velg sjøveien stavanger 11 stig hodne, sea_cargo, nordsjøens grønne motorvei - stavanger

13
Stig Hodne Nordsjøens Grønne Motorvei

Upload: shortsea-promotion-centre-norway

Post on 13-Jul-2015

234 views

Category:

Business


2 download

TRANSCRIPT

Stig Hodne

Nordsjøens Grønne Motorvei

Agencies Stavanger AS

Agencies Bergen AS

SEA-CARGO Eierstruktur

Agencies Immingham Ltd Agencies Amsterdam BV

AGENCIES NORWAY AGENCIES UK AGENCIES EUROPE

Agencies Esbjerg APSAgencies Aberdeen Ltd

SEA-CARGO AGENCIES (owned subsidiaries)

SEA-CARGO SKIPS ASSEA-CARGO AS

Agencies Kristiansund

Haugesund

Sea-Cargo I Stavanger

Fra Risavika:

Nordover til Haugesund, Bergen -- Trondheim

Sydover til Esbjerg, Amsterdam, Immingham, Aberdeen

Aberdeen – West Africa2-3 sailings /month

Immingham – Walvis Bay, East Africa, Far East

Esbjerg – Med., S. America

Amsterdam – Australia, Mid&Far East

Schedule / Connections

SC Baltic

SC Astrea

Prosjektbåter

Midtre Tårn til vindmølle

Reels som dekkslast

Mer last

Containers: 118 TEUKran: 50 tons SWLRo-Ro 100 tons rampe

Ro-Ro 35 @ 13.6m kapasitetSideport: 2 @ 10 tons SWL I service: Fra August 2012

Ny båt linjebåt – SC Express

SEA-CARGO - Utvikling

Sideport solutions 1968Asymmetrical stern 1986Automatic loading systems 1986 (low manning req.) Electronic charts 1990Teflon coated tanks 1990 (chemical carrier)Combined gas/chemical tanker 2000BigLng project management 2005Natural gas operated RORO vessel 2010 (through Sea-Cargo)

Leaders in use of technology and innovation

and

SC COMMENT:Sea-cargo, with its it’s major shareholder Seatrans, has a proud history of making use of technology as a competitive advantage. The above is just a few examples of some important milestones

Flåtefornyelse

World’s first cargo vessel operated on LNG (Natural gas)!

2 LNG-drevne skip under bygging i India

Nordsjøens Grønne...

NOx: -92%CO2: -23%SOx: -100%Particulates: -100%

Framtidens fartøy ?

SDC DESIGN – LNG POWERED RO/CON– A SEA-CARGO LINER DESIGN.

Frakt av containereFrakt av trailereFrakt av prosjektlast

Ukentlig til og fra Tananger – nord og sørProsjektbåter tilgjengelig for større laster

Grønt fokus

Velg Sjøveien

Velg

Oppsummering