This contextualizes claims for “sustainable” products.
The retrofit need is an infrastructure problem; energy efficiency and carbon reduction goals are solution dependent.
1
Façade retrofit process is costly and complex, high potential for waste and inefficiency.
Do it right this time!
2
Façade retrofit practices undefined:•design typologies, •evaluation criteria,•means and methods for implementation,all require best practice development.
3
Current design practices do not anticipate the need for retrofit.
Facade systems must be designed to accommodate retrofit and adaptive reuse
4
Recycling and reuse need to be adopted as primary strategies in facade retrofit.
5
Advanced recycling technology is needed for new high-performance materials.
Architectural glass is a prime example.
Renovation and new building design should be limited to the use of fully recyclable products.
6
Renewed emphasis on first principles and embracing the apparent constraints of sustainability.
R&D and education collaborations between the profession, industry and academy should be fostered.
7
Creative methods for rating buildings may be helpful, but it is highly likely that legislative measures for building energy and carbon performance will be required very soon.
8
Sustainability is still largely treated as an option, this at increasing cost to the world’s people, economies, and the environment.
9
questions & comments to:Mic [email protected] 266 5724