ERCOT Monthly Operational Overview(January 2019)

ERCOT PublicFebruary 15 2019

Grid Planning amp Operations

PUBLIC

Summary ndash January 2019

Operationsbull The preliminary Settlements hourly peak demand of 54670 MW on January 24 was

higher than the day-ahead mid-term load forecast peak of 50920 MW for the sameoperating hourndash The operational instantaneous peak demand was 55362 MW (telemetry)

bull Day-ahead load forecast error for January was 265bull ERCOT issued two notifications

ndash One OCN issued for potential extreme cold weatherndash One Advisory issued due to DAM timeline deviation

Planning Activitiesbull 489 active generation interconnection requests totaling 96744 MW including 39222

MW of wind generation as of January 31 2019 Twenty-four additional requests and anincrease of 4823 MW from December 31 2018

bull 21751 MW wind capacity in commercial operations as of January 31 2019

Per Demand and Energy Report as of 20719

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 2: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

Grid Planning amp Operations

PUBLIC

Summary ndash January 2019

Operationsbull The preliminary Settlements hourly peak demand of 54670 MW on January 24 was

higher than the day-ahead mid-term load forecast peak of 50920 MW for the sameoperating hourndash The operational instantaneous peak demand was 55362 MW (telemetry)

bull Day-ahead load forecast error for January was 265bull ERCOT issued two notifications

ndash One OCN issued for potential extreme cold weatherndash One Advisory issued due to DAM timeline deviation

Planning Activitiesbull 489 active generation interconnection requests totaling 96744 MW including 39222

MW of wind generation as of January 31 2019 Twenty-four additional requests and anincrease of 4823 MW from December 31 2018

bull 21751 MW wind capacity in commercial operations as of January 31 2019

Per Demand and Energy Report as of 20719

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 3: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Summary ndash January 2019

Operationsbull The preliminary Settlements hourly peak demand of 54670 MW on January 24 was

higher than the day-ahead mid-term load forecast peak of 50920 MW for the sameoperating hourndash The operational instantaneous peak demand was 55362 MW (telemetry)

bull Day-ahead load forecast error for January was 265bull ERCOT issued two notifications

ndash One OCN issued for potential extreme cold weatherndash One Advisory issued due to DAM timeline deviation

Planning Activitiesbull 489 active generation interconnection requests totaling 96744 MW including 39222

MW of wind generation as of January 31 2019 Twenty-four additional requests and anincrease of 4823 MW from December 31 2018

bull 21751 MW wind capacity in commercial operations as of January 31 2019

Per Demand and Energy Report as of 20719

3

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 4: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019

4

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 5: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019

5

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 6: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOTrsquos CPS1 Monthly Performance ndash January 2019

6

CPS1 12 Month Rolling Average = 17569

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 7: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Monthly Peak Actual Demand ndash January 2019

Preliminary for latest two months of the current year

7

Monthly Peak Actual Demand = 54670 MW 12419 HE 0800

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 8: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Monthly Minimum Actual 15-Minute Demand ndash January 2019

Preliminary for latest two months of the current year

8

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 9: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Day-Ahead Load Forecast Performance ndash January 2019

9

Mean Absolute Percent Error (MAPE) for ERCOT Mid-Term Load Forecast (MTLF) Run at 1400 Day Ahead

2016MAPE

2017MAPE

2018MAPE

2019MAPE

January 2019MAPE

AverageAnnual MAPE

262 255 234 265 265

LowestMonthly MAPE

194 169 164 265LowestDailyMAPE

063Jan 11

HighestMonthly MAPE

386 407 366 265

Highest DailyMAPE

725Jan 25

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 10: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Reliability Unit Commitment (RUC) Capacity by Weather Zone ndashJanuary 2019

10

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 11: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Generic Transmission Constraints (GTCs) ndash January 2019

11

GTC A transmission flow limit more constraining than a Transmission Elementrsquos normal limit established to constrain flow between geographic areas of the ERCOT Transmission System that is used to enforce stability and voltage constraints that cannot be modeled directly in ERCOTrsquos transmission security analysis applications

Note This table lists how many times a constraint has been activated to avoid exceeding a GTC limit it does not imply an exceedance of the GTC occurred

GTCsJan-18 Nov-18 Dec-18 Jan-19 Last 12 Months Total

DaysDays Days Days DaysGTCs GTCs GTCs GTCs (Feb 18 ndash Jan 19)

North ndash Houston 0 0 0 0 7

Valley Import 5 0 0 0 6

Panhandle 24 19 17 21 233

Red Tap 0 3 5 0 8North Edinburg ndash

Lobo 0 0 0 0 0Nelson Sharpe ndash

Rio Hondo 11 0 0 0 43

East Texas 0 0 0 0 0

McCamey - 0 0 0 0

Treadwell - 0 0 0 0

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 12: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Advisories and Watches ndash January 2019

bull One OCN issued for a potential extreme cold weather for operating day 122019 and 132019

ndash Issued 1230

bull One Advisory issued for DAM timeline deviationndash Issued 0128

12

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 13: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Lake Levels Update ndash February 1 2019

13

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 14: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Planning Summary ndash January 2019

bull ERCOT is currently tracking 489 active generation interconnection requests totaling 96744 MW This includes 39222 MW of wind generation

bull ERCOT is currently reviewing proposed transmission improvements with a total cost of $5277 million (as of January 31 2019)

bull Transmission Projects endorsed in 2019 total $34 million (as of January 31 2019)

bull All projects in engineering routing licensing and construction total approximately $603 billion (as of October 15 2018)

bull Transmission Projects energized in 2018 total about $144 billion (as of October 15 2018)

14

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 15: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Mapping of Counties to ERCOT Zones ndash January 2019

15

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 16: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019

16

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 17: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Wind Generation ndash January 2019

17

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 18: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Solar Generation ndash January 2019

18

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 19: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Generation Interconnection Activity by Fuel ndash January 2019

19

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 20: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Generation Interconnection Activity by Project Phase ndash January 2019

20

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 21: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

Market Operations

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 22: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Day-Ahead Schedule (Hourly Average) ndash January 2019

22

0

10000

20000

30000

40000

50000

60000

MW

Hour Ending

Scheduled Energy Only Offer

Scheduled Three-part Offer

DAM Energy Purchase

RT System Load

Liquidity and activity are normal in the Day-Ahead Market

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 23: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndashJanuary 2019

23

0

20

40

60

80

100

120Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

The dotted lines represent the bounds for major outliers

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 24: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

DAM and RTM Price Convergence ndash January 2019

24

-20

-10

0

10

20

30

40

50

60Ja

nM

arM

ay Jul

Sep

Nov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

Mar

May Ju

lSe

pN

ov Jan

2013 2014 2015 2016 2017 2018

Aver

age

DAM

-R

TM S

PP ($

MW

h)

The dotted lines represent the bounds for major outliers

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 25: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndashJanuary 2019

25

0

10

20

30

40

50

Pric

e ($

MW

h)

Hour Ending

Regulation Up

Regulation Down

Responsive Reserve

Non Spinning Reserve

DAM Power Balance Price(System Lambda)

Ancillary Service prices reflect the opportunity cost of energy

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 26: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019

26

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - LZ West

RTSPP - LZ North

RTSPP - LZ South

RTSPP - LZ Houston

DASPP - LZ West

DASPP - LZ North

DASPP - LZ South

DASPP - LZ Houston

Prices reflect relative transmission congestion and system scarcity

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 27: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019

27

0

15

30

45

60

75

Pric

e ($

MW

h)

Hour Ending

RTSPP - Hub Average

DASPP - Hub Average

Energy prices reflect the risk premium between Day-Ahead amp Real-Time

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 28: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

DRUC Monthly Summary (Hourly Average) ndash January 2019

28

0

20000

40000

60000

80000

MW

h

Hour Ending

Self Scheduled CapacitySelf Scheduled Ancillary Service LimitLoad ForecastDRUC Recommended Capacity

31 executions (0 missed)1 published after 16006 minutes average execution time0 Resources committed

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 29: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019

29

000

002

004

006

008

010

0

20

40

60

80

100

RTO

RD

PA ($

MW

h)

MW

h

Hour Ending

744 executions (0 missed)6 minutes average execution time0 Resources committed through HRUC or by Verbal Dispatch Instruction

The dotted line indicates the average RTORDPA

No Resources committed through RUC in January

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 30: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

NonndashSpinning Reserve Service Deployment ndash January 2019

30

Deployment Start Time

Deployment End Time

Deployment Duration (Hours)

Max Deployment(MW) Reason

None

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 31: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

CRR Price Convergence ndash January 2019

0

50

100

150

200

250

Mill

ions

$

Cost Value

Congestion Revenue Right cost in auction convergence with payment in Day-Ahead Market and Real Time Market

31

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 32: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Daily Average System Lambda and ORDC Price Adders ndash January 2019

0

10

20

30

40

50

60

$M

Wh

Day of Month

RTOFFPA

RTORPA

System Lambda

Monthly Maximum Minimum AverageRTORPA $369 $000 $000

RTOFFPA $023 $000 $000

32

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 33: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERS Procurement for October 2018 ndash January 2019

Time Period Time Period Hours

Time Period 1 Hours Ending 0600 - 0800 (50000 am to 80000 am) Monday through Friday except ERCOT Holidays

Time Period 2 Hours Ending 0900 - 1300 (80000 am to 10000 pm) Monday through Friday except ERCOT Holidays

Time Period 3 Hours Ending 1400 - 1600 (10000 pm to 40000 pm) Monday through Friday except ERCOT Holidays

Time Period 4 Hours Ending 1700 - 1900 (40000 pm to 70000 pm) Monday through Friday except ERCOT Holidays

Time Period 5 Hours Ending 2000 - 2200 (70000 pm to 100000 pm) Monday through Friday except ERCOT Holidays

Time Period 6 All other hours

TP1 TP2 TP3 TP4 TP5 TP6

Non Weather-Sensitive ERS-10 MW 162740 168420 116642 161688 160131 144273

Non Weather-Sensitive ERS-30 MW 755973 809020 459787 791528 761368 661249

Weather-Sensitive ERS-10 MW 0 0 0 0 0 0

Weather-Sensitive ERS-30 MW 76 0 0 76 0 0

Total MW Procured 926313 977440 576429 960816 921499 805522

Clearing Price $1463 $1190 $027 $1734 $1292 $106

33

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 34: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Reliability Services ndash January 2019

Reliability Unit Commitment (RUC) $ in Millions

RUC Make-Whole Payments $000

RUC Clawback Charges $000

RUC Commitment Settlement $000

RUC Capacity Short Charges $000

RUC Make-Whole Uplift $000

RUC Commitment Cost Allocation $000

RUC Decommitment Payments $000

Total RUC Allocation to Load $000

In January 2019 $000M was allocated to load for RUC compared to bull A credit of $002M in December 2018bull A credit of $039M in January 2018

34

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 35: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Ancillary and Other Services ndash January 2019

Ancillary and Other Services $ in Millions

Regulation Up Service $200

Regulation Down Service $134

Responsive Reserve Service $1624

Non-Spinning Reserve Service $190

Black Start Service $062

Voltage Services - Reactive Power $000

Voltage Services - Lost Opportunity $000

Total Charges Allocated to Load $2210

In January 2019 Ancillary and Other Services was a charge of $2210M compared to bull A charge of $2654M in December 2018bull A charge of $8838M in January 2018

35

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 36: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019

In January 2019 Real-Time Ancillary Service Imbalance was a charge to load of $4K compared to bull A charge of $154K in December 2018bull A charge of $366K in January 2018

36

Real-Time Ancillary Service Imbalance $ in Thousands

Real-Time AS Imbalance ($4)

Real-Time Reliability Deployment AS Imbalance $0

Total RTASI Amount Allocated to Load $4

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 37: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Energy Settlement ndash January 2019

37

Day-Ahead Market Energy Settlement $ in Millions

Energy Purchases $48854

Point to Point Obligation Purchases $3791

Energy Sales ($47538)

Day-Ahead Congestion Rent $5107

Day-Ahead Market Make-Whole Payments ($038)

Real-Time Market Energy Settlement $ in Millions

Energy Imbalance at a Resource Node ($34020)

Energy Imbalance at a Load Zone $58661

Energy Imbalance at a Hub ($21353)

Net Real-Time Energy Imbalance $3288

Real Time Congestion from Self Schedules $044

Block Load Transfers and DC Ties ($086)

Total Impact to Revenue Neutrality $3246

Load-Allocated Emergency Energy Payments ($021)

Load-Allocated Base Point Deviation Charges $016

Day-Ahead Market energy settlement activity decreased from last month and decreased from January 2018

Real-Time Market energy settlement activity decreased from last month and decreased from January 2018

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 38: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Congestion Revenue Rights (CRR) ndash January 2019

$ in Millions

Long-Term Auction ($3899)

Monthly Auction (1087)

Total Auction Revenue ($4986)

Day-Ahead CRR Settlements ($5144)

Day-Ahead CRR Short-Charges $171

Day-Ahead CRR Short-Charges Refunded ($171)

Day-Ahead CRR Short-Charges Net $000

Total CRR Funding ($5144)

Day-Ahead Point-to-Point Obligations $3791

Real-Time Point-to-Point Obligations ($3445)

Net Point-to-Point Obligations $346

Congestion Revenue Rights settlement payments were fully funded The additional funding to settle the CRR Short Charges was provided from the CRR Balancing Account Fund

Point to Point Obligations settled with a net charge of $346M compared to a net credit of $1764M last month

38

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 39: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

CRR Balancing Account Fund ndash January 2019

CRR Balancing Account $ in Millions

Monthly Day-Ahead Congestion Rent $5107

Monthly Day-Ahead CRR Settlements ($5144)

Monthly Day-Ahead CRR Short -Charges $171

CRR Balancing Account Credit Total $134

Beginning Fund Balance for the Month $777

CRR Balancing Account Credit Total $134

Day-Ahead CRR Short-Charges Refunded ($171)

CRR PTP Option Award Charges $005

Load-Allocated CRR Amount $000

Total Fund Amount $744

39

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 40: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Revenue Neutrality ndash January 2019

Revenue Neutrality $ in Millions

Real-Time Energy Imbalance $3288

Real-Time Point to Point Obligation ($3445)

Real-Time Congestion from Self-Schedules $044

DC Tie amp Block Load Transfer ($086)

Allocation to Load $199

In January 2019 the Revenue Neutrality charge to load was $199M compared to bull A charge of $725M in December 2018bull A charge of $1657M in January 2018

40

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 41: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Net Allocation to Load ndash January 2019

Market-Based Allocation $ in Millions

Reliability Unit Commitment $000

Ancillary and Other Services $2210

Real-Time Ancillary Service Imbalance $000

Emergency Energy $021

Base Point Deviation ($016)

CRR Auction Revenue ($4986)

CRR Balancing Account $000

Real-Time Revenue Neutrality $199

Reliability Must Run $000

Monthly Block Load Transfer $000

Total ($2572)

Fee AllocationERCOT Administrative Fee $1662

Net Allocated to Load ($910)

In January 2019 the Net Allocation to load was a credit of $910M compared to bull A charge of $1658M in December 2018bull A charge of $7178M in January 2018

41

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 42: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Advanced Meter Settlement Impacts ndash January 2019

January 2019 At month end settling 73M ESIIDs using Advanced Meter data

January 2019 993 of the load in ERCOT is settled with 15-min interval data (AMS Competitive IDR and NOIE IDR)

42

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 43: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndashJanuary 2019

43

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 44: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

44

Transaction Type January 2019 January 2018 January 2019 January 2018

Switches 108941 88933 108941 88933

Acquisition 0 0 0 0

Move - Ins 236129 230409 236129 230409

Move - Outs 106685 111821 106685 111821

Continuous Service Agreements (CSA) 235409 49740 235409 49740

Mass Transitions 0 0 0 0

Total 687164 480903 687164 480903

Year-To-Date Transactions Received

Board Presentation Input

Trans Volumes by Month_New

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Retail Transactions Summary
January 2019 December 2018 November 2018 October 2018 September 2018 August 2018 July 2018 June 2018 May 2018 April 2018 March 2018 February 2018 January 2018 December 2017 November 2017 October 2017 September 2017 August 2017 July 2017 June 2017 May 2017 April 2017 March 2017 February 2017 January 2017 December 2016 November 2016 October 2016 September 2016 August 2016 July 2016 June 2016 May 2016 April 2016 March 2016 February 2016 January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 June 2015 May 2015 April 2015 March 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014 July 2014 June 2014 May 2014 April 2014 March 2014 February 2014 January 2014 December 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Grand total
814_01 - Switch Received 108941 65380 185003 84425 89078 120867 121926 109653 96828 81291 95159 76119 88933 60560 77860 78096 79502 84134 84059 108784 130828 71769 67845 66875 87140 66556 56202 64452 67323 86656 82923 86376 75323 70300 76235 68057 63954 61486 52887 65276 70342 81674 91211 102661 86229 81255 79997 73394 72885 71072 67080 110465 175164 89677 99568 101490 111077 91983 93887 71130 86953 69691 55957 166882 82415 93194 102562 103756 116086 78919 68950 64329 67116 1321827
Difference from previous month 43561 (119623) 100578 (4653) (31789) (1059) 12273 12825 15537 (13868) 19040 (12814) 28373 (17300) (236) (1406) (4632) 75 (24725) (22044) 59059 3924 970 (20265) 20584 10354 (8250) (2871) (19333) 3733 (3453) 11053 5023 (5935) 8178 4103 2468 8599 (12389) (5066) (11332) (9537) (11450) 16432 4974 1258 6603 509 1813 3992 (43385) (64699) 85487 (9891) (1922) (9587) 19094 (1904) 22757 (15823) 17262 13734 (110925) 84467 (10779) (9368) (1194) (12330) 37167 9969 4621 (2787)
814_16 - Move - Ins Received 236129 192182 213210 245672 230635 287935 270122 257125 244431 225380 224289 215281 230409 238340 207921 236397 244511 258046 252360 257759 237611 197865 217962 201984 202612 196236 201714 220958 231999 268781 241844 247481 214383 199804 218245 212474 193716 189862 181098 215908 229405 248124 263233 247089 208166 207932 215950 197765 198025 193973 178624 226283 231418 243482 251957 233679 223201 258649 214724 208160 207059 172981 178671 233469 216550 255967 249114 220397 216982 204412 197200 191955 194507 3162148
Difference from previous month 43947 (21028) (32462) 15037 (57300) 17813 12997 12694 19051 1091 9008 (15128) (7931) 30419 (28476) (8114) (13535) 5686 (5399) 20148 39746 (20097) 15978 (628) 6376 (5478) (19244) (11041) (36782) 26937 (5637) 33098 14579 (18441) 5771 18758 3854 8764 (34810) (13497) (18719) (15109) 16144 38923 234 (8018) 18185 (260) 4052 15349 (47659) (5135) (12064) (8475) 18278 10478 (35448) 43925 6564 1101 34078 (5690) (54798) 16919 (39417) 6853 28717 3415 12570 7212 5245 (2552)
814_24 - MVO and MVO to CSA Received 106685 92240 99302 117436 107043 131468 129820 125861 124403 113795 108753 100127 111821 144987 100830 116519 129103 128104 127073 133582 127218 102055 111459 100285 101107 96289 100578 109493 114094 133170 122932 129025 118022 103789 109278 103747 96628 99552 96214 109578 117949 123894 133905 133855 114675 108275 108859 94864 98233 97901 89578 111857 115918 121662 131607 126785 119107 107956 107266 99428 104273 93385 93977 115469 115524 129594 135196 121446 120049 111598 106467 102429 104399 1660500
814_10 - DTP Mass Acquisition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_10 - DTP Mass Transition Received - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 9034 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 639 - 0 - 0 4975 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0
814_18 - CSA AdditionDeletes Received 235409 44361 46093 51991 37663 59562 40217 62083 99016 55581 46720 42587 49740 47725 31726 52888 41597 40616 55770 43745 52139 26702 21791 39082 44030 38884 39856 31786 33061 42622 48489 64178 50499 59475 59400 48536 42179 40351 34796 34420 54677 35078 49489 59611 39384 44247 44577 35386 40420 54831 43550 45039 44268 40405 57954 64408 65032 80184 70310 41156 34811 46680 50347 71847 48606 52585 50867 62747 59763 34925 40977 40389 41227 747237
Total 687164 394163 543608 499524 464419 599832 562085 554722 573712 476047 474921 434114 480903 491612 418337 483900 494713 510900 519262 543870 547796 398391 419057 408226 434889 397965 398350 426689 446477 531229 496188 527060 458227 433368 463158 432814 396477 391251 364995 425182 472373 488770 537838 543216 448454 441709 449383 401409 409563 417777 378832 493644 566768 495865 541086 526362 523392 538772 486187 419874 433096 382737 378952 587667 463095 531340 537739 508346 512880 429854 413594 399102 407249 6891712
Counts from Monthly Retail Transaction report
To do
Break Out 814_10s - AQ and MT
Break Out 814_18 Additions from Deletes
Year-To-Date Transactions Received
Transaction Type January 2019 January 2018 January 2019 January 2018
Switches 108941 88933 108941 88933
Acquisition 0 0 0 0
Move - Ins 236129 230409 236129 230409
Move - Outs 106685 111821 106685 111821
Continuous Service Agreements (CSA) 235409 49740 235409 49740
Mass Transitions 0 0 0 0
Total 687164 480903 687164 480903
There has been a change since this was created
Mass Acquisition has been broken out of Mass Transition
Page 45: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

Retail Transaction Volumes ndash Summary ndash January 2019

SwitchesAcquisitions Move-Ins

Move-Outs Mass Transition

45

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 46: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

Projects Report

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 47: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Footnotes1 - One or more phases took longer than expected resulting in additional time required

2 - One or more phases required more labor than expected resulting in additional funding andor time required

3 - Project placed on holdNA - Metric not calculated because - it is reported at the parent project level or - it is an administrative project

47

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 48: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

DC4 DC4 Network - Command and Control 1

DC4 DC4 Network - Command and Control Stage 3 11292017 11282018 2282019 2282019 362019 0 NASee DC4 Netw ork

Command and Control

DC4 DC4 Telecom - Corp Voice System 1

DC4 DC4 Telecom - Corp Voice System Stage 2 11142018 11202019 11202019 11202019 11202019 0 NA See DC4 Telecom Corp Voice System

DC4 DC4 MV90 Communication Hardware Refresh 7182018 5222019 5222019 5222019 5222019 0 22170-01 Enterprise Content Alignment Program 8262015 11152017 3272019 3272019 3272019 0 0170-06 ECAP - ECMS Implementation Phase 1 4252018 11302018 3282019 3282019 4302019 0 -1173-02 ERCOT Flight Certification Website 11152017 2282019 642019 642019 7312019 0 2 -5

183-01 CMM Tech Refresh 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

196-01 GINR Project Status Application Replacement 12212016 9142017 2282019 2282019 3312019 0 0209-02 Weather Imaging and Line Observation (WILO) 5302018 212019 452019 452019 5282019 0 -4209-03 Study Network (STNET) Integration 11282018 8282019 8282019 8282019 9252019 0 2228-01 Enterprise Database Upgrade 882018 1292020 1292020 1292020 1292020 0 8238-01 Application Authentication Tech Refresh 962017 3192018 5312019 5312019 7302019 0 3239-01 Identity and Access Management 592018 12152018 6192019 6192019 7302019 0 0244-01 Corporate Wireless 11292017 3282018 422019 422019 4302019 0 0245-01 2017 EPS Metering Enhancements 6272018 892019 12122019 12122019 1142020 0 -3

257-01Security Constrained Optimal Powerflow in Study Network Analysis

1262017 10252018 272019 272019 3282019 0 4

263-01 Market Simulator 4112018 12132018 6212019 6212019 7302019 0 1265-01 Real-Time Assessment Continuity 1312018 12132018 282019 282019 2282019 0 -4293-01 Governance Risk and Compliance (GRC) Replacement Tool 262019 642019 642019 642019 8272019 0 4Various 2015 CMM NPRRs 3

NPRR519Exemption of ERS-Only QSEs from Collateral and Capitalization Requirements

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR620Collateral Requirements for Counter-Parties with No Load or Generation

3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR660 Remove CRR State Change Adder 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR741 Clarifications to TPE and EAL Credit Exposure Calculations 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR749 Option Cost for Outstanding CRRs 882018 12132018 272019 272019 4232019 0 NA See NPRR833

Budget HealthSchedule Health

48

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 49: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects in Execution Phase (Count = 36) Phase Start Baseline Go-

Live DateApproved Go-

Live DateScheduled

Go-Live DateScheduled

Phase Finish

NPRR755 Data Agent-Only QSE Registration 3152017 5192018 6152019 6152019 9302019 0 NA See 2015 CMM NPRRs

NPRR821 Elimination of the CRR Deration Process 1252018 442019 442019 442019 572019 0 0NPRR833 Modify PTP Obligation Bid Clearing Change 882018 12132018 272019 272019 5212019 0 -1NPRR817 Create a Panhandle Hub 1152019 442019 442019 442019 512019 0 1NPRR842 Study Area Load Information 10172018 282019 282019 282019 3272019 0 1NPRR845 RMR Process and Agreement Revisions 12192018 442019 442019 442019 572019 0 10NPRR847 Exceptional Fuel Cost Included in the Mitigated Offer Cap 1152019 442019 442019 442019 512019 0 See NPRR817NPRR865 Publish RTM Shift Factors for Hubs Load Zones and DC Ties 262019 462019 462019 462019 4232019 0 9

NPRR880Publish Real-Time Market Shift Factors for Private Use Network Settlement Points

262019 462019 462019 462019 4232019 0 See NPRR865

Project Number Expedited Projects in Execution (Count = 16)

Project Number Projects in Stabilization (Count = 13) Execution

Phase StartBaseline Go-Live Target

Approved Go-Live Target

ActualGo-Live Date

Scheduled Execution Phase

Finish

NPRR648 Remove References to Flowgate Rights 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR683 Revision to Available Credit Limit Calculation 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR743 Revision to MCE to Have a Floor For Load Exposure 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR760 Calculation of Exposure Variables For Days With No Activity 3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

NPRR800Revisions to Credit Exposure Calculations to Use Electricity Futures Market Prices

3152017 5192018 5192018 262018 9302019 23 NA See 2015 CMM NPRRs

SCR777 Bilateral CRR Interface Enhancement 10262016 1022017 11192018 11192018 2272019 0 NA See 181-01

181-01 CRR Framework Upgrade 10262016 1022017 11192018 11192018 2272019 0 0193-01 PMU Tool Evaluation and Implementation 12132017 892018 852018 852018 3202019 0 20229-01 IT Change and Configuration Management Phase 2 822017 6192018 282019 12162018 3252019 9 0243-01 Training Facility 1262017 12122018 12122018 1162018 242019 9 0266-01 Remote Email Access Enhancement 12132017 372018 662018 6192018 422019 2 -7 0279-01 Cyber Security Project 24 6272018 10262018 11302018 11302018 2272019 0 31282-01 Synchronous Condenser Outage Modeling 662018 10252018 10252018 10252018 352019 0 0

Schedule Health Budget Health

Budget HealthSchedule Health

49

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 50: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number Projects On Hold (Count = 6) Forecast

Start DateBaseline

Phase FinishApproved Go-

Live TargetScheduled

Go-Live DateScheduled

Phase Finish

SCR789 Update NMMS Topology Processor to PSSE 34 Capability 0246-01 iTest Data Refresh 0

269-01Document Repository Redesign and Governance Implementation - Phase 1

0

287-01 Security Constrained Unit Commitment (SCUC) 0291-01 IT Asset Recovery 0292-01 Additional Branch Limit for Relays 0

Project Number Projects Completed (Count = 7)

Baseline Execution

Phase Start

Baseline Go-Live Target

Approved Go-Live Target

Actual Go-Live Date

Actual Execution Phase Finish

DC4 DC4 Telecom - Control Room and Grid Ops 8302017 3182018 12132018 12132018 1152019 0 18DC4 DC4 Network - Command and Control Stage 1 8302017 3182018 12132018 12132018 1152019 0 0DC4 DC4 Telecom - Data Center Connectivity 8302017 3182018 12132018 12132018 1152019 0 0

210-01 REC Technology Refresh 8302017 3182018 12132018 12132018 1152019 0 0261-01 Generic Transmission Constraint Calculation 372018 12132018 12132018 12132018 1232019 0 15

NPRR843Short-Term System Adequacy and AS Offer Disclosure Reports Additions

7182018 10252018 12132018 12132018 1152019 0 0

SCR795 Addition of Intra-Hour Wind Forecast to GTBD Calculation 882018 10252018 10252018 10252018 12192018 0 2 -17

Project Number Expedited Projects Completed (Count = 1)

Budget HealthSchedule Health

Budget HealthSchedule Health

50

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
Page 51: ERCOT Monthly Operational Overvie · 2020-07-16 · ERCOT Monthly Operational Overview (January 2019) ERCOT Public. February 15, 2019. Grid Planning & Operations. PUBLIC Summary –

PUBLIC

ERCOT Portfolio Stoplight Report ndash January 2019

Project Number 2019 Projects Not Yet Started (Count = 15) Forecast

Start Date

NPRR899 Digital Certificate and User Security Administrator Clarifications and Opt Out Procedure

Feb-2019

TBD Tech Refresh - MMSOS Feb-2019TBD Tech Refresh - REC Rewrite Feb-2019

SCR797 Provide IRR Current Operating Plan (COP) to TSPs Mar-2019

NPRR829Incorporate Real-Time Non-Modeled Telemetered Net Generation by Load Zone into the Estimate of RTL

Apr-2019

NPRR887 Monthly Posting of Default Uplift Exposure Information Apr-2019TBD Tech Refresh - Business Intelligence Apr-2019

NPRR841Real-Time Adjustments to Day-Ahead Make Whole Payments due to Ancillary Services Infeasibility Charges

Jun-2019

NPRR856Treatment of OFFQS Status in Day-Ahead Make Whole and RUC Settlements

Jun-2019

NPRR877Use of Actual Interval Data for IDR ESI IDs for Initial Settlement - Phase 2

Jul-2019

TBDAutomation of MP Partnership Deletions Mothballed Status amp Seasonal Operation Period and other Siebel fields

Jul-2019

TBD Implement ILM in ISM for Nodal TIBCO Instance Jul-2019TBD Objectives and Key Results (OKR) Tool Implementation Jul-2019TBD Parameter Estimation Jul-2019TBD Standard Report for Events and Near-Miss Analysis Jul-2019

51

  • Slide Number 1
  • Slide Number 2
  • Summary ndash January 2019
  • Daily Peak Demand Hourly Average Actual vs Forecast Wind Day-Ahead COPs amp On-Line Capacity at Peak ndash January 2019
  • Actual Wind Output plus Curtailments vs Wind Day-Ahead COPs for All Hours ndash January 2019
  • ERCOTrsquos CPS1 Monthly Performance ndash January 2019
  • Monthly Peak Actual Demand ndash January 2019
  • Monthly Minimum Actual 15-Minute Demand ndash January 2019
  • Day-Ahead Load Forecast Performance ndash January 2019
  • Reliability Unit Commitment (RUC) Capacity by Weather Zone ndash January 2019
  • Generic Transmission Constraints (GTCs) ndash January 2019
  • Advisories and Watches ndash January 2019
  • Lake Levels Update ndash February 1 2019
  • Planning Summary ndash January 2019
  • Mapping of Counties to ERCOT Zones ndash January 2019
  • Cumulative MW Capacity of Interconnection Requests by Zone ndashJanuary 2019
  • Wind Generation ndash January 2019
  • Solar Generation ndash January 2019
  • Generation Interconnection Activity by Fuel ndash January 2019
  • Generation Interconnection Activity by Project Phase ndash January 2019
  • Slide Number 21
  • Day-Ahead Schedule (Hourly Average) ndash January 2019
  • Percentage of Real-Time Load Transacted in the DAM (Counter-Party Level) ndash January 2019
  • DAM and RTM Price Convergence ndash January 2019
  • Day-Ahead Electricity and Ancillary Service Prices (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Load Zone SPP (Hourly Average) ndash January 2019
  • Day-Ahead vs Real-Time Hub Average SPP (Hourly Average) ndash January 2019
  • DRUC Monthly Summary (Hourly Average) ndash January 2019
  • HRUC Monthly Summary and Real Time On-Line Reliability Deployment Price Adder (RTORDPA) (Hourly Average) ndash January 2019
  • NonndashSpinning Reserve Service Deployment ndash January 2019
  • CRR Price Convergence ndash January 2019
  • Daily Average System Lambda and ORDC Price Adders ndash January 2019
  • ERS Procurement for October 2018 ndash January 2019
  • Reliability Services ndash January 2019
  • Ancillary and Other Services ndash January 2019
  • Real-Time Ancillary Service Imbalance (ORDC) ndash January 2019
  • Energy Settlement ndash January 2019
  • Congestion Revenue Rights (CRR) ndash January 2019
  • CRR Balancing Account Fund ndash January 2019
  • Revenue Neutrality ndash January 2019
  • Net Allocation to Load ndash January 2019
  • Advanced Meter Settlement Impacts ndash January 2019
  • ERCOT Wide Load Volumes by Meter Type ndash INITIAL Settlement ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Retail Transaction Volumes ndash Summary ndash January 2019
  • Slide Number 46
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019
  • ERCOT Portfolio Stoplight Report ndash January 2019