f-3, midc area, andheri (e ast), mumbai - 400 093wrpc.gov.in/pcm/pa_defects_sep2014.pdf ·...
TRANSCRIPT
Baart sarkarGovernment of Indiakond`Iya ivaVut p`aiQakrNa
Central Electricity AuthoritypiScama xao~Iya ivaVut saimait
Western Regional Power Committeeef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauMba[- - 400 093
F-3, MIDC Area, Andheri (East), Mumbai - 400 093
Aa[- esa Aao : 9001-2008IS/ISO: 9001-2008
dUrBaaYa Phone: 022- 28209506, 28200195; 28200196; fO@sa Fax : 022 – 28370193Website : www.wrpc.gov.in E-mail : [email protected] [email protected]
NO. WRPC/Protection/PA/2014/1849 Date: 03.12.2014
To
The Secretary,
CERC, 4th Floor, Chanderlok Complex, 36,
Janpath, New Delhi 110001.
Sub: Compliance Status of protection audit of Western Region for the quarter ending on 30.09.2014 –
Reg.
Sir / Madam,
Please find enclosed herewith the compliance status of protection audit carried out by
utilities (Maharashtra as on 30.09.2014, Chhattisgarh as on 30.06.2014 and Madhya Pradesh
as on 13.08.2014) in Western Region as on 30.09.2014, as per Hon’ble Commission’s order
dated 05.03.2014 in petition no. 220/MP/2012.
Gujarat intimated vide email that all deficiencies of category ‘A’ have been attended and
there were no deficiencies of category ‘B’.
Thankingyou,Yours’ faithfully,
Sd/-Satyanarayan. S,
Member Secretary (I/c), WRPC.
CC:1. COO, CTU, PGCIL, Saudamini, Plot No. 2, Sector - 29, Gurgaon – 122001.
1 2 3 4 5 6 7 8 9 10 11
Yes/
No
Whether
attended
Yes/No
If not
attended,
reason
Yes/
No
Whether
attended
Yes/No
If no, expected
date to attend
1 NAGOTHANE 400
At present only one 220 Volt DC Source
is in service / used instead of both 220V
DC source, even through the two DC
source are available.
Yes Yes Completed.
2 VASAI 220
The 220kV TBC bay is not taken into
service since commissioning due to
defective REC 670 relay.
Yes Yes
TBC is taken in service
on dt. 05.08.14.
Completed.
3 VASAI 220
The ABB make SCADA is in service with
standby PC not in working condition. The
GPS & SCADA timing is not matching
due to problem in GPS clock & system.
Yes No
4 VASAI 220TF LV side data is not available at SCADA
due to communication failure problems.Yes No
5 VASAI 220The 100kV Busbar protection scheme is
not in service.Yes No
Work is in progress &
will be completed by
March 2015.
6 TROMBAY 220
The ER make SMS is not in working
condition. UPS is not working. Two TF
bays & 220kV newly commissioned
Reliance bays are not intgrated with SMS
system.
Yes YesThe existing ER make
SMS is in put in service.
7 Wardha 220Faulty Annuciators shall be replaced
immediatelyYes No 31.08.14
Replaced on dt.
15.09.2014
ABB representative
visited site on
23/07/2014 & in co-
ordination with M/s
ABB work will be
completed by Dec.-
2014.
Present Status of Protection Audit Deficiencies (A & B type) in MSETCL for the year 2012-13 as on 30/09/2014
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection Audit
Deficiencies that can be
corrected without
procurement (Category-A)
Deficiencies involving
procurement (Category-B) Present Status as on
30/09/2014
Yes/
No
Whether
attended
Yes/No
If not
attended,
reason
Yes/
No
Whether
attended
Yes/No
If no, expected
date to attend
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection Audit
Deficiencies that can be
corrected without
procurement (Category-A)
Deficiencies involving
procurement (Category-B) Present Status as on
30/09/2014
8 Wardha 220Diagnostic Testing progress needs to be
accelerated.Yes Yes - 100% completed
9 Umred 220Diagnostic Testing progress needs to be
accelerated. Yes Yes 100% completed
10MIDC
Chandrapur 220
Diagnostic Testing progress needs to be
accelerated. Yes Yes 100% Completed
11 Hinganghat 220Diagnostic Testing progress needs to be
accelerated.Yes Yes 100% Completed
12 Hinganghat 220
The annunciator of 220kV TSS-I &
Warora are out of service which need to
be replaced immediately.
Yes No 30.09.14Replaced on dt.
09.08.2014
13 Warora 220
The annunciator of 220kV Chandrapur-I
feeder is faulty which needs to be
replaced immediately.
Yes YesReplaced on dt.
12.08.2014
14 Warora 220The Differntial relay of 220/33kV 50MVA
T/F-II shall be replacedYes No 31.08.14
Replaced on dt.
16.09.2013
15 Khaperkheda 400
The time synchronization, GPS receiver
display problem, DR monitor problem
shall be resolved by concerned Engineer.
Yes Yes - - -Attended except time
synchronisaztion
16 Khaperkheda 400 The NDR relay shall be replaced Yes No 31.08.14Replaced on dtd.
07.06.2014
17 Koradi 400 The NDR relay shall be replaced Yes No 31.07.14Replaced on dtd.
11.06.2014
18 Deepnagar GCR 220 LBB scheme is not in service Yes No 31.12.14 work is in progress
19 Girwali 400400kV PGCIL CKT I & II -
Broken Conductor Detection is off.Yes No Pertains to PGCIL
Yes/
No
Whether
attended
Yes/No
If not
attended,
reason
Yes/
No
Whether
attended
Yes/No
If no, expected
date to attend
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection Audit
Deficiencies that can be
corrected without
procurement (Category-A)
Deficiencies involving
procurement (Category-B) Present Status as on
30/09/2014
20 Girwali 400400kV PGCIL CKT I & II - ZONE 3 &
ZONE 4 trip time is same to 1S .Yes No Pertains to PGCIL
21 Akola 220Busbar scheme for 132kV bus is not
providedNo -- -- Yes No -- Pl. ref. **
Note: ** Tender has been finalizaed for procurement of 76 Nos. of Busbar protection schemes at various EHV substations in MSETCL. Busbar
Protection schemes will be tentatively receved at site by 31/03/2015 & commissioning works will be taken up thereafter.
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection AuditExpected date to
attend Present Status as on 30/09/2014
1 PADGHE 400
Commissioning of 2 Nosof 220kV Hybrid PASS (GIS
Bus-sectionalizer) at Padghe alongwith additional
220kV TBC, 2 sets of PTs & shifting of 220kV side
bay of ICT3 & strenthening of 400kV & 220kV Bus
Within 1 Year (After
receipt of material
at site)
work is in progress.
2 PADGHE 400Replacement of 220kV & 100kV static Busbar
schemes by Numerical Busbar schemes.
Within 1 Year (After
receipt of material
at site)
Existing schemes are in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
3 BOISAR 220Replacement of 132kV Busbar protection schemes
by Numerical Busbar schemes.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
4 KALWA 400Replacement of 400kV Static Busbar protection
schemes by Numerical Busbar schemes
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
5 KALWA 400Shifting of 500 MVA, 400/220kV ICT 1 from 400kV
Kalwa II ss to 220kV Kalwa I ss Completed.
6 URAN 220 All 220kV Control panels needs to be replaced.
The Control panels are very old & need
replacement. The scheme is being prepared
by field office. However, as existing panels
are in service, there is no urgency & will be
replaced in a phased manner.
7 APTA 220Replacement of 100kV Busbar protection schemes
by Numerical Busbar schemes.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
Present Status of other issues identified during Protection Audit for system improvement in MSETCL for the year 2012-13
as on 30/09/2014
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection AuditExpected date to
attend Present Status as on 30/09/2014
8 APTA 220The C & R panels needs replacement with new
Control Room.
The C & R panels are very old & need
replacement. The scheme is being prepared
by field office. However, as existing panels
are in service, there is no urgency & will be
replaced in a phased manner.
9 KANDALGAON 220Replacement of 220kV Busbar protection schemes
by Numerical Busbar schemes.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
10 KANDALGAON 220Replacement of 100kV C & R panels, also
replacement of TF C &R panels. Completed.
11 KANDALGAON 220Making LILO of 220kV Nagothane - Mahad line at
Kandalgaon.
The work is under progress & expected to
be completed by Dec. 2014.
12 NAGOTHANE 400Replacement of 400kV & 220kV Busbar protection
schemes by Numerical Busbar schemes.
Existing schemes are in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
13 KHARGHAR 400Replacement of 400kV & 220kV Busbar protection
schemes by Numerical Busbar schemes.
Existing schemes are in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
14 TROMBAY 220
The work of shifting of 220kV C & R panels from old
CR to newly constructed CR by REL is to be taken on
priority.
Order is placed & work will be completed
by March 2015.
15 Kaulewada 220
Internal module problems in the exisitng Busbar
scheme (ALSTOM-PBLSB). The scheme is
maloperated in the past hence needs to be replaced.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
16 Bhandara 220
The exisitng Busbar scheme (ABB-RADSS) has
maloperated in the past due to RQDA module
problem and hence needs to be replaced.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
17 Kanhan 220 48V DC battery set must be replaced immediately 30.09.14
Replacement planed. However, in the mean
time set reconditioned between 25.03.2014
to 31.03.2014
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection AuditExpected date to
attend Present Status as on 30/09/2014
18 Ambazari 220The deffective 220V DC battery sets shall be
replaced 31.12.14
19 Ambazari 22048V DC set no:-1 efficiency observed as 60%. Battery
set needs replacement.31.12.14
20 Ambazari 220
The exisitng Busbar scheme (ABB-RADSS) has
maloperated in the past due to RQDA module
problem and hence needs to be replaced.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
21 Khaperkheda 220
The exisitng Busbar scheme (ABB-RADSS) has
maloperated in the past due to RQDA module
problem and hence needs to be replaced.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
22 Butibori-I 220
The exisitng Busbar scheme (ABB-RADSS) has
maloperated in the past due to RQDA module
problem and hence needs to be replaced.
Existing scheme is in service. However,
replacement by Numerical scheme is
planned. Pl. ref. **
23 Khadka 400Electromechanical Relays of ICT to be replaced by
numerical one31.03.15 Tender finalised & LOA issued.
24 Chalisgaon 220Electromechanical Relays of ICT to be replaced by
numerical one. 31.03.15 Tender finalised & LOA issued.
25 BBLR 40002 number of Distance Protection scheme to be
commissioned
Will be done in
next immediate
outage
Non-availability of outage is major
constraint. Relays are available
26 Waghala 220 Line B/U electromechanical relays - 10 31.03.15 Order for retrofit of Back up relays is issued.
27 Akola 220Followg relays are non numerical: *Dist relays (132kV
feeders)- 5 nos. *B/U relays-5 nos *Diffl relays-3 nos. --
> Disatnce Relay received and configured
but pending for company representative/
engineer. The same are being retroffited by
Nov. 2014.
> Order placed by C.O. for Back up &
Differential relays and are yet to be received
at store. Works expected to be completed
by 31.03.15.
Sr.
No.
Name of S/s
identified for
Protection Audit
S/s
voltage
(kV)
Observations of protection AuditExpected date to
attend Present Status as on 30/09/2014
28 Amravati 220
Followg relays are non numerical:
*Dist relays- 2 nos.
*B/U relays- 4 nos
*Diffl relays-3 nos.
31.03.2015
> Distance Relay retrofitted
>Order placed by C.O. for Back up &
Differential relays and are yet to be received
at store. Works expected to be completed
by 31.03.15.
29 Badnera 220
Followg relays are non numerical:
*Dist relays- 2 nos.
*B/U relays- 2 nos
31.03.2015
> Distance Relay retrofitted.
>Order placed by C.O. for Back up relays
and are yet to be received at store. Works
expected to be completed by 31.03.15.
Note: ** Tender has been finalizaed for procurement of 76 Nos. of Busbar protection schemes at various EHV substations in MSETCL. Busbar
Protection schemes will be tentatively receved at site by 31/03/2015 & commissioning works will be taken up thereafter.
Remarks
Yes /No
WhetherattendedYes/No
If notattended,reason
Yes / NoWhetherattendedYes/No
If no,expecteddate toattend
Khedamara 400/ 220Main-II protection of 220 KVBRSS-I&II,220 KV Urla & 220 KV PGCIL feedersnot available.
Yes No Estimate submitted
Bemetara 220/ 132
1. Carrier protection is not available.2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14 -
Gurur 220/ 1321. Carrier protection is not available..2. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14 -
Sohela 220/ 132
1. Carrier protection is not available..2. GPS time synchronizing facility is notavailable.3. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14 -
Bhatapara 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.
- Yes No 14.08.14 -
Mopka 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.7. Synchronization trolly not available.
- Yes No 14.08.14 -
PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE [As on 30.06.2014]
Name of S/Sidentified for
protection audit
S/S voltage(kV)
Observations of protection audit
Deficiencies that can be correctedwithout procurement (Category-
A)
Deficiencies involving procurement(Category-B)
Banari 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.
- Yes No 14.08.14 -
Siltara 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.7. Synchronization trolly not available.
- Yes No 14.08.14 -
Doma, Raipur 220/132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14 -
Paraswani 220/132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14
Urla 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.
- Yes No 14.08.14 -
Thelkadih 220/132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.
- Yes No 14.08.14 -
Barsoor 220/132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.
- Yes No 14.08.14 -
Bhilai 220/132
1. Carrier protection is not available.2. M II protection for 220 KV feeder notavailable.4. LBB protection not available.
- Yes No 14.08.14 -
Kotmikala 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.7. Synchronization trolly not available.
- Yes No 14.08.14 -
Raigarh 220/ 132
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.6. LBB protection not available.7. Synchronization trolly not available.
- Yes No 14.08.14 -
1. Separate two sets DC system isrecommended for switchyard protection
No YesEstimate and Requisition forseparate DC source has been sendfor approval.
2. Carrier Protection is out of service. Yes
Yes, for220 kVKorba East-West I/CNo. I&II
Restfeeder'scarrier prot.ckt will bechecked
In E-W I/C No. I & II Carrierprotection checked & taken inservice.
3. Disturbance Recorder and SERs are notavailable.
Yes Estimate processed for approval.
4. Old THR make Static DPR relays needsto be replaced by numerical relays
Yes NA NA Tender to be opened on 13.08.2014
5. Auto re-closer is not available. Yes Nockt will bechecked
6. Bus Bar Differential scheme is notavailable.
Yes
3)Dual channel carrier protection is availablein all 220 KV feeders but kept out YES No
Due to nonavailabilityof Panel atremote end.
8) Auto reclose is available but presentlykept out. YES No
As carrierprotection isout.
9) Bus Bar differential scheme is availablebut presently kept out.
YES No
To becheckedbefore put inservice
KTPS, Korba(E)
220
DSPMTPS,Korba
220
3) Non availability of B/B differential &LBB protection
Yes No 31.10.2014Bus Bar protection panel has beenreceived
4)GPS is available however no relay issynchronised with it.
Yes No 31.05.2014Relays have been synchronisedwith new GPS.
5) Replacement of ABCB with SF6 breakers& commissioning of isolator sequentialoperation with ABCB opening.
Yes No 31.03.2016
Replacement of ABCB with SF6breakers is included in the scope ofwork of R&M of station proposedin year 2015-16
1) Second DC system is recommended . Yes No 31.03.2015 In R&M
2) To renovate/retrofit Main-I & Main-IIProtection with numeric relays in all outgoing feeders. Yes No 30.09.2014
05 no. Numeric Relays have beenretrofitted as MainI/II protection inthe following feeders: KW-Churi I& II,KW-DSPM, KW-KE I & II .Rest will be fitted after the receiptof ordered material.
3) Carrier Protection is not in service. 02 no. havebeencommissioned in KEB-KWB interconnectors
Yes No 31.03.2016for other 4 feeders procurement isrequired
4) Disturbance Recoder and SER s are notavailable.
Yes No 31.09.2014
Bay control panels for SCADAsystem have been received .M/sABB is being persuaded tocommission the same as early aspossible.
5) Non availability of Auto reclose scheme.Yes No 30.09.2014
After the commissioning of thenumeris relays will be put inservice
6) Non availability of B/B differentialYes No 31.03.2015
Old scheme to be replaced by newone.Estimate is being sent forapproval.
8)GPS is available however no relay issynchronised with it. Yes No 31.03.2015
After commissioning of SCADApanel, Relays will besynchronised.GPS facility isavailable in SCADA.
Korba WestTPS
220
Korba WestTPS
400
MfP'T"'c.,L-
MP Annexure - I~.--Name of Deficiencies that can be
Sl. Sub-S tation S/S corrected withoutNo.
identified for Voltage Observation of Protection Audit procurement (Category-Deficiencies involving procurement (Category-B) Remark
Protection kV A)Audit
Yes I Wether ifnot Wether
Noattended attended Yes I No attended if no, expected date to attendYeslNo reason YeslNo
I Bhopal 400 Providing of Separate Event LoggerYes No 4 months
Order placed. Panel not received atsubstation
2 Bhopal 400Replacement of220KV Static Bus Bar system Yes No 2 months 220 KV Numerical Bus bar panelwith Numeric received at Substation
3 Mandideep 220 Providing of220KV Bus Bar Protection SchemeYes No 2 months 220 KV Numerical Bus bar panel
received at Substation
4 Gwalior 220 220KV Bus Bar scheme to be providedYes No 4 months 221 KV Numerical Bus bar panel
received at Substation
5 Gwalior 220Providing ofNIFPS on 3x40MVA 220/1 32KV Yes No 6 monthsTransformer
6 Gwalior 220 Providing ofDG set Yes No 6 months
7 Bina 400 Providing of Separate Event Logger Yes No 4 months Under process
8 Katni 400 DG set not provided Yes No 4 months
9 Malanpur 220 Providing of DG set Yes No - Under process
10 Malanpur 220Providing ofNIFPS on 160MVA 2201132KV Yes No - Under processTransformer-II
II Mehgaon 220Providing ofNIFPS on 160MVA 220/132KV Yes No - Under processTransformer-II
12 Shujalpur 220 220KV Bus Bar scheme to be provided Yes No 4 months Under process
South Zone220KV Bus Bar protection scheme is ASEA 2 months
BEING COMMISSIONED,• 13 Indore
220 make needs to be replaced with numerical YES NO TO BE TAKEN IN SERVICEscheme
14 South Zone220 Providing of DG set YES NO 6 MONTHS UNDER PROCESS
Indore15 Pithampur 220 Providing of DG set YES NO 6 MONTHS UNDER PROCESS
220KV Bus Bar protection scheme is ASEA16 Barwaha 220 make needs to be replaced with numerical Yes No 4 months
scheme17 Barwaha 220 Providing ofDG set Yes I No Under Process
18 Jabalpur 220Air Conditioning system should be provided in
Yes No Matter is under consideration.the Control Room
19 Rewa 220Automatic Fire Protection System (NIFPS)to be Yes No Matter is under consideration.installed on all TransformersSynchronising scheme must be provided as many
20 Rewa 220 Hydel Generators are connected to the 220KV Yes Noand 132KV Bus.
21 Satna 220Automatic Fire Protection System( NIFPS) to be
Yes No Matter is under consideration.installed on 160MV A AREV A Transformer
22 Sagar 220Automatic Fire Protection System (NIFPS)to be
Yes No Matter is under consideration.installed on both Transformers
,.
Name of Deficiencies that can beSL
Sub-Station . S/S corrected withoutNo.
identified for Voltage Observation of Protection Audit procurement (Category-Deficiencies involving procurement (Category-B) Remark
Protection kV A)Audit
Yes/Wether if not Wether
Noattended attended Yes/No attended if no, expected date to attendYes/No reason Yes/No
23 Sagar 220 220KV Bus Bar scheme to be provided Yes No 4 months
24 Julwaniya 220 220KV Bus Bar scheme to be provided Yes No 4 months
25 Nimrani 220 220KV Bus Bar scheme to be provided YES NO 2 months
26 Nagda 400 Separate event logger for S/S is not available and Yes No 6 Month Under processneeds to be orovided,
Tertiary Reactor of3l5MV A Tr-I & Il are notUnder process
27 Indore 400being taken in service due to high Tan delta
YES NO I
values of Bushings, which should be replaced -and reactors should be taken in to service.
On 400KV side Bus Bar relay make EE typeFAC is electromagnetic type relay and it is very
COMMISSIONED TO BE TAKEN28 InGbre 400 old and obsolete. Its spares are not available,This YES NO I 2 months
scheme may be replaced with the numerical Bus IN SERVICE
Bar protection scheme.
r:,1
~I-<Y\·S~)
w..r .,.
•
••-lARDING IMPLEMENTING PROTECTION AUDIT RECOMMENDATIONS AND CERC - Reg https://mail.googlc.com/mail/u/Ol?ui=2&ik=b3d635c8bd&vicw=pt&cat=fortnight data grid dis
G~EJil~<...<::.~~r"
SP BirtO.-.
FOLLOW UP REGARDING IMPLEMENTING PROTECTION AUDIT RECOMMENDATIONS AND CERC - Reg1 message
Sidc Mpseb <sldcmpjbp@gmaiL
Sun, Aug l, 2014 at 11:25 AMsk.chakraborty <[email protected]>To: [email protected]: "s.sen" <[email protected]>, "rs.sharma" <[email protected]>, "rajncesh.gaur" <[email protected]>
This has reference to your message dated 31-07·14 on the above subject. The point and extract of the romarks from our consultant MIS TCE forwarded to you long ago arc given below once again. However initial data compilation and studies by MIS CPRI ,Bangalore forthe protection co ordination by third party as per recommendation from grid failure committee has already been conducted in the 4th week ofjuly 2014 and there draft report will be available by 2 months. Discussion regarding all these point will be held at that time and a
conscious decision will be taken at that time
~
'Iame ofSL Sub-StationNo. idertifi ed for
Observational Prctec ton .A,udltDefideccies that can be
corrected withoutprccuremera (CategiXy-A)
SiSVoltage
kV
Df!icienaes ervclving
prccuren eu (C"'~'Orr3)Remark
113 IJ""pee Bill. IPS I 4/J()1no. 0fI1igh..l,[ascto"·#rUtstaUednear400kVtrunsf" I~' I y",bus in he $'Ititchya,.d J ()
ir",dJtal E'F'rolIyuttiJ,g 1sec.f o- PGCIL i.1S<t:Jo,114 IJ",'P'"Bin. IPS I 4/J() I~"a lin e is 'ow,.""'" ~,",w '~.' •• IYes
rll/wJ.1.wd& rft:;.w
115 l,raypaBitta IPS I 4/J()Owr ,·oItag_ <w.g [or 4()O~vPGCIL&..IiPPTCL IiJI< Ir ••(11'6 not as per Q3IP r6commt18tion(GjO' REV :1'(4).
116 l1a.\.po141!'Billa. TPS
117
Twollo higlt masthasbe0.! gJYct,dartJucom e: ofs/s
I.:!""wei' from DIU' COrl.tuifaJlt ;:\:lIS TCE:jUirl7ctiottal..z{ispravwdto pr~cr &11
:rstotlfroIJthigr •.impeti.QJlcliliIt6/fUl1.Js.rMtV fdu.tCU1'I'ezttJ au £o.t! Sol seeopl1l'tliing time is sufJici21tC 1lHd. caJtb, used{or both It e tnes. Decreaseur tltI OfuraJing
timl!lttay CalUI1 Lito i.Jttff'f"nr wilt 31l1.. :;,ott~.MlflsetriJ.lgS.
COItUlUlH.ts
rMt OUl'
C01fSUi..t4/fi :"L~TeE is gi.VJ!1t
Our COUsullalft. feE t rip-lp :PtelLfIt /tOel
~
dutran in-S"taJUlZlt.,1I0US 01'6i" ••.•d.tage set.iJtg of ~co'"ttten.cs130~'phasetoPtas8cdnbeused. .•upu .taJt.da:rdr=:Wles are OlpttbU of :o:.::r:n! J£S
wihsta.Pt.dinglJO%ollrighl~uy$tnn volC4c':tf TeE is 'i.'m
a.c.po-t:lr frequencyfor 1 INUtUC6. So alXJ1I« gtIseuines are ok.
y"':rom our
./
Ourc~tS!d.taJtlrCE's r"npy ;.41 p.,.,.mu.,/axdtudpractict1, in/1!',.-tUr"ltp,.ocociimt isrovid8d on.ly whtlt! SpedFLCallj"
recolftJt1mtU:d.l1y dttl1t1aJtU!a.ctur8f.
1119 Va-. ~ BiJt.a. TPS I «oo (eriOdiCal fz$d.ttgoj relays & yartIgquipHtattntust b# eti~dit:aL.=« of I'B~ ~ yard}P dOIf2. eqlUppuftCJ - ({ uiJ! be ad)1t.V1t too. _-.J
RepLyfrom COIt.JI~b:zu1C TCE;A..r perrQC"otnm€f'ldai(mjrorn r'iilaynta.n.uai..s,si'tiiJlg of lito 30% it used for fifdth lfmtolf l.C bloc kUtg. A.r pu our stJutd4rdn-ITr'20~i.s''''ltf.r'''d!luzrmoni:b1.0<king.
IlUobsw-vsddlat!ofgilJUllCOt'P'Olt!ctiOtt "-ttdu . ... ColtttMltU. i----.--Jr,"'l""''''' "lay trips.nxin. 48.5I1z/m- Ssec.& owr • Ou,' <"",.,/tan"",ly Fr.qll.olltCy proOlcu.on rom 0"·
aypee Bma TPS! «oo .:s fer ' is u sed maiillvjo,.alcvm aJtdasp<IY ow'. . Irrequ.en(,~·TlSla..vt:rips(/ttiltg51.0HtforSs8c.I$taken.thll I' I I ..' hi . ts 'ads . ~Oi""!IalIt.\i,s
S'4ItIlma.pbsreu.ew4!AL I' r,.acr.u~aWtlfl L.Qyo;, $,I!CLS" qltau. I~CEis gt-a'1!11
118 IJ d•.•.•pee: 1)[1(a. rPS
Gr&Srr"-dtkarm.",,icsb1.od.'iJtgi.sdtJ~'for]O%,This'md,,.oesn,dies & revised:
4/J()
It turn procdioll has Me baJltproWled,dtrough irisIUJCOIttntendsdfOt' G~ItiUa1Dr'mO'8tJuz.n.l00 .MVA.
y",
Regards.
S.K. Chakraborty
4/J()
Jaypee Bina Thermal Power Plant(A Division of Jaiprakash Power Ventures Umited)RajN Nagar. Post Box No.1.
Sub P.O. Agasod
Tehsil & P.O: Bina-470113
Distt Sagar (MP)
Phone: 07580-277101-3
Contm2ncr
ConsUU41ft ;\£5TCE is gillen
iii.
Comments'rom. OIU"
consuuant: )1:S IrCEisgU~