enbridge offshore pipelines - federal energy regulatory ... enbridge... · enbridge offshore...
TRANSCRIPT
TM
Enbridge Offshore PipelinesEnbridge Offshore Pipelines
Natural Gas Infrastructure ConferenceHurricane Panel - Presented by David Halphen
Natural Gas Infrastructure ConferenceHurricane Panel - Presented by David Halphen
2
TMOutlineOutline
Hurricane Timeline and Actions Undertaken
Current Status of Enbridge Offshore Facilities
Lessons Learned for Future Consideration
3
TMTransmission and GatheringTransmission and Gathering
5 large supply aggregation corridor pipelines1482 miles – Enbridge operates 1000 mi4.7 BCF/D delivery capacity7 partnership pipelines – Enbridge operates 4Connecting deepwater developments in up to 6500 ft. of water depth
10
DESTIN
Gulf of Mexico
GARDEN BANKS MANTA RAY
AUGER
ENCHILADA BULLWINKLE
MISS. CANYON
URSAMARS
NAUTILUS
Texas LouisianaMississippi
Alabama
4000’1500’
STINGRAY
West CameronDehydration Facility
RAM POWELL
BRUTUS
HICKORY
OKEANOS
5000’
CLEOPATRA
GUNNISON
THUNDER HORSE
NAKIKA
SPIRIT
MAGNOLIA
GEMINI
WC 509
HI 330
StingrayCorridor
Green Canyon Corridor
Mississippi Canyon Corridor
DestinCorridor
Garden Banks Corridor
DESTIN
Gulf of Mexico
GARDEN BANKS MANTA RAY
AUGER
ENCHILADA BULLWINKLE
MISS. CANYON
URSAMARS
NAUTILUS
Texas LouisianaMississippi
Alabama
4000’1500’
STINGRAY
West CameronDehydration Facility
RAM POWELL
BRUTUS
HICKORY
OKEANOS
5000’
CLEOPATRA
GUNNISON
THUNDER HORSE
NAKIKA
SPIRIT
MAGNOLIA
GEMINI
HI 330
MENSA
GB 668
GB 191BALDPATE
Enbridge GatheringEnbridge TransmissionProducer Owned
VENICE
WD143
HOLSTEINMAD DOG
ATLANTIS
4
TMOffshore Infrastructure DevelopmentOffshore Infrastructure Development
Gulf of Mexico
InterstateInterstate
30” - 36” JurisdictionalPipeline
30” - 36” JurisdictionalPipeline
Market AccessMarket AccessIntrastateIntrastate
Gas Processing PlantGas Processing Plant
1500’
8000’
18” - 24” GatheringPipeline
18” - 24” GatheringPipeline
Subsea ProductionFlowlines
Subsea ProductionFlowlines
Natural Gas Liquids Natural Gas Liquids
StorageStorageRefineryRefinery
Oil Terminal &Pump StationOil Terminal &Pump Station
5
TMHurricane Katrina & RitaHurricane Katrina & RitaKatrina Rita Isolated damage to Enbridge assets Currently assessing damage
- primarily at Venice facility Curtailed production onShutdown of Mississippi Canyon Stingray due to repair of Curtailed Production on Destin onshore facility
10
DESTIN
Gulf of Mexico
GARDEN BANKS MANTA RAY
AUGER
ENCHILADA BULLWINKLE
MISS. CANYON
URSAMARS
NAUTILUS
Texas LouisianaMississippi
4000’1500’
STINGRAY
West CameronDehydration Facility
RAM POWELL
BRUTUS
HICKORY
OKEANOS
5000’
CLEOPATRA
GUNNISON
THUNDER HORSE
NAKIKA
SPIRIT
MAGNOLIA
GEMINI
WC 509
HI 330
StingrayCorridor
Green Canyon Corridor
Mississippi Canyon Corridor
DestinCorridor
GardenBanks CorridorMENSA
DESTIN
Gulf of Mexico
GARDEN BANKS MANTA RAY
AUGER
ENCHILADA BULLWINKLE
MISS. CANYON
URSAMARS
NAUTILUS
Texas LouisianaMississippi
4000’1500’
STINGRAY
West CameronDehydration Facility
RAM POWELL
BRUTUS
HICKORY
OKEANOS
5000’
CLEOPATRA
GUNNISON
THUNDER HORSE
NAKIKA
SPIRIT
MAGNOLIA
GEMINI
HI 330
MENSA
GB 668
GB 191 BALDPATE
115 MPH
125 MPH
145 MPH
155 MPH
160 MPH
175 MPH
120 MPH
125 MPH
120MPH
HOLSTEINMAD DOG
ATLANTIS
12
TM
3
Asset positions
1,4827,745TotalEOP 100%820016OCSLASpirit
EOP 33% and BP 67%100100020/24OCSLAOkeanos (portion under construction)
EOP 33% and BP 67%385120024/30/36FERCDestin PipelineDestin
EOP 100%4580030FERCMississippi CanyonPipeline
Mississippi Canyon
EOP 22%, BP 54%, BHP 22%,and Unocal 2%
11150016/20OCSLACleopatra
EOP 75% and Enterprise 25%
25080014/16/24OCSLAManta Ray
EOP 75% and Enterprise 25%
10360030FERCNautilusGreen Canyon
EOP 100%5025016OCSLAMagnolia
EOP 100%50100030FERCGarden Banks PipelineGarden Banks
EOP 50% and Mark West 50%552754 –16OCSLATriton/Gunnison
EOP 50% and Mark West 50%EOP 100%
32530
11201200
4 –3642
FERCFERC
StingrayUTOS
Stingray
OwnersLength(miles)
CapacityMMcf/d)
Diameter(inches)JurisdictionGas PipelinesCorridor
Offshore Asset PositionsOffshore Asset Positions