As we look back over the results for the past year and the causal learning, it is obvious that we must make a bigturnaround in our HSE performance for 2015. From the data underlying the results a clear picture emerges, andthere can be no doubt that last year's setbacks were mainly due to supervisors simply concentrating on thetasks in hand rather than properly supervising operations, together with reluctance and possibly evencomplacency, to fully exercise the Stop Work policy at work sites.
Once again, I emphasize that everyone Must Fully Comply with our ZeTo rules, Intervene without hesitation andRespect the safety needs of each other in carrying out the duties. Let there be no doubt that we will enforce theconsequence management strictly for non-compliance.
For 2015, we will continue our Back to Basics and Hearts & Minds programs, but with the emphasis more ontheir hands-on implementation. We will carry out a more rigorous and disciplined Rig Assurance Audit cycliccampaign, and assign Special Task Forces to follow up and close out the corrective actions promptly. Our RigContractors will be given the full authority to run the “Rig as a Second Home” program. Together with all ourWells Contractors, we will drive continuously the “Hands & Fingers” campaign and the 11 elements in ourspider-web WHM (Worksite Hazard Management) tool that covers the ZeTo rules, Leadership & Behavior,Observation & Intervention, HSE Case operationalization, Permit to work, JHA / toolbox talk, DROPS program,PMS / Lifting register, MOC, Bridging document and Simultaneous Operations.
Whereas for Wells Risk, we will be adopting the 3-pronged PETRONAS Resiliency Model, also known as thePAYUNG analogy (Enterprise Risk Management, Crisis Management and Business Continuity Management), as aholistic approach to manage risk. This will be implemented through 4 core strategies - Policy & Strategy,Infrastructure, Capability & Culture, and Measurement. Similar to HSE, the emphasis will be on hands-on siteactivities, ensuring compliance and providing assurance on implemented mitigations. This is to support theinternalization and cascading of risk management culture and practices from the office down to the work site.Our priority will be on risk prevention for drilling activities in order to strengthen our internal control,specifically for Well Control and Stuck Pipe prevention.
Having a plan alone is obviously not sufficient, we need proper execution and implementation. I thereforerequire your full commitment, discipline and ownership to implement all programs and activities planned forthis year.
All of the above will be on our webpage, and also on a specially created webpage for our Contractors. Cascadingwill be facilitated by on-line bulletins, providing the latest information and alerts. There will also be morecoverage this time on near- misses, process safety and proactive KPIs.
Let us all keep working towards excellence in Health, Safety and Environment in making all our offices & Rigs thegreat places to work, and ensure that “Everyone Goes Home Safely”.
___________________George Ling Kien Sing
Head, Wells-Technical Global DivisionPETRONAS Carigali Sdn. Bhd.
HSE Plan Prepared by
ASUL KAHAR MUDASenior ManagerWells HSE
______________Date:
Risk Plan Prepared by
AZWATI OSMANHeadWells Risk Management Unit
______________Date:
Endorsed by
ROSLI HAMZAHHeadWells International
______________Date:
HISHAM BASARHeadWells Malaysia
______________Date:
M ARIFFIN DAUDHeadWells Intervention & Services
______________Date:
RAHIMI A WAHABHeadWells Technology Engineering & Support
______________Date:
AHMAD NAHRAWI MOHDHeadWells Competency & Assurance
______________Date:
Approved by DATUK GEORGE LING KIEN SINGHeadWells-Technical Global Division
______________Date:
*This page is left intentionally blank*
H
S
E
CONTENTS
2015 HSE PLAN FRAMEWORK
2015 WELLS HSE SCORECARD
2015 WELLS STRATEGY & HSE PLAN • LEADERSHIP & COMPETENCY• CULTURE & BEHAVIOUR• SYSTEMS & STRUCTURE
WELLS HSE CONTACT INFORMATION
Page 4-7
Page 8
Page 3
Page 1-2
Leadership & Competency
Systems & Structure
Culture & Behaviour
WELLS HSE FOCUSED PROGRAM 2015
2015 HSE PLAN FRAMEWORK
• HSE Training
• HSE Critical Position
• Site induction & ZeTo Rules
• Observation & Intervention system
• Leadership & Behaviour
Leadership & Competency
• Implementation of WELLS MCF Gaps
• HSE Contracts Requirement Verification
• Hazard and Effect Register (HER)
• HSE Assurance Program
• TIPS 5 (HSE Case Validation)
• HSE Project Management
• MOC Implementation (eMOC)
• Drops Prevention Program
• PMS – Lifting register
• Permit to Work (PTW)
• JHA/ Toolbox Talk
• Bridging Document
• SISO/SIPROD Preparedness
Systems & Structure
• Hearts & Minds Program for WELLS
• Rig as a Second Home
• Operationalization HSE Case
Culture & Behaviour
*Workplace Hazard Management (WHM)
Maintain good housekeeping
2015 FOCUS AREA
WELLS HSE SCORECARD 2015
HSE Score Card Min Bus Plan Stretch
<<< LIMIT >>>
Fatality 0 0 0
Lost Time Incident Frequency (LTIF)
0.63 0.57 0.51
Total Recordable Case Frequency (TRCF)
1.72 1.55 1.38
Major Loss of Primary Containment (LOPC)
2 1 0
Major Fire 1 0 0
Major LOPC Loss of hydrocarbon primary containment, equal to or in excess of 7 bbl of petroleum products (e.g. condensate, diesel); or 14 bbl of crude oil; or 5 kg (about 25 MMscf) of natural gas)
FatalityDeath due to work related injury or occupational illness
Lost Time Injury Frequency(Total number of lost time injuries per 1,000,000 (1 x 106) manhours)
Major FireNumber of major fires or explosions resulting in damage of more than USD 25,000 (direct cost)
Total Recordable Case Frequency(Total number of fatality, LWC, RWC & MTC per 1,000,000 (1 x 106) manhours)
LEADERSHIP & COMPETENCY
No. Program Specific Program Implementation Action KPITarget
(Bus. Plan)
1 HSE Training
To conduct "HSE in Drilling" for SHO and HSE Executives MAL/INT WHSE Session 2
To conduct HSE on-boarding program for all HSE critical position
MAL/INT WHSE/WCA % of attendance 90%
To conduct "HSE for Leaders" training for WLT MAL/INT/WIS WHSE/WCA Plan vs Actual May '15
To establish HSE Training Matrix for Global WELLS MAL/INT WCA Timeline June '15
2 HSE Critical Position
To conduct HSE competency assessment on rig key personnel
MAL WHSE/WO Completion 80%
To develop specific HSE competency to be utilized for hiring process of staff in HSE Critical Position
MAL/INT/WIS WCA/WHSE/WO Timeline June '15
To roll out HSE questionnaire for new comer MAL WO/WHSE Timeline March ‘15
3WELLS Contractors HSE Forum
To conduct an engagement session with all contractors and service providers, to communicate WELLS Management’s HSE direction FY2015
MAL WHSE Timeline February '15
2015 WELLS STRATEGY & HSE PLAN 2015
CULTURE & BEHAVIOUR
No. Program Specific Program Implementation Action KPITarget
(Bus. Plan)
1 Health Program To roll out Occupational Health Program MAL/WIS WHSE/Contractor Timeline June '15
2Hearts & Minds Program for WELLS
1. To develop H&M awareness & conditioning program for rig/barges leadership and all crew
2. To analyze the effectiveness of H&M implementation conducted on selected rigs involved in pilot projects
MAL/INT/WIS
MAL
WHSE/WO
WHSE
Timeline
Timeline
March '15
February '15
3Rig as a Second Home
To introduce content of Rig as a Second Home package to all rigs/barges
MAL/INT/WIS WHSE/WO Completion February '15
4Operationalization HSE Case
1. To monitor the closure of gaps from Rig HSE Case Validation 2. To develop rig acceptance guideline 3. To develop SCE performance standard framework/guideline
MAL
MAL/INTMAL/INT
WHSE
WHSE/WOWHSE/WO/WTES
Close out
TimelineTimeline
80%
April '15May '15
To conduct awareness training on HSE Case MAL/INT WHSE Session per rig 2
5 HSE communication To roll out Wells HSE bulletin MAL/INT/WIS DRIVE/WDs/WHSE Timeline Quarterly
2015 WELLS STRATEGY & HSE PLAN 2015
SYSTEMS & STRUCTURE
No. Program Specific Program Implementation Action KPITarget
(Bus. Plan)
1Implementation of WELLS MCF Gaps
To review the Gaps for MCF and evaluate the compliance MAL/INTWHSE/WO/WDs/
WTESTimeline June '15
2HSE Contracts Requirement Verification
To verify rig acceptance for new rigs MAL/INT WO/WTES
Timeline & Completion
(Finding Close Out)
100% P1 closed 1 week prior Pre
Spud
3Workplace Hazard Management (WHM)
To analyze the WHM findings and evaluate the compliance MAL/WIS WO/WHSE Frequency Quarterly
To roll out of WHM to all WELLS International Counterparts INT WO/WHSE Timeline March '15
Appointment of champion and preparation of guideline for each element in WHM
MAL WHSE Completion 1st
Quarter
4 eMOCTo develop and roll out WELLS eMOC (online system to manage MOC)
MAL/INT/WIS WHSE/ WTS Timeline August '15
5Drops Prevention Program
To conduct Drop Prevention Campaign MAL/INT WO Completion 2nd
Quarter
To establish Drops Standards for WELLS MAL/INT/WIS WHSE Timeline 2nd
Quarter
To implement the Drops Prevention Program MAL/INT/WIS WHSE/Contractor Completion 80%
To conduct Drops Survey (Third Party) MAL/INT/WIS Contractors Timeline 6 monthly
2015 WELLS STRATEGY & HSE PLAN 2015
*10 elements of MCF consist of; capability, health, environment, safety & transportation, process safety & integrity, management of change, safe operation, contractor HSE management, design, engineering & construction, incident, management & emergency response
*WHM : Workplace Hazard Management
No. Program Specific Program Implementation Action KPITarget
(Bus. Plan)
6Drops Prevention Program
To conduct the Periodical Inspection (internal) as per contractor plan
MAL/INT/WIS Contractors Plan vs Actual 80%
To conduct the Drops Prevention Training MAL/INT/WIS WHSE/Contractor Session 2
7 HSE Assurance
To conduct Contractors' HSEMS Assurance (Rig Contractor & Service Companies)
MAL/WIS WHSE Plan vs Actual 80%
To conduct MHSEV and Rig/Barges Technical HSE Assurance MAL/INT WO/WHSE Plan vs Actual 80%
8 Establish HER To establish HER for project MAL/INT WHSE/WO/WDs Completion 90%
9 TIPS 5 To conduct HSE Case validation for international rigs INT WO/WTES/WHSE Completion 80%
10HSE Project Management
To establish Project HSE Task list MAL/INT/WIS WHSE Timeline 2nd
Quarter
To standardize the format and content for SISO & HSE Bridging Document
MAL/INT WHSE/WO Timeline 2nd
Quarter
To conduct well control emergency exercise MAL/WIS WHSE/WO/WTES Frequency Twice /year
2015 WELLS STRATEGY & HSE PLAN 2015
SYSTEMS & STRUCTURE
Feel free to reach usLevel 20 Tower 1
Wells HSE
Asul Kahar | 1- 6073 | [email protected]
Senior Manager, Wells HSE
M Rozaki A Rashid | 1-5858 | [email protected]
Manager, Project HSE
Morrison Daniel Lom| 1-7645 | [email protected]
Manager, Occupational Safety
Incident Notification, Incident Investigation & HSE Performance