Form 1, Form 1(A) and Proposed ToR for Residential cum Commercial Project at Dahegam, Taluka: Dahegam & District: Gandhinagar, Gujarat.
DECEMBER 2016
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 2
CONTENTS
1 SCOPING ................................................................................................... 4
1.1 FORM – 1 ............................................................................................... 4
1.2 FORM – 1(A) ......................................................................................... 17
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 3
LIST OF ANNEXURES
Annexure 1: Toposheet .................................................................................................................................... 28
Annexure 2: Soil Analysis Report ...................................................................................................................... 29
Annexure 3: Source of Water Supply, Sewer line connection and Solid Waste Management Permission Letter ...... 30
Annexure 4: NA documents, Land Possession document (7/12), TP scheme map and location of project on it,
Zoning Certificate, Agreement between land owner and developer ..................................................................... 31
Annexure 5: Satellite Map................................................................................................................................. 36
Annexure 6: Land Use Map............................................................................................................................... 37
Annexure 7: Site Layout Plan ............................................................................................................................ 38
Annexure 8: Water Balance and Water Balance Diagram ................................................................................... 39
Annexure 9: Storm Water Management Plan ..................................................................................................... 41
Annexure 10: Parking Details ............................................................................................................................ 45
Annexure 11: Fire & Safety............................................................................................................................... 47
Annexure 12: Environmental Management Plan ................................................................................................. 48
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 4
1 SCOPING
1.1 FORM – 1
The scoping for the project has been done based on FORM 1, as per EIA Notification, dated September 14, 2006
amended as on date. The scoping details are as follows:
I. Basic Information
S.
No. Item Details
1 Name of the Project/s Proposed Residential cum Commercial Project
2 S. No. in the Schedule 8(a)
3
Proposed capacity / area / length /
tonnage to be handled/ command area
/ lease area / no. of wells to be drilled
Plot area – 22,417 m2
Built up area –29,207.52 m2
4 New / Expansion / Modernization New
5 Existing Capacity / Area etc. Not applicable
6 Category of Project (A or B) ‘B’
7 Does it attract the general conditions?
If yes, please specify. No
8 Does it attract specific condition? If
yes, please specify No
9
Location Dahegam, Gujarat
Plot Survey / Khasra No. F.P. No. 144/1, O.P. No. 144, Survey No. 1413/1 of
D.T.P.S. No. 3 (Dahegam)
Village Moje: Dahegam
Tehsil / Taluka / Mandal Dahegam
District Gandhinagar
State Gujarat
10 Nearest railway station / airport /
along with distance in km.
Dahegam Railway Station is ~2.4 Km by road in NE
direction
Ahmedabad Airport is~23.5 Km in WSW direction.
11
Nearest town, city, district
headquarters along with distances in
kms
Proposed project developed in Dahegam Taluka
12
Village Panchayat, Zilla Parishad,
Municipal Corporation, Local Body
(complete postal address with
telephone nos. to be given)
Ahmedabad Urban Development Authority
Sardar Vallabhbhai Patel Sankul, Usmanpura,
Ashram Road, Ahmedabad
r Name of the applicant Arjun Developers
14 Registered address
Arjun Developers
2/2 Vaikunth Complex, Raspan Cross Road, New India
Colony Road, Nikol, Ahmedabad - 382350
15 Address for correspondence As Above
Name Mr. Manoharbhai Patel
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 5
S.
No. Item Details
Designation Partner
Address
Arjun Developers
2/2 Vaikunth Complex, Raspan Cross Road, New India
Colony Road, Nikol, Ahmedabad - 382350
Pin Code 382350
E-mail [email protected]
Telephone no. +91 9825411504
Fax no. -
16
Details of alternative sites examined, if
any. Location of these sites should be
shown on the Toposheet
Location of Site shown on Topo sheet is given in
Annexure 1
17 Interlinked Projects No
18
Whether separate application of
interlinked project has been
submitted?
No
19 If yes, date of submission -
20 If no, reason Individual project
21
Whether the proposal involves
approval / clearance under: if yes,
details of the same and their status to
be given:
The Forest (Conservation) Act, 1980
The Wildlife (Protection) Act, 1972
The C.R.Z Notification, 1991
No
22
Whether there is any Government
order / policy, relevant / relating to the
site
No
23 Forest-land involved (ha.) No
24
Whether there is any litigation pending
against the project and / or land in
which the project is proposed to be set
up?
Name of the Court
Case No.
Order / directions of the Court, if any
and its relevance with the proposed
project
No litigation pending
II. Activity
1. Construction, operation or decommissioning of the project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S. No. Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 6
S. No. Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
1.1
Permanent or temporary change in
land use, land cover or topography
including increase in intensity of land
use (with respect to local land use
plan)
Yes
The project will partially change in land use, land
cover or topography with respect to local land use.
The project will be developed as per Ahmedabad
Urban Development Authority approved plan. The
project will be developed as a Residential cum
Commercial Project.
1.2 Clearance of existing land, vegetation
and buildings? No
There are 6 trees existing at site. None of them
will be cut but replanted.
1.3 Creation of new land uses? Yes
The project is developed as Residential cum
commercial as per Ahmedabad Urban
Development Authority
1.4 Pre-construction investigations e.g.
bore houses, soil testing? Yes
The soil was tested before construction. The soil
report is attached vide Annexure 2
1.5 Construction works? Yes
There will be construction of Residential bungalows
and commercial units with One level of Basement
for Parking. (Total – 108 bungalows, , 25 shops,
64 offices)
1.6 Demolition works? No Not applicable
1.7
Temporary sites used for construction
works or housing of construction
workers?
No
Labors will hired from nearby local market. So
temporary sites will not require.
1.8
Above ground buildings, structures or
earthworks including linear structures,
cut and fill or excavations
Yes
There is a construction of G + 4 floors and One
level of Basement in commercial complex and G + 2
in Bungalows.
1.9 Underground works including mining
or tunneling? Yes
One level of basement
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.13 Production and manufacturing
processes? No
Not applicable
1.14 Facilities for storage of goods or
materials? Yes
Construction Phase :
It is envisaged that common warehouses /
stockyards would be constructed to enable centrally
coordinated bulk storage of construction materials.
This would ensure planned movement within the
project site during transport of materials thereby
optimizing the construction material transport
related trips.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents? Yes
Solid Wastes:
Solid waste generated in Project area will be
mainly of domestic nature. The 30 kg/day
(Construction Phase) and 0.4 Tone/day
(Operation phase) of solid wastes generated will
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 7
S. No. Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
be segregated into biodegradable and non-
biodegradable wastes and collected in separate
bins.
The biodegradable waste will be collected in
Green bins and will be disposed nearby municipal
bins. Non-biodegradable (Recyclable) waste will
be collected in White bins and sold to Vendors as
per Municipal Solid Waste (Management and
Handling) Rules, 2000. Waste from such bins will
be collected separately on daily basis.
Liquid Effluent:
Wastewater generated during construction (11
KLD) and operation (68 KLD) phase will be
disposed into STP. Treated waste water will be
used in flushing, horticulture, floor washing and
car washing.
1.16 Facilities for long-term housing of
operational workers? No
Construction workers will be hired from near local
market. So housing facility will not be required.
1.17 New road, rail or sea traffic during
construction or operation? No
Not applicable
1.18
New road, rail, air waterborne or other
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
No
Not applicable
1.19
Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No
Not applicable
1.20 New or diverted transmission lines or
pipelines? No
Not applicable
1.21
Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or aquifers?
No
Not Applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from
ground or surface waters? Yes
Not applicable
1.24 Changes in water bodies or the land
surface affecting drainage or run-off? No
Construction Phase:
During construction phase fresh water requirement
16.25 KLD will be met through tankers
Operation Phase:
During operational phase fresh water requirement
of 52 KLD will be met through Dahegam
Nagarpalika. Permission letter is attached vide
Annexure 3
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 8
S. No. Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible) with
source of information data
1.25
Transport of personnel or materials for
construction, operation or
decommissioning?
Yes
Transport of personnel and materials will be
required for both construction and operation
phases.
1.26 Long-term dismantling or
decommissioning or restoration works? No
Not applicable
1.27
Ongoing activity during
decommissioning which could have an
impact on the environment?
No
Not applicable
1.28 Influx of people to an area either
temporarily or permanently? Yes
Construction Phase:
About 150 workers will be transported to the
site.
Construction material will be brought to site in
bulk.
Operation Phase:
About 856 residents will stay inside project
premises.
About 150 Visitors will influx during operation
phase.
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic
diversity? No
Not applicable
1.31 Any other actions? No Not applicable
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short supply):
S.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities /
rates, wherever possible) with source of
information data
2.1 Land especially undeveloped or
agricultural land (ha) No
Presently the land is undeveloped. NA documents
,land possession documents, 7/12, Partplan and
zoning certificate are attached vide Annexure 4
2.2 Water (expected source & competing
users) unit: KLD Yes
Water demand will be as follows:
Construction Phase:
Maximum Quantity: 16.25 KLD
Source : Tankers
Operational Phase:
Maximum Fresh water Quantity: 52 KLD
Source: Dahegam Nagar Palika
2.3 Minerals (MT) No Not Applicable
2.4
Construction material stone,
aggregates, sand / soil (expected
source, MT)
Yes
Construction materials such as stone, cement, sand,
bricks, aggregate, glass, decorative stones, wood,
paints, tiles, electrical, sanitary and plumbing
fixtures, etc. will be used.
All the above materials are purchased from local
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 9
S.
No.
Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate quantities /
rates, wherever possible) with source of
information data
markets and nearest approved quarries. They will be
transported to site as and when required. They will
be stored temporarily at site.
Approximate Quantity:
SN Material Quantity
1. Steel (MT) 1900
2. Cement (Bags) 122200
3. Stone Aggregate
(m3) 11500
4. Sand (m3) 1350
5. Bricks (m3) 700
6. Glass (m2) 3100
7. Fly Ash Based Products (m3)
2050
2.5 Forests and timber (source, MT) No Not Applicable
2.6
Energy including electricity and fuels
(source, competing users) unit: fuel
(MT), energy (MW)
Yes
Source: Uttar Gujarat Vij Company Limited (UGVCL)
Expected Demand: 1000 KVA
D.G Sets: 1 x 125 KVA in case of power failure
(dedicated to fire only)
Fuel: HSD, 25 l/hr
2.7 Any other natural resources (use
appropriate standard units) No Not Applicable
3. Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerns about actual or perceived
risks to human health.
S. No. Information / Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
3.1
Use of substances or materials, which
are hazardous (as per MSIHC rules) to
human health or the environment
(flora, fauna, and water supplies)
Yes Only HSD will be stored at site for D.G Sets.
3.2
Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No
Suitable drainage and waste management
measures will be adopted during both
construction and operational phase, which will
restrict stagnation of water or accumulation of
waste. This will effectively restrict the growth
and reproduction of disease vectors.
3.3 Affect the welfare of people e.g. by
changing living conditions? Yes It will increase the standard of living of people
3.4
Vulnerable groups of people who
could be affected by the project e.g.
hospital patients, children, the elderly
etc.,
No Not Applicable
3.5 Any other causes No Not Applicable
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 10
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
4.1 Soil, overburden or mine wastes Yes
Excavated surplus earth will be refilled to
maintain desirable slope in the project premise.
The top soil will be used in Green belt because
of its high humus content.
4.2 Municipal waste (domestic and or
commercial wastes) Yes
The municipal solid wastes generated during
operation phase will consist of
Organic
Waste
Food Waste, kitchen refuse,
flowers, dried leaves, paper,
fruits, etc.
Inorganic
Waste
Plastic, tapes, wrappers,
cardboard, packaging
material, thermocol,
aluminium foils, glass,
ceramic, rubber, tins, etc.
Solid waste storage locations will be
incorporated in the design itself.
Adequate independent collection bins for waste
will be provided as per Municipal Solid Waste
(Management and Handling) Rules, 2008.
The waste will be segregated and collected
daily. The approximate quantity of solid wastes
generated will be approximately 0.4 Tone/Day.
Recyclable waste will be given to recyclers. The
biodegradable waste will be disposed off in
Nagarpalika bins.
4.3 Hazardous wastes (as per Hazardous
Waste Management Rules) Yes
Only used oil (Category 5.1) will be generated
and collected and will be handed over to
authorized recyclers.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from
effluent treatment No Not Applicable
4.7 Construction or demolition wastes Yes
The construction waste consists of construction
debris along with cement bags, steel in bits and
pieces, insulating and packaging materials, etc.
Empty cement bags, waste paper and
cardboard, etc are sold to recyclers. Unusable
steel scrap is also collected at site and sold to
recyclers.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 11
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5. Release of pollutants or any hazardous, toxic or noxious substances to air(kg/hr)
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
5.1
Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes Emission from combustion of fossil fuels from
mobile sources only. E.g. Cars, bikes, etc.
5.2 Emissions from production processes No Not Applicable
5.3 Emissions from materials handling
including storage or transport Yes
At the time of transportation, dust may be
generated but it will be restricted to the
construction phase and to the construction site
only. For minimizing the dust transfer, a 5 m tall
peripheral barrier will be provided.
5.4 Emissions from construction activities
including plant and equipment Yes
At the time of transportation & construction,
dust may be generated. Water sprinkling will be
carried out in that case, to minimize the dust.
5.5
Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes
Construction Phase:
Dust could be generated during construction
activity. Water sprinkling will be carried out to
minimize dust. During the construction phase,
sewage will be disposed in Septic tank and
soak pit. Temporary solid waste storage will
also be provided at site with covered lids.
Operation Phase:
During the operational phase, sewage will be
collected and disposed into STP. Treated waste
water will be used in flushing, horticulture, floor
washing and car washing.
5.6 Emissions from incineration of waste No Not Applicable
5.7
Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No Not Applicable
5.8 Emissions from any other sources No Not Applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers Yes
During construction, the machineries used for
construction will be of high quality and
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 12
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
efficiency. These quality standards will ensure
lesser noise and air emissions.
Hence, care will be taken to minimize noise
impacts due to construction machinery.
Apart from this, the construction activities which
are likely to generate noise will be restricted to
daytime only.
6.2 From industrial or similar processes No Not applicable
6.3 From construction or demolition Yes
Due to various construction activities, there may
be short-term noise impacts in the immediate
vicinity of the project site.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational
traffic Yes
During the construction phase, noise may be
generated due to construction activity but it will
be for short term only.
During the operational phase, minor noise will
be generated due to traffic.
6.6 From lighting or cooling systems No Not applicable.
6.7 From any other sources No Not applicable.
7. Risks of contamination of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
7.1 From handling, storage, use or
spillage of hazardous materials No Not Applicable
7.2
From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
No
The wastewater will be collected and disposed
into STP. Treated waste water will be used in
flushing, horticulture, floor washing and car
washing.
7.3 By deposition of pollutants emitted to
air into the land or into water No Not Applicable
7.4 From any other sources No Not Applicable
7.5
Is there a risk of long term buildup of
pollutants in the environment from
these sources?
No Not Applicable
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 13
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
8.1
From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
No Not Applicable
8.2 From any other causes Yes
During Construction phase(for further
construction) there may be possibilities of
accidents, fall from height, from scaffold and
temporary stairs, Cut or Burn injuries during
cutting and welding activities, and electrocution
during electrical fitting works.
During operation phase may be possibility of
accidents due to electrical fire hazard may
occur.
8.3
Could the project be affected by
natural disasters causing environmental
damage e.g. floods, earthquakes,
landslides, cloudburst etc)?
Yes
Project area is categorized in the seismic zone
III, which is classified as having a moderate
seismic intensity. The structure design is as per
Codes to negate the threat of environmental
and other damages.
9. Factors which should be considered (such as consequential development) which could lead
to environmental effects or the potential for cumulative impacts with other existing or
planned activities in the locality
S. No. Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
9.1
Lead to development of supporting
Facilities, ancillary development or
development stimulated by the project
which could have impact on the
environment e.g.: supporting
infrastructure (roads, power supply,
waste or waste water treatment, etc.)
housing development extractive
industries supply industries, (other)
Yes
The project site falls within AUDA, therefore,
any further development of infrastructure will
not be needed.
9.2
Lead to after-use of the site, which
could have an impact on the
environment
Yes
Negligible increase in traffic and there will be
positive impact on socio- economic
environment.
9.3 Set a precedent for later developments Yes
The project will lead to development of
bungalows and commercial shops-offices, which
will improve living standard in locality.
9.4
Have cumulative effects due to
proximity to other existing or planned
projects with similar effects
Yes As Above
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 14
III. Environmental Sensitivity
S.
No. Areas
Name /
Identity
Aerial Distance (within 15 km) of the
proposed project location boundary
1
Areas protected under international
conventions, national or local
legislation for their ecological,
landscape, cultural or other related
value
No
Not applicable
2
Areas which are important or
sensitive for ecological reasons -
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
Yes
Sabarmati river is ~12.7 km in WSW direction
3
Areas used by protected, important
or sensitive species of flora or fauna
for breeding, nesting, foraging,
resting, over wintering, migration
No
Not applicable
4 Inland, coastal, marine or
underground waters No
Not applicable
5 State, National boundaries No Not applicable
6
Routes or facilities used by the
public for access to recreation or
other tourist, pilgrim areas
Yes
Ahmedabad Airport is ~23.5 Km in WSW direction
Dahegam Railway Station is ~ 2.4 Km in NE
direction
National Highway -59 is adjacent to site.
7 Defense installations No Not applicable
8 Densely populated or built-up area Yes Vapi Town
9
Areas occupied by sensitive man-
made land uses (hospitals, schools,
places of worship, community
facilities)
Yes
Krishna Hospital is ~1.9 Km in ENE direction Sahjanand Hospital is ~ 2.7 Km in ENE direction Dahegam College is ~0.3 km in ENE direction
10
Areas containing important, high
quality or scarce resources (ground
water resources, surface resources,
forestry, agriculture, fisheries,
tourism, minerals)
No
Not applicable
11
Areas already subjected to pollution
or environmental damage. (Those
where existing legal environmental
standards are exceeded)
Yes
Dahegam GIDC is ~ 0.6 Km in NE direction
12
Areas susceptible to natural hazard
which could cause the project to
present environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
Yes
Project area is categorized in the seismic zone III,
which is classified as having a moderate seismic
intensity. The structure Design is as per Codes to
negate the threat of environmental and other
damages.
ARJUN DEVELOPERS
PROPOSED RESIDENTIAL CUM
COMMERCIAL PROJECT AT DAHEGAM, GUJARAT SCOPING – FORM 1
PAGE 15
S.
No. Areas
Name /
Identity
Aerial Distance (within 15 km) of the
proposed project location boundary
conditions)