flow produksi gravity.pdf

1
MATERIAL AC4B PASIR / CORE MELTING SAND BLOWING 1 GRAVITY CASTING 2 HAMMER 3 CUTTING, KIKIR CUTTING, KIKIR, BUFFING 5 6 CNC LEAK TEST 7 IMPRAC 8 REIMPRAC 9 FINISHING CNC NLT LT NG ALUMINIUM NG LEAK TEST 10 11 REWORK REWORK NG NG IMPRAC 13 REIMPRAC 14 BOCOR BOCOR BOCOR BOCOR REWORK NG FINAL CHECK PACKING STORE FG READY TO DELIVERY BOCOR PEMBUANGAN PASIR NG PASIR 12 BOCOR NG FINISHING MNL LT NLT GUDANG BAHAN BAKU STORE B FG NLT MNL

Upload: asep-sucipto

Post on 09-Nov-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

  • MATERIAL AC4B PASIR / CORE

    MELTING SAND BLOWING

    1

    GRAVITY CASTING

    2

    HAMMER

    3

    CUTTING, KIKIR CUTTING, KIKIR, BUFFING

    5 6

    CNC

    LEAK TEST

    7

    IMPRAC

    8

    REIMPRAC

    9

    FINISHING CNC

    NLT LT

    NG

    ALUMINIUM NG

    LEAK TEST

    10

    11

    REWORK REWORKNG NG

    IMPRAC

    13

    REIMPRAC

    14

    BOCOR

    BOCOR

    BOCOR

    BOCOR

    REWORKNG

    FINAL CHECK

    PACKING

    STORE FG

    READY TO DELIVERY

    BOCOR

    PEMBUANGAN PASIR

    NG

    PASIR

    12

    BOCOR

    NG

    FINISHING MNL

    LT NLT

    GUDANG BAHAN BAKU

    STORE B

    FGNLT MNL

    Page-1