (Hrs.)
To (Hrs.)
1 400KV PTCL-400KV PATRAN, SS
400/220KV 500MVA ICT-1 A 27-6-17 27-Jun-17 D 8:00 Hrs 15:00 Hrs
For Yearly Maintenance & Testing.
2 400KV PTCL-400KV PATRAN, SS
400/220KV 500MVA ICT-2 A 28-6-17 28-Jun-17 D 8:00 Hrs 15:00 Hrs
For Yearly Maintenance & Testing
List of members of OCC
Adani PL. (i) Sh. Nirmal Sharma, VP (O&M), Fax- 0141-2292065 (ii) Sh. Sameer Ganju, Head-Northern Region, Fax No. 011-24115560 APCPL (i) AGM (O&M)-I, IGSTPP, Fax No. 01251-266326 (ii) AGM (EEMG), 01251-266326 BBMB (i) Director (PR) Fax- 0172-2652820 (ii) Power Controller, Fax- 0172-2653297. HVPNL Chief Engineer (Comm.); SE (SO & SLDC): 0181-2664440 Fax-0172-2560622 NHPC (i) Sh. Janardan Choudhary, E.D., Faridabad – Fax-0129-2272413 (ii) Sh. S P.Singh, Chief Engineer (O&M), Faridabad – Fax-0129-2272413 POWERGRID (i) Sh. Prabhakar singh, ED (NR-I), Fax No. 011-26853488 (ii) Sh. A.K. Arora, General Manager (O&M), NR-I, (iii) Sh. R.V.S Kushwaha, General Manager (O&M), Jammu; Fax- 0191-2471187 (iv) Sh.Rajeev Sudan Dy, General Manager (OS), Fax- 0191-2471187 RRVUNL Sh. P.S Arya, Chief Engineer (PPMC & IT), ) Fax- 0141-2740006 NTPC (i) Head of OS/ Head of RCC, Fax No. 0120-2410082 (ii) Sh. Praveen Chaturvedi, GM (OS), NRHQ Lucknow; Fax-0522-2305849. HPSEBL (i) Sh Suneel Grover, Chief Engineer (SO &P), Fax No. 0177-2653656 (ii) Sh. Deepak Uppal, SE (PR& ALDC): Fax-0177-2837143 (iii) Sh. Joginder Singh. Power Controller, Fax No. 0177-2837143. NRLDC General Manager - 26854861, 4051, 26569504 Fax- 26852747 NLDC General Manager, NLDC, Fax: 011-26853488/26601079 Lanco APTL Sh. Raj Kumar Roy, Director, Fax: 0124-2341627/4741024 SJVNL/NJHPS General Manager (C&SO), Fax- 0177-2673283 PTCUL/UPCL (i) Sh. Anupam Sharma, SE (SLDC), Fax- 0135-2451160, 0135-2763570 UPPTCL (i) Director (Op), Fax- 0522-2286476 (ii) Chief Engineer (SLDC), Fax- 0522-2287880, 2288736 HPLDS (i) Sh. N.P.sharma, SE, SLDC, Fax: 0177-2837649 (ii) Sh. Lokesh Thakur, Executive engineer, Fax: 0177-2837649 DTL General Manager (SLDC)/ General Manager (Protection) Fax-23236462, 23221069 THDCIL Sh. U.C Kannaujia, AGM (EMD), Tehri, Fax- 0135-2438682 PSTCL (i) Sh. S.S.Mal, Chief Engineer (SLDC) Fax – 0175-2365340 (ii) Sh D.P.Sethi, Dy.Chief Engineer (SLDC) Fax – 0175-2365340 CHANDIGARH Sh. M.P.Singh, SE (Elect. Op.Circle) – Fax-0172-2740505 IPGCL/PPCL (i) Sh. Y.P.Arora,GM (T), IPGCL, New Delhi, Fax- 23370884 (ii) Sh. R.K.Yadav, DGM (T), IPGCL, New Delhi, Fax- 23370884 BRPL Sh. Satinder Sondhi, VP & Head System Operations, Fax No. 011-39996549 Everest PPL Sh. Yogendra Kumar, Chief Operating Officer, Fax No. 011-45823862/ 43852507 RPSCL Sh. Niranjan Jena, Addl.VP/ Sh. Suvendu Dey, Asst. VP-O&M, Fax: 05842-300003 HPGCL Sh. S.K. Wadhwa SE/Technical(HQ), Fax: 0172-5022436
From organizations which are yet to submit revised nominations
Uttar Haryana Bijli Vitaran Nigam Ltd. Jodhpur Vidyut Vitran Nigam Ltd.
HPPTCL Director (Planning & Contracts), Fax: 0177-2626284 J&K (PDD) Chief Engineer (Survey & Commercial) Fax-0191-2476213 J&K SPDCL GM, Fax: 0194-2500145 PSPCL Engineer-in- Chief (PPRR), Fax- 0175-2308698. RRVPNL Chief Engineer (LD); SE (SO&LD) – Fax- 0141-2740920 UPRVUNL DGM (TOM), 0522-2287861 UJVNL General Manager Engineering: 0135-2761485, fax- 0135-2761549 CEA Director, (GM-I), Fax- 26170385, 26108834 Chief Engineer, NPC NPCIL (i) Station Director, NAPS; Fax. 05734-222177.(ii) Sr. Manager (Transmission),
NPCILFax.-022-25563350 JPPVL Sh. Suresh Chandra, Director, Fax- 0120-4516201/4609464/4609496 Jhajjar PL Sh. Goutam Biswas, GM (Production), 01251-270155. Talwandi Saboo Limited Distt Mansa 02266461451
New Members for the year 2016-17 (Nominations not received)