offshore rigid pipelines engineering · pdf fileoffshore rigid pipelines engineering petrobras...

31
05th July 2010 Rio de Janeiro OFFSHORE RIGID PIPELINES ENGINEERING OFFSHORE RIGID PIPELINES ENGINEERING PETROBRAS PETROBRAS PETROBRAS - IPLOCA

Upload: dangnhi

Post on 30-Jan-2018

268 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

OFFSHORE RIGID PIPELINES ENGINEERING OFFSHORE RIGID PIPELINES ENGINEERING PETROBRASPETROBRAS

PETROBRAS - IPLOCA

Page 2: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

AGENDA

OFFSHORE PIPELINE ENGINEERING AT PETROBRAS ORGANOGRAM

INTRODUCTION

PIPELINE DESIGN DESCRIPTON

FUTURE PIPELINE PROJECTS

NEW CHALLENGES AT OIL & GAS PRODUCTION

CONCLUSION

Page 3: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

PETROBRAS ORGANOGRAM

Page 4: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

EEPTMEEPTM

PETROBRAS ORGANOGRAM - ENGINEERING

Page 5: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

EDI

Design of Submarine Pipelines Systems and Submarine Installations, Structures and Equipments.

PETROBRAS ENGINEERING

Page 6: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

PETROBRAS ENGINEERING

“Provide services and Engineering Solutions, with social

and environmental responsibility, that meet clients’ needs

and that contribute to the development of Brazil and the

countries in which it operates”.

“We will be one of the five largest integrated energy

companies in the world and the preferred choice among

our stakeholders”.

Mission and Vision 2020

Page 7: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Introduction

Scenarios full of Challenges to be overcome

High Quality products in accordance with International Standards and Petrobras Technical Specifications

Challenging pipeline projects – Ultra-Deep WaterResearch and Development as practical Solution

Fast track projects

Special requirements at each project

Strictly environmental requirements

OFFSHORE PIPELINES AT PETROBRAS

Page 8: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Pipeline Design Description

OFFSHORE PIPELINES AT PETROBRAS

Page 9: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Pipeline Design Description

OFFSHORE PIPELINES AT PETROBRAS

Page 10: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Pipeline Design Description - RequirementsThe 3 stages of offshore pipelines Design: Conceptual engineering,

Issues of technical feasibility and constraints on the system design and construction are addressed Showing all Potential difficulties and providing required information for the forthcoming pipeline Design and Construction.

Basic engineering,Definition of system concept (pipeline size and grade), provide sufficient detail to define the technical input for all procurement and construction activities. A complete pipeline design includes pipeline sizing (diameter and wall thickness) and material grade selection based on analyses of stress, hydrodynamic stability, span, thermal insulation, corrosion and stability coating, and riser specification.

Detail engineering.Engineering , Procurement Construction and Installation summarize all activities.

OFFSHORE PIPELINES AT PETROBRAS

Page 11: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Pipeline Installation Requirements

Ultra Deep Water,Pipelines subjected to high requirements of axial tension, bending moments and external pressure.

Pipeline Diameter up to 34”,Fields located far away from shore. Requirements for large diameters export pipelines.

OFFSHORE PIPELINES AT PETROBRAS

Page 12: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

OFFSHORE PIPELINES - INSTALLATION METHODS

S-LAY CONFIGURATION

Page 13: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

J-LAY CONFIGURATION

OFFSHORE PIPELINES - INSTALLATION METHODS

Page 14: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

REEL LAY CONFIGURATION

OFFSHORE PIPELINES - INSTALLATION METHODS

Page 15: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

OFFSHORE PIPELINES AT PETROBRAS

New Challenges at Oil & Gas Production

Floating Production Units

• Mooring in water depths of 2,200m

• Interaction with the riser’s system

• Scenario for platforms with access to the wells (SPAR, FPDSO)

Subsea engineering

• Qualification of risers for water depth of 2,200m, considering CO2 and high pressure.

• Scenario for riser towers, SCRs with lazy wave and other technologies.

• Qualification of thermal insulated flowlines for water depths of2,200m.

• Flowlines for high pressure gas injection.

Page 16: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

OFFSHORE PIPELINES AT PETROBRAS

New Challenges at Oil & Gas Production

High strength and low alloy steel linepipe – API 5L X70 and API 5L X80

Ultra deep water and HTHP Pipelines

High efficient insulation materials

Overall Heat Transfer Coefficient (U value) (from flow assurancestudies)

Cool Down Time requirements

Technical solutions for insulated Field Joint Coating, Coating Bends (internal and external)

Pipe-in-Pipe Systems

Page 17: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

FUTURE PIPELINE PROJECTS

Brazil Offshore Pipelines

2013 – 2020

OFFSHORE PIPELINES AT PETROBRAS

Page 18: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Pará-MaranhãoSão Luis

Caciporé

IcaraíMundau

Potiguar

Sergipe/Alagoas

Jacuipe

CumuruxatibaMucuri

Espirito Santo

Campos

Santos

Paraná

Parecis

Tapajós

Amazonas

Parnaiba

Marajó Rio doPeixe

Tacutu

Solimões

Acre

Xingu

Bananal

Taubaté

JequitinhonhaCamamu/Almada

Bolívia

Peru

Colômbia VenezuelaSuriname

Guiana

FrenchGuyana

Argentina

Paraguai

Tocan

tins

Guama

Gurupá

Canastra

Rio Grande

Florianópolis

Vitória

Iquitos

Xingu

Rio Guaporé

Purus

Ferrer-Urbano Santos

-200m

-2000

m

++

+

+

SEDIMENTARY BASINSPASSIVE MARGIN

RIFT/INTERIOR SAG

OFFSHORE MARGINAL

CENOZOIC

PALEOZOIC/MESOZOIC

ONSHORE MARGINAL

MESOZOIC/CENOZOIC

PALEOZOIC

PRECAMBRIAN

PALEOZOIC/PRECAMBRIAN

REGIONAL ARCH

500 km

BRAZILIAN SEDIMENTARYBASINS

Serra Formosa

Fitzcarra

ld

Pantanal

AraripeJatobá

Tucano

RecôncavoS.Francisco

S O U

T H

A

T L A N

T I C

O C E

A N

Cabo Frio

Pelotas

Uruguai

Ponta Grossa

M. Alegre

Assu

ncio

n

Foz do AmazonasBragança

Viseu BarreirinhasCamocimAcarau

Pará-MaranhãoSão Luis

Caciporé

IcaraíMundau

Potiguar

Sergipe/Alagoas

Jacuipe

CumuruxatibaMucuri

Espirito Santo

Campos

Santos

Paraná

Parecis

Tapajós

Amazonas

Parnaiba

Marajó Rio doPeixe

Tacutu

Solimões

Acre

Xingu

Bananal

Taubaté

JequitinhonhaCamamu/Almada

Bolívia

Peru

Colômbia VenezuelaSuriname

Guiana

FrenchGuyana

Argentina

Paraguai

Tocan

tins

Guama

Gurupá

Canastra

Rio Grande

Florianópolis

Vitória

Iquitos

Xingu

Rio Guaporé

Purus

Ferrer-Urbano Santos

-200m

-2000

m

++

+

+

SEDIMENTARY BASINSPASSIVE MARGIN

RIFT/INTERIOR SAG

OFFSHORE MARGINAL

CENOZOIC

PALEOZOIC/MESOZOIC

ONSHORE MARGINAL

MESOZOIC/CENOZOIC

PALEOZOIC

PRECAMBRIAN

PALEOZOIC/PRECAMBRIAN

REGIONAL ARCH

500 km

BRAZILIAN SEDIMENTARYBASINS

Serra Formosa

Fitzcarra

ld

Pantanal

AraripeJatobá

Tucano

RecôncavoS.Francisco

S O U

T H

A

T L A N

T I C

O C E

A N

Cabo Frio

Pelotas

Uruguai

Ponta Grossa

M. Alegre

Assu

ncio

n

Foz do AmazonasBragança

Viseu BarreirinhasCamocimAcarau

BRAZIL SEDIMENTARY BASINS

Page 19: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

SOUTH EAST BRAZIL OFFSHORE BASINS

Page 20: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

ACCOMPLISHED PROJECTS

SUPRIMENTOS DE TUBOS DOS PROJETOS IMPLEMENTADOS NA IEDS DISTRIBUIÇÃO ANUAL DE DIÂMETROS EM FUNÇÃO DO COMPRIMENTO DE TUBOS

86 80 92 97,5

216 251

23

370

09050

100150200250300350400450500550600650700750

DN(IN) - 34" 9DN(IN) - 24" 370DN(IN) - 20" 23DN(IN) - 18" 216 251DN(IN) - 16"DN(IN) - 12" 86 80 92 97,5

2009 2010 2011 2014

com

prim

ento

(km

)

TOTAL(km)

REV-28.05.10

311 724 101 97,5

Page 21: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

FUTURE PROJECTS

PERSPECTIVAS DE SUPRIMENTOS DE TUBOS ATÉ 2017 PROJETOS POTENCIAIS NA IEDS

(DISTRIBUIÇÃO ANUAL DE COMPRIMENTO DE TUBOS INSTALADOS EM FUNÇÃO DO DIÂMETRO) �

80 40 0 0

250

52

750

133

134

04080

120160200240280320360400440480520560600640680720760800840880

DN - 34" 133DN - 24" 750DN - 22"DN - 20" 134DN - 18" 52DN - 12" 250DN - 10" 80 40 0 0

2011 2012 2014 2015 2016

com

prim

ento

(km

)

REV-28.05.10

TOTAL(km) 80 424 52 0 883

Page 22: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Future Pipeline Projects

OFFSHORE PIPELINES AT PETROBRAS

Sul-Norte Capixaba

Iracema – Cabiúnas

UOTE

Guará – Tupi (performing)

Qualification Project of high strength and low alloy steel linepipe for ultra deep water application.

Page 23: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

GUARÁ – TUPI PROJECT

Page 24: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

SUL-NORTE CAPIXABA PROJECT

Page 25: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

IRACEMA-CABIÚNAS PROJECT

Page 26: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Estado do Rio de Janeiro

IRACEMA-CABIÚNAS PROJECT

Page 27: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

2,5 Km 2 Km

LDA:65 m

NavioConvencional

DP Shuttle TankerFSO (turret)

DP Shuttle Tanker

Monobóia

UOTE

Riser(Mangote OCIMF)

Flow(Duto Rígido 34” DN)

PLEM PLEMPLEM

2,5 Km 2 Km2,5 Km 2 Km

LDA:65 m

NavioConvencional

DP Shuttle TankerFSO (turret)

DP Shuttle Tanker

Monobóia

UOTE

Riser(Mangote OCIMF)

Flow(Duto Rígido 34” DN)

PLEM PLEMPLEM

UOTE PROJECT

Page 28: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

QUALIFICATION PROJECT OF HIGH STRENGTH LOW ALLOY STEELS

The objective of this qualification project is to develop high strength low alloy grade steels (API 5L X70 and API 5L X80) to be apply in ultra deep water pipelines.

Special requirements: sour fluid and ultra deep water installation.

7 companies signed Cooperation Agreement with PETROBRAS to develop this new material with such special requirements.

Page 29: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

QUALIFICATION PROJECT OF HIGH STRENGTH LOW ALLOY STEELS

INITIALPHASE

KOREA

LW

X70X80

POSCO

SIGNEDINITIALPHASESIGNEDSIGNEDSIGNEDSIGNEDSIGNEDSIGNED

COOPERATION AGREEMENT -

STATUS

ALEMANHAJAPANCHINAINDIA JAPANJAPANBRASILBRASILCOUNTRY

LWLWLWLWLW AND SMLSLWLWSMLSPRODUCTION

PROCESS

X 70X 80

X70X80

X 70X 80

X 70X 80X 70X 70X 70

X 80X 70X 80

API 5L STEEL GRADES

EUROPIPEJFEJULONG(HUABEI)WELSPUNSUMITOMONIPPON

STEELTENARISCONFAB

VM DO BRASIL

LINEPIPE PRODUCER

Page 30: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Conclusions

THE CHALLENGE IS TO DEVELOP AND PRODUCE ULTRA DEEP OIL AND GAS FIELDS.

FURTHER DEVELOPMENT OF HIGH QUALITY MATERIALS (ANTICORROSIVE AND INSULATION COATINGS) AND NATIONAL SUPPLIERS.

INDUSTRY EXPERIENCE AND TECNOLOGY DEVELOPMENT TO SOLVE BIG CHALLENGES.

OFFSHORE PIPELINES AT PETROBRAS

Page 31: OFFSHORE RIGID PIPELINES ENGINEERING · PDF fileoffshore rigid pipelines engineering petrobras petrobras - iploca. ... offshore pipelines - installation methods. 05th july 2010 –

05th July 2010 – Rio de Janeiro

Thanks!

Marcelo TeixeiraMarcelo [email protected]@petrobras.com.br