lll'(d '1"1 (Cfll ( Government of India ftl <:<I (1 oR ;j I (01 <I ,., Ministry of Power fl4 f4 ?J)d '1"1 Rl Northern Regional Power Committee 09.06.2017 Wn"if: Sl"''l&l"' To: Members of OCC Subject: Prop.osed outage programme of Transmission Assets for consideration in136 1 h OCC Meeting-Reg. 05.06.2017 f!ii;8&1Cfl \3<:"q cf;qf.i<:j'f ID"<T \3<:"q I rn=t13fUT CfiT S1fa1Rla Cflllf9flii cf;T tR: 1 Cflllf9flii 14.06.2017 eFT 10:30 Cfliibf?i41 Sl"''l&l"' fliirq4 \3qf!fl!Rl cf;T f.tmfur 136cff ID"<T I This is with reference to the NRPC letter of even no. dated 05.06.2017. The outage program of Generating Units and Transmission Lines proposed by Generating companies and Transmission Licensee's has been uploaded on NPRC's web-site. This proposed outage programme is for consideration/approval of the OCC in its 136 1 h meeting scheduled to be held on 14.06.2017 at 10:30 hrs through video conferencing. \_ - o9 .c S1 "''I r1 'i)

Upload: lamtuong

Post on 11-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

lll'(d '1"1 (Cfll ( Government of India

ftl <:<I (1 oR ;j I (01 <I ,., Ministry of Power ~~ fl4 f4 ?J)d '1"1 ~ Rl

Northern Regional Power Committee

~: 09.06.2017

Wn"if: Sl"''l&l"' flii.-cP~ \3qf!~Rl ~~I To: Members of OCC

Subject: Prop.osed outage programme of Transmission Assets for consideration in1361h

OCC Meeting-Reg.

\3".~.-Rf.B". ~ ~- 05.06.2017 ~ f!ii;8&1Cfl ~~~if, \3<:"q 1~'1 cf;qf.i<:j'f ID"<T \3<:"q I ~'1 ~ ~ rn=t13fUT ~ CfiT S1fa1Rla ~ Cflllf9flii \3".~.-Rf.B". cf;T ~Gifll'tiC: tR: ~a-~ 1 ~ ~ Cflllf9flii 14.06.2017 eFT 10:30 ~it Rl~ltl Cfliibf?i41 ~ ~ Sl"''l&l"' fliirq4 \3qf!fl!Rl cf;T f.tmfur 136cff ~if~ ID"<T ~-~l<T ~ ~ I

This is with reference to the NRPC letter of even no. dated 05.06.2017. The outage program of Generating Units and Transmission Lines proposed by Generating companies and Transmission Licensee's has been uploaded on NPRC's web-site. This proposed outage programme is for consideration/approval of the OCC in its 1361

h

meeting scheduled to be held on 14.06.2017 at 10:30 hrs through video conferencing.

~?:5'1'1 \_ - o9 .c b.::~;<N~

(~~)

~merur ~( S1 "''I r1 'i)

2

PROPOSED OUTAGE OF GENERATING UNITS FOR THE 136th OCC MEETING ANNEXURE 1

NTPC-NR

Station/Unit/Capacity Period Remarks

From To Schedule O/H Days

Singrauli/U#2/200 MW 01.07.17 25.07.17 25 Boiler O/H+ Expansion bellow replacement+ ESP R&M.

Rihand/U#6/500 MW 03.07.17 01.08.17 30 Boiler over haul, Inspection of LPT blades+ Turbine Governing system over haul.

Unchahar/U#4/210 MW 01.07.17 25.07.17 25 Boiler Over haul

Tanda/ U#3/110 MW 01.07.17 25.07.17 25 Boiler Over haul

PROPOSED OUTAGE OF INTER REGIONAL TRANSMISSION LINES FOR THE 136th OCC MEETING ANNEXURE 2A

Sno Request By Element Name Owner Name Mode Reasons

From Date From Time To Date To

Time Remarks Request Detail

1 SLDC_RAJASTHAN

[ RAJASTHAN ] ANTA-PHAGI-1(765 kv) Rajasthan Daily Stability test for spare

reactors. 12-7-2017 9:00 12-7-17 20:00 -

2 SLDC_RAJASTHAN

[ RAJASTHAN ] ANTA-PHAGI-2(765 kv) Rajasthan Daily Stability test for spare

reactors. 19-07-17 9:00 19-07-17 20:00 -

3 SLDC_RAJASTHAN

[ RAJASTHAN ] Kota-Badod(220 kV) Rajasthan Daily

To carry out the annual bay

maintenance of the bay equipment. 20-07-17 7:00 20-07-17 18:00 -

4 POWERGRID

[ DELHI ] 765 kV S/C Bhiwani-

Jaipur-I (PG) Line(765 kV) Powergrid Daily

Commissioning of CSD for Line Reactor

& NGR Bypass scheme at Bhiwani 10-07-17 8:00 10-07-17 13:00 -

5 POWERGRID

[ DELHI ] 765 kV S/C Bhiwani-

Jaipur-I (PG) Line(765 kV) Powergrid Daily

Commissioning of CSD for Line Reactor

& NGR Bypass scheme at Bhiwani 11-07-17 8:00 11-07-17 13:00

-

6 POWERGRID

[ DELHI ] Balia-Patna Ckt-3(400 kV) Powergrid Daily

As informed by ER-1 applied for polymer insulator installation

by replacing disc insulator. During this opportunity S/D , NR-

III will also replace disc insulator by

polymer 01-07-17 7:00 04-07-17 18:00

7 SLDC_ UTTAR

PRADESH

500KV DC Dadri Dankaur Earth Electrode line

(Both Ckt.) UP Daily

For stringing (crossing) of 400KV Jahangirpur Greater

Noida lineS/D is being applied as due to

ROW problem it may not be possible to

avail already applied S/D during June-17. 1-7-17 7:00 2-7-17 19:00

8 SLDC_ UTTAR

PRADESH 765KV Unnao-Anpara C

Line UP Daily

For Routine Protection Testing of

Anpara 'C' line 5-7-17 8:00 5-7-17 18:00

9 SLDC_ UTTAR

PRADESH 765 kV Bara- MainpuriCkt-II UP Daily

For Maintenance after first charging of 765

kV line with tightening/ replacement etc. 5-7-17 8:00 6-7-17 18:00

10 POWERGRID

[ DELHI ] 765KV LUCKNOW-BAREILLY(765 kV) Powergrid Daily

For taking of line reactor out of service

for AMP work at 765KV Bareilly

Outage required for one hour each in the morning at 9:00Hrs

and 17:00Hrs respectively 11-7-17 9:00 11-7-17 18:00

11 POWERGRID

[ DELHI ] Balia-Bhiwadi Pole 2(500

kV) Powergrid Continuous

Diversion work by Bhiwadi due to

Railway DFCC project 01-7-2017 8:00 15-7-17 18:00

12 POWERGRID

[ DELHI ] Balia-Bhiwadi Pole 1(500

kV) Powergrid Continuous

Diversion work by Bhiwadi due to

Railway DFCC project 01-7-2017 8:00 15-7-17 18:00

13 POWERGRID

[ DELHI ] Meerut-Bhiwani(PG)(765

kV) Powergrid Daily

Line AMP,Tightening of Jumper, Spacers & other equipment AMP

at Bhiwani 03-07-17 8:00 03-07-17 18:00

14 POWERGRID [ DELHI ] Agra-Jatikala(765 kV) Powergrid Daily

Jumper tightening and other line

maintenance work. 01-07-17 8:00 01-07-17 18:00

15 POWERGRID

[ DELHI ] Agra-Meerut(765 kV) Powergrid Daily

Jumper modification at Meerut and other maintenance work. 03-07-17 8:00 04-07-17 18:00

16 POWERGRID

[ DELHI ] Balia-Patna Ckt-4(400 kV) Powergrid Daily

As informed by ER-1 applied for polymer insulator installation

by replacing disc insulator. During this opportunity S/D , NR-

III will also replace disc insulator 05-07-17 7:00 08-07-17 18:00 -

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE 136th OCC MEETING ANNEXURE 2B

Request By Element Name Owner Name Mode Reasons From Date From

Time To Date To Time Remarks

Request Detail

1 NTPC [ DELHI ]

Koldam(NTPC)-Banala(PKTCL)

(400 kV)

Parbati-Koldam

Transmission Co. ltd. Daily

To carryout DGA of 400kV CT after First Charging of 400kV

Switchyard 6-7-17 09:00 6-7-17 13:00

2 NTPC [ DELHI ] Koldam(NTPC)-

Nallagarh(PG)(400 kV) Powergrid Daily

To carryout DGA of 400kV CT after First Charging of 400kV

Switchyard 5-7-17 14:00 05-7-17 18:00

3 NTPC [ DELHI ]

Koldam(NTPC)-Ludhiana(PKTCL)

2(400 kV)

Parbati-Koldam

Transmission Co. ltd. Daily

To carryout DGA of 400kV CT after First Charging of 400kV

Switchyard 5-7-17 09:00 5-7-17 13:00

4 NTPC [ DELHI ]

Koldam(NTPC)-Ludhiana(PKTCL)

1(400 kV)

Parbati-Koldam

Transmission Co. ltd. Daily

To carryout DGA of 400kV CT after First Charging of 400kV

Switchyard 4-7-17 09:00 4-7-17 13:00

5 NTPC [ DELHI ]

Sultanpur(UP)-Tanda(NTPC) 1

(220 kV) Uttar Pradesh Daily

Bay Equipment Maintenance and Testing. (Shutdown

required in 220 KV Tanda - New Tanda line which is LILO-ed at New Tanda from Sultanpur -

Tanda - 1 line) 12-717 08:00 13-7-17 18:00

6 SLDC_UP

[UTTAR PRADESH] Obra-Sultanpur(400

kV) Uttar Pradesh Daily

Replacement of disc insulator by polymer insulator and

Lopping & Chopping of tree branches and Other M&R

Works. 5-7-17 08:00 7-7-17 18:00

7 SLDC_UP

[UTTAR PRADESH] Azamgarh-Sultanpur

(400 kV) Uttar Pradesh Daily Maintenance work 8-7-17 08:00 10-7-17 18:00

8 SLDC_UP

[UTTAR PRADESH] Balia(PG)-Mau(UP) 1

(220 kV) Powergrid Continuous General maintenance and

testing of bay. 9-7-17 08:00 9-7-17 18:00

9 SLDC_UP

[UTTAR PRADESH] Lucknow(PG)-

Lucknow(UP)(400 kV) Powergrid Daily Tree cutting, Jumper tightening,

repairing of jumper 9-7-17 08:00 9-7-17 18:00

10 SLDC_UP

[UTTAR PRADESH] Lucknow-Unnao

(400 kV) Uttar Pradesh Daily Tree cutting, Jumper tightening,

repairing of jumper 10-7-17 08:00 10-7-17 18:00

11 SLDC_UP

[UTTAR PRADESH] Balia(PG)-Mau(UP) 2

(400 kV) Powergrid Continuous General maintenance and

testing of bay. 11-7-17 08:00 11-7-17 18:00

12 SLDC_UP

[UTTAR PRADESH] Lucknow(PG)-

Sultanpur(UP)(400 kV) Uttar Pradesh Daily Maintenance work 11-7-17 08:00 12-7-17 18:00

13 SLDC_UP

[UTTAR PRADESH] Agra-Unnao(400 kV) Uttar Pradesh Continuous

For replacement of old porcelain insulator by new

polymer insulator & repairing maintenance work. 1-7-17 08:00 09-7-17 18:00

14 SLDC_UP

[UTTAR PRADESH]

Sultanpur(UP)-Tanda(NTPC) 1

(220 kV) Uttar Pradesh Daily Maintenance work 13-7-17 08:00 16-7-17 18:00

15 SLDC_UP

[UTTAR PRADESH] Napp(NPC)-

Simbholi(UP)(220 kV) Uttar Pradesh Daily Line maintenance & looping and

chopping of tree branches. 14-7-17 08:00 15-7-17 18:00

16 SLDC_UP

[UTTAR PRADESH]

Muradnagar-Muzaffarnagar

(400 kV) Uttar Pradesh Continuous Replacement of CT, CVT and B

Bus pantograph isolator 14-7-17 08:00 16-7-17 18:00

17 SLDC_UP

[UTTAR PRADESH] Azamgarh-Mau

(400 kV) Uttar Pradesh Continuous General maintenance and

testing at 400 kV Kasara Mau 17-7-17 08:00 17-7-17 18:00

18 SLDC_UP

[UTTAR PRADESH]

Rai Bareilly(PG)-Unchahar(NTPC)

1(220 kV) Uttar Pradesh Daily Maintenance work 17-7-17 08:00 18-7-17 18:00

19 SLDC_UP

[UTTAR PRADESH]

Rai Bareilly(PG)-Unchahar(NTPC)

2(220 kV) Uttar Pradesh Daily Maintenance work 19-7-17 08:00 20-7-17 18:00

20 SLDC_UP

[UTTAR PRADESH] 400 kV Bara – Rewa

Road Ckt- II Uttar Pradesh Continuous

For LILO of 400 kV Rewa Road – Bara Ckt-I & II at 400 kV Meja

TPS 1-7-17 08:00 2-7-17 18:00

21 SLDC_UP

[UTTAR PRADESH] 400 kV Bara – Rewa

Road Ckt- I Uttar Pradesh Continuous

For LILO of 400 kV Rewa Road – Bara Ckt-I & II at 400 kV Meja

TPS 3-7-17 08:00 4-7-17 18:00

22 SLDC_UP

[UTTAR PRADESH] 400 kV Mainpuri (PG)

– Parichcha Uttar Pradesh Continuous

For LILO of 400 kV Mainpuri (PG) – OraiCkt-II at 400 kV Sw.

Yd at 765 MNP SS (SEUPPTCL) 4-7-17 08:00 5-7-17 18:00

23 SLDC_UP

[UTTAR PRADESH]

400KV Muradnagar-Aligarh line

Uttar Pradesh Daily Line maintenance and looping and chopping of tree branches. 11-7-17 08:00 12-7-17 18:00

24 SLDC_UP [UTTAR PRADESH]

400 KV Panki-Aligarh line Uttar Pradesh Continuous

1. For Diversion of line due to construction of NTPC plant in

Bilhoure between LNO 92 to 04 & General maintenance. No

supply loss. 2. For opening of line reactor & other maintenance work for 03

hours. 3 F ki b i

4-7-17 08:00 10-7-17 18:00

25 SLDC_UP [UTTAR PRADESH]

400KV Fatehabad(765)-Agra-I

line Uttar Pradesh Continuous

For replacement of damage jumper & fixing of pilot string copper bond, bull dog clamp and other line maintenance

k

28-7-17 08:00 31-7-17 18:00

26

SLDC_UP [UTTAR PRADESH]

Anpara-Sarnath 2 (400 kV) Uttar Pradesh Continuous General maintenance. 23-7-17 08:00 23-7-17 18:00

27 SLDC_UP

[UTTAR PRADESH] Azamgarh-Sarnath 1

(400 kV) Uttar Pradesh Continuous General maintenance. 24-7-17 08:00 24-7-17 18:00

28 SLDC_UP

[UTTAR PRADESH] Anpara-Sarnath 2

(400 kV) Uttar Pradesh Continuous General maintenance. 26-7-17 08:00 26-7-17 18:00

29 SLDC_UP

[UTTAR PRADESH]

Khodri(UPCL)-Saharnpur(UPPCL)-2

(220 kV) Uttar Pradesh Daily

For carryout maintenance works and looping/chopping of trees

laying in the corridor. 10-7-17 08:00 12-7-17 18:00

30 SLDC_UP

[UTTAR PRADESH] Khodri-Saharnpur ckt2

(400 kV) Uttar Pradesh Daily

For carryout maintenance works and looping/chopping of trees

laying in the corridor. 16-7-17 08:00 18-7-17 18:00

31 SLDC_UP

[UTTAR PRADESH] Mainpuri-Orai(220 kV) Uttar Pradesh Continuous

For LILO of Mainpuri (PG) OraiCkt-I at 765 kV MNP SS

(SEUPPTCL) 01-7-17 09:00 02-7-17 15:00

32 BBMB

(CHANDIGARGH) 400 KV Panchkula-

Panipat Line BBMB DAILY Replacement of earth wire fron

TL No. 767 to 770 03-7-17 08:00 4.7.17 17:00

33 BBMB (CHANDIGARGH)

220 KV Hisar-Sangrur Ckt-I & II BBMB Continuous

Shifting/raising of height between TL 314-315, 360-361 & 373-374 due to four laining of Kaithal-Rajsthan Border Road NH-152/65 & Shifting/raising of height between TL 230-231 due

toelectrification of Rohtak- Bhatinda Section of Railway.

19.6.17 8.00 4.7.17 17:00

34 BBMB

(CHANDIGARGH) 220 KV Sangur-Jamalpur Ckt. I BBMB Continuous

Overhauling of 220, 245KV SF-6 breaker ABB make installed at

220 KV S/s, BBMB, Sangrur. 19.6.17 8:00 24.6 17:00

35 BBMB

(CHANDIGARGH) 220 KV Sangur-Jamalpur Ckt. II BBMB

Continuous Overhauling of 220, 245KV SF-6 breaker ABB make installed at

220 KV S/s, BBMB, Sangrur. 26.6.17 8:00 1.7.16 17:00

36 BBMB

[ CHANDIGARGH ] Panipat-Narela 1(220

kV) BBMB Daily

Replacement of conventional Disc insulator with polymer

insulator. 11-7-17 08:00 22-7-17 17:00

37 BBMB

[ CHANDIGARGH ] Panipat-Dhulkote

1(220 kV) BBMB Daily

Replacement of conventional disc insulator with polymer

insulator. 01-7-17 08:00 10-7-17 17:00

38 BBMB

[ CHANDIGARGH ] Panipat-Kurukshetra

(220 kV) BBMB Daily

Replacement of conventional disc insulator with polymer

insulator. 24-7-17 08:00 31-7-17 17:00

39 BBMB

[ CHANDIGARGH ]

Ballabhgarh(BBMB)-Ch.Dadri(BBMB)

(220 kV) BBMB Continuous

For Shifting/Raising the Height of Towers due to electrification

and doubling of Rewari-Manheru railway line by

RRVNL. 6-7-17 08:00 20-7-17 17:00

40 BBMB

[ CHANDIGARGH ]

Ch.Dadri(BBMB)-Samaypur(BBMB)

(220 kV) BBMB Continuous

For Shifting/Raising the Height of Towers due to electrification

and doubling of Rewari-Manheru railway line by

RRVNL. 6-7-17 08:00 20-7-17 17:00

41 BBMB

[ CHANDIGARGH ]

Charkhi Dadri(BBMB)-Mohindergarh(HVPNL)

1(220 kV) Haryana Daily For testing of Tan delta of

equipments 03-7-17 08:00 03-7-17 17:00

42 BBMB

[ CHANDIGARGH ]

Badshahpur(HVPNL)-Samaypur(BBMB) 1

(220 kV) Haryana Daily Half yearly maintenance. 04-7-17 08:00 04-7-17 17:00

43 BBMB

[ CHANDIGARGH ]

Badshahpur(HVPNL)-Samaypur(BBMB) 2

(220 kV) BBMB Daily Half yearly maintenance. 05-7-17 08:00 05-7-17 17:00

44 SLDC_HARYANA

[ HARYANA ]

Daultabad(HVPNL)-Jhajjar(APCPL) 2

(400 kV) Haryana Daily

For OPGW rectification work B/w T.No-121 to 123 & Gen. Maintenance work at S/Stn 04-7-17 08:00 04-7-17 17:00

45 SLDC_HARYANA

[ HARYANA ]

Daultabad(HVPNL)-Jhajjar(APCPL) 2

(400 kV) Haryana Daily

For OPGW rectification work B/w T.No-99 to 101 & Gen. Maintenance work at S/Stn 05-7-17 08:00 05-7-17 17:00

46

SLDC_HARYANA [ HARYANA ]

Daultabad-Dhanonda ckt-1(400 kV) Haryana Daily

For tree cutting, Gen. Maintenance of line & Tie bay at 7-7-17 08:00 7-7-17 17:00

S/Stn

47 SLDC_HARYANA

[ HARYANA ] Jhajjar CLP-Kabulpur

1 (400 kV) Haryana Daily For attending hop spot in line

isolator 7-7-17 08:00 7-7-17 13:00

48 SLDC_HARYANA

[ HARYANA ] Dipalpur-Kabulpur 2

(400 kV) Haryana Daily For attending hop spot in line

isolator 10-7-17 08:00 10-7-17 13:00

49 SLDC_HARYANA

[ HARYANA ]

Daultabad(HVPNL)-Jhajjar(APCPL) 1

(400 kV) Haryana Daily

For tree cutting, Gen Maintenance of line & Tie bay at

S/Stn 10-7-17 08:00 10-7-17 17:00

50 SLDC_HARYANA

[ HARYANA ] Daultabad-Dhanonda

ckt-2(400 kV) Haryana Daily

For tree cutting, Gen Maintenance. of line & Tie bay

at S/Stn 12-7-17 08:00 12-7-17 17:00

51 SLDC_HARYANA

[ HARYANA ]

400kV G.Noida(UP)-Nawada(HVPNL)

(400 kV) Powergrid Daily

Tightening of 400KV Nawada-G.Noida BPI & Bus and Gen.

Maintenance. 13-7-17 6:00 13-7-17 11:00

52 SLDC_HARYANA

[ HARYANA ]

Daultabad(HVPNL)-Gurgaon(PG) -1

(400 kV) Haryana Daily

For tree cutting, Gen Maintenance. of line and Tie

bay at S/Stn. 18-7-17 08:00 18-7-17 17:00

53 SLDC_HARYANA

[ HARYANA ]

Daultabad(HVPNL)-Gurgaon(PG) -2

(400 kV) Haryana Daily

For tree cutting, Gen. Maintenance. of line and Tie

bay at S/Stn 19-7-17 08:00 19-7-17 17:00

54 SLDC_HARYANA

[ HARYANA ]

400kV Ballabgarh(PG)-Nawada(HVPNL)

(400 kV) Powergrid Daily

Tightening of 400KV Nawada- Ballabgarh BPI & Bus and Gen.

Maintenance 20-7-17 6:00 20-7-17 11:00

55 SLDC_RAJASTHAN

[ RAJASTHAN ]

Anta(RVPNL)-Kalisindh(RVPNL) 1

(400 kV) Rajasthan Continuous

For Erection of Tower at Loc No 09 & Stringing between Loc No 01 to 50 (old No) & 09 to 56 (old No) of 400 KV D/C Quad Moose Kalisindh TPS to Anta Line for shifting of line Near Kolana Air Strip between Loc No 50 to 56 7-7-17 08:00 14-7-17 18:00 -

56 SLDC_RAJASTHAN

[ RAJASTHAN ]

Anta(RVPNL)-Kalisindh(RVPNL) 2

(400 kV) Rajasthan Continuous

For Erection of Tower at Loc No 09 & Stringing between Loc No 01 to 50 (old No) & 09 to 56 (old No) of 400 KV D/C Quad Moose Kalisindh TPS to Anta Line for shifting of line Near Kolana Air Strip between Loc No 50 to 56 7-7-17 08:00 14-7-17 18:00 -

57 SLDC_RAJASTHAN

[ RAJASTHAN ] Chabra-Hindaun II

(400 kV) Rajasthan Continuous For opening of Jumper at

Location No. 67 10-7-17 08:00 11-7-17 18:00 -

58 SLDC_RAJASTHAN

[ RAJASTHAN ] RAPP (A )-KOTA-1

D/C(220 kV) Rajasthan Continuous

FOR REPLACEMENT OF SEVERELY DETORIATED

BUS CONDUCTOR & Clamp connector OF 220 KV BUS B

and annual bay maintenance of the equipments 13-7-17 7:00 13-7-17 18:00 -

59 SLDC_RAJASTHAN

[ RAJASTHAN ] Akal-Jodhpur II

(400 kV) Rajasthan Continuous Quarterly Maintenance 12-7-17 10:00 12-7-17 18:00 -

60 SLDC_RAJASTHAN

[ RAJASTHAN ] Heerapura-Hindaun II

(400 kV) Rajasthan Continuous 2nd Quarterly maintenance of 400 KV side bay Equipments 04-7-17 10:00 04-7-17 17:00 -

63 SLDC_RAJASTHAN

[ RAJASTHAN ] Hindaun- Alwar

(400 kV) Rajasthan Continuous Quarterly maintenance 7-7-17 10:00 7-7-17 17:00 -

64 SLDC_RAJASTHAN

[ RAJASTHAN ] Akal-Barmer 1(400 kV) Rajasthan Continuous Quarterly maintenance 20-7-17 10:00 20-7-17 18:00 -

65 SLDC_RAJASTHAN

[ RAJASTHAN ] Bikaner-Didwana

1(400 kV) Rajasthan Continuous Routine bay maintenance 7-7-17 09:00 7-7-17 17:00 -

66 SLDC_RAJASTHAN

[ RAJASTHAN ] Anta-Lalsot(220 kV) Rajasthan Continuous Half yearly maintenance 13-7-17 08:00 13-7-17 11:00 -

67 SLDC_RAJASTHAN

[ RAJASTHAN ] Ratangarh(RVPNL)-Sikar(PG) 4(220 kV) Rajasthan Continuous Testing of relays of this bay 05-7-17 09:00 05-7-17 20:00 -

68 SLDC_RAJASTHAN

[ RAJASTHAN ] RAPP (A )-

DEBARI(220 kV) Rajasthan Continuous For Line maintenance 13-7-17 09:00 13-7-17 18:00

69 POWERGRID [ DELHI ]

Kanpur(PG)-Singrauli(NTPC)

(400 kV) Powergrid Daily For Stringing of section AP 79/0

- AP 80/0 at Allahabad 20-6-17 08:00 20-6-17 18:00

70

POWERGRID [ DELHI ]

Agra(PG)-Auraiya(NTPC) 1

(400 kV)

Powergrid Continuous Retrofitting of C&P of Auriya-1 at Agra HVDC

02-7-17 8:00 05-7-17 18:00

71 POWERGRID [ DELHI ]

Agra-Fatehpur (400 kV) Powergrid Daily

Retro fitment of 710 89A 89B Auxiliary Bus Isolators ,taken Y phase of the LT out of service

and R phase taken into the service at Fatehpur, S/C(Line-2)

22-6-17 9:30 22-6-17 18:00

72 POWERGRID [ DELHI ]

Agra-Fatehpur (400 kV) Powergrid Continuous

For Diversion work due to DFCC work. At Agra HVDC ,

S/C(Line-2) 05-7-17 9:00 05-7-17 18:00

73 POWERGRID [ DELHI ]

Agra-Bhiwadi 1 (400 kV)

Powergrid Daily For Switchyard 04-7-17 9:00 04-7-17 18:00

74 POWERGRID [ DELHI ]

400KV LUCKNOW-SHAHJHNPR-II

(400 kV) Powergrid Daily

For recification / replacement of long twin moose jumpers in all three phases at location no. 14

15-6-17 8:30 16-6-17 18:00

75 POWERGRID [ DELHI ]

Fatehpur-Singrauli(220 kV)

Powergrid Daily For Stringing of section AP 79/0 - AP 80/0 at Allahabad

20-6-17 8:00 20-6-17 18:00

76 POWERGRID [ DELHI ]

Hiranagar(JK)-Sarna(PSEB)(220 kV) Powergrid Daily

For Diversion of highly vulnerable T. No. 66 on new

tower. Foundation od this tower severly got damaged by change of river flow. Dismatelling of old tower and de-stringing. Erection of new tower & stringing in span

65-66-67.

10-7-17 9:00 15-7-17 18:00

77 POWERGRID [ DELHI ]

Fatehabad-Moga (400 kV)

Powergrid Daily For AMP Works. 13-7-17 9:00 13-7-17 17:15

78 POWERGRID [ DELHI ]

Kishenpur-New Wanpoh - 1 (220 kV) Powergrid Daily

For replacement of damaged conductor in three spans of Pir

Panjal Area.

01-7-17 9:00 03-7-17 18:00

79 POWERGRID [ DELHI ]

Salal(NHPC)-Kishenpur(PG) 3

(220 kV) Powergrid Daily

For replacement of broken insulators and repair to damaged conductor.

19-7-17 9:00 19-7-17 17:00

80 POWERGRID [ DELHI ]

Chamera pool-Jalandhar 1(400 kV) Powergrid Daily

For Replacement/Installation of broken spacer in span 52-53

(719 m).

04-7-17 11:00 04-7-17 14:00

81 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .

03-7-17 8:00 03-7-17 18:00

82 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.

04-7-17 8:00 04-7-17 18:00

83 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.

09-7-17 8:00 09-7-17 18:00

84 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.

10-7-17 8:00 10-7-17 18:00

85 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.

15-7-17 8:00 15-7-17 18:00

86 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line.

16-7-17 8:00 16-7-17 18:00

87 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .

21-7-17 8:00 21-7-17 18:00

88 POWERGRID [ DELHI ]

Jalandhar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line .

22-7-17 8:00 22-7-17 18:00

89 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

6-7-17 8:00 6-7-17 18:00

90 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

7-7-17 8:00 7-7-17 18:00

91 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

12-7-17 8:00 12-7-17 18:00

92 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

13-7-17 8:00 13-7-17 18:00

93 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

18-7-17 8:00 18-7-17 18:00

94 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

19-7-17 8:00 19-7-17 18:00

95 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

24-7-17 8:00 24-7-17 18:00

96 POWERGRID [ DELHI ]

Nakodar - Kurukshetra(400 kV) Powergrid Daily

For stringing on the lower circuit of Multi Circuit Towers of 400KV Kurukshetra- Jalandhar / Kurukshetra- Nakodar Transmission Line

25-7-17 8:00 25-7-17 18:00

97 POWERGRID [ DELHI ]

Bhiwani(PGCIL)-Mohindergarh(Adani)-

1(400 kV)

Adani Power Limited Daily AMP and bay equipment jumper

tightening at Bhiwani end. 03-7-17 8:00 04-7-17 18:00

98 POWERGRID [ DELHI ]

Bhiwani(PGCIL)-Mohindergarh(Adani)-

2(400 kV)

Adani Power Limited Daily AMP and bay equipment jumper

tightening at Bhiwani end. 04-7-17 8:00 04-7-17 18:00

99 POWERGRID [ DELHI ]

Agra(PG)-Agra(UP) 1(400 kV) Powergrid Daily

Stringing of OPGW in LILO portion of Fatehabad(UP)-

Agra(UP)-2 line under ULDC project. Reapplied as

discussed in 135th OCC.

19-6-17 8:00 24-6-17 18:00

100 POWERGRID [ DELHI ]

Manesar-Neemrana 1(220 kV) Powergrid Daily

S/D for jumper tightening and providing pilot string on the

tension towers

03-7-17 8:00 03-7-17 18:00

101 POWERGRID [ DELHI ]

Manesar-Neemrana 2(400 kV) Powergrid Daily

S/D for jumper tightening and providing pilot string on the

tension towers 04-7-17 8:00 04-7-17 18:00

102 POWERGRID [ DELHI ]

Ballabgarh-Mainpuri 1(400 kV) Powergrid Continuous

For Line diversion work under DFCC. During S/D, 02 Nos

tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up.

Rescheduled-135OCC

08-7-17 8:00 17-7-17 18:00

103 POWERGRID [ DELHI ]

Ballabgarh-Mainpuri 2(400 kV) Powergrid Continuous

For Line diversion work under DFCC. During S/D, 02 Nos

tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up.

Rescheduled-135OCC

08-7-17 8:00 17-7-17 18:00

104 POWERGRID [ DELHI ]

Agra-Ballabgarh (400 kV) Powergrid Continuous

For Line diversion work under DFCC. During S/D, 02 Nos

tower to be erected out of 03 Nos tower after that stringing of the new section shall be taken

up.

01-7-17 8:00 7-7-17 18:00

105 POWERGRID [ DELHI ]

Ballabgarh-Kanpur 1(400 kV) Powergrid Continuous

For Line diversion work under DFCC. During S/D, 02 Nos

tower to be erected out of 04 Nos tower after that stringing of the new section shall be taken

up.

25-7-17 8:00 31-7-17 18:00

16 POWERGRID [ DELHI ]

Bhinmal-Kankroli(400 kV) Powergrid Daily

End to End testing of PLCC link after retrofitting and Dropper

replacement work of wave trap 14-7-17 8:00 14-7-17 18:00

17 POWERGRID [ DELHI ]

Bawana(GT)-Bhiwani (PG) (400 kV) Delhi Daily

Alternate day S/D for fixing CC Ring Grading Ring/ Arcing

Horn, check nut in jumpers & other AMP.

10-7-17 8:00 16-7-17 18:00

108 POWERGRID [ DELHI ]

Bahadurgarh(PG)-Bawana(GT)(400 kV) Powergrid Daily

Alternate day S/D for fixing CC Ring Grading Ring/ Arcing Horn ,check nut in jumpers & other

AMP.

11-7-17 8:00 13-7-17 18:00

109 POWERGRID [ DELHI ]

Bahadurgarh - Kabulpur(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP.

15-7-17 8:00 15-7-17 18:00

110 POWERGRID [ DELHI ]

Bahadurgarh - Kabulpur(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP. 18-7-17 8:00 18-7-17 18:00

111 POWERGRID [ DELHI ]

Bhiwani(BBMB)-Bhiwani(PG)(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP. 19-7-17 8:00 19-7-17 18:00

112 POWERGRID [ DELHI ]

Bhiwani(BBMB)-Hisar(PG)(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP.

20-7-17 8:00 20-7-17 18:00

113 POWERGRID [ DELHI ]

Bahadurgarh-Sonepat 1(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP. 21-7-17 8:00 21-7-17 18:00

114 POWERGRID [ DELHI ]

Bahadurgarh-Sonepat 2(400 kV) Powergrid Daily

S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in

jumpers & other AMP. 22-7-17 8:00 22-7-17 18:00

115 POWERGRID [ DELHI ]

Neemrana-Sikar 1(400 kV) Powergrid Daily

Line maintenance, jumper tightening spacer & Bird guard

fixing. 05-7-17 8:00 6-7-17 18:00

116 POWERGRID [ DELHI ]

Neemrana-Sikar 2(400 kV) Powergrid Daily

Line maintenance, jumper tightening spacer & Bird guard

fixing. 7-7-17 8:00 08-7-17 18:00

117 POWERGRID [ DELHI ]

Agra-Kanpur(400 kV) Powergrid Continuous Retrofitting of C&P of Kanpur at AGRA HVDC

08-7-17 8:00 11-7-17 18:00

118 POWERGRID [ DELHI ]

Dhauliganga(NHPC)-Pithorgarh(PG)(220

kV)

Powergrid Daily For AMP Work at Pithoragarh 10-7-17 9:00 10-7-17 18:00

119 POWERGRID 400KV Moga(PG)-Hisar(PG) Line-2

POWERGRID Daily For AMP Works. 21.7.2017 9:00 21.7.2017 17:30

120 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-I (400 kV)

PSTCL Daily General Maintenance 03.7.17 10.00 03.7.17 16.00

121 SLDC_PUNJAB Kangra-Pathankot Ckt-I (132 kV) PSTCL Daily

Disc cleaning & Jumper tightening

05.7.17 10.00 05.7.17 16.00

122 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-II (400 kV)

PSTCL Daily General Maintenance 05.7.17 10.00 05.7.17 16.00

123 SLDC_PUNJAB Kangra-Pathankot Ckt-II (132 kV)

PSTCL Daily Disc cleaning & Jumper tightening

7.7.17 10.00 7.7.17 16.00

124 SLDC_PUNJAB Kangra-Pathankot Ckt-I (132 kV)

PSTCL Daily Disc cleaning & Jumper tightening and other

t t b d

10.7.17 10.00 10.7.17 16.00

125 SLDC_PUNJAB Moga-Nakodar (400kV)

PSTCL Daily General Maintenance 11.7.17 10.00 11.7.17 16.00

126 SLDC_PUNJAB Shanan-Kangra Ckt-I (132kV)

PSTCL Daily Disc cleaning & Jumper tightening and other

t t b d

13.7.17 10.00 13.7.17 16.00

127 SLDC_PUNJAB Shanan-Kangra Ckt-II (132kV)

PSTCL Daily Maintenance of line 14.7.17 10.00 14.7.17 16.00

128 SLDC_PUNJAB Talwandi Sabo – Nakodar (400 kV)

PSTCL Daily General Maintenance 17.7.17 10.00 17.7.17 16.00

129 SLDC_PUNJAB Nakodar-Makhu Ckt-I (400 kV)

PSTCL Daily General Maintenance 19.7.17 10.00 19.7.17 16.00

130 SLDC_PUNJAB Shanan-Kangra Ckt-I (132kV)

PSTCL Daily Maintenance of line 21.7.17 10.00 21.7.17 16.00

131 SLDC_PUNJAB Talwandi Sabo – Mukatsar I (400 kV)

PSTCL Daily General maintenance, Jumper tightening and Tree Cutting

21/7/17 16.00 21/7/17 22.00

132 SLDC_PUNJAB Hamirpur-Chohal (132kV)

PSTCL Daily Tightening of Jumpers of Dead end Towers, Disc Cleaning &

21.7.17 9.00 21.7.17 17.00

133 SLDC_PUNJAB Talwandi Sabo – Mukatsar II (400 kV)

PSTCL Daily General maintenance, Jumper tightening and Tree Cutting

22/7/17 17.00 22/7/17 23.00

134 SLDC_PUNJAB Nakodar-Makhu Ckt-II (400 kV)

PSTCL Daily General Maintenance 24.7.17 10.00 24.7.17 16.00

135 SLDC_PUNJAB Rajpura - Nakodar PSTCL Ckt-II (400 kV)

PSTCL Daily General Maintenance 26.7.17 10.00 26.7.17 16.00

136 SLDC_PUNJAB Talwandi Sabo – Mukatsar I (400 kV)

PSTCL Daily General maintenance, Jumper tightening and Tree Cutting

26/7/17 18.00 26/7/17 0.00

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR 136TH OCC MEETING ANNEXURE 3A POWER GRID NR 2 S.N. Details of Transmission Element Category

of element

DURATION Daily/ Continuo

us

Reason Voltage level (KV)

NAME OF THE ELEMENT AND SUBSTATION

FROM TO DATE TIME DATE TIME

X-2 For construction activity

1 800K V Champa Kurukshetra HVDC Pole-I

A 22.6.17 9:00 24.06.17 18:00 Daily To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at Kurukshetra.

2 800 KV Champa Kurukshetra HVDC Pole-I

A 05.7.17 9:00 7.07.17 18:00 Daily To facilitate the testing & commissioning of 800KV HVDC Pole-2 (under construction) at Kurukshetra.

X-3 For O&M activity

1 765KV Meerut-Moga A 27.7.17 09:00 27.07.17 17:30 Daily For AMP Works.

Name of Transmission Utility/licensee : Uttar Pradesh Power Transmission Corporation Limited

Sl. No.

Detail of Transmission element

Code

Category to which

transmission element belong

(A/B/C/D)

Date Timings

Reason Remark Voltage level

Name of Transmission

Elements From To From To

1 2 3 4 5 6 7 8 9 10 11

1 765/400 KV

765KV MAIN BUS-I Unnao

A 26.6.17 27.6.17 08:00 18.00

Daily basis for erection & commissioning of new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power flow remain intact through 765 KV Main Bus-II only

Daily basis

2

765 KV 765 kV MNP SS SD of Bus -II

A 5.07.17 5.07.17 08:00 18:00 765 kV Bus-II extension upto Dia 3 & 4 for charging 3*80 MVAR Reactor in Dia-4

Daily basis

3

765 kV 765 kV MNP SS SD of Bus -I

A 6.07.17 6.07.17 08:00 18:00

765 kV Bus-I extension upto Dia 3 & 4 for Charging of 765 kV Greater Noida in Dia-4

Daily basis

4 765/ 400 KV

765KV MAIN BUS-I Unnao

A 13.7.17 14.7.17 08:00 18.00

Daily basis for erection & commissioning of new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power flow remain intact through 765 KV Main Bus-II only

Daily basis

RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED

S.No. Details of Transmission element Date Timings Type of Shutdown Purpose Remarks

Voltage Level Name From To From To Daily/Continuous

Basis

1 765 KV 400/765 KV ,3X500 MVA ICT Bank -III at 765kV GSS Anta

03.07.2017 05.07.2017 09.00 Hrs.

20.00 Hrs. Continuous

Synchronisation of 400/765 KV ICT

Bank-III with spare ICT

2 765 KV 400/765 KV ,3X500 MVA ICT Bank -II at 765kV GSS Anta

06.07.2017 08.07.2017 09.00 Hrs.

20.00 Hrs. Continuous

Synchronisation of 400/765 KV ICT

Bank-II with spare ICT

3 765 KV

765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - I at 765kV GSS Anta

10.07.2017 12.07.2017 09.00 Hrs.

20.00 Hrs. Continuous

For synchronisation

and commissioning of

765 KV Anta-Phagi ckt-I Line

Reactor Bank with spare Reactor

4 765 KV

765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - II at 765kV GSS Anta

17.07.2017 19.07.2017 09.00 Hrs.

20.00 Hrs. Continuous

For synchronisation

and commissioning of

765 KV Anta-Phagi ckt-I I Line Reactor Bank with

spare Reactor

5 765 KV 400/765 KV ,3X500 MVA ICT Bank -I at 765kV GSS Anta

20.07.2017 20.07.2017 09.00 Hrs.

20.00 Hrs. Continuous

RPH 2 relay, 02 nos

commissioning

6 765KV 800 KV CB (706-52B) of Phagi- Anta-1 line at 765kV GSS Phagi

04.07.2017 05.07.2017 9.00Hrs. 18.00Hrs Daily

1. Measurement of tan-delta of CTs 2.

Maintenance of CB & CTs. 3. Tightening of

clamps & connectors.

7 765KV 3X 500 MVA ICT-1 at 765kV GSS Phagi 12.07.2017 13.07.2017 9.00

Hrs. 18.00Hrs. Daily

1. To replace the damaged

conductors of dropper of quad

Bull from high bus to switching

isolator (701-89BT-R). 2. Tightening of

clamps & connectors. 3. To check the tripping

of CBs through main & auxiliary

protection.

8 765KV

800 KV Tie CB (707-52T) of Phagi- Anta-2 line at 765kV GSS Phagi

17.07.2017 18.07.2017 9.00Hrs. 18.00Hr. Daily

1 .Measurement of tan-delta of CTs 2.

Maintenance of CB & CTs. 3. Tightening of

clamps & connectors.

9 765KV 3 X 500 MVA ICT-2 at 765kV GSS Phagi 20.7.2017 21.07.2017 9.00Hrs. 18.00Hr. Daily

1. To check the air leakage from air

cell of R-Phase Tr. as the air has

been observed in the conservator

tank. 2. To check the tripping of CBs through Main &

auxiliary protection.

3. Measurement of Tan-delta of Bushings.

10 765KV 800 KV CB (702-52B) of ICT-2 at 765kV GSS Phagi

25.07.2017 26.07.2017 9.00Hrs. 18.00Hrs Daily

1 .For the measurement of

Tan-delta of Current

transformers. 2. Tightening of

clamps & connectors

.3. Maintenance of CB.

11 765KV 765 KV Bus-B at 765kV GSS Phagi 28.07.2017 28.07.2017 9.00Hrs. 19.00Hrs Daily

For the tightening of clamps &

connectors of droppers from Main Bus to isolators of

different 765KV Bays connected to

Main Bus-B.

PROPOSED OUTAGE OF TRANSMISSION ELEMENTS FOR THE 136th OCC MEETING ANNEXURE 3 B HVPNL

Sr. No.

Details of Transmission

element Name of

S/Stn

Name of transmission

elements

Category to which

transmission element belong

(A/B/C/D)

Date Daily basis

Timings

Purpose/ Reasons

Voltage level From To From (Hrs.)

To (Hrs.)

1 400kV 400kV Nawada

400/220 kV, 315 MVA ICT-1, TIE-1 & Bus-

2

A 06.07.17 06.07.17 D 06:00 11:00 For General maintenance

of T/F and allied equipments

2 400kV 400kV D/Bad ICT-1 A 13.07.17 13.07.17 D 08:00 17:00 For General maintenance

3 400kV 400kV K/Pur

400/220 kV, 315 MVA ICT-2 A 14.07.17 14-07-2017 D 8:00

Hrs 17:00 Hrs

For Yearly Maintenance & Testing.

4 400kV 400kV D/Bad ICT-2 A 14.07.17 14.07.17 D 08:00 17:00 For General Maintenance

5 400kV 400kV D/Bad ICT-3 A 17.07.17 17.07.17 D 08:00 17:00 For General maintenance

6 400kV 400kV D/Bad

400KV Bus-Bar I A 24.07.17 24.07.17 D 08:00 17:00

Nut & Bolts tightening of bus isolators and attending

hot points

7 400kV 400kV D/Bad

400KV Bus-Bar II A 25.07.17 25.07.17 D 08:00 17:00

Nut & Bolts tightening of bus isolators and attending

hot points

8 400kV 400kV Nawada

400/220 kV, 250 MVA ICT-II, TIE-II & Bus-

II

A 27.07.17 27.07.17 D 06:00 11:00 For General maintenance

of T/F and allied equipments

BBMB

Sr. No.

Element Name Owner Name

Mode (Daily/Conti.)

Reasons From To

Date Time Date Time 3 220/33 KV 60 MVA Transformer

T-2 at Panipat BBMB Continuous basis For dehydration of transformer oil due to low

BDV 05.07.2017 8.00 06.07.2017 17.00

5 220/132 KV 100 MVA Transformer T-1 at Ch. Dadri

HVPNL Daily basis For testing of tan delta of equipments 06.07.2017 8.00 06.07.2017 17.00

6 220/132 KV 100 MVA Transformer T-2 at Chd. Dadri

HVPNL Daily basis For replacement of 220kV isolators 10.07.2017 8.00 12.07.2017 17.00

Name of Transmission Utility/licensee : Uttar Pradesh Power Transmission Corporation Limited

Sl. No.

Detail of Transmission element Date Timings

Reason Remark Voltage level Name of Transmission Elements From To From To

1 400kV 500 MVA ICT at 400kV S/S Azamgarh. 01.07.17 01.07.17 08:00 18:00 Replacement of Isolator. Continuous basis

2 400KV 400/220KV 240MVA ICT-II at Sultanpur 01.07.17 01.07.17 08:00 18.00 For Bay maintenance Daily basis

3 400KV 400/220KV 240MVA ICT-III at Sultanpur 03.07.17 03.07.17 08:00 18.00 For Bay maintenance and jumper tightness

of 220KV bay Daily basis

4 400 KV 400 KV MAIN BUS-I ALONG WITH 400 KV BUS COUPLER Sarojaninagar Lucknow

03.07.17 17.07.17 09:00 16:00

FOR RETROFITTING WORK OF BUS-I PANTOGRAPH ISOLATOR OF FOLLOWING BAYS:- (1) 400 KV SAROJINI NAGAR-UNNAO LINE (03.07.17 to 10.07.17) (2) 315 MVA 400/220 kV ICT-I (11.07.17 to 17.07.17)

Continuous basis

5 400kV 315 MVA ICT - I at 400kV S/S Azamgarh. 05.07.17 05.07.17 08:00 18:00 Replacement of Isolator. Continuous basis

10 400kV 315MVA ICT-I at 400KV sub-station, Muradnagar-I 06.07.17 08.07.17 08:00 18:00 Replacement of HV CT, HV side standard

isolator and HV side LA. Continuous basis.

11 400kV 500 MVA ICT at 400kV S/SAzamgarh. 07.07.17 07.07.17 08:00 18:00 Replacement of Isolator. Continuous basis

12 400KV 240MVA 400/220KV ICT-I at 400KV S/S Panki 08.07.17 08.07.17 08:00 18:00 For routine maintenance work. Daily basis

13 400KV 50MVAR line reactor at 400KV S/S Panki 09.07.17 13.07.17 09:00 12:00 For centrifuging of t/f oil Continuous basis

15 400kV 200 MVA T/F - I Bay at 400 kV S/S Kasara Mau 13.07.17 13.07.17 08:00 18:00 General maintenance and testing of bay. Continuous basis

16 400kV 400KV A Bus at 400KV Sub-station, Muradnagar-I 13.07.17 13.07.17 08:00 18:00 Replacement of R phase CVT Daily Basis

17 400KV 315 MVA ICT II alongwith 220KV Main Bus I & II Bareilly 14.07.17 14.07.17 08:00 Hrs. 18:00 Hrs. For Replacement of damaged Jack Bus. Daily basis

18 400kV 200 MVA T/F - II Bay at 400 kV S/S Kasara Mau 15.07.17 15.07.17 08:00 18:00 General maintenance and testing of bay. Continuous basis

19 400kV 315MVA ICT-II at 400KV Sub-station, Greater Noida 16.07.17 16.07.17 07:00 11:00 For general maintenance of T/F & its bay Daily Basis

20 400KV 400KV Bareilly - Unnao Ckt. I Main Breaker Bareilly 16.07.17 20.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis

21 400 KV Main Circuit Breaker of 400/220 KV 315 MVA ICT-I at Unnao end 17.07.17 24.07.17 08:00 18.00

Major Overhauling of Main Circuit Breaker of 400/220 KV 315 MVA ICT-I at Unnao end. (400/220 KV 315 MVA ICT-I remain charged through 400 KV TBC)

Continuous basis

22 400 KV 400KV Fatehabad-(765KV UP)Muradnagar line 17.07.17 27.07.17 08:00 18:00

For replacement of damage jumper & fixing of pilot string copper bond, bull dog clamp and other line maintenance work.

Daily basis

23 400kV 240MVA ICT-I at 400KV sub-station, Muradnagar-II 18.07.17 18.07.17 10:00 14:00 Tightening of Bay Daily Basis

24 400kV 400 kV Main Bus - I at 400 kV S/s Sarnath 18.07.17 30.07.17 08:00 18:00 General maintenance & strengthening of

Main Bus - I

Continuous basis. Load will be fed through Main Bus-II.

25 400kV 240MVA ICT-II at 400KV sub-station, Muradnagar-II 19.07.17 19.07.17 10:00 14:00 Tightening of Bay Daily Basis

26 400KV 400/220KV 240MVA ICT-I at Sultanpur 20.07.17 21.07.17 08:00 18.00 220KV side jumpers replacement Daily basis

27 400kV 500 MVA T/F - II Bay at 400 kV S/S Sarnath 20.07.17 22.07.17 08:00 18:00 Commissioning of new Aircell by M/s ABB

Engineer.

Continuous basis. Load will be fed through 315 MVA T/F - I & III.

28 400KV 400KV Bareilly - Unnao Ckt. II Main Breaker Bareilly 21.07.17 25.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis

29 400kV 400 kV Sarnath - Varanasi - II Line at 400 kV S/S Sarnath 25.07.17 25.07.17 08:00 18:00 General maintenance. Continuous basis

30 400 KV 315 MVA ICT-I Sarojaninagar Lucknow

25.07.17 25.07.17 09:00 16:00

RETROFITTING OF LINE ISOLATOR (SHUTDOWN IS REQUIRED FOR DISCONNECTION OF PIPE BUS BETWEEN LINE ISOLATOR & TRANSFER BUS ISOLATOR). AFTER DISCONNECTION OF PIPE BUS, ICT-I WILL BE CHARGED FROM TRANSFER BUS.

Daily basis.

29.07.17 29.07.17 09:00 16:00

RECONNECTION OF PIPE BUS BETWEEN LINE ISOLATOR & TRANSFER BUS ISOLATOR AFTER RETROFITTING OF LINE ISOLATOR.

Daily basis.

31 400KV 315 MVA ICT - I Main Breaker Bareilly 26.07.17 27.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis

32 400kV 315 MVA T/F - I Bay at 400 kV S/S Sarnath 27.07.17 27.07.17 08:00 18:00 General maintenance. Continuous basis

33 400kV 400 kV Sarnath - Varanasi - I Line at 400 kV S/S Sarnath 28.07.17 28.07.17 08:00 18:00 General maintenance. Continuous basis

34 400KV 315 MVA ICT - II Main Breaker Bareilly 28.07.17 29.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker Continuous basis

35 400kV 315 MVA T/F - III Bay at 400 kV S/S Sarnath 29.07.17 30.07.17 08:00 18:00 Attending oil seepage by M/s EMCO

Engineer

Continuous basis. Load will be fed through 315 MVA T/F -I & 500 MVA T/F.

36 400KV 315 MVA ICT - III Main Breaker Bareilly 30.07.17 31.07.17 08:00 Hrs. 18:00 Hrs. For complete O / H of Main Breaker on Continuous basis

DTL

Sr. No. Element Name Owner Name

Mode (Daily/Conti.)

Reasons From To

Date Time Date Time 1. 315MVA ICT-1

at Bawana

DTL Daily Shutdown requried for completion of errection of HVW system on 315MVA ICT-I. 50% work of errection of HVW system has been completed. Shutdown was taken for 5-6 days as approved earlier in 135th Meeting of OCC of NRPC. ICT would be charged daily after 13:00 Hrs on daily basis from 15.05.2017 and during shutdown of transformer No-1 the load has been meet through ICT 2,3,4,5,6

18.06.2017

07:00

30.06.2017

13:00

PATRAN TRANSMISSION COMPANY LIMITED

No.

Details of Transmission element Category to which transmission element belong (A/B/C/D)

Date Timings

Purpose/ Reasons Voltage

level Name of

S/Stn

Name of transmission

elements From To

Daily basis

From (Hrs.)

To (Hrs.)

1 400KV PTCL-400KV PATRAN, SS

400/220KV 500MVA ICT-1 A 27-6-17 27-Jun-17 D 8:00 Hrs 15:00 Hrs

For Yearly Maintenance & Testing.

2 400KV PTCL-400KV PATRAN, SS

400/220KV 500MVA ICT-2 A 28-6-17 28-Jun-17 D 8:00 Hrs 15:00 Hrs

For Yearly Maintenance & Testing

List of members of OCC

Adani PL. (i) Sh. Nirmal Sharma, VP (O&M), Fax- 0141-2292065 (ii) Sh. Sameer Ganju, Head-Northern Region, Fax No. 011-24115560 APCPL (i) AGM (O&M)-I, IGSTPP, Fax No. 01251-266326 (ii) AGM (EEMG), 01251-266326 BBMB (i) Director (PR) Fax- 0172-2652820 (ii) Power Controller, Fax- 0172-2653297. HVPNL Chief Engineer (Comm.); SE (SO & SLDC): 0181-2664440 Fax-0172-2560622 NHPC (i) Sh. Janardan Choudhary, E.D., Faridabad – Fax-0129-2272413 (ii) Sh. S P.Singh, Chief Engineer (O&M), Faridabad – Fax-0129-2272413 POWERGRID (i) Sh. Prabhakar singh, ED (NR-I), Fax No. 011-26853488 (ii) Sh. A.K. Arora, General Manager (O&M), NR-I, (iii) Sh. R.V.S Kushwaha, General Manager (O&M), Jammu; Fax- 0191-2471187 (iv) Sh.Rajeev Sudan Dy, General Manager (OS), Fax- 0191-2471187 RRVUNL Sh. P.S Arya, Chief Engineer (PPMC & IT), ) Fax- 0141-2740006 NTPC (i) Head of OS/ Head of RCC, Fax No. 0120-2410082 (ii) Sh. Praveen Chaturvedi, GM (OS), NRHQ Lucknow; Fax-0522-2305849. HPSEBL (i) Sh Suneel Grover, Chief Engineer (SO &P), Fax No. 0177-2653656 (ii) Sh. Deepak Uppal, SE (PR& ALDC): Fax-0177-2837143 (iii) Sh. Joginder Singh. Power Controller, Fax No. 0177-2837143. NRLDC General Manager - 26854861, 4051, 26569504 Fax- 26852747 NLDC General Manager, NLDC, Fax: 011-26853488/26601079 Lanco APTL Sh. Raj Kumar Roy, Director, Fax: 0124-2341627/4741024 SJVNL/NJHPS General Manager (C&SO), Fax- 0177-2673283 PTCUL/UPCL (i) Sh. Anupam Sharma, SE (SLDC), Fax- 0135-2451160, 0135-2763570 UPPTCL (i) Director (Op), Fax- 0522-2286476 (ii) Chief Engineer (SLDC), Fax- 0522-2287880, 2288736 HPLDS (i) Sh. N.P.sharma, SE, SLDC, Fax: 0177-2837649 (ii) Sh. Lokesh Thakur, Executive engineer, Fax: 0177-2837649 DTL General Manager (SLDC)/ General Manager (Protection) Fax-23236462, 23221069 THDCIL Sh. U.C Kannaujia, AGM (EMD), Tehri, Fax- 0135-2438682 PSTCL (i) Sh. S.S.Mal, Chief Engineer (SLDC) Fax – 0175-2365340 (ii) Sh D.P.Sethi, Dy.Chief Engineer (SLDC) Fax – 0175-2365340 CHANDIGARH Sh. M.P.Singh, SE (Elect. Op.Circle) – Fax-0172-2740505 IPGCL/PPCL (i) Sh. Y.P.Arora,GM (T), IPGCL, New Delhi, Fax- 23370884 (ii) Sh. R.K.Yadav, DGM (T), IPGCL, New Delhi, Fax- 23370884 BRPL Sh. Satinder Sondhi, VP & Head System Operations, Fax No. 011-39996549 Everest PPL Sh. Yogendra Kumar, Chief Operating Officer, Fax No. 011-45823862/ 43852507 RPSCL Sh. Niranjan Jena, Addl.VP/ Sh. Suvendu Dey, Asst. VP-O&M, Fax: 05842-300003 HPGCL Sh. S.K. Wadhwa SE/Technical(HQ), Fax: 0172-5022436

From organizations which are yet to submit revised nominations

Uttar Haryana Bijli Vitaran Nigam Ltd. Jodhpur Vidyut Vitran Nigam Ltd.

HPPTCL Director (Planning & Contracts), Fax: 0177-2626284 J&K (PDD) Chief Engineer (Survey & Commercial) Fax-0191-2476213 J&K SPDCL GM, Fax: 0194-2500145 PSPCL Engineer-in- Chief (PPRR), Fax- 0175-2308698. RRVPNL Chief Engineer (LD); SE (SO&LD) – Fax- 0141-2740920 UPRVUNL DGM (TOM), 0522-2287861 UJVNL General Manager Engineering: 0135-2761485, fax- 0135-2761549 CEA Director, (GM-I), Fax- 26170385, 26108834 Chief Engineer, NPC NPCIL (i) Station Director, NAPS; Fax. 05734-222177.(ii) Sr. Manager (Transmission),

NPCILFax.-022-25563350 JPPVL Sh. Suresh Chandra, Director, Fax- 0120-4516201/4609464/4609496 Jhajjar PL Sh. Goutam Biswas, GM (Production), 01251-270155. Talwandi Saboo Limited Distt Mansa 02266461451

New Members for the year 2016-17 (Nominations not received)