ESS Cryogenic System Process Design
Philipp ArnoldSection Leader Cryogenics
www.europeanspallationsource.seCEC – ICMC 2015
June 29, 2015
![Page 2: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/2.jpg)
2
View of the Southwest in 2025
MAX IV
ESS
• Max IV – a national research facility, under construction, opens up in 2016
• Science City – a new part of town
Lund(113 500)
Malmö(309 000)
Copenhagen(1 200 000)
![Page 3: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/3.jpg)
Cryogenics at ESS
Coldbox building Compressor building
![Page 4: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/4.jpg)
4
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 5: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/5.jpg)
Pure Helium Gas Storage 1
20 m3 LHe Tank
Standalone Helium Purifier
Helium Recovery System
Pure Helium Gas Storage 2
AcceleratorCryoplant
Test & Instrument Cryoplant
5 m3 LHe Tank
Target ModeratorCryoplant
LHe Mobile Dewars
Test Stand Distribution
System
Instruments & Experiments
LN2 Storage Tanks
LN2 Mobile Dewars
Cryogenic Distribution
System
Cryomodules Cryomodule Test Stand
Target Distribution
System
Hydrogen Circulation Box
Hydrogen Moderator
5
(1) System overview
![Page 6: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/6.jpg)
6
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 7: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/7.jpg)
7
(2.1) The Accelerator cryogenic setup
![Page 8: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/8.jpg)
8
(2.1) The Accelerator cryogenic setup
![Page 9: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/9.jpg)
9
(2.2) Cryomodule cooling at 2K
Production of 2 K helium in 2 K heat exchanger and a sub-sequent Joule-Thomson valve in each of the cryomodule–valve box assemblies
![Page 10: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/10.jpg)
10
(2.3) The Accelerator cryoplant dutyspec
Type Temperature range
Max. loadStage 1
Max. loadStage 2
Static and dynamic load in CMs 2 K 1850 W 2230 W
Recuperators and CDS load 2 – 4 K 630 W 830 W
Thermal shields 33 – 53 K 8 550 W 11 380 W
Coupler cooling 4.5 – 300 K 6.8 g/s 9.0 g/s
![Page 11: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/11.jpg)
11
(2.4) The Accelerator cryogenic load
10 15 20 25 30 35 40 45 50 55 600
500
1000
1500
2000
2500
3000
3500ACCP 2K heat load vs number of installed CMs
Beam ON w/ safety factorsBeam ON w/o safety factorsBeam OFF w/ safety factorsBeam OFF w/o safety factors
Number of Cryomodules
ACCP
2K
heat
load
, W
Beam commissioning
Medium beta CM complete
High beta CM 1-11 complete
Optimus+High beta CM com-
plete (Stage 1)
Optimus+ contin-gency
High beta CM com-plete (Stage 2)
![Page 12: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/12.jpg)
12
(2.5) The Accelerator cryoplant process
300 K
115 K
70 K 53 K 33 K
24 K
9 K
6 K
4.5 K
Compressor skids with 3 identical screws
6 turbo expanders
Thermal shield ~43K
Connection to 20 m3 tank
3 cold turbo compressors
VFD for SPMP and LPMP
![Page 13: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/13.jpg)
13
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 14: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/14.jpg)
1414
Proton beam windowModerator and reflector plugs
Target wheel
Neutron beam windows
Neutron beam extraction
(3.1) The Target Monolith
![Page 15: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/15.jpg)
15
(3.2) The Target Monolith inside
Target wheel
Proton beam windowModerator and reflector plugs
![Page 16: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/16.jpg)
16
Target wheel
Bottom MR plug
Proton beam
Top MR plug
(3.3) Moderator-Reflector system
![Page 17: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/17.jpg)
17
(3.4) The Target cryogenic load
0 1 2 3 4 5 60
5
10
15
20
25
30
35TMCP 15-20K heat load vs. beam power
Load w/ safety factorsLoad w/o safety factors
Beam power, MW
TMCP
hea
t loa
d, k
W
Beam OFFBeam
commissioningMedium beta CM complete
High beta CM 1-11 complete
Nominal designHigh beta CM com-
plete
![Page 18: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/18.jpg)
18
(3.5) The Target Moderator cryoplant process (proposed by ESS)
300 K
90…120 K
60…80 K
23 K
20 K 15K
Helium buffers with “low” and “high” pressure region
Turbine for HXs
2 screw compressor skids
Intermediate “heating” of feed flow upstream turbines
Helium
20.5 K
17.0 K
Hydrogen
2 expansion turbines
Multi purpose ambient heater
![Page 19: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/19.jpg)
19
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 20: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/20.jpg)
20
(4.1) Where sits the helium
1) ACCP: Over 2000 kg in Cryomodules and distribution system
NO CD0
500
1000
1500
2000
2500
Helium mass in CMs & CDS w/o shield[kg]
Vapour Helium
Liquid Helium
2) TMCP: Over 350 kg in Cryotransferline between helium and hydrogen box
3) TICP: About 600 kg in open loop system for neutron instruments
2 x 335 m x 4”
![Page 21: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/21.jpg)
21
(4.2) Helium storage
1) Pure medium pressure tanks– 19 x 67 m3
– Theoretically up to 3.5 tons– Pressure restrictions for TICP and TMCP– Effectively ~ 3 tons
2) Liquid helium storage tank– 20 m3
– When filled to 80% another 2 tons– Used as ”2nd fill” and help in transient modes
(cool-down, pump-down)
3) Impure high pressure tanks or bundles– 12 m3
– Nearly 300 kg – Used as buffer in recovery system
![Page 22: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/22.jpg)
22
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 23: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/23.jpg)
23
(5.1) Definitions
Kinetic Experiments
Flux Integrated Experiments
A reliability of at least 90% should be provided for the duration of the measurement.The measurement will be considered failed when the beam power is reduced to less than 50% of the scheduled power for more than 1/10th of the measurement length.
For the duration of the experiment at least 90% of the experiments should have at least 85% of beam availability and on average more than 80% of the scheduled beam power. The beam will be considered unavailable when its power is less than 50% of its scheduled power for more than one minute.
At least 90% of the users should receive a neutron beam that will allow them to execute the full scope of their experiments
![Page 24: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/24.jpg)
24
(5.2) Anticipated failure rates
Downtime duration Accelerator Target ICS SI
1 second - 6 seconds 120 per day - - -
6 seconds - 1 minute 40 per day - - -
1 minute - 6 minutes 4.8 per day - 40 per year -
6 minutes - 20 minutes 1.7 per day - 10 per year -
20 minutes - 1 hour 90 per year 2 per year 4 per year 3 per year
1 hour - 3 hours 29 per year 1 per year 2 per year 1 every 2 years
3 hours - 8 hours 15 per year 1 every 2 years 1 every 2 years 1 every 2 years
8 hours - 1 day 5.5 per year 1 every 2 years 1 every 5 years 1 every 3 years
1 day - 3 days 2.3 per year 1 every 2 years - 1 every 10 years
3 days - 10 days 1 every 5 years 1 every 20 years - -
more than 10 days 3 every 40 years 1 every 40 years - -
Not relevant for the
cryogenic system
![Page 25: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/25.jpg)
25
(5.3) Backup compressor system
![Page 26: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/26.jpg)
26
Outline
1) System Overview
2) Accelerator Load and its Cryoplant
3) Target Moderator Load and its Cryoplant
4) Helium Management and Storage
5) Reliability and Availability
6) Energy
![Page 27: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/27.jpg)
27
(6.1) Energy high level goals
![Page 28: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/28.jpg)
28
(6.2) Heat recovery
• No elevated oil or helium temperatures out of compressor suppliers specs
• More efficient heat exchangers, especially oil coolers
• Dedicated cooling water circuit for cryoplant
• Cooling function has priority over heat recovery
Motor
Middle temperature
Supply
Oil separator
Helium compressor
Helium cooler
Oil cooler
Helium
High temperature
Return
Middle temperature
Return
25°C
30°C
27°C
40°C
73°C
32°C
32°C 65°C
37°C
70°C
Oil pump
![Page 29: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/29.jpg)
29
(6.3) Energy efficiency and sustainability
• Focus on process design and optimization
• Good match between plant and load by staging, dual equipment, VFDs for low pressure machines
• Focus on turn-down scenarios
• Incentive OPEX approach in ACCP and TMCP tender evaluation and contracts as well
• As much as possible helium recovery
![Page 30: ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015](https://reader036.vdocuments.us/reader036/viewer/2022062804/56649dc35503460f94ab5abf/html5/thumbnails/30.jpg)
30
Conclusions
• The conceptual design of the cryogenic system at ESS is finished
• One cryoplant is ordered, one out for quote, one to 90% specified ESS is rolling
• High level goals in terms of energy efficiency and sustainability can be met
• Continued work on meeting reliability and availability requirements