Forebygging av storulykker HMS-direktør Anita Utseth 9.11.10
![Page 2: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/2.jpg)
About Det norske
Founded in 2005 on basis of PGS owned Pertra
Merger with NOIL AS and Aker Exploration AS
Head office in Trondheim, four offices, about 200 employees
Only activity on the Norwegian Continental Shelf
Organic growth into production
2
![Page 3: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/3.jpg)
Storulykkerisiko i leteboring -hva er viktig?
Styringssystem og organisasjon Kompetanse og erfaring til personell Risikoforståelse hos ledelsen Langsiktige samarbeidspartnere Brønndesign og trykkkontroll Vedlikehold
![Page 4: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/4.jpg)
Organisasjon og kompetanse
4
Lagt vekt på en organisasjon som skal følge opp og se til aktiviteten: • Kompetanse, erfaring og ferdigheter • Kapasitet • Synelig ledelse med korte rapporteringslinger
Planlegging
![Page 5: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/5.jpg)
Risk Based Management
Systematically identify risk (probability and consequences) Reduce risk to an acceptable level Control risk Use the identified risk for decicion-making Communicate the risk Regular updates and reviews
Acquiring a license and accept work committment
G&G work,
Recom-mendation
to drill, site surveys
Basis of Design,
Anchore analysis, Well design, Blow out analysis, Risk
analysis
Application for discarges and emissions and
environmental risk assesment,
15 weeks before spud
AFE Detailed engineering Application for
Consent
Preparation to Spud
Drill on Paper, Verification
activity
Spud, follow up of
contractors and
operational activity
Two years 6 months to one year
![Page 6: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/6.jpg)
Pre well planning
Safety issues – acquisition of site survey • Shallow gas pockets • Corals • Ice plough marks • Other obstacles to the well – boulders, shallow
faults, etc.
Mapping of seabed and sub-seabed condition • Identify corals with side scan sonar • Verification with camera
![Page 7: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/7.jpg)
How to drill a well
HSE and emergency preparedness is an integrated part of the well design and well planning process:
Blow out analysis, Environmental risk analysis Emergency preparedness analysis Site spesific emergency preparedness analysis Risk analysis of well design Emergency prepardness plans Oil spill contigency strategy and plans In house competence
7
![Page 8: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/8.jpg)
Follow up the operations
Common system for reporting, follow up, investigations, analysis etc. Daily morning meetings Regulary operational meetings Regulary HSE meetings Contractual meetings Consortium meetings, both HSE and
Management Comitee
Yearly consortium and project based HSE- and audit program, including 3. parties
Monitoring of major accident risk
8
![Page 9: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/9.jpg)
9
Etablering av indikatorer for storulykkeovervåking
Et best mulig sett med indikatorer for overvåking av risiko for storulykker ved leteboring.
Verktøyet skal sørge for at ledelsen i Det norske har den nødvendige oversikt over utviklingen i risiko for storulykker for de boreriggene de opererer.
![Page 10: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/10.jpg)
Utestående vedlikehold
Rigg 1 Rigg 2
![Page 11: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/11.jpg)
Kunne vi ha sett Macondo hendelsen med Storulykkerisiko indikatorene?
11 SINTEF for Det norske, sept 2010
![Page 12: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/12.jpg)
Oppfølging av storulykke
12
Innblikk i forhold på riggen som vi ikke hadde vist noe særlig om uten og rettet oppmerksomheten mot disse.
Bidratt til å løfte fram storulykkeperspektivet i organisasjonen og blant våre samarbeidspartnere
Initiert en rekke aktiviteter ut fra målsettingen om å redusere riskoen for storulykke
Forankring i ledelsen og langsiktig samarbeidspartnere viktig
![Page 13: Forebygging av storulykker](https://reader033.vdocuments.us/reader033/viewer/2022052900/5559ddd1d8b42a34498b495d/html5/thumbnails/13.jpg)
13