2IS:!!1!I5!t liU.fI1liHli il51 OUR REF: (21 ) in Ax(12)to Environmental Protection Department EP21 N910 1 65 IV j!iil!;IIH ,I Hh ! l5!t Branch Office YOUR REF : -8=-!- 5!t 28th Floor, Southorn Centre, Il )\11 TEL. NO.: 2835 1751 130 Hennessy Road, FAX NO: 2591 0558 Wan Chai, Hong Kong. 1l 71U ! 1 ;.J'· !!IlI 'f E-MAIL: I II HOMEPAGE: http://www.epd.gov.hk 5 May 2016 By Registered Post & Fax Dear Environmental Impact Assessment (EIA) Ordinance, Cap.499 Application for Further Environmental Permit Project Title: Chok Ko Wan Link Road (Part) Road P2 - Yam 0 to Penny's Bay (Part) (Application No. FEP-16S/2016) I refer to your above application received on I I April 2016 for a further enviromnental pennit under Section 12(1) of the EIA Ordinance. Pursuant to Section 12(3) of the ElA Ordinance, I now issue the attached further enviromnental pennit (No. FEP-02/097/2001lB) for your use. Under Section IS of the ElA Ordinance, the further environmental pennit will be placed on the EIA Ordinance Register. It will al so be placed on the ElA Ordinance website (http://www.epd.gov.hkleia/). Please note that if you are aggrieved by any of the conditions imposed in this pennit, you may appeal under Section 17 of the ElA Ordinance within 30 days of receipt of this penni!. P.2/ ...

Upload: tranminh

Post on 20-Mar-2018

220 views

Category:

Documents


5 download

TRANSCRIPT

  • 2IS:!!1!I5!t liU.fI1liHli il51~ OUR REF: (21 ) in Ax(12)to Environmental Protection Department EP21N910 165 IV j!iil!;IIH

    ,IHh!l5!t Branch Office ~1E i1ill!i YOUR REF : -8=-!-5!t28th Floor, Southorn Centre, Il .~ 1~ !li

  • Should you have any queries on the above application, please contact my colleague Ms. Clara U at 2835 2164.

    Yours sincerely,

    l _ M~ \ (Lawrence K.K. N )

    Acting Principal Environmental rotection Officer

    (Regional Assessment)

    for Director of Enviromnental Protection

    Encl. c.c.

    P.2

  • Environmental Permit No. FEP-02/097/2001lB

    !.Im~fi'iJm!lliilJl}f FEP-02/097 1200 lIB

    ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

    (CHAPTER 499)

    SECTIONS 10 & 12

    J:ll!U.~ft!i~19!J (~499 ~)

    ~10:&.12~

    FURTHER ENVIRONMENTAL PERMIT TO OPERATE

    A DESIGNATED PROJECT

    PART A (MAIN PERMIT)

    A $ (g.;:PIli!H:'~$5t)

    Pursuant to Sections 10 and 12 of the Environmental Impact Assessment Ordinance (EIAO), the

    Director of Environmental Protection (the Director) granted this Further Enviromnental Pennit

    (hereinafter referred to as thi s "Permit") to the Leisure and Cultural Services Department

    (hereinafter referred to as the "Permit Holder") to operate the designated project described in Part B of

    this Pennit subject to the conditions specified in Part C of thi s Penni!. The issue of thi s Permit is based

    on the documents, approval and pennissions described below:

    tlU}~D!P~ ~~ ~'I' 1i5 ltiId7tl(f~~'1'11* 17U) ~ I O:&. 12 1~ B':J ~5i.JE ' J!:l j;JHiH~ ~~ -& (~ -& ) H~ ::zjs: ~Jf 8':1 f~ ~ "f PI m Cf fiJ} "::zjs: "f PI g~ "Hlt T &lO'i~ :&. :>c il:; "$ 1% !!f Cf fiJ} ""f PI g~ ffl1"r A ") j;J iBM ::zjs: "f PI m B g~ ,off g)t BjJ 8':1 1 ~ I tli Jft , i.~ ~~ }I 'c# m*:&.~PJ.#@~.

    Application No.

    $~t!f!lliilJl}f

    Documents in the Register:

    !Hc.fHj-.t.It:Jx1if :

    FEP-168/20l6

    (1 ) Environmental Impact Assessment - Construction of an Intemational Theme Park in Penny's Bay of North Lantau and its Essential Associated Infrastructures

    - Final EIA Report

    - Annex (Volume 1)

    - Annex (Volume 2)

    - Annex (Volume 3)

    - Executive Summary

    (Register No.: AEIAR-032/2000) 1'" ~ [Hereinafter referred to as "the EIA Report"] ! ~~1.0 ~ ~ ~. fiOf.~~~ ~

  • jt*d!V4 LlJtT~;m~'~.:t~0~&1Hi~.:t!t~j,J[g9:lJffill~If~ ~~~W'g,{~ :

    ~~~~~~W'~'{M~15-Ilij{'!= (~-$)

    Ilij{'!= (~=$)

    Ilij{'!= (~-$)

    iilfi !t

    (1l':~G$~i~ : AElAR-032/2000) [rfjij"~g,~15-"l

    (2) Tile Director's letter of approval of tile ElA Report dated 28 April 2000, ref: (53) in Annex (3) to EP2IN9/0 /65 III.

    f!!!~*~lf~"~-&In 2000 ~ 4 fl 28 E3fttlmAtf!!!~,~15-B':J{{,!= Cm::m:~i~ : (53) in Annex (3) to EP2IN9/0 /65 Ill)

    (:i) Application documents for Environmental Pennit including all attachments submitted on 16 May 2001 (Application No. AEP-097/200 1)

    In 2001 ~ 5 fl 16 E3mX:B':JglfiJn~$gj1jX:{'!=-E1f3pJT1llij{,!= ( $gj1j'i!j:ti~ AEP-097/200 1)

    (4) Environmental Pemlit (No. EP-097/2001) issued on 13 June 200 1.

    (5) Application documents for Variation ofEnvirorunental Permit including all attachments submitted on II August 200 I . (Application No. VEP-05 1/2001)

    In 2001 ~ 8 fl ll E3mX:]!!a'iI:~~gIfOJ~B':J$gfj~~ VEP-05 1/2001 fDllij{'!=

    (6) Environmental Permit (No. EP-097/2001lA) issued on 23 August 200 I.

    In 2001 ~ 8 fl 23 E3:@ftB':Jf~~gIfOJ~~~ EP-097/2001/A

    (7) Application documents for Variation of Envirorunental Pennit including all attachments submitted on 19 December 2002. (Application No. VEP-081/2002)

    In 2002 ~ 12 fl 19 E3mX:]!!a'iI:~~gIfOJ~B':J$gj!j~i~ VEP-081/2002 fD'fj{,!=

    (8) Environmental Pennit (No. EP-097/2001 /B) issued on 13 January 2003.

    In 2003 ~ I fl 13 E3 :@ftB':J~J:l[gIfOJ~~i~ : EP-097/2001lB

    ~------------------~----------------------------------------~ ~

  • I(9) Application for Further Environmental Permit submitted on II April 2016. (Application No. FEP-168/2016)

    ~ 2016 if 4 J=j II EltlrX:B'J~JiB'Jfi'lJ:.ltlfDJmB'JEj3jjX:14' ( Ej3jj~~~5J7t : FEP-1 68/2016)

    5May2016 2016 if 5 J=j 5 El

    Date (Lawrence K.K. NG ElM Acting Principal Environmental Pr ection Officer

    (Regional Assessment) for Director of Environmental Protection

    !~m1*g~~~-& (~fJI!IIi\'!~J:.ltf*g~~1f(m!j~gf1i5 ) ~~~~1ift)

    ~()\~\~~!~ ~ ~/.

  • PART B (DESCRIPTION OF PART OF DESIGNATED PROJECT)

    B $ (m5EI.~lJi 8':1~BJ3)

    Hereunder is the description of the designated project mentioned in Part A of this environmental

    permit (hereinafter referred to as the "Permit"):

    --r51j~*f~m~'FOJ~~ (--rf~ "~'FOJm" )A '&BrfimMiJ/;Jf/EItjlJ[ iJ/;J~>tBJ3 :

    Title of Designated Project

    mn~lJift:lijW

    I. Chok Ko Wall Link Road (Part)

    2. Road P2 Yam to Penny's Bay (Part) [This designated project is hereinafter referred to as "the Proj ect"]

    I. 1r-'r%!i )!!JljlH~~ (flWi) 2 P2 0~ - ~i~~tt%!i)!!J (flll1B)

    [:$:;t135EIffflJi Tf~ "IfffJi'j " ]

    Nature of Designated Project

    mn~lJi ft:lt!:'it 1

    lo peration of about 2.7 km of a primary distributor.

    ~JJ$-11*~"J 2.7 =f**B"J1'.~~'f~ 0

    Location of Designated Project

    mn~lJift:ljjj;15

    Pell1lY's Bay, Lantau. The location ofille Project is shown in Figure Rl of

    this Permit.

    I Scale and Scope of Designated

    Project(s)

    mn~lJift:lmmW~1II

    Maintenance of roadside planting areas along part of Magic Road, Sunny

    Bay Road and Fantasy Road (previously known as Road P2) and part of

    Pell1lY's Bay Highway (previously known as Chok Ko Wan Link Road) as

    shown in the attached Figures Rl to Rll of this Pennit.

  • PART C (PERMIT CONDITIONS)

    C l'ffl (iffilJm~{tf:)

    1. General Conditions

    1.1 The Pennit Holder shal1 ensure ful1 compliance with all conditions of thi s envirorunental

    pennit. Any non-compliance may constitute a contravention of the EIAO and may become

    subject of appropriate action to be taken under the Ordinance.

    ~tfilJmfi'f~A:J6'~Jiilii {~7E~r-g:[5*!~JJi~tDJmB'9~g~{I*{tf: 0 ~D~/fr-g:[5*~tDJ~'il'8/;J'I'~

    ;5(. , DJli6t$liRt~.&: O~JJi~~B'{til*17n 8/;JliJi.5E ' fffi'JE:lDJt~~il*17ut:;1nr:iZ~'1'JiJ:J 0

    1.2 The Pe1111it Holder shal1 ensure, from time to time, full compliance with all legislation in

    force including but without limitation to the Noise Control Ordinance (Cap. 400), Air

    Pollution Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358) and

    Waste Disposal Ordinance (Cap. 354). This Pennit does not of itself constitute any ground

    of defense against any proceedings instituted under any legislation.

    BtDJmfi'f~A~MJl!'ffilii{~7E~r-g:[5:fJi.1'J;~17U8/;JliJi.5E ' :ft!i ( {B /f~~~) D*'I-~iliU{I*17UOf; 400 ~) ; ~*155!4l:~iliUil*17UC~ 311 ~); ?K;'5~~iliU{~17U(~ 358 ~) ; &}g~~Ii{I*17U(~

    354 ~) 0 *~tDJm*~/fwr~,tt~~1ffcJ;~17U~jI]B'9;~1f:~jfft$liRt{f{OJtfLraij[E13 0

    1.3 The Pennit Holder shall make copies of this Pennit together with all documents referred to in

    this Pennit or the documents referred to in Part A of this Pennit readily available at all times

    for inspection by the Director at the Permit Holder 's office. Any reference to the Permit shall

    include all documents referred to in the Pennit and also the relevant documents in the

    Register.

    ~tDJmfi'f~A~JiifP~~*~tDJ~'il'8/;JtJ:* ' ~[OJ*~tDJmpJTlli8/;JpJT~:x:{tf:~*~tDJm ~ pJTlli:x:{tf: ' j;){:!t~-&{ffcJ8~FI3~pqtt~tDJmfi'f~AB'9~JJf$~i!l'~ 0 fL~lli*~tDJ~'il' ' ~~ 13*~tDJ~'il'pJTlliB'9pJT~:x:iHD~~r,ffflpq8/;J;f~m:x:{tf: 0

    1.4 The Pennit Holder shall give a copy of this Permit to the person(s) in charge of the operation

    of the Project and ensure that such person(s) fully understands all conditions and all

    requirements incorporated by the Pennit.

    http:ffilii{~7E~r-g:[5:fJi.1'J;~17U8/;JliJi.5Ehttp:8/;JliJi.5E

  • 1.5 The Pennit Holder shall operate the part of the Project described in Part B of this Pem1it.

    1.6 The Pennit Holder shall ensure that the Project is operated in accordance with the

    infonnation and recommendations described in the approved EIA Report (Register No.

    AEIAR-032/2000), the application documents for environmental pennits, other relevant

    documents in the Register, the infonnation and mitigation measures described in this Pennit,

    . mitigation measures to be recommended in submissions that shall be deposited with or

    approved by the Director as a result of pennit conditions contained in this Pennit, and

    mitigation measures to be recommended under on-going surveillance and monitoring

    activities during all stages of the Project. Where recommendations referred to in the

    documents of the Register are not expressly referred to in this Pennit, such recommendations

    are nevertheless to be implemented unless expressly excluded or amended in this Pennit.

    ~~mM~A~~~Im~m~T~.M.~ : .~.*(~~W.~ AEIAR-03212000 ) pfi~~8JjB"J.*4.&-ltJ~ltm ; .~~t~g'lfB"J$g~X:jlf ; ~~['Wi*JB"J;!t

    iiEffirnmx:itf: ; *~t~mpfi~BA8"'J.*4~g,)]lMm)jfE ; ttUI!*~t~mi*J~8"'Jil%dHliloJ~ft:

    ff)'j!l~Ji~ ft: jtt~t8"'J:fitXX: itf: pfiltmB"'J *,)]1 M m)jfE ; J;).&:t:EI tjJfi -It~~Ji1}iiTB"J M*1'l ~ .&~.I~ffilt.B"J.Mm~ ~~WX:#ffi~ltm~~~:t:E*~~m8Jj~* :;-r; , llUiJ]~fi'!i!f~~ltm ' 1l#;~F1i*~t~m8JjliiWIl#;~il~~J

    2. Specific Conditions

    tUUi~it

    2.1 The Pennit Holder shall manage and maintain the roadside planting areas as shown in Figures

    Rl to RI2 of