hon’ble commission’s order dated 05.03.2014 in petition no. … · replacement of 400kv static...
TRANSCRIPT
Baart sarkarGovernment of Indiakond`Iya ivaVut p`aiQakrNa
Central Electricity AuthoritypiScama xao~Iya ivaVut saimait
Western Regional Power Committeeef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauMba[- - 400 093
F-3, MIDC Area, Andheri (East), Mumbai - 400 093
Aa[- esa Aao : 9001-2008IS/ISO: 9001-2008
dUrBaaYa Phone: 022- 28209506, 28200195; 28200196; fO@sa Fax : 022 – 28370193Website : www.wrpc.gov.in E-mail : [email protected] [email protected]
NO. WRPC/Protection/2014/1594 Date: 26.09.2014
To
Secretary,
CERC, 4th Floor, Chanderlok Complex, 36,
Janpath, New Delhi 110001
Sub: Compliance Status of protection audit of Western Region – Reg.
Sir / Madam,
Please find enclosed herewith the compliance status of protection audit carried out by
utilities (Maharashtra, Chhattisgarh and Madhya Pradesh) in western region, as per
Hon’ble Commission’s order dated 05.03.2014 in petition no. 220/MP.2012 for your perusal.
The data of Maharashtra is on 08.08.2014 and is of Chhattisgarh is as on 30.06.2014 and with
respect to Madhya Pradesh it is as on 31.03.2014 (updated status from Madhya Pradesh still
awaited).
Gujarat has already attended all the observations of the category A and there
were no defects of Type B as reported by them vide email .
Thankingyou,Yours’ Sincerely,
Sd/-
S D Taksande,Member Secretary (I/c), WRPC.
CC:1. COO, CTU, PGCIL, Saudamini, Plot No. 2, Sector - 29, Gurgaon – 122001.
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
1 PADGHE 400
Commissioning of 2 Nosof 220kVHybrid PASS (GIS Bus-sectionalizer) atPadghe alongwith additional 220kVTBC, 2 sets of PTs & shifting of 220kVside bay of ICT3 & strenthening of400kV & 220kV Bus
Yes NoWithin 1 Year
(After receipt ofmaterial at site)
The order for supply & instatallationof Hybrid switchgear has alreadybeen placed & work is in progress.The works are expected to becompleted by March 2015.
2 PADGHE 400Commissioning of 220kV & 100kVstatic Busbar schemes by NumericalBusbar schemes.
Yes NoWithin 1 Year
(After receipt ofmaterial at site)
> Procurement of 100kV Busbarschemes is under process at CO. Pl.ref. **.> Scheme sanctioning of 220kVBusbar Protection is under process atC. O.
3 BOISAR 220Replacement of 132kV Busbarprotection schemes by NumericalBusbar schemes.
Yes No Pl. ref. **
4 KALWA 400Replacement of 400kV Static Busbarprotection schemes by NumericalBusbar schemes
Yes No Pl. ref. **
5 KALWA 400Shifting of 500 MVA, 400/220kV ICT 1from 400kV Kalwa II ss to 220kV KalwaI ss
Yes Yes
System improvement for Reductionof 220kV Bus fault MVA which isabove 40 KA. The work is completed.However, The ICT could not beshifted due to system constraints.
6 URAN 220All 220kV Control panels needs to bereplaced.
Yes No
The Control panels are very old &need replacement. The scheme isbeing prepared by field office.However, as existing panels are inservice, there is no urgency & will bereplaced in a phased manner.
Present Status of Protection Audit Deficiencies (A & B type) in MSETCL for the year 2012-13 as on 08/08/2014
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
Page 1 of 42
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
7 APTA 220Replacement of 100kV Busbarprotection schemes by NumericalBusbar schemes.
Yes No Pl. ref. **
8 APTA 220The C & R panels needs replacementwith new Control Room.
Yes No
The C & R panels are very old & needreplacement. The scheme is beingprepared by field office. However, asexistingpanels are in service, there isno urgency & will be replaced in aphased manner.
9 KANDALGAON 220Replacement of 220kV Busbarprotection schemes by NumericalBusbar schemes.
Yes No Pl. ref. **
10 KANDALGAON 220Replacement of 100kV C & R panels,also replacement of TF C &R panels.
Yes No
The C & R panels are very old & needreplacement. The panels are available& PO for replacement work is issued.Panels are erected. Work will becompleted by March 2015.
11 KANDALGAON 220Making LILO of 220kV Nagothane -Mahad line at Kandalgaon.
Yes NoThe work is under progress &expected to be completed by Dec.2014.
12 NAGOTHANE 400Replacement of 400kV & 220kV Busbarprotection schemes by NumericalBusbar schemes.
Yes No Pl. ref. **
13 NAGOTHANE 400
At present only one 220kV DC Sourceis in service / used instead of both220V DC source, even through the twoDC source are available.
Yes YesSeparation of 220V DC source work iscompleted on dtd. 28.05.2014.
14 KHARGHAR 400Replacement of 400kV & 220kV Busbarprotection schemes by NumericalBusbar schemes.
Yes No Pl. ref. **
Page 2 of 42
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
15 VASAI 220The 220kV TBC bay is not taken intoservice since commissioning due todefective REC 670 relay.
Yes Yes TBC is in service now.
16 VASAI 220
The ABB make SCADA is in service withstandby PC not in working condition.The GPS & SCADA timing is notmatching due to problem in GPS clock& system.
Yes No
17 VASAI 220TF LV side data is not available atSCADA due to communication failureproblems.
Yes No
18 VASAI 220The 100kV Busbar protection is nottaken into service sincecommissioning.
Yes NoWorkb in progress & will becompleted by March 2015.
19 TROMBAY 220
The ER make SMS is not in workingconditionUPS is not workingThe 2nosof TF bays & 220kV newlycommissioned Reliance bays are notintgrated with SMS system, Else it issuggested to explore the possibility ofintegration of all MSETCL bays withSAS provided by M/s Reliance.
Yes YesThe existing ER make SMS is in put inservice.
20 TROMBAY 220
The work of shifting of 220kV C & Rpanels from old CR to newlyconstructed CR by REL is to be takenon priority.
No NoOrder is placed & work will becompleted by March 2015.
21 Kaulewada 220
Lack of proper vermin proofing &internal module problems, the exisitngBusbar scheme (ALSTOM-PBLSB)maloperated in the past hence needsto be replaced.
Yes No Pl. ref. **
22 Wardha 220Faulty Annuciators shall be replacedimmediately
Yes No 31.08.14
23 Wardha 220Diagnostic Testing progress needs tobe accelerated.
Yes Yes - 100% completed
ABB representative visited site on23/07/2014 & in co-ordination withM/s ABB work will be completed byDec.-2014.
Page 3 of 42
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
24 Bhandara 220
The exisitng Bus-bar scheme (ABB-RADSS) was lying idle for more than 10years & maloperated in the past due toRQDA module problem or lack ofvermin proofing. Hence needs to bereplaced.
Yes No Pl. ref. **
25 Umred 220Diagnostic Testing progress needs tobe accelerated.
Yes Yes 100% completed
26MIDC
Chandrapur220
Diagnostic Testing progress needs tobe accelerated.
Yes Yes 100% Completed
27 Kanhan 22048V DC battery set must be replacedimmediately
Yes No 30.09.14 However, set reconditioned between25.03.2014 to 31.03.2014
28 Hinganghat 220Diagnostic Testing progress needs tobe accelerated.
Yes Yes 100% Completed
29 Hinganghat 220The annunciator of 220kV TSS-I &Warora are out of service which needto be replaced immediately.
Yes No 30.09.14
30 Ambazari 220The deffective 220V DC battery setsshall be replaced
Yes No 31.12.14
31 Ambazari 22048V DC set no:-1 efficiency observedas 60%.
Yes No 31.12.14
32 Ambazari 220
The exisitng Bus-bar scheme (ABB-RADSS) was lying idle for more than 10years & maloperated in the past due toRQDA module problem or lack ofvermin proofing. Hence needs to bereplaced.
Yes No Pl. ref. **
33 Warora 220The annunciator of 220kV Chandrapur-I feeder is faulty which needs to bereplaced immediately.
Yes Yes
34 Warora 220The Differntial relay of 220/33kV50MVA T/F-II shall be replaced
Yes No 31.08.14
Page 4 of 42
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
35 Khaperkheda 400
The time synchronization, GPS receiverdisplay problem, DR monitor problemshall be resolved by concernedEngineer.
Yes Yes - - -Attended except timesynchronisaztion
36 Khaperkheda 400 The NDR relay shall be replaced Yes No 31.08.14 Replaced on dtd. 07.06.2014
37 Khaperkheda 220
The exisitng Bus-bar scheme (ABB-RADSS) was lying idle for more than 10years & maloperated in the past due toRQDA module problem or lack ofvermin proofing. Hence needs to bereplaced.
Yes No Pl. ref. **
38 Butibori-I 220
The exisitng Bus-bar scheme (ABB-RADSS) was lying idle for more than 10years & maloperated in the past due toRQDA module problem or lack ofvermin proofing. Hence needs to bereplaced.
Yes No Pl. ref. **
39 Koradi 400 The NDR relay shall be replaced Yes No 31.07.14 Replaced on dtd. 11.06.2014
40 Khadka 400Electromechanical Relays of ICT to bereplaced by numerical one
Yes No 31.03.15Tender finalised & LOA is beingissued shortly.
41 Chalisgaon 220Electromechanical Relays of ICT to bereplaced by numerical one.
Yes No 31.03.15Tender finalised & LOA is beingissued shortly.
42 Deepnagar GCR 220 LBB scheme not in service Yes No 31.12.14 Wiring work is in progress
43 BBLR 40002 number of Distance Protectionscheme to be commissioned
Yes NoWill be done innext immediate
outage
Non-availability of outage is majorconstraint. Relays are available
44 Girwali 400400kV PGCIL CKT I & II -Broken Conductor Detection is off.
Yes No Pertains to PGCIL
45 Girwali 400400kV PGCIL CKT I & II - ZONE 3 &ZONE 4 trip time is same to 1S .
Yes No Pertains to PGCIL
Page 5 of 42
Yes/No
WhetherattendedYes/No
If notattended,
reason
Yes/No
WhetherattendedYes/No
If no, expecteddate to attend
Sr.No.
Name of S/Sidentified for
protectionAudit
S/Svoltage
kVObservations of protection Audit
Deficiencies that can becorrected without
procurement(Category-A)
Deficiencies involvingprocurement (Category-B)
Present Status
46 Waghala 220 Line B/U electromechanical relays - 10 Yes No 31.03.15Order for retrofit of Back up relays isissued.
47 Akola 220Followg relays are non numerical: *Distrelays (132kV feeders)- 5 nos. *B/Urelays-5 nos *Diffl relays-3 nos.
No -- -- Yes No --
> Disatnce Relay received will beretrofitted by Sept-14.> Order for Back up relay is issued.Works expected to be completed by31.03.15.
48 Akola 220Bus bar scheme for 132kV bus is notprovided
No -- -- Yes No -- Pl. ref. **
49 Amravati 220
Followg relays are non numerical:*Dist relays- 2 nos.*B/U relays- 4 nos*Diffl relays-3 nos.
No -- -- Yes No 31.03.2015
> Distance Relay retrofitted>Order for Back up relay is issued.Works expected to be completed by31.03.15.> Differential relay order is beingissued shortly.
50 Badnera 220Followg relays are non numerical:*Dist relays- 2 nos.*B/U relays- 2 nos
No -- -- Yes No 31.03.2015
> Distance Relay retrofitted.>Order for Back up relay is issued.Works expected to be completed by31.03.15.
Note: ** Tender already floated for procurement of 76 Nos. of Busbar protection schemes at various EHV substations in MSETCL. Busbar Protectionschemes will be tentatively receved at site by 31/03/2015 & commissioning works will be taken up thereafter.
Page 6 of 42
Remarks
Yes /No
WhetherattendedYes/No
If notattended,reason
Yes / NoWhetherattendedYes/No
If no,expecteddate toattend
DC leakage to be monitored Yes Yes
Main-II protection of 220 KVBRSS-I&II,220 KV Urla & 220 KV PGCIL feedersnot available.
Yes No Estimate submitted
220 KVBemetara
220/ 132KV
CSPTCLEngineers
13.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.
S.No.5
Yes -Yes forS.No.1 to 4
No 14.08.14 -
220 KV Gurur220/ 132KV
CSPTCLEngineers
12.03.13
1. Carrier protection is not available..2. M II protection for 220 KV feeder notavailable.3.DC leakage to be monitored.
S.No.3
Yes -Yes forS.No.1 & 2
No 14.08.14 -
220 KV Sohela220/ 132KV
CSPTCLEngineers
22.03.13
1. Carrier protection is not available..2. GPS time synchronizing facility is notavailable.3. M II protection for 220 KV feeder notavailable.4. DC leakage to be monitored.
S.No.4
Yes -Yes forS.No.1 to 3
No 14.08.14 -
220 KVBhatapara
220/ 132KV
CSPTCLEngineers
23.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.
S.No.5
Yes -
Yes forS.No.1 to 6
except 5
No 14.08.14 -
220 KV Mopka220/ 132KV
CSPTCLEngineers
29.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.7. Synchronization trolly not available.
S.No.5
Yes -
Yes forS.No.1 to 7
except 5
No 14.08.14 -
PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE [As on 30.06.2014]
Name of Utility : CHHATTISGARH POWER TRANSMISSION COMPANY LIMITED
Name of S/Sidentified for
protection audit
S/Svoltage
Name of 3rdparty protection
audit agency
Date onwhich auditconducted
Observations of protection audit
Deficiencies that can be correctedwithout procurement (Category-
A)
Deficiencies involving procurement(Category-B)
400 KVKhedamara
400/ 220KV
NTPC/PGCIL &CSPTCLEngineers
19 - 20Feb'13
Page 7 of 42
220 KV Banari220/ 132KV
CSPTCLEngineers
29.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.
S.No.5
Yes -
Yes forS.No.1 to 6
except 5
No 14.08.14 -
220 KV Siltara220/ 132KV
CSPTCLEngineers
01.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.7. Synchronization trolly not available.
S.No.5
Yes -
Yes forS.No.1 to 7
except 5
No 14.08.14 -
220 KV Doma,Raipur
220/132KV
CSPTCLEngineers
22.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.
S.No.5
Yes -Yes forS.No.1 to 4
No 14.08.14 -
220 KVParaswani
220/132KV
CSPTCLEngineers
29.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.
S.No.5
Yes -Yes forS.No.1 to 4
No 14.08.14
220 KV Urla220/ 132KV
CSPTCLEngineers
23.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.
S.No.5
Yes -
Yes forS.No.1 to 6
except 5
No 14.08.14 -
220 KVThelkadih
220/132KV
CSPTCLEngineers
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.
S.No.5
Yes -Yes forS.No.1 to 4
No 14.08.14 -
Page 8 of 42
220 KV Barsoor220/132KV
CSPTCLEngineers
07.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.
S.No.5
Yes -
Yes forS.No.1 to 6
except 5
No 14.08.14 -
220 KV Bhilai220/132KV
CSPTCLEngineers
11.03.13
1. Carrier protection is not available.2. M II protection for 220 KV feeder notavailable.3. DC leakage to be monitored.4. LBB protection not available.
S.No.3
Yes -
Yes forS.No.1 to 4
except 3
No 14.08.14 -
220 KVKotmikala
220/ 132KV
CSPTCLEngineers
05.04.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.7. Synchronization trolly not available.
S.No.5
Yes -
Yes forS.No.1 to 7
except 5
No 14.08.14 -
220 KV Raigarh220/ 132KV
CSPTCLEngineers
20.03.13
1. Carrier protection is not available..2. 2nd DC battery set is not available.3. GPS time synchronizing facility is notavailable.4. M II protection for 220 KV feeder notavailable.5. DC leakage to be monitored.6. LBB protection not available.7. Synchronization trolly not available.
S.No.5
Yes -
YesforS.No.
1 to 7except 5
No 14.08.14 -
1. Separate two sets DC system isrecommended for switchyard protection
No Yes
Estimate andRequisition forseparate DC sourcehas been send forapproval.
2. Carrier Protection is out of service. Yes
Yes, for220 kVKorba East-West I/CNo. I&II
Rest feeder'scarrier prot.ckt will bechecked
In E-W I/C No. I & IICarrier protectionchecked & taken inservice.
3. Disturbance Recorder and SERs are notavailable.
YesEstimate processed forapproval.
4. Old THR make Static DPR relays needsto be replaced by numerical relays
Yes NA NATender to be openedon 13.08.2014
5. Auto re-closer is not available. Yes Nockt will bechecked
Name of Utility : CHHATTISGARH POWER GENERATION COMPANY LIMITED
220 KV KTPS,Korba (E)
220 KV
M.K.BanchhorCSPTCL,
N.P.DewanganNTPC,
N.K.BizoraCSPGCL,G.P.Rai
CSPGCL,S.C.Chakraborty
CSPGCL
25.04.2013
Page 9 of 42
6. Bus Bar Differential scheme is notavailable.
Yes
7. All relay settings are verified and found tobe generally in order.
Yes Yes
8. Multiple Earthing is not found in CTsecondary.
Yes Yes
9. PSB feature is Enabled for Z2, Z3, andZ4.
Yes Yes
10. Synchronizing Panel is available for allfeeders except Budhipadar Feeder No-III forthat individual Synchronizing Trolley hasprovided.
Yes Yes
1) Two independent source of 220 V DCare available in Switchyard.No DC leakageobserved.
YES YES
2) All relay settings are verified & foundgenerally in order.
YES YES
3)Dual channel carrier protection isavailable in all 220 KV feeders but kept out
YES No
Due to nonavailabilityof Panel atremote end.
4) DRs are available in Numeric relays andSER is available.
YES YES
5)Multiple earthing of CT secondary core isnot available.CT secondary earthing isprovided in Panel only.
YES YES
6) 01 no synchronising trolley is available &in working condition.
YES YES
7)PSB feature is enabled & in blockingcondition for Z2,Z3 & Z4.
YES YES
8) Auto reclose is available but presentlykept out. YES No
As carrierprotection isout.
9) Bus Bar differential scheme is availablebut presently kept out.
YES No
To becheckedbefore putin service
1) Non availability of Main-II protection
Yes
2) Non availability of Auto reclose scheme.
Yes
3) Non availability of B/B differential &LBB protection Yes No 31.10.2014
Bus Bar protectionpanel has beenreceived
4)GPS is available however no relay issynchronised with it. Yes No 31.05.2014
Relays have beensynchronised with newGPS.
ABB Make Relay &control panelsequipped with Main-I& Main-II protectionand Auto reclose offeeders have beencommissioned.
Korba West TPS 400 KVNTPC &CSPTCLEngineers
26.04.2013
220 KVDSPMTPS,
Korba220 KV
Third PartyProtection Auditwas carried outby SE(ET&I-I)
HTPS,CSPGCL,Representative
ofNTPC,EE,CSPTCL,EE(Testing),DSPMTPS,CSP
GCL
25.04.2013
220 KV KTPS,Korba (E)
220 KV
M.K.BanchhorCSPTCL,
N.P.DewanganNTPC,
N.K.BizoraCSPGCL,G.P.Rai
CSPGCL,S.C.Chakraborty
CSPGCL
25.04.2013
Page 10 of 42
5) Replacement of ABCB with SF6 breakers& commissioning of isolator sequentialoperation with ABCB opening.
Yes No 31.03.2016
Replacement of ABCBwith SF6 breakers isincluded in the scopeof work of R&M ofstation proposed inyear 2015-16
1) Second DC system is recommended .Yes No 31.03.2015 In R&M
2) To renovate/retrofit Main-I & Main-IIProtection with numeric relays in all outgoing feeders.
Yes No 30.09.2014
05 no. Numeric Relayshave been retrofittedas MainI/II protectionin the followingfeeders: KW-Churi I &II,KW-DSPM, KW-KE I & II . Rest willbe fitted after thereceipt of orderedmaterial.
3) Carrier Protection is not in service. 02 no. havebeencommissioned in KEB-KWB interconnectors
Yes No 31.03.2016for other 4 feedersprocurement isrequired
4) Disturbance Recoder and SER s are notavailable.
Yes No 31.09.2014
Bay control panels forSCADA system havebeen received .M/sABB is beingpersuaded tocommission the sameas early as possible.
5) Non availability of Auto reclose scheme.
Yes No 30.09.2014
After thecommissioning of thenumeris relays will beput in service
6) Non availability of B/B differential
Yes No 31.03.2015
Old scheme to bereplaced by newone.Estimate is beingsent for approval.
7) Non availability of LBB protectionYes YES
LBB has been kept inservice
8)GPS is available however no relay issynchronised with it.
Yes No 31.03.2015
After commissioningof SCADA panel,Relays will besynchronised.GPSfacility is available inSCADA.
Korba West TPS 220 KVNTPC &CSPTCLEngineers
26.04.2013
Korba West TPS 400 KVNTPC &CSPTCLEngineers
26.04.2013
Page 11 of 42
NAID
PR
BA
BA
BA
No.07 To
Sub: Ref:
Dear S CERC Powerobservreceiv deficie2014 CERC for recMPPGC
AME OF S/s DENTIFIED
FOR ROTECTION
AUDIT
ARGI HPS
ARGI HPS
ARGI HPS
MAD
Te
7-05/RPC-37
The MembWRPC, F-Andheri (
Compliance This office
Sir,
This is in corder dated
r Pvt. Ltd. vations of P
ved in the pr
The M.P. encies involvor in the yi.e. within sctification oCL, as listed
OBSERVPROTEC
132 KV RBus Coup
not a
Bus Bar Pin
LBB Relayon the 13
1, JaLakhnad
DHYA PRA
Nelephone: (0761
7A/ 1514
ber Secret3, MIDC AE), Mumba
e mechanismletter No. 0
continuationd 21.02.201have been
Protection Aurescribed fo
Power Genving procur
year 2014-1six months of some of td below:
VATIONS OCTION AUDI
R phase CT opler (Bus-I) iavailable.
rotection is nservice.
y not provide2 KV Jabalpubalpur-2 , don Feeders.
ADESH POWSTATE
NAYAGAON1) 2702740/2660
tary, Area, ai-400093
m for implem07-05/RPC-3
n to this off14 in petitiofurnished i
udit in respeormat and ar
nerating Co.rement i.e. 5 and 2015of issue of Che deficienc
F IT
DEFICPROCU
YES/NO
of is YES
not YES
ed ur-
.
YES
WER TRANLOAD DESP
N, RAMPUR,0240 Fax: (0761
.
mentation o37A/1450 da
…
fice above on No. 220/in the prescect of MPPGre enclosed
. Ltd. in itsCategory-B 5-16, whichCERC order cies of Cate
CIENCIES INUREMENT (C
B)
WHETHER
ATTENDED
YES/NO
NO
NO
NO
NSMISSIONPATCH CEN, JABALPUR1) 2664343 e-m
of observatioated 23.04.
letter where/MP/2012 incribed formGCL, ISP, OS with this le
s status rephave ment
h is beyond dated 21.0
egory-B whic
NVOLVEINGCATEGORY-
IF NO, EXPECTED DATE
TO ATTEND
It is not required asper power
house electrical scheme.
NA
NA
N COMPANTRE
R 482008 mail sldcmpjbp@y
Jabalp
ons of Prote2014.
ein complian respect o
mat, now thSP and Jaypetter.
port of rectitioned expethe limit s
2.2014. Acch are along
G -
E
s r
The provof Bus-
scheme 132KV p
to bcommissSo was
with CSince costation commis
been conit rem
ProvisioJBP-1, Jincorpo
case of nco
NY LIMITED
yahoo.com
pur, dtd: 26
Fax: 022-2
ection Audit
nce report of MPPTCL ahe complianpee Bina hav
ification of ected date apecified by
ction has notg with the c
REMAR
vision of 132 -Coupler Busfor bus bar p
protection wabe commissioioning of thinever kept inCTs of other ommissioningBus bar protessioned as itsnsidered at th
mained un-coon for LBB reJBP-2, LKD ferated in fresh
numerical relammissioned
D
6.04.2014
28370193
– Reg.
in regard tand M/s BLAce report ove also bee
most of thas Novembe
the Hon’blt been takecomments o
RK
KV R phase s-I was undeprotection sinas not intendoned since is power houn service alontwo phases.
g of this powection was ns need had nohat time, henmmissioned.elay on 132KVeeders is beinh procuremeays and shallin future.
to A of n
he er e n
of
CT er nce ed
use. ng
wer ot ot nce
KV ng nt l be
Page 12 of 42
SGTPS # 5
DG set available in power plant and it is
suggested by the committee to extend AC supply as stand by to
400 kv control room and switchyard in case of
emergency.
YES NO
As suggested by the committee the technical comments will be obtained
from Engineering Cell,MPPGCL,Jabalpur
SGTPS # 5
High voltage problem are reported and it is suggested to provide bus reactor or line
reactor on 400 kv BRS-Damoh line I & II at
BRS end.
YES NO
Line reactors for 400 kv BRS-DAMOH Line -I/II has already been proposed to counter the problem of persistent high voltage in 400KV switchyard, SGTPS,Birsinghpur. Matter will be
finalized with M/s PGCIL by competent persuasions. The
installation of Bus reactor is not possible in 400KV switchyard as there is no space available for
construction of a separate bay which needs minimum of 27 meters North-
South space.
STPS PH-I
No GPS in control room and it is necessary for the root cause analysis
of the disturbance occurred in the grid
YES NO
At present GPS system is not required because there is no numerical relay and system
disturbance recorder is available which require time synchronization
The remarks recorded as above and the time limits mentioned are not acceptable in view of CERC order. The Omkareshwar HPS of NHDC in regard to deficiencies of Category-B observed during the Protection Audit conducted by the team constituted by SLDC has mentioned that they will take action for rectification only after conducting the Third Party Protection Audit of OSP which is in the tendering stage. It is also to mention that the status report furnished by all the intrastate entities of MP except M/s BLA Power, is for the protection audit conducted by a team constituted by SLDC in 2012-13 & 2013-14, which was for only 28 Nos. of EHV stations and 9 Nos. power stations. This is for further needful please. Encl: as above. Thanking you, Yours faithfully, Chief Engineer (LD), SLDC, MPPTCL, Jabalpur. Copy to – 1. The Executive Director (O&M:Gen), M.P. Power Generating Co. Ltd., Jabalpur. 2. The Chief Engineer (PM&C), NHDC Parisar, Shyamla Hills, Bhopal-462013, Fax: 0755-
4030130.
Page 13 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
Yes/NoWether
attended Yes/No
if not attended
reasonYes/No
Wether attended
Yes/No
if no, expected date
to attend
1. Time synchronisation problem of protective relays with GPS.
Yes Yes NIL NIL NIL NIL
2. Providing of Separate Event Logger NIL NIL NIL YES NO 4 months3. Providing of adequate fire protection system.
Yes Yes NIL NIL NIL NIL
4. Replacement of 220KV Static Bus Bar system with Numeric
NIL NIL NIL YES NO 2 months
5. Providing of additional Backup element on 315MVA Transformer -III
Yes Yes NIL NIL NIL NIL
1. Replacement of 1No 132KV NGEF SF6 CB of BHEL Bay
Yes Yes NIL NIL NIL NIL
2. Replacement of Electromechanical O/C & E/F relays of Incomers with numerical relays.
Yes Yes NIL NIL NIL NIL
3. Provision for taking REF protection in Circuit on 160MVA, 3x40MVA and 100MVA Transformers Yes Yes NIL NIL NIL NIL
4. Providing of Additional wave trap on 220KV Inter Connector-II
Yes Yes NIL NIL NIL NIL
1. LBB scheme to be taken in service Yes Yes NIL NIL NIL NIL2. Providing of 220KV Bus Bar Protection Scheme
NIL NIL NIL YES NO 4 months
3. LAs leakage Current measurement to be doneYes Yes NIL NIL NIL NIL
1. Replacement of Static/Electromechanical DPR by Numerical relays
Yes Yes NIL NIL NIL NIL
2 Commissioning of new 600AH 48V Battery ChargerYes Yes NIL NIL NIL NIL
3 Synchronisation of GPS system with protection of 132KV Traction-I & II feeders
Yes Yes NIL NIL NIL NIL
1. Zone-III setting of 220KV Gwalior-Bina-I & II to be reviewed
Yes Yes NIL NIL NIL NIL
2 Extending GPS time synchrinising facility to all panels
Yes Yes NIL NIL NIL NIL
3 220KV Bus Bar scheme to be provided NIL NIL NIL YES NO 4 months4. Providing of NIFPS on 3x40MVA 220/132KV Transformer
NIL NIL NIL YES NO 6 months
5. Providing of DG set NIL NIL NIL YES NO 6 months
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1 400KV S/S Bhopal 400KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
17-01-13 to 18-01-13
2 220KV S/S Bhopal 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
22-04-13 to 23-04-13
3 220KV S/S Mandideep220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
26-04-13 to 27-04-13
4 220KV S/S Bina 220KV
Internal Protection Audit party compirising of
representatives of State Utility and Power Grid
07-05-13 to 08-05-13
5 220KV S/S Gwalior 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
27-04-13 to 28-04-13
Page 14 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. 33KV, 25MVAr reactor of 315MVA Tr-I to be taken back in service by replacement of R phase 33KV Bushing and repair of 33KV CB.
Yes Yes NIL NIL NIL NIL
2 Oil leakage from B phase Turret of 400KV Bushing of 315MVA No-I
Yes Yes NIL NIL NIL NIL
3. 33KV, 25MVAr reactor of 315MVA Tr-II to be taken back in service by replacement of R phase 33KV Bushing and repair of 33KV CB.
Yes Yes NIL NIL NIL NIL
4. Mixing of 220V DC source-I & II to be rectifiedYes Yes NIL NIL NIL NIL
5. Replacement of B phase CVT of 400KV Main Bus-IIYes Yes NIL NIL NIL NIL
6. Auto Check synchronising facility is not in serviceYes Yes NIL NIL NIL NIL
7. Extending GPS connectivity to balance DPRs and Differential relays
Yes Yes NIL NIL NIL NIL
8. Providing of Separate Event Logger NIL NIL NIL YES NO 4 months9. Connecting 220KV Bus Bar Panel for tripping
Yes Yes NIL NIL NIL NIL
10 Testing of DPR of 220KV Interconnector-II Yes Yes NIL NIL NIL NIL1 Providing of Emergency light in Control and Battery Room
Yes Yes NIL NIL NIL NIL
2 Providing GPS connectivity in 400KV Controlpanels
Yes Yes NIL NIL NIL NIL
3. DG set not provided NIL NIL NIL YES NO 2 months4. 400KV Bus Bar protection out of service Yes Yes NIL NIL NIL NIL5 High resistance of Earth pit of 220KV PGCIL-II bay
Yes Yes NIL NIL NIL NIL
6. 220KV side LBB to be commissioned Yes Yes NIL NIL NIL NIL7 Directional E/F feature to be enabled on 220KV Birsinghpur and Damoh feeder.
Yes Yes NIL NIL NIL NIL
8. REF protection on 160MVA TELK Tr. To be enabled
Yes Yes NIL NIL NIL NIL
6 400KV S/S Bina 400KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
12-02-13 to 13-02-13
7 400KV S/S Katni 400KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
17-01-13 to 18-01-13
Page 15 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. Relay setting of 132KV Malanpur-Banmore-I feeder to be reviewed
Yes Yes NIL NIL NIL NIL
2. Zone-III setting of 220KV Malanpur-Auraiya feeder to be reviewed
Yes Yes NIL NIL NIL NIL
3. Providing of DG set NIL NIL NIL YES NO Under Process4. DC leakage in 110V DC system to be removed
Yes Yes NIL NIL NIL NIL
5. GPS time synchronising to be extended to Transformer panels
Yes Yes NIL NIL NIL NIL
6. Providing of NIFPS on 160MVA 220/132KV Transformer-II
NIL NIL NIL YES NO Under Process
7. 220KV Bus Bar protection to be taken into circuit for tripping
Yes Yes NIL NIL NIL NIL
8 Earth resistance of 20 and 40MVA transformer pits are not taken
Yes Yes NIL NIL NIL NIL
1. SSRR3V scheme on 132KV Bhind feeder to be replaced
Yes Yes NIL NIL NIL NIL
2. 220KV and 132KV feeder DPRs Zone-II & III settings to be reviewed
Yes Yes NIL NIL NIL NIL
3. DC leakage in 110V DC system to be removedYes Yes NIL NIL NIL NIL
4. GPS time synchronising facility to be extended to 132KV Bhind,Seondha feeder and 160MVA BBL Transformer panels
Yes Yes NIL NIL NIL NIL
5. Providing of NIFPS on 160MVA 220/132KV Transformer-II
NIL NIL NIL YES NO Under Process
6. 220KV Bus Bar protection scheme to be taken into circuit after configuration of new 160MVA BBL transformer
Yes Yes NIL NIL NIL NIL
1. 220KV Bus Bar scheme to be provided NIL NIL NIL YES NO 4 months2. 160MVA TransformerI & II panels are synchronised with GPS system, other panels needs to be synchronised
Yes Yes NIL NIL NIL NIL
3. Oil temp. indicator is not available in 20MVA Transformer
Yes Yes NIL NIL NIL NIL
4 Earth resistance meaurement to be done Yes Yes NIL NIL NIL NIL5. Zone-II & III settings of DPRs of 220KV PGCIL,132KV Arniya feeders to be checked
Yes Yes NIL NIL NIL NIL
8 220KV S/S Malanpur 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
01-05-13 to 02-05-13
9 220KV S/S Mehgaon 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
29-04-13 to 30-04-13
10 220KV S/S Shujalpur 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
24-04-13 to 25-04-13
Page 16 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. CT junction Box earthing in 132KV Bays to be strengthen
Yes Yes NIL NIL NIL NIL
2. 220KV and 132KV CB Marshalling Box earthing to be checked and strengthen Yes Yes NIL NIL NIL NIL
3 IOC feature in Differential and DPR relays to be enabled from reliability point of view Yes Yes NIL NIL NIL NIL
4. Over fluxing alarm and Trip time settings may be verified and corrected
Yes Yes NIL NIL NIL NIL
1. AREVA make 220KV CB marshalling Boxes are not properly earthed
Yes Yes NIL NIL NIL NIL
2. Minor DC leakage found in 110V DC source-IIYes Yes NIL NIL NIL NIL
3. Five nos DPRs (220KV Handiya-I&II, Barwaha,Sarni-Iii and Transfer B/C) are not time synchronised with GPS
Yes Yes NIL NIL NIL NIL
4. Auto reclosed feature is to be made operationalYes Yes NIL NIL NIL NIL
5. LBB and Bus Bar protection scheme have to be taken in to circuit
Yes Yes NIL NIL NIL NIL
6. H.Set feature of Differential relays to be enabledYes Yes NIL NIL NIL NIL
1. GPS is installed but not functioning, to be taken into service
Yes Yes NIL NIL NIL NIL
2. 220KV Bus Bar protection scheme is ASEA make needs to be replaced with numerical scheme NIL NIL NIL YES NO 4 months
3. Providing of DG set NIL NIL NIL YES NO Under Process4 Numeric DPR on 220KV Jetpura feeder to be provided
Yes Yes NIL NIL NIL NIL
5 DTOC setting of Transformers may be reviewed with latest fault level and CT ratio Yes Yes NIL NIL NIL NIL
1. GPS is installed but intermittent outage of GPS has been reported, needs to be discussed with manufacturer
Yes Yes NIL NIL NIL NIL
2. Uniformity in settingds of both 160MVA transformers may be reviewed
Yes Yes NIL NIL NIL NIL
3. Rajgarh-II DPR relay setting to be reviewed for Phase/Ground Impedance for Zone-III Yes Yes NIL NIL NIL NIL
4. Providing of DG set NIL NIL NIL YES NO Under Process5 V/F protection in any of Differential relay on 132/33KV Transformers not enabled
Yes Yes NIL NIL NIL NIL
11220KV S/S Hoshangabad
220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
08-05-13 to 09-05-13
12 220KV S/S Itarsi 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
06-05-13 to 07-05-13
13220KV S/S South Zone Indore
220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
22-04-13 to 23-04-13
14 220KV S/S Pithampur 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
24-04-13 to 25-04-13
Page 17 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. Some numerical relays are not time synchronised with GPS
Yes Yes NIL NIL NIL NIL
2. 220KV Bus Bar protection scheme is ASEA make needs to be replaced with numerical scheme NIL NIL NIL YES NO 4 months
3. V/F setting for 3x40MVA, 63MVA ,40MVA is not enabled
Yes Yes NIL NIL NIL NIL
4. REF is not enabled in 220KV and 132KV Transformers, to be enabled
Yes Yes NIL NIL NIL NIL
5 LBB protection for 220KV Class Transformers to be commissioned
Yes Yes NIL NIL NIL NIL
6. Providing of DG set NIL NIL NIL YES NO Under Process1. GPS system for relay time synchrinisation is out of order
Yes Yes NIL NIL NIL NIL
2. Automatic Fire Protection System( NIFPS) to be installed on all Transformers
Yes Yes NIL NIL NIL NIL
3. Fire extinguishers are available but to be placed at appropriate locations as per requirement. Yes Yes NIL NIL NIL NIL
4. Air Conditioning system should be provided in the Control Room NIL NIL NIL YES NO
Matter is under consideration.
1 Bus Bar protection system is provided but is in alarm mode only.
Yes Yes NIL NIL NIL NIL
2. 110V DC System is having earth leakage problemYes Yes NIL NIL NIL NIL
3. Automatic Fire Protection System (NIFPS)to be installed on all Transformers NIL NIL NIL YES NO
Matter is under consideration.
4. Synchronising scheme must be provided as many Hydel Generators are connected to the 220KV and 132KV Bus. Yes Yes
At S/S end it is not required as it is provided at Generating S/S end.
NIL NIL NIL
5. Lighting Visibility in the Control Room should be increased
Yes Yes NIL NIL NIL NIL
6. Fire extinguishers are available but to be placed at appropriate locations as per requirement. Yes Yes NIL NIL NIL NIL
7. REF feature in 160MVA CGL is not enabled. Yes Yes NIL NIL NIL NIL8. Load dropping scheme on Transformers must be connected.
Yes Yes NIL NIL NIL NIL
15 2220KV S/S Barwaha 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
26-04-13 to 27-04-13
16 220KV S/S Jabalpur 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
24-04-13 to 25-04-13
17 220KV S/S Rewa 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
29-04-13 to 30-04-13
Page 18 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. GPS system is available but the relays are not connected to it.
Yes Yes NIL NIL NIL NIL
2 Bus Bar and LBB protection of B-90 Bus Bar protection scheme is not in service due to Y phase CT module defect.
Yes Yes NIL NIL NIL NIL
3 Earth leakage problem in 110V DC system is there.
Yes Yes NIL NIL NIL NIL
4. REF feature in 160MVA BHEL is not enabled.Yes Yes NIL NIL NIL NIL
5. Automatic Fire Protection System( NIFPS) to be installed on 160MVA AREVA Transformer NIL NIL NIL YES NO
Matter is under consideration.
6. REF protection is not available on 160MVA BHEL transformer
Yes Yes NIL NIL NIL NIL
1. Oil leakage observed from 33KV Tertiary Bushing Turret of BHEL Transformer
Yes Yes NIL NIL NIL NIL
2. Fire extinguishers are not available at Control Room
Yes Yes NIL NIL NIL NIL
3 Providing of Emergency light in Control roomYes Yes NIL NIL NIL NIL
4 Internal panel cabeling/Wiring of Control panel is meshed
Yes Yes NIL NIL NIL NIL
1. GPS system is not connected with all relaysYes Yes NIL NIL NIL NIL
2. 48V Battery Charged is working in only Boost mode.
Yes Yes NIL NIL NIL NIL
3. Automatic Fire Protection System (NIFPS)to be installed on both Transformers NIL NIL NIL YES NO
Matter is under consideration.
4. 220KV Bus Bar scheme to be provided NIL NIL NIL YES NO 4 months
21 220KV S/S Barod 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
24-04-13 to 25-04-13
1. GPS system is available but some relays are not connected to it.
Yes Yes NIL NIL NIL NIL
1. GPS system is available but some relays are not connected to it.
Yes Yes NIL NIL NIL NIL
2. 220KV Bus Bar scheme to be provided NIL NIL NIL YES NO 4 months3 V/F protection in any of Differential relay on 132/33KV Transformers not enabled
Yes Yes NIL NIL NIL NIL
4 DTOC setting of Transformers may be reviewed with latest fault level and CT ratio
Yes Yes NIL NIL NIL NIL
5. Float mode of 110V DC Charger is defective Yes Yes NIL NIL NIL NIL6 In 220KV Julwaniya-Omkareshwar, Zone-III time setting is 800ms.It is not programmable as push buttons are not working and relay communication software is not available. It may be rectified soon.
Yes Yes NIL NIL NIL NIL
18 220KV S/S Satna 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
01-05-13 to 02-05-13
19 220KV S/S Damoh 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
06-05-13 to 07-05-13
20 220KV S/S Sagar 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
09-05-13 to 10-05-13
22 220KV S/S Julwaniya 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
08-05-13 to 09-05-13
Page 19 of 42
Sl. No.
Name of Sub-Station
identified for Protection Audit
S/S Voltage
Name of Protection Audit Agency
Date of which Audit Conducted
Observation of Protection Audit Remark
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES / OBSERVATIONS COMPLIANCE ANNX.-I
Name of Utility - MADHYA PRADESH POWER TRANSMISSION CO. LTD .JABALPUR
Deficiencies that can be corrected without procurement (Category-A)
Deficiencies involving procurement (Category-B)
1. GPS system is available but some relays are not connected to it.
Yes Yes NIL NIL NIL NIL
2. 220KV Bus Bar scheme to be provided NIL NIL NIL YES NO 4 months
3. Float mode of 110V DC Charger is defective Yes Yes NIL NIL NIL NIL
24220KV S/S Indore-II Jetpura
220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
08-05-13 to 09-05-13
1. Time synchronisation system is available with GPS, Its connectivity was made with all 220KV DPR/Differential relays. As this has created problem in functioning of DPR/Differential ralays, time synchronisation system is disconnected. Rectification of the problem and connectivity of time synchronisation system with all the relays is to be done.
Yes Yes NIL NIL NIL NIL
25 220KV S/S Ujjain 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
26-04-13 to 27-04-13
1. Time synchronisation system is available with GPS system, its connectivity is made with few 220KV & 132KV relays, Connectivity for the rest of the system is to be done.
Yes Yes NIL NIL NIL NIL
1. 220KV DC system voltage have been checked w.r.t. (+ Ve) to earth=136V, (-Ve) to Earth=89V, and to be rectified
Yes Yes NIL NIL NIL NIL
2. 220V DC Source I & II mixing possibility is there and to be checked.
Yes Yes NIL NIL NIL NIL
3. Float charger of 220V systemis not working in both chargers and presently chargers are working in Boost charging mode.
Yes Yes NIL NIL NIL NIL
4. Illumination in AC/DC room is very poor and same to be rectified
Yes Yes NIL NIL NIL NIL
5. All 400KV and 220KV line relays are numerical except Main-Irelay of 400KV Nagda-Indore, which has been installed and has to be connected.
Yes Yes NIL NIL NIL NIL
6. Separate event logger for S/S is not available and needs to be provided.
NIL NIL NIL YES NO 4 months
7. Directional E/F features is to be enabled on following feeders,400KV Main-II Relay (GE D60), 400KV ISP Main-II (ABB REL 521) and 400KV Rajgarh I & II ( Alstom make EPAC 3000relay is to be replaced by SEL 311C relay and feature has to be enabled soon)
Yes Yes NIL NIL NIL NIL
8. 25MVAr 33KV Reactors installed on Tertiary winding of ICT-II and ICT-IIIre out of order since long time.
Yes Yes NIL NIL NIL NIL
23 220KV S/S Nimrani 220KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
06-05-13 to 07-05-13
26 400KV S/S Nagda 400KV
Internal Protection Audit party compirising of representatives of State Utility and Power Grid
17-01-13 to 18-01-13
Page 20 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NO
WHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO ATTEND
TONS HPS220 KV SUB-STATION
1. DG Set –a. Poor cleaning of the panels, equipments, diesel tank & room has been observed.b. 250 KVA DG set is available. Auto start of it is not available. Manual start is satisfactory.c. Frequency observed is 52 Hz. It could not be reduced to normal 50 HZ values. d. Over current protection is out of service.e. Earthing strip of the DG set & control panel was found corroded.
a) YESb) YESc) YESe) YES
YES YES NO d) overcurrent protection taken on service upto 2015-16.
Compliance: Cleaning of the panels, equipments, diesel tank & room has been done regularly. Frequency maintained at 50 Hz. Procurement of numerical protection relay is under process. Electromechanical protection relays are in service at 0.4 KV MCC DG set incomer breaker. Earthing strip of the DG set & control panel was kept intact.
TONS HPS220 KV SUB-STATION
2. 220 Volt DC System-a. Poor house keeping in the charger & battery room.b. Battery bank – 1 of 300 Ah tubular type of Exide make was commissioned in December, 2010.c. Battery bank – 2 of 300 Ah VRLA type of Exide make was commissioned in April, 2009.d. Chargers –i. Charger - 2 was supplying the load through DCDB 1 & 2. a. Float current 14 amp,b. Load current 4 amp.It is not in proper order.ii. Charger - 1 was kept in hot standby condition, the voltage recorded are as
YES YES Replacement of charger will be done by FY15-16
Compliance : Two nos. 220 V DC , 600 AH battery chargers are installed with two nos. battery bank exide make of Tubular and VRLA of 300 AH capacity each. Battery chargers are operating since commissioning of the plant i.e. 1991. The chargers are very old technology based and needs to be replaced as the OEM M/s Chabbi Electricals is not supplying the spares. Capacity test of batteries is to be carried out shortly. Earth leakage of DC system has been attended.
TONS HPS220 KV SUB-STATION
3. 48 Volt DC System-a. No log book of PLCC battery set is maintainedb. Battery set is placed on the floor without putting insulator.
YES NO UPTO 2015-16 Compliance: Log book of PLCC battery set is being maintained. Procurement of new battery charger and battery set with stand is under process.
TONS HPS220 KV SUB-STATION
4. PLCC ROOM -a. Dead Rodents odor was felt.b. No PLCC cabinets for Rewa – 1, Rewa - 2 & Kotar directions.
YES NO UPTO 2015-16 Compliance: PLCC room is being kept clean. Procurement of new PLCC cabinets for feeders is being processed by the O/o The CE (O&M) Hydel, Jabalpur.
TONS HPS220 KV SUB-STATION
5. Communication -a. Communication to 220 KV Kotar s/s is not availableb. Communication to 220 KV Rewa s/s is not availablec. Mode of communication with SLDC is very poor which may be improved by providing Landline phone in control room or by other suitable means. PLCC communication to Jabalpur is having much hauling.
YES NO UPTO 2015-16 Compliance: Procurement of new PLCC cabinets including communication equipments for the feeders is being processed by the O/o The CE (O&M) Hydel, Jabalpur.
TONS HPS220 KV SUB-STATION
6. RTU - a. Active power transducer of 220 KV Rewa feeder-2 is found out.b. Alternate data channel to SLDC is not available.
YES NO UPTO 2015-16 Compliance: Procurement of transducers is under process.
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCENAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT PROCUREMENT (CATEGORY-A)
DEFICIENCIES INVOLVEING PROCUREMENT (CATEGORY-B)
Page 21 of 42
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCENAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
TONS HPS220 KV SUB-STATION
7. 220 KV Feeders-a. TMS of directional E/F is 0.1 second. It appears very low and to be reviewed in reference to fault MVA of Tons HPS.b. Carrier Protection & Auto re-closure feature has not been commissionedc. 220 KV feeders’ isolators with earth switch are not in working order.d. Female contact of R & Y phases of bus-2 isolator of 220 KV Rewa feeder-2 is not available. Hence, it is not possible to put on this bus in case of any eventuality.
A) YES b) YES
NO C) YES D) YES
NO UPTO 2015-16 Compliance: To review the relay settings , guidance from the central testing team of the office of CE (O&M) Hydel , Jabalpur is desired. For carrier protection and auto reclose facility , letter for offer from OEM has been called but no response has been received. Mean while procurement of new duplex control and relay panels is under process. Procurement of 220 KV feeders isolators earth switches is under process. New Isolator assemblies has been purchased for the replacement of R & Y phases of bus-2 isolator of 220 KV Rewa feeder-2 and will be done during maintenance of 220 KV switchyard in April 2014.
TONS HPS220 KV SUB-STATION
8. Transformer-a. Oil parameters of all transformers are not being done regularly and not produced for the verification.b. Routine testing of transformers is irregular.c. Winding resistance of the transformers is irregular.d. Tan delta of the power transformers, instrument transformers and bushing of the transformers has not been done. e. Breather condition of the transformers is poor.f. MOLG of all the GTs are not working.
YES YES EXPECT POINT NO.(F)
(f)MOLG of all the GTs will be attended at the time of AOH.i.e upto 2014-2015
Compliance: Testing of oil parameters of transformers is being done by CPRI banglore . Routine testing of transformers has been done during AOH by central testing team of the office of CE (O&M) Hydel , Jabalpur . Winding resistance and tan delta will be done by central testing team of the office of CE (O&M) Hydel , Jabalpur. New breathers has been installed . MOLG of all the GTs will be rectified during AOH.
TONS HPS220 KV SUB-STATION
9. Station Transformer - 33 KV lightening arrestor found disconnected. YES NO UPTO 2014-2015 Compliance: Lightening arrestor has to bested before reconnecting to the transformer. Testing will be done by central testing team of the office of CE (O&M) Hydel , Jabalpur.
TONS HPS220 KV SUB-STATION
10. Generator Transformer - No mechanical tripping on existing 220 KV Gas Circuit Breaker of generator transformer and it is Single Pole Mechnism, it shall be Gang operated circuit breaker.
YES NO UPTO 2015-16 Compliance: Procurement of new gang operated 220 KV SF6 breakers for Generator Transformer is under process at the office of CE (O&M) Hydel , Jabalpur.
TONS HPS220 KV SUB-STATION
11. Spare Generator Transformer – Oil filled up to core but positive pressure is not there. It should be maintained by the dry nitrogen.
YES YES Compliance: Nitrogen gas filled in the transformer to maintain the positive pressure but could not be succeeded due to heavy leakage . Meanwhile it is filled with oil up to the core. Work contract of servicing of the GT is also under tendering stage.
TONS HPS220 KV SUB-STATION
12. Fire Protection – Generator fire protection is not in working order. YES NO UPTO 2015-2016 Compliance: Work contract for deputation of service engineer for the rectification of faults in the Generator fire protection is placed.
TONS HPS220 KV SUB-STATION
13. Governor - Unit 1 & 2 are on manual mode of governor operation. YES NO UPTO 2015-2016Compliance: Procurement of new RGMO microprocessor based digital governor has been placed and the 50 % material has been received. After receiving the material the governors will be installed.
TONS HPS220 KV SUB-STATION
14. Automatic Voltage Regulator - Arc chute of field flashing breaker of unit 2 is not available.
YES YES Compliance: Arc chute of field flashing breaker of unit 2 is installed.
Page 22 of 42
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCENAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
TONS HPS220 KV SUB-STATION
15. RELAYS-a. Generator Protection & transformer protection is provided through electromechanical relays. It is to be provided with numeric relays.b. The existing bus bar protection is un-commissioned and obsolete. It is to be provided through Numeric relays.c. LBB protection is not commissioned on 220 KV feeders.d. Carrier protection is not available on all 220 KV feeders.e. 220 KV Bus coupler earth fault relay is out of orderf. Zone 3 time setting of 220 KV feeders is 600 mili seconds and it may be 700 milli seconds as per new instruction.g. Some of the protection/ auxiliary relays are not having cover to prevent from dust, moisture and water etc.
YES NO UPTO 2015-16 Compliance: Procurement of new duplex control and relay panel equipped with microprocessor based numerical relays and latest systems are under process.
TONS HPS220 KV SUB-STATION
16. Earth Resistance – Earth Resistance record has not produced for 220/33 KV switch yard & electronic earthing of DAVR.
Compliance: Earth resistance has to be done by the central testing team of the office of CE (O&M) Hydel , Jabalpur during AOH.
TONS HPS220 KV SUB-STATION
17. Followings are not available for the root cause analysis –a. GPS Time Synchronizerb. Sequence Event Recorderc. Disturbance Recorderd. Diagnostic Station
YES NO UPTO 2015-16 Compliance: All above items are included in the procurement of duplex control and relay panels which is under process.
TONS HPS220 KV SUB-STATION
18. Auxiliary AC supply-Most of the cubicles and cable alleys of following are found open- a. Station service boardb. Unit auxiliary MCC boardc. AC lighting board &d. Emergency lighting board.
YES YES Compliance: All above has been attended with the availability of spares.
TONS HPS220 KV SUB-STATION
19. The condition of emergency lighting at various floors and control locations is poor.
YES NO UPTO 2014-2015 Compliance: The emergency lighting distribution board was not in service . To make it in to service the order has been placed for the spares. After availability of spares it will be made available .
TONS HPS220 KV SUB-STATION
20. Illumination- Very poor illumination on following –a. Inside of the duplex C&R panel in control room.b. Emergency light in control room and other location. It shall be improved by adding more points for the proper and sufficient illumination in case of station dark etc for fast and timely action by operation staff.c. Generator barrelsd. 220 KV switch yard.
YES YES Compliance: Most of above have been attended.
Page 23 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NO
WHETHER
ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NO
WHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO ATTEND
BARGI HPS132 KV SUB-STATION
DPR relay setting of the 132 KV Jabalpur 1, Jabalpur 2 and Lakhnadon feeders to be reviewed
YES YES Setting from SLDC (T&C) not provided.
BARGI HPS132 KV SUB-STATION
220 V DC system having positive earth fault and mixing of the DC source 1 and 2 is observed. Periodical load test of the battery may be ensured.
YES YES220KV DC system is now separately laoded on unit I & II . Hence there is no mixing of DC source I and II .
BARGI HPS132 KV SUB-STATION
The 132 KV switchyard, Power House and equipment needs more attention towards its up keeping.
YES YES Power house up keeping is improved now.
BARGI HPS132 KV SUB-STATION
132 KV MOCB installed on 132 KV Jabalpur-1, Jabalpur-2, Lakhnadon, bus coupler bay and 20MVA transformer to be replaced with SF6 CB.
YES NO UPTO 2015-16Offer for procurement of 132 KV SF6 breaker is being asked from M/s Crompton Greaves, ABB , Siemens etc. are awaited.
BARGI HPS132 KV SUB-STATION
132 KV R phase CT of Bus Coupler (Bus-I) is not available.
YES NO
It is not required as per power house elctrical scheme.
The provision of 132 KV R phase CT of Bus-Coupler Bus-I was under scheme for bus bar protection since 132KV protection was not intended to be commissioned since commissioning of this power house. So was never kept in service along with CTs of other two phases.
BARGI HPS132 KV SUB-STATION
Bus Bar Protection is not in service. YES NO NA
Since commissiong of this power station Bus bar protection was not commissioned as its need had not been considered at that time, hence it remained uncommissioned.
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES INVOLVEING PROCUREMENT (CATEGORY-B)
Page 24 of 42
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
BARGI HPS132 KV SUB-STATION
LBB Relay not provided on the 132 KV Jabalpur-1, Jabalpur-2 , Lakhnadon Feeders.
YES NO NA
Provision for LBB relay on 132KV JBP-1, JBP-2, LKD feeders is being incorporated in fresh procurement case of numerical relays and shall be commissioned in future.
BARGI HPS132 KV SUB-STATION
Records of the mock drill / trial of the fire fighting equipments and DG set are not available at Bargi Power Station.
YES YESRecords of mock drill, trial of firefighting equipment and DG set are available in power house.
BARGI HPS132 KV SUB-STATION
All Existing Electomechanical / Electostatic Relays to be replaced with numerical relays.
YES NO UPTO 2015-16
Offer for replacing all electromechanical relay for supply with complete retrofitting from M/s ABB, M/s Electromech engineers and M/s Siemens are under process.
BARGI HPS132 KV SUB-STATION
Fire Fighting system with CO2 Cylinders are available at power station but it is observed that it is in the mannual mode. It may be in the auto mode.
YES NOUPTO 2014-2015
The case of repairing and upgrading of CO2 system is under process.
BARGI HPS132 KV SUB-STATION
The Facility of DR/ SER is not available at the HPS Bargi.
YES NO UPTO 2015-16
The facility of DR/SER is provided in the offer of M/s ABB for retrofitting of numerical relay panel which is in the process i.e. EL, DR Communication on IEC61850 they provided.
BARGI HPS132 KV SUB-STATION
GPS Facilities is not available. YES NO UPTO 2015-16Bill of quantities and budget estimate shall be met from O&M budget 2014-15 & 2015-16.
Page 25 of 42
NAME OF S/s IDENTIFIED FOR
PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION
AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NO
WHETHER ATTENDED
YES/NO
IF NOT ATTEND, REASON
YES/NO
WHETHER ATTENDED
YES/NO
IF NO, EXPECTED DATE TO ATTEND
GANDHISAGAR HPS
132 KV SUB-STATION
Carrier System is use for communication only, no carrier protection is provided.
N.A.
GANDHISAGAR HPS
132 KV SUB-STATION
Positive side of 220 V DC sources - 1 is found earthed (Voltage between positive to earth is Zero and negative to earth is 240 V) Point at which DC leakage / earthling have developed may be detected and rectified at the eariliest.
YES YES Fault has been removed
GANDHISAGAR HPS
132 KV SUB-STATION
220 V Battery charger - 2 and Battery set - 2 is very old and under replacement.
YES YES220 V set No. 2 has been
comissioned on dated 25/01/2014
GANDHISAGAR HPS
132 KV SUB-STATION
DRs, SERs are not available for recording of system disturbances.
YES NOUPTO 2015-
16
Material Budget provision for the year 2015-16 amounting Rs. 2400000 for 06 Nos. DPRs.
GANDHISAGAR HPS
132 KV SUB-STATION
Synchronizing trolley is available and working properly. YES YES OK
GANDHISAGAR HPS
132 KV SUB-STATION
CTs star point earthling of 132 KV are checked and found no multiple earthlings in the system.
YES YESChecked and multiple earthing
carried out
GANDHISAGAR HPS
132 KV SUB-STATION
Back up O/c - E/F relays are not provided for all Generator Transformer. It should be provided at the earliest.
YES NOUPTO 2015-
16
Material Budget provision for the year 2015-16 amounting Rs. 1200000 for 06 Nos. O/c -
E/F relays.
GANDHISAGAR HPS
132 KV SUB-STATION
Almost of the relays provided for Generator, Generator, Generatior Transformer (GT), Station service Transformer of 20 MVA are electromagnetic type. These existing relay
should be replaced with numerical relays for better reliability, sensitivity, faster response and compatibility
with GPS system.
YES NOUPTO 2015-
16
Material Budget provision for the year 2015-16 amounting Rs. 15000000 for Generator,
GT and others.
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES INVOLVEING PROCUREMENT (CATEGORY-B)
Page 26 of 42
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
GANDHISAGAR HPS
132 KV SUB-STATION
Almost of the relays (Distance protection, O/c, E/F relays) provided for 132 KV Feeders are electromagnetic type and
required to be replaced by numerical relay for better reliability, sensitivity, faster response and comptibility with
GPS system.
YES NOUPTO 2015-
16
Material Budget provision for the year 2015-16 amounting Rs. 2400000 for 06 Nos. DPRs.
GANDHISAGAR HPS
132 KV SUB-STATION
Height of Live conductor in HV section from CB to wave trap in 132 KV Manasa bay is seams to be very less.
Sufficient Ground clearance may be maintained for safety purpose.
YES YESGuarding has already provided
for safety
GANDHISAGAR HPS
132 KV SUB-STATION
Operation of DG set is available in manual mode. Provision for auto mode operation may be provided so that DG set
starts automatically in black - cut condition/exigency.YES NO
UPTO 2015-16
CASE UNDER PROCESS FOR BUDGETERY OFFER.
GANDHISAGAR HPS
132 KV SUB-STATION
Auto Chck synchronizing facility is not available, which should be provided for betterment of system.
YES NOUPTO 2014-
2015
Material Budget provision for the year 2014-15 amounting
Rs. 800000 for misc.
GANDHISAGAR HPS
132 KV SUB-STATION
Testing of DPR, Differential and other Relays. Along with corresponding CT & PT should be carried out in regular
interval.YES NO UPTO 2014.
Central testing team from Jabalpur will be dupte shortly.
Note:-GandhiSagar HPS commissioned in year 1960-66.Allelectrical and mechanical system are very old and every equipment cannot be replaced as the service life has already completed and cost benefit analysis does not permit to invest huge amount in such R&M activities.
Page 27 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NO
WHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO ATTEND
SGTPS 1 TO 4 220 KV220 KV Bus Bar Protection is available but not in service due to some problems
YES NO अ�ैल-15
Purchase of new scheme is in process,technical bid opened and approval for price bid opening submitted on dtd.31.01.14 and after the finalization of case and receipt of material at site atleast 6 to 9 months reqired to put into service as per availability of shunt down on different section of 220 kv sub-stations.
SGTPS 1 TO 4 220 KVLBB Protection relay are available but protection are not provided for any element and it is suggested to put the same in service.
YES NO अ�ैल-15LBB protection will be commissioned along withbus bar protection
SGTPS 1 TO 4 220 KV
Most of the 220 KV feeders station DPRs provided and Electro-Magnetic Directional O/C and E/F Relays provided as back-up protection as suggested numerical relay should be provided.
YES YES COMPLIED
SGTPS 1 TO 4 220 KVESR/DR is not installed but it available in numerical relays provided in 220 kv pali interconnector-I and 220 kv Sukha feeders only.
YES NO नवम्बर-14DR facility is now available with DPR CSC-101 realy and offer for ESR is called from manufacture.
SGTPS 1 TO 4 220 KVAuto reclose facility not provided on any 220 KV feeders.It is intimated that protection couplers are not availableand it is suggested to provide the same.
YES NO नवम्बर-14Estimate is submitted for procurement of the new PLCC Panel
SGTPS 1 TO 4 220 KV Auto check synchronisation facility YES YES COMPLIED
SGTPS 1 TO 4 220 KVGPS based time synchronisation facility is not available it is suggested to provide the same.
YES NO नवम्बर-14
GPS facility is available in 500 MW unit and extension to PH-I & II Is not succeeded due to non-availabilty of separate data signal from master clock panel of 500 MW units.
SGTPS 1 TO 4 220 KVRelay setting of 220 kv Sukha Feeder and 220 kv Satna feeder are verified and found as per relay setting records provided
YES YES COMPLIED
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES THAT CAN BE CORRECTED WITH PROCUREMENT
(CATEGORY-B)
Page 28 of 42
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
SGTPS 1 TO 4 220 KVTime delay setting for Zone 2/3/4 are given as 300ms/1000ms/inst.It required revision as per the CBIP recommendations.
YES YES COMPLIED
SGTPS 1 TO 4 220 KVCT secondary star point earthed in switchyard only.It is intimated that no multiple earthing provided for any element
YES YES COMPLIED
SGTPS 1 TO 4 220 KV
A separate source for 220 KV dc supply is provided for electrical control room and 220 kv switchyard.This battery set is very old,commissioned 1991 needs replacement.
YES NO नवम्बर-14Procurement of new battery set will be done shortly.
SGTPS 1 TO 4 220 KVTo avail 220V DC supply from power plant as stand-by DC source in case of emergencies
YES YESManual tie between unit and station DCDB is available and checked.
SGTPS 1 TO 4 220 KVPartial Dc leakage observed,it is advised to recify the same.
YES NO नवम्बर-14
It is in practice to attend the partial leakage during the S/D of units/ feeders. Procurement of DC earth fault locator under final stage.
SGTPS 1 TO 4 220 KV
DG set is available in power plant only it is suggested to make a ready arrangement to avail AC supply from power plant DG set to 220kv switchyard auxiliaries as stand by source.
YES YES COMPLIED
SGTPS 1 TO 4 220 KVIn most of the GT units of PH-1 & II moisture contents of oil is detected more than 20 ppm.corrective action are required.
YES YES COMPLIED
SGTPS 1 TO 4 220 KVIn PH-2 GT Transformer no.3 Acetylene contents detected as 3 ppm.Corrective action required.
YES YES COMPLIED
SGTPS 1 TO 4 220 KVEmulsifier system is provided on GT and UAT for Fire protection.Same is operate manually.
YES NO नवम्बर-14Analysis has been carried out for requirement of material to start auto operation
Page 29 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO ATTEND
SGTPS # 5 400 KV
Static Bus Bar Protection scheme is provided on 400 kv bus make ABB Type-RADHA.A numerical Bus-Bar protection scheme may be provided as suggested by the committee.
YES NO 15-16 Bus bar protection scheme will be augmented after the technical and administrative approval with numerical technology to avoid malfunction and erratic behavior of ABB make RADHA type differential relays.
SGTPS # 5 400 KVLBB protection scheme is provided but kept out of service in 400 kv BRS-KATNI-II due to some relay logic problem
YES YES COMPLIED Attented by service engineer of M/s Areva/Alstom Chennai
SGTPS # 5 400 KV Disturbance Recorder YES YES COMPLIED Avaliable and is in service
SGTPS # 5 400 KVAuto check synchronizing facility is available but it can be done manullay
YES YES COMPLIED Synchronization can be done both through auto and manual mode.
SGTPS # 5 400 KV
HATHAWAY make time synchronising GPS system is available but out of service due to some programming errors.
YES YES COMPLIED HATHAWAY make GPS system replaced by SIRTEL make GPS system in the month of april-14 and which is working effectively
SGTPS # 5 400 KVCT secondary star point earthed in control panel only and it is intimated no multiple earthing provided for any element.
YES YES COMPLIED As confirmed from M/s BHEL and M/s PGCIL for smooth operation of protective relay.
SGTPS # 5 400 KV
Relay setting of 400 kv BRS-KATNI feeders including ICT,GT.Station Transformer and all other PGCIL feeders is kept as per the recommendation of DCPL/PGCIL/WRLDC.
YES YES COMPLIED
SGTPS # 5 400 KV
Time delay setting for Zone -II /Zone-III/Zone-IV is given as 400ms/800ms/800ms for 400 kv BRS-KATNI feeder and it is suggested to revised the same as CBIP recommendations.
YES YES COMPLIED Setting revised as per CBIP recommendations.
SGTPS # 5 400 KV220V Nickel-Cadmium battery system are provided and partial dc leakage detected.
YES YES COMPLIED DC leakage is monitored time to time and rectification measures are taken accordingly.
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCENAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES THAT CAN BE CORRECTED WITH PROCUREMENT
(CATEGORY-B)
Page 30 of 42
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCENAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
SGTPS # 5 400 KV
DG set available in power plant and it is suggested by the committee to extend AC supply as stand by to 400 kv control room and switchyard in case of emergency.
YES NO As suggested by the committee the technical comments will be obtained fron Engineering Cell,MPPGCL,Jabalpur
SGTPS # 5 400 KVMulsifire fire protection system YES YES COMPLIED Mulsifire fire protection system is in service for all
power transformers available in 500 MW.
SGTPS # 5 400 KV
Moisture content in GT is detected more than 20ppm as per CPRI report theefore rechecking and corrective action required.
YES YES COMPLIED Moisture content has been cross checked again and found to be around 5ppm.
SGTPS # 5 400 KVSpare unit of single phase ICT is not ready to use,it should be attented and kept in ready condition in case of emergency.
YES NO नवम्बर-14 Dry out of winding of spare ICT was recommended by M/s BHEL Bhopal.The work is likely to be completed within 2 months.
SGTPS # 5 400 KV
High voltage problem are reported and it is suggested to provide bus reactor or line reactor on 400 kv BRS-Damoh line I & II at BRS end.
YES NO Line reactors for 400 kv BRS-DAMOH Line -I/II has already been proposed to counter the problem of persistent high voltage in 400KV switchyard,SGTPS,Birsinghpur.Matter will be finalized with M/s PGCIL by competent persuasions.The installation of Bus reactor is not possible in 400KV switchyard as there is no space available for construction of a separate bay which needs minimum of 27 meters North-South space.
SGTPS # 5 400 KV400 KV BRS-BAlCO and BRS-Vandana Power (KORBA) bays belongs to PGCIL
Testing and maintenance of PGCIL extension switchyard is presently being carried out by M/s PGCIL Jabalpur/PGCIL Damoh.
Page 31 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO
STPS PH-I 220 KV
No GPS in control room and it is necessary for the root cause analysis of the disturbance occurred in the grid
YES NO At present GPS system is not required because there is no numerical relay and system disturbance recorder is available which require time synchronization
STPS PH-I 220 KV
DG SET 160 KVA is available with manual and auto start since 2009.DG set trial run taken and observed parameters are 415v,50.4 Hz,RPM-1504.
YES YES COMPLIED.
STPS PH-I 220 KV
220 KV DC BATTERY SOURCE in which scaling and dust deposition observed on the terminal of some batterys.Also the cleaning of the batteries and battery room need improvement.
YES YES Scaling and dust deposition has been removed.We are taking extra effort for regular cleaning of the batteries and battery room.
STPS PH-I 220 KVSuitability of short circuit breaking capacity of circuit bkr & short time current capacity of CT's shall be reviewed in respect of exsisting fault level's
YES YES The setting of above Breakers and short time current capacity of CT's is appropriate.
STPS PH-I 220 KV
In the protection scheme electromechnical and static relay are in use but as per present grid norms avaliabilty of numerical relay is required for fault analysis and event recorder.
YES NO 15-16 In the protection scheme electromechnical and static relay are in use because PH-I is very old about 40-45 years. Numerical Relays will be installed.
STPS PH-I 220 KVOil parameter of GT-I in which water content is more than 30 ppm and BDV is 30KV appropriate corrective action is recommended.
YES YES BDV OF GT-I 68.4 KV AND moisture content is 22.66 PPM as plant laboratory.
STPS PH-I 220 KV
Furan contents of the some of the UATs are beyond acceptable limits appropriate corrective action is recommended.
YES YES To check the Furan concentrations in UATs which are in service the procedure has been intiated and under progress.
STPS PH-I 220 KV
Fire protection system of transformers are out of order and suitability of nitrogen injection fire protection system may be explored.
YES NO 15-16 Fire protection system of transformers are out of order and it is requested to kindly intimate addresses of firms who is interested in installation of nitrogen injection fire protection system of transformer.
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES THAT CAN BE CORRECTED WITH PROCUREMENT
(CATEGORY-B)
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
Page 32 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO
STPS PH-II 220 KV
No GPS in control room and it is necessary for the root cause analysis of the disturbance occurred in the grid
YES NO FY 15-16 At present GPS system is not required because there is no numerical relay and system disturbance recorder is available which require time synchronization
STPS PH-II 220 KV
Suggestion made by committee in 220 VOLT DC BATTERY SOURCE are as follows:- a) Some of the cells of unit no.7 are bulged in plante type battery set which resulting in breaking of the container and lid therfore it should be replaced at the earliest .b) Some of teh cell are bypassed due to above mentioned problem in s.no.(a) thereby reducing the available capacity of the bank.c) 220 V DC Battery Source have earth leakage in DC circuit. d) Battery bank of unit 6& 7 were commissioned in the year 2004 & 2001 respectively.As per CEA circular fair life of battery is 5 years only therefore suitable action for their replacement is to be initiated at the earliest.e) unit no.6 has earth leakage in their tubular battery set. f) No alarm for DC E/F is provided in the chargers. g)Capacity test has not been conducted recommended to do onces in a year. h) Scaling is observed on the terminal of some of the batteries.
YES YES YES NO 15-16 A)rectification work is in process.B) rectification work is in process.C) COMPLIED.D) For replacement of battery bank ,budgetary offer has been called for processing the purchase od battery bank. However as per prevailing practice of STPS battery bank replace after 10 years of service. Therefore recommendation of protection audit committee will be taken for future corse of action.E) COMPLIED.F) In original scheme alarm for E/F was not provided by BHEL however modification shall be done during AOH of units.G) Matter taken up with OEM for capacity test during the time of AOH.H) Cleaning of battery terminal has been done during shunt done on dtd.06.04.13
STPS PH-II 220 KV220 KV tie breaker is commissioned but it is not being used as informed by concered offical/staff.
YES YES 220 KV tie breaker is healthy and ready for use when and where required.
STPS PH-II 220 KV
In the protection scheme electromechnical and static relay are in use but as per present grid norms avaliabilty of numerical relay is required for fault analysis and event recorder.
YES NO 15-16 Proposal for installation of one no. numerical relay in generator 6 & 7 has been submitted for approval on dtd.29.12.2012.
STPS PH-II 220 KV Pole slip protection is not available so it shall be provided. Pole slip protection is not in original scheme.
STPS PH-II 220 KVAuto reclosure/Disturbance Recorder/Event Logger/SER all are not available.
YES NO 15-16 These features available in numerical DPR relays which shall be commissioned shortly.
STPS PH-II 220 KVCarrier Protection is not available in 220 kv switchyard. YES NO 15-16 Carrier protection scheme will be procured ,installed
and commissioned STPS PH-II 220 KV Earth Mettaling is not visible in 220 kv switchyard YES NO NOV'14 matter taken up with concered civil circle
STPS PH-II 220 KVL&T make switchgear indicating lamp assembly is missing and they are vacant i.e whole are uncovered.
YES NO AUG'14 sealing of panel under process.the work is being carried out during shut-down.
STPS PH-II 220 KVMulsi Fire protection of the transformer is out of order, suitability of Nitrogen injection may be explored
YES NO NOV'14 Fire protection of the transformer will put in service
STPS PH-II 220 KVSuitability of short circuit breaking capacity of circuit bkr & short time current capacity of CT's shall be reviewed in respect of exsisting fault level's
YES NO NOV'14 will be done shortly
STPS PH-II 220 KV
Distance proct.zone 2 timimg is taken 0.5 sec and Zone 3 timing is taken 1.5 sec. These are on higher side. The zone 2 timing of 0.3 sec & zone 3 timing of 0.7 sec is recomonded. Reverse zone is not provided. The zone calculations may be revised
YES YES COMPLIED
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES THAT CAN BE CORRECTED WITH PROCUREMENT
(CATEGORY-B)
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
Page 33 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO
STPS PH-III400 KV SWITCH YARD
1. GPSNO GPS IN 400KV CONTROL ROOM . GPS IS NECESSARY FOR THE ROOT CAUSE ANALYSIS OF THE DISTURBANCE OCCURRED IN THE GRID.
YES NO NOV'14 (1) GPS(a) Time synchronizing through GPS has been provided by PGCIL for Relays of 400Kv Sarni-Koradi Feeder and 400Kv Sarni-Itarsi Feeder at 400Kv control room Sarni.(b) Purchase and installation of GPS time synchronizing equipment for other feeders is under process.(Ref:-T.O proposal No SE(ET&I)PH-III/T&C/PP/96 Sarni Dtd 12.12.2013.)
STPS PH-III400 KV SWITCH YARD
2. AIR CONDITIONERECR: IT IS FOUND OFF FOR NUMERIC RELAYS IT IS ESSENTIAL TO MAINTAIN THE ROOM TEMPERATURE WITHIN TEMPERATURE RANGE OF 23 TO 27 °C.PCR: PCR TEMPERATURE FOUND 31°C. IT IS REPORTED THAT IN SUMMER IT GOES UPTO 34°C. THE NUMERIC GENERATOR PROTECTION RELAYS ARE PROVIDED IN PCR. ITS ROOM TEMPERATURE SHALL ALSO BE MAINTAINED WITH IN TEMPERATURE RANGE OF 25°C.
YES YES (2) Air conditionAt present temperature of 400Kv control room and PCR are maintain at 29 and 28 respectively.
STPS PH-III400 KV SWITCH YARD
3. DG SET
A. DG SET IS AVAILABLE FOR UNIT # 8 & 9 SEPARATELY WITH REMOTE START FROM PCR (PLANT CONTROL ROOM). DG SET IS HAVING CAPACITY OF 610 AMP., 437.5 KVA.B. DG SET FOR # 9: TRAIL RUN TAKEN & OBSERVED PARAMETERS WITHOUT LOAD ARE AS 420V, BUT OSCILATIONS ARE OBSERVED IN THE FREQUENCY IN THE RANGE OF 48.76 TO 49 HZ.C. ANY ONE DG SET OF UNIT # 6,7,8 & 9 ARE EQUIPPED TO FEED EMERGENCY POWER TO ANY UNIT FROM # 6,7,8 & 9.D. DG SET FOR # 8: IT IS UNDER MAINTENANCE.E. THE TRAIL OF DG SET IS BEING TAKEN REGULARLY AS PER RECORD. SHOULD BE AT LEAST WEEKLY AS PER STANDING INSTRUCTION OF SLDC/ WRLDC/WRPC.
YES YES (3) D.G SetBoth the D.G set of Unit No.8 & 9 are healthy and trial is taken on weekly basis.
STPS PH-III400 KV SWITCH YARD
4. 220V DC BATTERY SOURCEA. 216V DC BATTERY SOURCE OF UNIT# 8 OF 1200AH CAPACITYa. POSITIVE TO EARTH 154 VOLTb. NEGATIVE TO EARTH 81 VOLTc. IT WAS COMMISSIONED IN THE YEAR 2004. AS PER CEA CIRCULAR THE REVISED FAIR LIFE IS 5 YEARS ONLY. SUITABLE ACTION FOR THEIR REPLACEMENT IS TO BE INITIATED AT THE EARLIEST.B. 216 V DC BATTERY SOURCE OF UNIT #9 OF 1200AH CAPACITYa. POSITIVE TO EARTH 145 VOLTb. NEGATIVE TO EARTH 95 VOLTc. IT WAS COMMISSIONED IN THE YEAR 2004. AS PER CEA CIRCULAR THE REVISED FAIR LIFE IS 5 YEARS ONLY. SUITABLE ACTION FOR THEIR REPLACEMENT IS TO BE INITIATED AT THE EARLIEST.C. 216 V DC BATTERY SOURCE FOR STATION OF 1200AH CAPACITYa. POSITIV TO EARTH 186 VOLTb. NEGATIVE TO EARTH 56 VOLTc. IT WAS COMMISSIONED IN THE YEAR 2009. AS PER CEA CIRCULAR THE REVISED FAIR LIFE IN 5 YEARS ONLY.D. NO ALARM FOR DC E/F IS PROVIDED IN THE CHARGERS.E. CAPACITY TEST HAS BEEN CONDUCTED IN THE YEAR 2011. RECOMMENDED TO DO THE CAPACITY TEST ONCE IN A YEAR.F. RECORDS INDICATED THE VOLTAGE MEASUREMENT OF INDIVIDUAL CELLS WITH THE CHARGER ON CONDITION. THIS READINGS ARE TO BE TAKEN WITH CHARGER OFF CONDITION ALSO.G. SCALLING IS OBSERVED ON THE TERMINALS OF SOME OF THE BATTERIES. ALSO THE GENERAL CLEANLINESS OF THE BATTERIES AND BATTERY ROOM NEED IMPROVEMENT.
YES YES YES NO NOV'14 (4) 220V D.C. Battery source (A) DC battery source for Unit No.8+ve to Earth: 110V -ve to Earth: 120V (B) DC battery source for Unit No.9 +ve to Earth: 130V -ve to Earth: 110V (C ) DC Station Battery +ve to Earth: 138V -ve to Earth: 102V 1) E/F in STN Battery has been removed .Now, sometimes there is floating E/F and is being monitored and shall be removed.2) C-10 test of 1200 AH Battery bank of Unit #8 	 has been conducted in AUG 2013.and SEP 2012 respectively. The same shall be conducted in next available opportunity/AOH.3) Normally battery bank replacement is proposed on the basis of C-10, after calculating the remaining useful AH capacity of bank. However, it is our past experience that tubular Battery banks are replaced after useful service of 10-12 yrs.4) Normally individual cell voltage on float condition are taken however it is in practice that during shut down of units battery charger is switched off and individual cell readings are taken .5) Scaling on battery terminals of cells removed and cleaning of battery is done on regular basis.
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT PROCUREMENT (CATEGORY-A)
DEFICIENCIES INVOLVEING PROCUREMENT (CATEGORY-B)
Page 34 of 42
FORMAT FOR PROTECTION AUDIT DEFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
STPS PH-III400 KV SWITCH YARD
5. SYNCHROSCOPEA. SYNCHRONISING TROLLY WITH CHECK RELAY IS AVAILABLE IN ECR.B. PANEL HINGED SYNCHROSCOPE IS PROVIDED IN MCR FOR GENERATOR & UAT.
YES YES (5) Synchroscope.Synchronizing Trolley is available in 400Kv control room and is in healthy condition.Panel synchroscope is available in PCR for Gen and UAT and is healthy.
STPS PH-III400 KV SWITCH YARD
6. 400KV FEEDERSA. 400KV FEEDERS NAME HAS NOT BEEN REVISED AFTER THE REORIENTATION OF LINES SINCE LONG.B. 1000 MILLI-SECOND TIME SETTING HAS BEEN ADOPTED FOR ZONE 3. IT SHALL BE 700 MILLI SECOND FOR ZONE 3 AS PER NEW GUIDE LINES. THE SAME MAY BE REVIEWED.C. SINGLE PHASE AUTO RECLOSING DEAD TIME & RECLAIM TIME ADOPTED AS UNDER:ISP 1 SEC(DEAD TIME) 6SEC (RECLAIM TIME)SEONI 0.6 SEC(DEAD TIME) 6SEC (RECLAIM TIME)KORADI 0.5 SEC(DEAD TIME) 25SEC (RECLAIM TIME)ITARSI 0.5 SEC(DEAD TIME) 25SEC (RECLAIM TIME)
AS PER STANDERD PRACTICE. 0.7 SEC DEAD TIME & 15 SEC RECLAIM TIME IS ADOPTED . THE SAME MAY BE REVIEWED AND REVISED.
D. LBB TIME SETTING OF 240 MILLI SEC IS ADOPTED FOR ISP, SEONI, KORADI BUS COUPLER AND BUS TIE. AS PER STANDERED PRACTICE 200MILLISEC TIME SETTING IS RECOMMENDED. THE SAME MAY BE REVIEWED AND REVISED.E. IN GT AND ICT, DEFINITE TIME O/C PROTECTION IS NOT AVAILABLE. AS PER STANDED PRACTICE DTOC1 & DTOC2 SHOULD BE ADOPTED.F. IN 400KV LINES MAIN I & MAIN II DISTANCE PROTECTION IS USED. AS PER CBIP GUIDELINES, ADDITIONAL IDMT DIRECTIONAL EARTH FAULT RELAY SHOULD ALSO BE INSTALLED.G. IN THE PROTECTION SCHEMES ELECTRO-MECHANICAL & STATIC RELAYS ARE IN USE. AS PER THE GRID NORMS, AVAILABILITY OF OSCILOGRAPHY AND FAULT ANALYSIS, EVENT RECORING ETC. ARE COMPULSORY, THEREFORE THE NUMERICAL RELAYS HAVING ABOVE INBUILT FACILITIES MAY BE PROVIDED.
YES YES (6) 400Kv feedersA) The names of 400KV feeders in control room as well as in switchyard have been revised.B) (i)Time setting of Sarni-ISP feeder is revised and adopted as per recommendation of audit team and are as follows:Zone-2:-300 msZone-3-700 ms (ii) Time setting of Sarni-Koradi, Sarni-Itarsi and Sarni-Seoni feeder is decided by PGCIL and are as follows:Zone-2:-300 msZone-3-1000 ms
C) Single phase auto reclosing dead time and reclaim time of 400KV feeder is as follows:- Dead time Reclaim timeSarni-ISP Sarni end 0.7Sec 15Sec Sarni-Seoni Sarni end 0.7Sec 15Sec *Sarni-Koradi Sarni end 0.5Sec 25Sec *Sarni-Itarsi Sarni end 0.5Sec 25Sec *Settings adopted by PGCIL.
STPS PH-III400 KV SWITCH YARD
7. ISP FEEDERA. MAIN BREAKER HAS FAILED AND IS OUT SINCE 04.08.2012B. REVERSE ZONE IS NOT PROVIDED IS REL 521 RELAY. THE ZONE CALCULATIONS MAY BE REVISED.C. OVER VOLTAGE PROTECTION HAS NOT BEEN ENABLED IN REL521 NUMERICAL RELAY.D. OVER VOLTAGE STAGE I AND STAGE II PROTECTION HAS BEEN PROVIDED THROUGH SEPARATE RXEG-21 RELAYS.E. OVER VOLTAGE STAGE II SETTING HAS BEEN ADOPTED AS 130% . THIS SHOULD BE REVIEWED.
YES YES YES NO NOV'14 ( FOR POINT B,C&D)
7) ISP FEEDERA) Main breaker has been commissioned and taken in service on dtd 25.10.13 at 19.19 hrs
B,C&D) Proposal has been processed for availing services of M/s ABB for testing of REL521 and revision of settings of reverse zone and overvoltage protection (Ref: T.O No SE/ET&I/III/T&C/WP/101,Sarni dtd 21.12.13) .Overvoltage setting stage-I and stage-II have been provided through separate RXEG-21.
E) Overvoltage stage-II setting provided by MPPTCL and shall be revised after consulting MPPTCL (As O/V stage II is 150% in PGCIL Feeders i.e. Koradi and Itarsi)
STPS PH-III400 KV SWITCH YARD
8. REACTORA. 63 MVAR BUS REACTOR NO. 1 IS OUT SINCE 24.05.2005.B. NEW REACTOR IS AVAILABLE. IT SHOULD BE COMMISSIONED EARLY.C. 50 MVAR SEONI LINE REACTOR IS OUT DUE TO INCREASED FURAN LEVELS.
FOR POINT C: YES
YES YES NO NOV'14 8) REACTOR
A&B ) NIT issued for installation and commissioning of 63 MVAR Bus Reactor No.1.C) 50MVAR Seoni line reactor still is in service .(Earlier it was Sarni-Bhilai feeder and after LILO at SEONI the line length has reduced)
STPS PH-III400 KV SWITCH YARD
9. 400 KV BUS BAR PROTECTION ABB MAKE STATIC BUS BAR PROTECTION IS IN SERVICE. NEW ALSTOM MAKE NUMERICAL BUS BAR PROTECTION HAS BEEN COMMISSIONED BUT KEPT OUT OF SERVICE. IT SHALL PUT IN THE OPERATION AT THE EARLIEST.
YES YES 9) 400KV BUS BAR PROTECTION
New ALSTOM make numerical bus bar protection is in service.
STPS PH-III400 KV SWITCH YARD
10. FIRE PROTECTION OF TRANSFORMERA. MULSIFIRE TYPE FIRE PROTECTION SYSTEM IS OUT OF ORDER.B. SUITABLE OF NITROGEN INJECTION FIRE PROTECTION SYSTEM MAY BE EXPLORED.
YES NO NOV'14 10) FIRE PROTECTION OF TRANSFORMER. Offer for nitrogen injection fire protection system has been called.Proposal shall be processed after receipt of the offer.
Page 35 of 42
NAME OF S/s IDENTIFIED FOR PROTECTION AUDIT
S/s VOLTAGE
NAME OF THIRD PARTY PROTECTION AUDIT AGENCY
DATE ON WHICH AUDIT CONDUCTED
OBSERVATIONS OF PROTECTION AUDIT REMARK
YES/NOWHETHER ATTENDED YES/NO
IF NOT ATTEND, REASON
YES/NOWHETHER ATTENDED YES/NO
IF NO, EXPECTED DATE TO
ATPS#5 220 KV
220 kv static Bus Bar Protection scheme make Areva,type RADSS is available at site since 2000,but awaited for commissioning.
YES NO 15-16 As per M/s ABB all relays & complete scheme RADSS is obsolete & beyond repair, the proposal for sanction of estimate of Numerical Bus Bar Protection scheme submitted to C.E.(Gen) ATPS MPPGCL Chachai.
ATPS#5 220 KV
LBB Protection is not provided for any element and it is suggested to take in service at earliest
YES NO 15-16 As per M/s ABB , LBB is obsolete & beyond repair, the proposal for sanction of estimate of LBB protection submitted to C.E.(Gen) ATPS MPPGCL Chachai.
ATPS#5 220 KV
On 220 kv Anupur I & II and 220 KV Jabalpur II feeders,Static DPR is provided as Main I protection and no back-up protection is provided and it is suggested to provide a main II protection or back-up protection at earliest.
YES YES COMPLIED On 220 KV Anuppur I & II, 220 KV Jabalpur II feeders, AREVA P442 DPR had been commissioned as main II Protection.
ATPS#5 220 KV
Auto Reclosure feature is provided for 220 KV Birshingpur - 3, Jabalpur I & II and Sidhi feeders only. For other 220 KV feeders Auto Reclose facility is available but not be commissioned due to non availability of PLCC protection couplers.
YES NO नवम्बर-14 Auto Reclosure feature is provided for 220 KV Birshingpur - 3, Jabalpur I & II and Sidhi feeders only. For other 220 KV feeders Auto Reclose facility is available but not be commissioned due to non availability of PLCC protection couplers. For 2 Nos feeder PLCC panel received & awaited for commissioning engineer.
ATPS#5 220 KV
DR is available for 220 kv Birsinghpur-3 and sidhi feeders and for the other element DR is to be connected as suggested by the committee.
YES YES नवम्बर-14 Numerical DPR is available in all 220KV feeders they have built in feature of SER / DR.
ATPS#5 220 KV
REF protection not provided on 220/132 kv ICTs,it is suggested to provide the same.
132 KV switchyard feeders will be shifted to MPPTCL 220/132 KV Anuppur sub station & complete 132KV switchyard is to be dismantled very soon. Hence no need of REF.
DEFICIENCIES THAT CAN BE CORRECTED WITHOUT
PROCUREMENT (CATEGORY-A)
DEFICIENCIES THAT CAN BE CORRECTED WITH
PROCUREMENT (CATEGORY-B)
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
Page 36 of 42
FORMAT FOR PROTECTION AUDIT DEFFICIENCIES/OBSERVATIONS COMPLIANCE
NAME OF UTILITY: MADHYA PRADESH POWER GENERATING Co. Ltd.
ATPS#5 220 KV
Hathway make GPS time synchronising system is provided but connected on 220 KV Birsinghpur-3 & Sidhi feeders only, all other relays of feeders & transformers are to be connected.
YES NO Hathway make GPS time synchronising system is provided but connected on 220 KV Birsinghpur-3 & Sidhi feeders only, all other relays of feeders & transformers is under process.
ATPS#5 220 KV
One set of 600 AH battery set is provided for switch yard, which is very old and in poor condition its need early replacement.Battery Capacity test could not be done due to some opertional problem.
YES NO 15-16 One set of 600 AH battery set is provided for switch yard, which is very old and procurement of same is under process.
ATPS#5 220 KV
A stand by DC supply is available at switchyard to power plant,DC load of 220 kv panels are running on this supply.It is recommended by committee to provide separate DC supply arrangement for power plant and switchyard.
YES NO 15-16 separate DC supply provide after commissioning of new Battery Set .
ATPS#5 220 KV
DC leakages detected in both the DC supply arrangement ,DC positive is found earthed with very low resistance and it is advised to rectify the same.
YES YES COMPLIED DC leakage had been rectified
ATPS#5 220 KVOld type 220kv LA are connected on 220/132 kv 63 MVA ICT,it is suggested to replace it by gapless Lightining Arrestor
YES YES COMPLIED old type 220KV LA of 220/132 KV 63 MVA ICT had been replaced.
ATPS#5 220 KV
ASEA make 132 kv MOCBs are in service,which is very old and inaquate as per the increased fault MVA of the site.It is suggested to replace same
YES NO 132 KV switchyard feeders will be shifted to MPPTCL 220/132 KV Anuppur sub station & complete 132KV switchyard is to be dismantled very soon. Hence no need to replaced the MOCB.
Page 37 of 42
S.No Obervation of Protection audit Remarks
Yes/NoWhetherAttended Yes/No If not attended ,reason
1
Time delay setting for Zone-3 is given as500ms, which is very low and it should berevised as per CBIP recommendation or in co-ordination with MPPTCL setting for Zone-3 thatis 700ms.
YES YES Non ApplicableTime delay settings changedfrom 500ms to 700ms on20.09.2013.
2 Thermovision survey/thermal scanning is beingdone annually, it should be done monthly.
YES YES Non Applicable Thermovision scanning isbeing done regularly
3
As per latest guidelines Directional Earth faultProtection is to be provided on 400 KV lines .Itcan be provided through existing numericalDPRs. It is suggested to provide the same
YES YES Non Applicable
Matter is undercommunication with otherend substations and theirsuggestion are sought for thesettings for directional E/Fprotections .Reply is stillawaited
4 PartialDC leakage observed in battery sets ofpower plant . It is suggested to rectify the same
YES YES Non Applicable Problem rectifiied
S.No Obervation of Protection audit Remarks
Yes/No
WhetherAttendedYes/No
If no, expected date toattend
1
In general voltages observed around 420KV to430KV when generating machines are off.Therefore to control overall high voltageproblem it is suggested to provide either 2x50MVAr shunt reactors on 400KV Bus at ISP or50 MVAr line reactors should be provided on400KV ISP-Sarni (200 Kms) line and on 400KVISP-Nagda (189 Kms) line on both the ends.
YES YES 2015 Case for installation of125MVAr Bus reactor isunder pre tendering stage .
2
On observation of higher voltages on R-phaseof 400 KV Sarni circuit, as a precautionarymeasure it is suggested to replace the R-phase CVT of Sarani circuit by spare CVTavailable at site to eliminate the possibility of
YES YES Non Applicable CVT of R-phase of ISP-Sarnifeeder at ISP end replacedby spare CVT on 06.06.2013.
3
Battery Capacity test carried out by keepingbattery charger off for 1hour, a voltage drop of6percent observed . Three battery sets werecommisioned in 2003 and have completedalmost 10 years . Further suitability of thesebattery sets should be confirmed by consultingmanufacturere and bt conducting longduration/high current discharge capacity test
YES YES जून-14 The complete Battery bankwrere overhauled in 2010 -11by the manufacturer and itgauaranteed the battery lifefor anothrer five years. Matterof conducting long duration/high current dischargecapacity test is under process
4
Tandelta and capacitance test of tranformerbushings is being done once in three year .Itshould be done once in a year
YES YES Matter is taken up with themanufacturer . Reply isawaited. Action shall betaken up accordingly onreciept of OEM reply
Deficiencies that can be corrected withoutprocurement (Category-A)
Deficiencies involving procurement (Category-B)
INDIRA SAGAR POWER STATION (8X125=1000 MW)PROTECTION AUDIT DEFICIENCIES AND OBSERVATION COMPLIANCE
SUBSTATION VOLTAGE
22-23-Feb-2013MPPTCL & MPSLDC members
(Category-B)
400 KV
Date of AuditNAME OF PROTECTION AUDIT AGENCY
(Category-A)
Page 38 of 42
Name of S/S identified for protection Audit
S/S voltage
Name of Third party
Protection Audit agency
Date on which Audit Conducted
Observations of protection Audit Remarks
Yes/NoWhether attended
yes/No
If not attended
reasonYes/No
Whether attended
yes/No
If no, expected date to attend
1Relay for Generators, Generator Transformer and Line Protections are not time synchronized with GPS
Yes Yes NoRelays have been synchronized with GPS installed for automation system.
2. Auto Reclosing for all 220 k V lines is disabled
The matter has been discussed with MPPTCL and as per their view it is not required for the system.However,the same may be reviewed during third party protection audit.
Yes Yes NoOver voltage stage-2 is activated in Main-2 relay(REL-316) for line protection
Yes
For Main-1 i.e. REL(511) The provision for second stage is not available.The matter is under pursuance with ABB for providing the same.
4.Line Protection main-1 & main-2 are having distance protection.In such cases CBIP recommends for additional directional IDMT Earth Fault relay.
The protection scheme is under study and will be implemented after recommendiation of Third Party Protection audit of Omkareshwar Power Station,if required.
5.Generator backup Impedance protection is provided with time delay of 3 sec whereas it is recommended the same may be 2 sec max.
The setting will be reviewed after Third Party Protection audit of Omkareshwar Power Station.
Battery cells of 48V bank-1&2-Most of the cell having low specific gravity.
Yes YesThe specific gravity is maintained as per standard.
Most of the protection relay needed to be tested regularly.
YesTesting of Protection relay is carried out regularly. However, testing of Numerical relay for units shall be carried out shortly.
PSB setting for allowing tripping in Zone-1 fault may be reviewed.
Yes YesThe setting will be reviewed after Third Party Protection audit of Omkareshwar Power Station.
Annexure-I
NHDC Ltd.
(8 65MW) ,Omkareshwar Power
Station
3.Only Stage-1 Overvoltage protection (110%-5sec) is only provided,however whereas two stages of Overvoltage protection is recommended by CBIP.
Internal Protection
Audit220 k V
05/03/2013 T0 06/03/2013
Deficiencies involving procurement (category -B)
Deficiencies that can be corrected without procurement (Category-A)
PROTECTION AUDIT DIFFICIENCIES/OBSERVATIONS COMPLIANCEName of Utility : OMKARESHWAR HYDEL POWER STATION.
Page 39 of 42
Name of Utility: JP Bina
Name of S/S identified for protection Audit
S/S voltage
Name of Third party Protection Audit agency
Date on which audit conducted
Observation of protection Audit
Remark
Yes/NoWhether attended Yes/No
If not attended,re
asonYes/No
Whether attended Yes/No
If not attended,re
ason
1)UAT 1&2 for unit 1 still not commissioned
Yes Yes NA NA NA NA UAT 1&2 for unit 1 commissioned
2) GPS system not commissioned
Yes Yes NA NA NA NA GPS system of whole station commissioned
3) 2no. Of High Mast tower installed near 400KV transfer bus in the switchyard
No YES NA NA NA NA Two no high mast has been erected at the
corner of s/s
4)DR&ER is provided in SCADA system.
Yes yes NA NA NA NA It is available in our SCADA system
5)Battery cell voltage need to be recorded with respective charger in OFF condition.
Yes yes NA NA NA NABattery cell voltage is now being recorded
respective to charger in off condition.
6)Directinal E/F relay setting 1 sec. for PGCIL 1.2 Sec.for MPPTCL line is provided .This is on higher side,to be reviewed& revise
Yes
Comments from our consultant M/S TCE is given
NA NA NA NA
Answer from our consultant M/S TCE : Directional e/f is provided to protect the
system from high impedance line faults where fault currents are low. So 1 sec operating time is sufficient and can be used for both the lines. Decrease in the operating time may cause it to
interfere with 3rd zone time settings.
7)Over voltage satting for 400kv PGCIL&MPPTCL line are not as per CBIP recomendetion(CBIP REV 274).
Yes
Comments from our consultant M/S TCE is given
NA NA NA NA
Our consultant TCE's reply :Please note that an instantaneous overvoltage setting of 130% phase to phase can be used. As per standard
practice lines are capable of withstanding 150% of highest system voltage at power
frequency for 1 minute. So above settings are ok.
FORMAT FOR PROTECTION AUDIT DIFFICIENCIES/OBSERVATIONS COMPLIANCE
14/02/2013-15/02/2013
SLDC,Jabalpur400 KVJaypee Bina
Thermal Power Plant
Deficiencies that can be corrected without procurement(Category-A)
Deficiencies involving procurement(Category-B)
Page 40 of 42
Name of Utility: JP BinaFORMAT FOR PROTECTION AUDIT DIFFICIENCIES/OBSERVATIONS COMPLIANCE
8)GT&ST fifth harmonics blocking is done for 20%. This may be studies & revised.
Yes
Comments from our consultant M/S TCE is given
NA NA NA NA
Reply from consultant TCE ;As per recommendation from relay manuals, setting
of 15 to 30 % is used for fifth harmonic blocking. As per our standard 20% is used fifth
harmonic blocking.
9)It is observed that for ganretor protection under frequency relay trip setting 48.5Hz for 5sec.& over frequency relay trip setting 51.0Hz for 5sec. Is taken,the same may be reviewed.
Yes
Comments from our consultant M/S TCE is given
NA NA NA NA OUR consultant reply Frequency protection
is used mainly for alarm and as per our practice a time delay of 5 sec is adequate.
10)In turn protection has not been provided,through it is recommended for Generatormore than 100 MVA.
Yes
Comments from our consultant M/S TCE is given
NA NA NA NA
Our consultant TCE's reply ;As per our standard practice, inter-turn protection is
provided only when specifically recommended by the manufacturer.
11)Periodical testing of relays & yard equipment must be done.
Yes NA NA NAPeriodical testing of relay & yard equipments -
it will be adhive too.
Page 41 of 42
1 Directional e/f relay (time multiplier) setting 1 secfor PGCIL & 1.2 sec for MPPTCL line is provided.This is on higher side, to be reviewed & revised.
Directional e/f is provided to protect the system from highimpedance line faults where fault currents are low. So 1 secoperating time is sufficient and can be used for both the lines.Decrease in the operating time may cause it to interfere with 3rdzone time settings.
2 Over voltage setting for 400 kV PGCIL &MPPTCL lines are not as per CBIPrecommendations (CBIP rev 274).
Please note that an instantaneous overvoltage setting of 130%phase to phase can be used. As per standard practice lines arecapable of withstanding 150% of highest system voltage at powerfrequency for 1 minute. So above settings are ok.
3 GT & ST fifth harmonic blocking is done for 20%.This may be studied & revised.
As per recommendation from relay manuals, setting of 15 to 30 %is used for fifth harmonic blocking. As per our standard 20% isused fifth harmonic blocking.
4 It is observed that for generator protection underfrequency relay trip setting 48.5 Hz for 5 sec &over frequency relay trip setting 51.0 Hz for 5 secis taken, the same may be reviewed.
Frequency protection is used mainly for alarm and as per ourpractice a time delay of 5 sec is adequate.
5 In turn protection has not been provided, though itis recommended for generator more than 100 MVA.
As per our standard practice, inter-turn protection is provided onlywhen specifically recommended by the manufacturer.
RegardsS.K. Chakraborty-------------------------------------------------------Jaypee Bina Thermal Power Plant(A Division of Jaiprakash Power Ventures Limited)Rajiv Nagar, Post Box No. 1,Sub P.O. AgasodTehsil & P.O: Bina-470113Distt. Sagar (M.P)Phone: 07580-277101-3Fax : 07580-277200Website: www.jalindia.com
Disclaimer:This email and any files transmitted with it may be confidential and intended solely for the use of the individual or entity to whom theyare addressed. If you are not the intended recipient be advised that any unauthorized use, disclosure, copying, distribution or the taking of anyaction in reliance on the contents of this information is strictly prohibited and you have received this email in error please notify the sender anddelete this email. The recipient should check this email and any attachments for the presence of viruses, Trojans, spy wares and the companyaccepts no liability for any damage caused by the same. This email doesn't serve as a legal notification until attached with supportingdocuments. Please note that any views or opinions presented in this email are those of the author and do not necessarily represent those of JILInformation Technology Ltd. (www.jilit.co.in)
2 attachments
Internal Protection Audit.pdf10K
award letter to cpri for third party audit Attacement (2).pdf1208K
- :// . . / /? =2& = 9 2 3& ...
2 2 28-04-2014 13:06Page 42 of 42