first public hearing * presentation to the board of county commissioners february 23, 2010

44
Gainesville Golf & Country Club SPECIAL ASSESSMENT DISTRICTS FIRST PUBLIC HEARING * PRESENTATION TO THE BOARD OF COUNTY COMMISSIONERS FEBRUARY 23, 2010

Upload: edena

Post on 22-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

Gainesville Golf & Country Club. Special Assessment Districts. First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010. Public Hearing. As required by Fla. Stat. and Alachua County Code §37.11 Properly advertised Purpose: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Gainesville Golf & Country ClubSPECIAL ASSESSMENT DISTRICTS

FIRST PUBLIC HEARING * PRESENTATION TO THE BOARD OF COUNTY COMMISSIONERSFEBRUARY 23, 2010

Page 2: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Public Hearing

• As required by Fla. Stat. and Alachua County Code §37.11

• Properly advertised• Purpose:– Adopt resolutions of notice of intent– Establish estimate of assessable cost

Page 3: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Recommendations

• Adopt Resolutions of Notice of Intent to Use Uniform Method to Impose Non-ad Valorem Assessment and authorize Chair to sign resolutions for:– District 1: Country Club Estates, Country Club

Manor & Country Club– District 2: Prairie Bluff & Social Square

• Do not adopt Resolution of Notice of Intent:– District 3: Fairway Estates

Page 4: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

History

• SEPT. 2007: Staff receives petition from GGCC asking County to mill and resurface SW 35th Way

• SUMMER 2009: Staff conducts petition process in accordance with then-code

• SEPT. 8, 2009: Board directs staff to: – Amend Chapt. 37, Alachua County Code– Hold hearings for GGCC districts prior to Sept. 15, 2010

• OCT. 2009: Property Appraiser & Tax Collector grant extensions• NOV. 10, 2009: Board adopts Ordinance 09-09, amending code:

– Property Owner Interest Poll: owners of 50% + 1 of properties responding must agree with creation of district

– Each potential special assessment district may be attempted once per County Fiscal Year

Page 5: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

History, cont.

• JAN. 2010: Staff conducts Property Owner Interest Polls (3) for districts

• TODAY:– Presentation of Property Owner Interest Polls– Public hearing for adoption of Notices of Intent (3) to Use

Uniform Method to Impose Non-ad Valorem Assessment• Intent to use uniform method• Public necessity • Improvement estimate• Allocation methodology

Page 6: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

District 1: Country Club Estates/Manor

Page 7: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

SW 35TH WAYRoadway Length (mi): 1.15Roadway Width (ft): 36

SPUR ROADSRoadway Lengths (mi): 1.52Roadway Width (ft): 24

D1: Country Club Estates/Manor

Page 8: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010
Page 9: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPUBLIC NECESSITY

Page 10: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPUBLIC NECESSITY

Page 11: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPUBLIC NECESSITY

Page 12: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPUBLIC NECESSITY

Page 13: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPUBLIC NECESSITY

Page 14: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorIMPROVEMENT ESTIMATE/ALLOCATION METHODOLOGY

Improvement: Mill and Resurface, Fog SealEstimated Construction Cost: $ 282,834.68*Allocation Methodology: ratio of average daily vehicular trips over total

average daily vehicular trips

* Best estimates of construction costs at this time. Final assessable costs would be determined in August/September at 2nd Public Hearing.

Per Parcel Annual AssessmentProperty Type # of Parcels ADT Construction Fees Total Cost

Single Family Residence 187 9.53 $ 130.74 $ 17.08 $ 147.83

Golf Course 1 665.64 $ 9,132.07 $ 1,193.05 $ 10,325.13 Total ADT 2447.75

Page 15: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D1: Country Club Estates/ManorPROPERTY OWNER INTEREST POLL RESULTS

Potential Respondents: Residential – 187 parcelsCommercial – 1 parcel

Actual Respondents: 133Response Weights: ratio of average daily vehicular trips over total

average daily vehicular trips

WEIGHTED RESULTS (%)For Against

75.7% 24.3%

RESULTSFor Against

83 Residential49 Residential1 Commercial

Page 16: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Recommendation

• District 1: Country Club Estates, Country Club Manor, & Country Club– ADOPT Resolution of Notice of Intent to Use

Uniform Method to Impose Non-ad Valorem Assessment and authorize Chair to sign resolutions for Country Club Estates and Country Club Manor District

Page 17: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

District 2: Prairie Bluff/Social Square

Page 18: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social Square

PRAIRIE BLUFF/SOCIAL SQUARERoadway Lengths (mi): 0.67Roadway Width (ft): 20-24

Page 19: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010
Page 20: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social SquarePUBLIC NECESSITY – SW 29TH WAY

Page 21: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social SquarePUBLIC NECESSITY – SW 30TH WAY

Page 22: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social SquarePUBLIC NECESSITY – SW 70TH LANE

Page 23: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social SquareIMPROVEMENT ESTIMATE/ALLOCATION METHODOLOGY

Improvement: Mill and ResurfaceEstimated Construction Cost: $ 50,008.02 Allocation Methodology: ratio of average daily vehicular trips over total

average daily vehicular trips

* Best estimates of construction costs at this time. Final assessable costs would be determined in August/September at 2nd Public Hearing.

Per Parcel Annual AssessmentProperty Type # of Parcels ADT Construction Fees Total Cost

Single Family Residence 36 9.53 $ 164.93 $ 17.08 $ 182.02Total ADT 343.08

Page 24: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D2: Prairie Bluff/Social SquarePROPERTY OWNER INTEREST POLL RESULTS

Potential Respondents: Residential – 36 parcelsActual Respondents: 22Response Weights: ratio of average daily vehicular trips over total

average daily vehicular trips

WEIGHTED RESULTS (%)For Against

59% 41%

RESULTSFor Against

13 Residential 9 Residential

Page 25: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Recommendation

• District 2: Prairie Bluff & Social Square– ADOPT Resolution of Notice of Intent to Use

Uniform Method to Impose Non-ad Valorem Assessment and authorize Chair to sign resolutions for Prairie Bluff and Social Square District

Page 26: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

District 3: Fairway Estates

Page 27: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D3: Fairway Estates

FAIRWAY ESTATESRoadway Lengths (mi): 0.15Roadway Width (ft): 20-24

Page 28: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010
Page 29: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D3: Fairway EstatesPUBLIC NECESSITY

Page 30: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D3: Fairway EstatesPUBLIC NECESSITY

Page 31: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D3: Fairway EstatesIMPROVEMENT ESTIMATE/ALLOCATION METHODOLOGY

Improvement: Mill and ResurfaceEstimated Construction Cost: $ 18,767.33*Allocation Methodology: ratio of average daily vehicular trips over total

average daily vehicular trips

* Best estimates of construction costs at this time. Final assessable costs would be determined in August/September at 2nd Public Hearing.

Per Parcel Annual AssessmentProperty Type # of Parcels ADT Construction Fees Total Cost

Single Family Residence 13 9.53 $ 171.41 $ 17.08 $ 188.49Total ADT 123.89

Page 32: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

D3: Fairway EstatesPROPERTY OWNER INTEREST POLL RESULTS

Potential Respondents: Residential – 13 parcelsActual Respondents: 9Response Weights: ratio of average daily vehicular trips over total

average daily vehicular trips

WEIGHTED RESULTS (%)For Against

33.33% 66.66%

RESULTSFor Against

3 Residential 6 Residential

Page 33: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Recommendation

• District 3: Fairway Estates– DO NOT ADOPT Resolution of Notice of Intent to

Use Uniform Method to Impose Non-ad Valorem Assessment in Fairway Estates District

Page 34: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Resident-Raised Issues

Page 35: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Resident-Raised Issues

• Themes in comments on Property Owner Interest Poll responses– SW 35th Drive– Speed Tables– GRU Water Lines Repairs

Page 36: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

SW 35th Drive

SW 35TH DRIVERoadway Lengths (mi): 1Roadway Width (ft): 22

Page 37: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Improvement: Mill and ResurfaceEstimated Construction Cost: $ 695,004.20Allocation Methodology: ratio of average daily vehicular trips over total

average daily vehicular trips

Per Parcel Annual AssessmentProperty Type # of Parcels ADT Construction Fees Total Cost

Single Family Residence 60 9.53 $ 1,375.31Total ADT 466.97

* Best estimates of construction costs at this time. Final assessable costs would be determined in August/September at 2nd Public Hearing.

SW 35th Drive

Page 38: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

SW 35TH WAYRoadway Length (mi): 1.15Roadway Width (ft): 36

Speed Tables

1

2

3

4

5

Existing Speed Tables

Page 39: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Speed Tables

• Speed Tables in GGCC Neighborhoods– 55% of responding property owners supported– Installed 2003– Design includes reinstallation of speed tables

• Public Works process for removal of speed tables1. Written request from HOA2. Staff-initiated poll requiring 50%+1 of responding

Page 40: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

GRU Water Lines Repairs

• Coordination with GRU

Page 41: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Timelines

Page 42: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

• Property Owner Interest Poll January 2010• Hold 1st Public Hearing February 2010• Adopted Notice of Intent sent to Property Appraiser, February 2010

Tax Collector, and Department of Revenue• Mail notices to all potentially affected parcel owners July 2010• Hold 2nd Public Hearing August 2010• Assessment implemented October 2010• Tax bills mailed November 2010

Estimated Construction January 2011

Special Assessment District Timeline

Page 43: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Summary of Recommendations

• Adopt Resolutions of Notice of Intent to Use Uniform Method to Impose Non-ad Valorem Assessment and authorize Chair to sign resolutions for:– District 1: Country Club Estates, Country Club

Manor & Country Club– District 2: Prairie Bluff & Social Square

• Do not adopt Resolution of Notice of Intent:– District 3: Fairway Estates

Page 44: First Public Hearing * Presentation to the Board of County Commissioners February 23, 2010

Gainesville Golf & Country ClubSPECIAL ASSESSMENT DISTRICTS

FIRST PUBLIC HEARING * PRESENTATION TO THE BOARD OF COUNTY COMMISSIONERSFEBRUARY 23, 2010