final environmental impact assessment report · pdf filefinal environmental impact assessment...

3
Final Environmental Impact Assessment Report Volume II Figures and Appendices November 2010

Upload: buidung

Post on 30-Mar-2018

224 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Final Environmental Impact Assessment Report · PDF fileFinal Environmental Impact Assessment Report ... As-Built Sediment Sampling Locations ... Appendix 3.1 Layout and Extent of

Final Environmental Impact Assessment Report

Volume II Figures and Appendices

November 2010

Page 2: Final Environmental Impact Assessment Report · PDF fileFinal Environmental Impact Assessment Report ... As-Built Sediment Sampling Locations ... Appendix 3.1 Layout and Extent of

Consultancy Agreement No. NEX/2213

MTR Corporation Limited

EIA Study for Shatin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Environmental Impact Assessment Report (Final)

AECOM Asia Company Ltd i Nov 2010

List of Figures and Appendices

LIST OF FIGURES LIST OF APPENDICES

Figure No. Title

NEX2213/C/331/ENS/M50/501 Project Site Plan

NEX2213/C/331/ENS/M50/502 General Layout Plan (Sheet 1 of 2)

NEX2213/C/331/ENS/M50/503 General Layout Plan (Sheet 2 of 2)

NEX2213/C/331/ENS/M59/501 Locations of Water Quality Sensitive Receivers (Sheet 1 of 3)

NEX2213/C/331/ENS/M59/502 Locations of Water Quality Sensitive Receivers (Sheet 2 of 3)

NEX2213/C/331/ENS/M59/503 Locations of Water Quality Sensitive Receivers (Sheet 3 of 3)

NEX2213/C/331/ENS/M59/504 Locations of Existing Stormwater Outfalls

NEX2213/C/331/ENS/M59/505 Sediment Loss Rate for Dredging and Sand Filling Activities – Unmitigated Scenario for SCL

NEX2213/C/331/ENS/M59/506 Coastline Configuration

NEX2213/C/331/ENS/M59/507 Locations of Important Coral Community

NEX2213/C/331/ENS/M59/508 Sediment Sampling Station for Elutriate Testing (Sheet 1 of 2)

NEX2213/C/331/ENS/M59/509 Sediment Sampling Station for Elutriate Testing (Sheet 2 of 2)

NEX2213/C/331/ENS/M52/501

Locations of Representative Noise Sensitive Receivers

NEX2213/C/331/ENS/M52/502

Locations of Representative Noise Sensitive Receivers

NEX2213/C/331/ENS/M60/501

Locations of Representative Air Sensitive Receivers

NEX2213/C/331/ENS/M60/502

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at

1.5m above Ground Level (Mitigated Scenario 1)

NEX2213/C/331/ENS/M60/503

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at

1.5m above Ground Level (Mitigated Scenario 2)

NEX2213/C/331/ENS/M60/504

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at

1.5m above Ground Level (Mitigated Scenario 1)

NEX2213/C/331/ENS/M60/505

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at

1.5m above Ground Level (Mitigated Scenario 2)

NEX2213/C/331/ENS/M60/506

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m

above Ground Level (Mitigated Scenario 1)

NEX2213/C/331/ENS/M60/507

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m

above Ground Level (Mitigated Scenario 2)

NEX2213/C/331/ENS/M58/501

As-Built Sediment Sampling Locations (Sheet 1 of 2)

NEX2213/C/331/ENS/M58/502

As-Built Sediment Sampling Locations (Sheet 1 of 2)

Appendix No. Title

Appendix 2.1 Graphic Illustrations of Alignment Options

Appendix 2.2 Temporary Reclamation Staging for SCL Construction

Appendix 2.3 Tentative Construction Programme

Appendix 3.1 Layout and Extent of Marine Piling for Construction of the Temporary Jetty

Appendix 3.2 Temporary Reclamation Stages at CBTS

Appendix 3.3 Coverage, Layout and Grid Quality of Refined VH Model

Appendix 3.4 Sediment Plume Modelling Results – Dry Season

Appendix 3.5 Sediment Plume Modelling Results – Wet Season

Appendix 3.6 Maximum Mixing Zone for SS Elevations (Contributed from this Project and other Concurrent Marine Works)

Appendix 3.7 Maximum Mixing Zone for SS Elevations (Contributed from this Project alone)

Appendix 3.8 Tracer Modelling Results for Zinc, total PCBs and total PAHs

Appendix 3.9 Typical configuration of silt curtains and silt screens

Appendix 4.1 Construction Plant Inventory for SCL Protection Work – Unmitigated Scenario

Appendix 4.2 Not Used

Appendix 4.3 Location of Notional Sources and Distance to NSRs

Appendix 4.4 Sample Calculation of Construction Noise Levels – Unmitigated Scenario

Appendix 4.5 Summary of Predicted Construction Noise Levels – Unmitigated Scenario

Appendix 4.6 Construction Plant Inventory for SCL Protection Work – Mitigated Scenario

Appendix 4.7 Sample Calculation of Construction Noise Levels – Mitigated Scenario

Appendix 4.8 Summary of Predicted Construction Noise Levels – Mitigated Scenario

Appendix 4.9 Cumulative Construction Noise Assessment – Mitigated Scenario

Appendix 5.1 Past Environmental Monitoring Data

Appendix 5.2 Calculations of Emission Rates for SCL Protection Works

Appendix 5.3 Justification for the percentage of Annual Average Active Area

Appendix 5.4 Calculations of Emission Rates for Wan Chai Development Phase II and Central-Wan Chai Bypass

Page 3: Final Environmental Impact Assessment Report · PDF fileFinal Environmental Impact Assessment Report ... As-Built Sediment Sampling Locations ... Appendix 3.1 Layout and Extent of

Consultancy Agreement No. NEX/2213

MTR Corporation Limited

EIA Study for Shatin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Environmental Impact Assessment Report (Final)

AECOM Asia Company Ltd ii Nov 2010

List of Figures and Appendices

LIST OF APPENDICES (Cont’d)

Appendix No. Title

Appendix 6.1 Breakdown of C&D Material by Year

Appendix 6.2 Response from EPD for Waste Disposal to Landfill

Appendix 6.3 Sediment Sampling and Testing Plan

Appendix 6.4 Testing Result and Disposal Classification

Appendix 6.5 Results of Biological Screening

Appendix 6.6 Dredging Rationale Approval

Appendix 6.7 Response Letter from Highway Department and Minutes from Liaison Meetings with Other Projects for Reusing C&D Materials

Appendix 9.1 Key Assessment Assumptions and Methodologies