» Level 1 & 2 Slab Pours » Exterior Stairs » Second Floor Masonry Walls » Brick Veneer » Roof Steel Verse of the Month 1 Corinthians 3:10-11 By the grace God has given me, I laid a foundation as a wise builder, and someone else is building on it. But each one should build with care. For no one can lay any foundation than the one already laid, which is Jesus Christ. Nuts & Bolts First Evangelical Covenant Church Newsletter September 2014 Issue 2 Upcoming Milestones

Upload: elzinga-volkers

Post on 03-Apr-2016

223 views

Category:

Documents


1 download

DESCRIPTION

Nuts and Bolts, Volume 2

TRANSCRIPT

» Level 1 & 2 Slab Pours » Exterior Stairs » Second Floor Masonry Walls

» Brick Veneer » Roof Steel

Verse of the Month1 Corinthians 3:10-11By the grace God has given me, I laid afoundation as a wise builder, and someone else is building on it. But each one should build with care. For no one can lay any foundation than the one already laid, which is Jesus Christ.

Nuts & BoltsFirst Evangelical Covenant Church Newsletter

September 2014 Issue 2

Upcoming Milestones

Executive SummaryAs summer comes to an end we can recognize a major project milestone – the completion of the new kitchen! Crews have been working persistently, installing FRP on the walls and epoxy flooring, to ready the space for the new kitchen equipment. All of the hard work will pay off so the kitchen will be operational for the start of the school year. We are seeing progress in the coffee area where they are finishing drywall and the existing offices where the demolition is complete and the window wall has been relocated.

Downstairs, the walls for the preschool have been reconstructed and painted and the casework installation is complete in the toddler room. In the office addition, the exterior masonry block walls have been erected in the lower level. The precast plank is complete. We are looking forward to the second story walls going up, exterior brick installation, and the roof installation.

Maria Nykerk, Project Manager616.392.2383 ext. 444

Prayer ItemsPlease help us pray for this project, which includes:

» The safety for those individuals working on-site » Patience and flexibility of the church members

as the renovation continues » God’s blessing on the classrooms and kitchen

as the church begins using these newly renovated rooms

FRP Installation in the Kitchen

Kitchen Exhaust Hood System