    FF-SIS

    2008 Fieldbus Foundation

    Fieldbus FoundationSafety Fieldbus for Process Automation FF

    SIS (SIF)

    Trygve Harvei

  • 7/29/2019 Ff Sis - Stavanger November 2008

    2/31

    2

    FF-SIS

    2008 Fieldbus Foundation

    ABB Corporate Research CenterResearch and Development within the area of automation

    networks at Billingstad (Oslo, Norway) One important topic is Safe Communication

    About 22 scientists in Oslo

    Integrated part of Scandinavian Corporate Research Center

    and Global Lab for Automation (ca 700 scientists)

    Work together with different ABB business units on

    research activities and front-end technology development

    ProcessAutomation

    AutomationProducts

    RoboticsPowerSystems

    PowerProducts

  • 7/29/2019 Ff Sis - Stavanger November 2008

    3/31

  • 7/29/2019 Ff Sis - Stavanger November 2008

    4/31

    4

    FF-SIS

    2008 Fieldbus Foundation

    What do we need to ensure with safe communication?

    Communication:

    We must know that the values of the data we receiveis right

    We must know that the data is not too old

    We must know that the data is received from the rightnode to the right node

    This is the purpose of the layered protocolssuch as TCP/IP or others?

    Yes, but the probability calculations for errors is notgood enough

  • 7/29/2019 Ff Sis - Stavanger November 2008

    5/31

    5

    FF-SIS

    2008 Fieldbus Foundation

    Some Industrial Safety Protocols

    CIP-Safety

    DeviceNet

    Ethernet/IP

    PROFIsafe PROFIBUS DP/PA

    PROFINET

    FF-SIS

    FF H1

    Vendor specific

    ABB (Ethernet)

    Hima (Ethernet)

    PILZ Others

  • 7/29/2019 Ff Sis - Stavanger November 2008

    6/31

    6

    FF-SIS

    2008 Fieldbus Foundation

    Motion Control and Safety

    Source: ARC

  • 7/29/2019 Ff Sis - Stavanger November 2008

    7/31

    7

    FF-SIS

    2008 Fieldbus Foundation

    Safety Measures in safety protocols

    Trans-

    mission

    error

    Number

    sequence

    Time

    stamp

    Receipt

    acknow-ledge-ment

    Identifier for

    sender &receiver withwatchdogtimeout

    Data

    integrityassurance(CRC)

    Redun-

    dancywithcrosscheck

    Different data

    integrityassurancesystems forsafety & standardmessages

    Messagerepetition

    Loss ofmessage Messageinsertion

    Sequencefailure

    Datacorruption

    SBonly

    Delay

    Masquerade

  • 7/29/2019 Ff Sis - Stavanger November 2008

    8/31

    9

    FF-SIS

    2008 Fieldbus Foundation

    Safety Instrumented System (SIS)

    FF SIS

    New approach to SIS Defines control in the field

    Function blocks for building safety applications Shared with host

    Distributed

    PROFISAFE PA

    PROFISAFE transparent to media

    Utilizes black channel approach

    ESD: emergency shutdown systemSIS: safety interlock (or instrumented)systemBMS: burner management system

    F&G: fire and gas system

  • 7/29/2019 Ff Sis - Stavanger November 2008

    9/31

  • 7/29/2019 Ff Sis - Stavanger November 2008

    10/31

    11

    FF-SIS

    2008 Fieldbus Foundation

    Foundation Fieldbus extension - FF SIS

    scope

    SafetyInstrumentedSystems

    n Extends FF Technology to Safety Instrumented

    Systemsn Based on the IEC 61508 International Standard.n Example Application Areas:

    Burner Management Systems Fire & Gas (petrochemical) Fuel Engineering

  • 7/29/2019 Ff Sis - Stavanger November 2008

    11/31

    12

    FF-SIS

    2008 Fieldbus Foundation

    International Development Team

    ABB AS NorwayABB Instrumentation ItalyBIFFI ItalyE.I. DuPont de Nemours, Inc. USAExxonMobil Research & Engineering USEEmerson Process Management USAFlowserve USAHIMA GermanyHoneywell SMS The Netherlands

    ice-PROS CanadaInfraserv Hchst Technik GmbH & Co. KG GermanyInvensys/Triconex USAMetso Automation FinlandRockwell Automation USARotork Control Systems UKSaudi Aramco Saudi ArabiaSmar Brazil and SingaporeShell Global Solutions The Netherlands

    Softing AG GermanyTV GermanyWestlock Controls Corporation USAYokogawa Electric Corporation JapanYokogawa - SCE The NetherlandsYokogawa UK Limited UK

  • 7/29/2019 Ff Sis - Stavanger November 2008

    12/31

    13

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS Scope

    n Extends FF Technology to SafetyInstrumented Systems

    n Based on the IEC 61508 InternationalStandard.

    n Example Application Areas:

    Burner Management Systems Fire & Gas Fuel Engineering

  • 7/29/2019 Ff Sis - Stavanger November 2008

    13/31

    14

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS End User Requirements

    n Reduced Total Cost of Ownership for FF-SIS

    applications.

    CAPEX Hardware, Footprint, Commissioning, Power Consumption

    OPEX Advanced diagnostics, Reduced test interval via increased DCF.

    n SIL 2 and 3 applications

    n Password protected access to FF-SIS field devices

    n Additional Function Blocks (e.g. logic, 2 out of 3

    voting)

    n Definable actions on diagnosed failures trip,

    message

    n Handle discrete signals (e.g. switches, motor trips,

    lights, push buttons, etc.) where H1 dynamic

    performance is acceptable

  • 7/29/2019 Ff Sis - Stavanger November 2008

    14/31

    15

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS End User Requirements

    n Total system approach Total Asset Management FF-SIS and Non-SIS

    Modular Logic Solvercentralized and distributedoption

    Diagnostics Hybrid system architecture FF-SIS & traditional

    hardware

    Guidance to manual proof test

    Signalling/procedures for auto proof test

    Awareness of opportunity-based proof test

    Logging/documentation of results

    Failure rate updates

  • 7/29/2019 Ff Sis - Stavanger November 2008

    15/31

    16

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS Extension Areas

    n Communication

    Meet IEC 61508 part 2 clause 7.4.8Communication Diagnostics

    n User Application

    Meet IEC 61508 part 3 clause 7.4.4Function Block DiagnosticsCRC on Device Description Files

  • 7/29/2019 Ff Sis - Stavanger November 2008

    16/31

    17

    FF-SIS

    2008 Fieldbus Foundation

    Process Safety Time/

    Safety Function Response Time

    Stale counter must be applied in accordance with the specific application

    3x communcation timeout as thumb rule

  • 7/29/2019 Ff Sis - Stavanger November 2008

    17/31

    18

    FF-SIS

    2008 Fieldbus Foundation

    FF Scheduling of communciation and FB execution

  • 7/29/2019 Ff Sis - Stavanger November 2008

    18/31

    19

    FF-SIS

    2008 Fieldbus Foundation

    FF H1- Slow but accurate & safe?The PID control algorithm

    depend on the sampling of

    process values + filtering

    Polled approach PLC cyclic IO Copy

    Jitter + drift

    introduces I&D-errors

    Synchronizedapproach

    FF -In loop execution of

    sampling and controlalgorithm

    The analog SIS voter can rely

    on fresh values -> best

    possible Process Safety

    Time

    1 ms synchaccuracy

    Alarm

  • 7/29/2019 Ff Sis - Stavanger November 2008

    19/31

    20

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS Communication Extensions

    n Black Channel Approach H1 Communication System (Black Channel) is unchanged.

    A new FF-SIS protocol above the Black Channel detects networkfaults and appropriate action is taken without human intervention.

    IEC 61508

    IEC 61508

    Black Channel

    New FF-SISCommunication Diagnostics

  • 7/29/2019 Ff Sis - Stavanger November 2008

    20/31

    21

    FF-SIS

    2008 Fieldbus Foundation

    FF-SIS User Application Extensions

    n User Application New Function Blocks for FF-SIS Applications FBAP Part 6

    New FBAP diagnostics detect application faults and appropriateaction is taken without human intervention.

    IEC 61508

    IEC 61508

    Black Channel

    New FF-SIS Function Blocks&Function Block Diagnostics

  • 7/29/2019 Ff Sis - Stavanger November 2008

    21/31

    22

    FF-SIS

    2008 Fieldbus Foundation

    Function Block Application Process Part 6 SIS Write Lock

    SIS Discrete Input

    SIS Analog Input

    SIS Discrete Output

    SIS Analog Voter

    SIS Discrete Voter

    SIS AND/OR/XOR

    FF-SIS Diagnostics and Statistics added to device Resource Block

    FF-SIS User Application Extensions

  • 7/29/2019 Ff Sis - Stavanger November 2008

    22/31

    23

    FF-SIS

    2008 Fieldbus Foundation

    Operation Engineering

    Proprietary Network

    SIS Logic

    Hardwired

    Todays Proprietary SIS

  • 7/29/2019 Ff Sis - Stavanger November 2008

    23/31

    24

    FF-SIS

    2008 Fieldbus Foundation

    EthernetSwitch

    Operation Engineering

    Proprietary Network

    SIS Logic

    Hardwired

    H1

    Operation Engineering

    Total Asset

    Management

    HSE

    FF-SIS Devices

    Tomorrows Open FF-SIS

    LinkingDevice

    H1

    Non-SIS FF Devices

    LinkingDevice

    . . . .Logic Solver?

    Logic Solver

  • 7/29/2019 Ff Sis - Stavanger November 2008

    24/31

    25

    FF-SIS

    2008 Fieldbus Foundation

    Control Network

    Control/PLC

    Seriell kommunikasjon/felt buss

    Firewall

    Plant Network / Intranett

    Applicationserver

    Aspectserver

    Client/server Network

    Tredje partapplikasjonserver

    ArbeidsstasjonerEnterprise OptimizationSuite

    MobileOperator

    Connectivityserver

    EngineeringArbeidsstasjoner

    F&G SIL 2ESD SIL 3 PSD SIL2

    System topology for process safety

    Trenger sikker (safe) kommunikasjon pKontrollnetverks-niv og p felt-niv.

    Delevis p operatr-niv

  • 7/29/2019 Ff Sis - Stavanger November 2008

    25/31

    26

    FF-SIS

    2008 Fieldbus Foundation

    Increased diagnostic coverage with FF-SIS

    The instruments and actuators

    are included in the safety systemand becomes part of the

    diagnostic testing

    The increased diagnosticcoverage

    Makes it possible to at an earlystage do repair in many cases

    No longer proven in usecertification

    TV will not accept the proven inuse concept for FF-SIS devices

  • 7/29/2019 Ff Sis - Stavanger November 2008

    26/31

    27

    FF-SIS

    2008 Fieldbus Foundation

    Effects of increased diagnostic coverage

  • 7/29/2019 Ff Sis - Stavanger November 2008

    27/31

    28

    FF-SIS

    2008 Fieldbus Foundation

    SIS_DI

    SIS_AVTR

    SIS_DO

    Write Lock

    S

    SIS_WL

    SIS_AI

    SIS_RB

    SIS_WL

    SIS_AI

    SIS_RB

    SIS_WL SIS_AISIS_RB

    SIS_WL

    SIS_RB

    Example FF-SIS Application

  • 7/29/2019 Ff Sis - Stavanger November 2008

    28/31

    29

    FF-SIS

    2008 Fieldbus Foundation

    SIS_DI

    SIS_DVTR

    SIS_DO

    Write Lock

    S

    SIS_WL

    SIS_DI

    SIS_RB

    SIS_WL

    SIS_DI

    SIS_RB

    SIS_WL SIS_DISIS_RB

    SIS_WL

    SIS_RB

    Example FF-SIS Application

    PS PS PS

    SIS_LOGIC

    SIS_WL

    SIS_DI

    SIS_RB

    Estop

  • 7/29/2019 Ff Sis - Stavanger November 2008

    29/31

    30

    FF-SIS

    2008 Fieldbus Foundation

    USER LAYER

    TRANSPORT LAYER

    SESSION LAYER

    PRESENTATION LAYER

    APPLICATION LAYER

    PHYSICAL LAYER

    DATA LINK LAYER

    NETWORK LAYER

    1

    2

    3

    4

    5

    6

    7

    OSI Model

    PHYSICAL LAYER 1

    2

    3

    4

    5

    6

    7

    COMMUNICATIONSTACK

    IEC 61158@ 31.25 kbit/s

    IEC 61158 - DLL

    IEC 61158 - FMS

    H1

    USER LAYERDD IEC 61804-2

    IETF TCP/UDP

    IEEE 802.3MAC

    IETF IP

    IEC 61158 - FDA

    IEEE 802.3u@ 100 Mbit/s

    HSE

    USER LAYERDD IEC 61804-2

    FF-SIS New Kid on the Block

    PHYSICAL LAYER

    COMMUNICATIONSTACK

    H1/HSE

    USER LAYERDD IEC 61804-2

    FF-SISIEC 61508

  • 7/29/2019 Ff Sis - Stavanger November 2008

    30/31

    31

    FF-SIS

    2008 Fieldbus Foundation

    Target Schedule

    2002 4Q FF Board of Director Approval for SIS Project

    2003 1Q Project Kickoff Meeting 2Q Architecture Completed 3Q Draft Preliminary Specifications (DPS) Version 0.4 4Q TV Concept Approval for SIS

    2004 1Q DPS Version 0.5 External Review 2Q Release DPS Version 1.0 3Q Develop Lab Test Tools and Lab Prototypes

    4Q Begin Specification Validation Lab Testing @ Infraserve inFrankfurt

    2005 Release SIS Specification 1.0 and Final TV Type Approval

    2008 FF SIS Rollout Team

  • 7/29/2019 Ff Sis - Stavanger November 2008

    31/31

    32

    FF-SIS

    FF SIS demonstrators - SROT