forecasting during the sop1-2

23
Forecasting during the SOP1-2 Forecasting Forecast Sub-Group of the AOC/ST2 J-P Lafore , D. Parker (Leeds U.), C. Thorncroft (SUNY - US), Z. Mumba, A. Kamga, M.C. Dufresne (ACMAD), A. Assam (ASECNA), E. Afiesimama (Nigerian Met S), A. Diongue (Senegelese Met S), A. Beljaars (ECMWF), S. Milton (UK Met O), W. Thiaw (NOAA)

Upload: burton

Post on 19-Jan-2016

22 views

Category:

Documents


0 download

DESCRIPTION

Forecasting during the SOP1-2. Forecasting Forecast Sub-Group of the AOC/ST2 J-P Lafore , D. Parker (Leeds U.), C. Thorncroft (SUNY - US), Z. Mumba, A. Kamga, M.C. Dufresne (ACMAD), A. Assam (ASECNA), E. Afiesimama (Nigerian Met S), Diongue (Senegelese Met S), A. Beljaars (ECMWF), - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Forecasting during the SOP1-2

Forecasting during the SOP1-2

Forecasting Forecast Sub-Group of the AOC/ST2

J-P Lafore , D. Parker (Leeds U.), C. Thorncroft (SUNY - US), Z. Mumba, A. Kamga, M.C. Dufresne (ACMAD),

A. Assam (ASECNA), E. Afiesimama (Nigerian Met S), A. Diongue (Senegelese Met S), A. Beljaars (ECMWF),

S. Milton (UK Met O), W. Thiaw (NOAA)

Page 2: Forecasting during the SOP1-2

PLAN

1. Forcasting requirements

2. Organization• Workplan• Rosters• Briefing

3. Tools and methods• RETIM-Afrique Synergie, MSG• AOC-Web site

4. Nowcasting

5. Main issues to be solved

Page 3: Forecasting during the SOP1-2

1. Forecasting requirements

1. Operational needs:– Provide the forecasts of key aspects AOC decisions – Help to plan IOPs and relevant observation strategies– Security (aircraft protection)– Answer to PIs and platforms needs

2. Contribute to the science:– Evaluate the skill of models– Predictability– Feed the scientific discussion at AOC based on a description

of the WAM system at all scales and for all its components

Review of the TT8 implementation plan:– Briefing schedule must be refined:– Lack of nowcasting requirements – Flights concerning MCSs: takeoff time, poor forecast

skill…

Page 4: Forecasting during the SOP1-2

Dec Jan Feb Ma Apr May June July Aug Sept

SOP0

ForecastTraining Workshop

PreparatoryForecast Meeting

SOP1-2

ForecastTeam 1

ForecastTeam 2 Forecast

Team 3

1525

2. Organization: Planning

1. Preparatory Meeting:15-22 March– Participants: ACMAD, ASECNA, MF

2. Training Workshop:22May-2June– Priority on practicals– Funded by AMMA-EU

3. Forecasting Team at ACMAD:1st May-15Sep.– Funding not secured (~30k€)– ~12 African forecasters from ~10 countries– 3 periods: Rosters of 5 Forecasters for periods 1-3

6 Forecasters for period 2– + Forecasting resource persons from ACMAD– + Forecast Scientific Support

Page 5: Forecasting during the SOP1-2

2. Organization: Schedule - Tasks

03

Day D

Daily Rosters of Forecasters

Shifts

06 09 12 15 18 21 0000

Period 2

BriefingD+1B107?

Briefing>D+1

B216?

ARPEGE

A-TropiqueUK

ECMWFGlobal NWP

Availability by RETIM-Afrique

B0On request

TASKSAnalysis D-1, DForecast D, D+1B1 preparation

Forecast D+2, D+4B2 preparationMonitor forecasts (D+1)Collaboration with airport/NowcastingDaily Weather reportEvaluation Report for D-2

Daily Rosters of Forecasters

Shifts

Period 1-3

BriefingB1

?

B0On request

Page 6: Forecasting during the SOP1-2

3. Tools -Methods• Synergie Forecasting System (MF)

– 4 Stations at ACMAD– Fed with NWP products + MSG with the RETIM

link

• AOC-Web site:– VSAT internet link at ACMAD– Reports, quicklooks, NWP, diagnostics,

research models…– In construction: Medias-France, CNRM– MCS tracking: RDT from SAF-Nowcasting

• Synthetic analysis– Main features on a single synthetic map for

analysis and forecasts• WASA at 06, 18: West Afr. Synthetic Analysis• WASF at 06, 18: West Afr. Synthetic Forecast

Page 7: Forecasting during the SOP1-2

3. Synthetic analysis: example

ITF

HL

TEJ

AEJ

Dry Air

Page 8: Forecasting during the SOP1-2

ACMADForecasters

Team (2)

AirportASECNA

DMNNiger

AOC Niamey

IRD

Data flows and Web sites

ToulouseAOC-Web

CESBIO

Leeds U.

SUNY

IPSL

CEH

ftp

Etc…

RETIM-Afrique

BeninSuper Site

GourmaSuper Site

Dakar?SOP3

ResearchCenters

SpecificModels runs

AnalysisDiagnosticsIndexes…

NWPCenters

OperationalForecasts + Analysis

Minimum set ofFields

DiagnosticsIndexes

Rule

Save communication with Niger!

internet

AOC-Web

Others?

NCEP

Morocco

Météo-France

ECMWF

UK Met O

VSATinternet

Ouagadougou

Page 9: Forecasting during the SOP1-2

AOC-Web Sitehttp://aoc.amma-international.org

PIs contribution

To provide

Quick Looks

Page 10: Forecasting during the SOP1-2
Page 11: Forecasting during the SOP1-2
Page 12: Forecasting during the SOP1-2
Page 13: Forecasting during the SOP1-2
Page 14: Forecasting during the SOP1-2
Page 15: Forecasting during the SOP1-2
Page 16: Forecasting during the SOP1-2
Page 17: Forecasting during the SOP1-2
Page 18: Forecasting during the SOP1-2
Page 19: Forecasting during the SOP1-2

Dec Jan Feb Ma Apr May June July Aug Sept

SOP0

ForecastTraining Workshop

PreparatoryForecast Meeting

SOP1-2

ForecastTeam 1

ForecastTeam 2 Forecast

Team 3

1525

Forecasting activities Plan

AOC-Web development Plan

Version 1 Version 3Version 2

1st Development 2nd Development

VSAT

TASKS New products integration: MEDIAS Strong collaboration with PIs and producersCoordination: JP LaforeEvaluation by producers and users

Page 20: Forecasting during the SOP1-2

4. Nowcasting

A subgroup (ASECNA+CNRM) works on this issue

The main points are:1.Definition and setup of a procedure for

the nowcasting to guide flights• 3 persons team at Airport: on request

Forecaster + PI at ground +Air controler• Tools: MSG products• Communication issue with aircrafts?

2.Praticals will be elaborated to train forecasters at airport collaboration with pilots and aircraft PIs

Page 21: Forecasting during the SOP1-2

On the use of Tracking algorithms in AMMA

MCS tracking from Meteosat IR 2 applications

1. Nowcasting trajectories + main characteristics: stage, speed, surface, duration…• See AMMA-SAT web site:• Will be put on AOC-Web

2. Climatologie of MCSs: Available on request

• Identification of different types of MCSs (4 classes)

• Documentation over 8 years: SOP preparation– Examples: Nbr of MCSs for a given period and location

Daily distribution of MCS passage…

Page 22: Forecasting during the SOP1-2

5. Main issues to be solvedBudget

– Not secured for SOP (~30k€) current actionsNowcasting

– Communication issue – Define a procedure– Work on case studies

Collaboration between PI, pilots, Forecast groupBriefing Time?

– Discussed yesterday must be finalizedAOC-Web development MEDIAS + CNRM

– Collaboration with Pis provide Quick looks (AOC coordination)

provide specifics products– Coordination by JP Lafore– Mirror site at other site? (Ouaga., Dakar)

Still a lot of work!– Organize the Forecasters team– Finalize methodes practical– Prepare the Training Workshop (22 May – 2nd June)

Page 23: Forecasting during the SOP1-2

2. Organization: Briefings

• Crucial issue to be discussed– Morning briefing B1 07UTC ( 8:00Loc)– Afternoon briefing B2 16UTC (17:00Loc)

• B1 implies the FT to start work around 2UTC

• B2 seems too late• B0 specific briefing at ACMAD early in the

morning• At what time is the briefing for periods

without aircrafts (late morning or early afternoon?)