EMIS 7307
T&E Part 2
1
• Documents in flux. • MNS - Mission need statement
– Non system specific, a needed capability.
• Being replaced by Initial Capabilities Document (ICD). – ICD identifies the capability gap, describes the
evaluation of different approaches and proposes an approach to pursue. - Supports the MS A decision.
DOD 5000 Changes
![Page 2: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/2.jpg)
EMIS 7307
T&E Part 2
2
• ORD - Operational requirements document• Minimum acceptable capability of possible system.
• ORD is being replaced by Capabilities Development Document (CDD) at MS B and Capabilities Production Document (CPD) for MS C.
• CDD- Contains operational performance parameters to design and build an affordable and useful increment includes KPPs (Key performance parameters).
• CPD - Contains production attributes of a single increment.
DOD 5000 Changes
![Page 3: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/3.jpg)
EMIS 7307
T&E Part 2
3
Revised DoD 5000
ICD CDD CPD
![Page 4: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/4.jpg)
EMIS 7307
T&E Part 2
4
DoD 5000 with planned upgraded capabilities called increments. A spiral is used when
upgrades are expected but are TBD.
AoA Analysis of Alternatives
DAB Defense Acquisition Board
JROC Joint Requirements Oversight Council
![Page 5: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/5.jpg)
EMIS 7307
T&E Part 2
5
A significant number of documents have relevancy to T&E.
![Page 6: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/6.jpg)
EMIS 7307
T&E Part 2
6
Test Documentation Relationships
Analogous to A, B and C spec relationships
![Page 7: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/7.jpg)
EMIS 7307
T&E Part 2
7
![Page 8: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/8.jpg)
EMIS 7307
T&E Part 2
8
Test Program Documentation
![Page 9: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/9.jpg)
EMIS 7307
T&E Part 2
9
NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS) Test
and Evaluation Master Plan (TEMP)
![Page 10: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/10.jpg)
EMIS 7307
T&E Part 2
10
NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS)
TEMP
![Page 11: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/11.jpg)
EMIS 7307
T&E Part 2
11
NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS)
TEMP
![Page 12: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/12.jpg)
EMIS 7307
T&E Part 2
12
Test Program Documentation
• System Test Plan– Describes ‘big picture’ of all the testing for the whole system,
not a management document.
– This is the foundational technical test document from which subservient plans are derived.
– Includes laboratory, component, subsystem, system, software etc.
• Detail Test Plan– In a large system, each of these topics (laboratory,
component, subsystem, system, software etc.) is likely to be a volume or a book of its own.
![Page 13: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/13.jpg)
EMIS 7307
T&E Part 2
13
![Page 14: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/14.jpg)
EMIS 7307
T&E Part 2
14
Other Documents
• Test Procedures– Implements a specific test with carefully constructed step
by step directions.– Completeness is paramount as unplanned steps may
invalidate the data being collected. – May be augmented by test cards or scripts.– Formality in execution may require QC and/or customer
sign-off.– Dry run - find problems in procedure or UUT and fix.– Document changes during execution.
![Page 15: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/15.jpg)
EMIS 7307
T&E Part 2
15
Other Documents
• Test Reports– Quick look - very important for management
• Based on observation and limited, if any, data analysis
• May affect next day’s testing - consider email?
– Final report includes:
![Page 16: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/16.jpg)
EMIS 7307
T&E Part 2
16
Test/Program Interrelationships
![Page 17: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/17.jpg)
EMIS 7307
T&E Part 2
17
More about types of testing.
• DT&E again.
• Contractor perspective.– Demonstrates design and development and in
the end-game, completeness i.e. meets spec.– Reduce risks.
• High-risk components.
• Intra-subsystems.
• Inter-subsystem.
![Page 18: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/18.jpg)
EMIS 7307
T&E Part 2
18
• DT&E government perspective.– Demonstrates spec compliance.– Used for acceptance of the EDM(s).– Estimate the military utility.– Confirms ready for field testing (OT&E).
![Page 19: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/19.jpg)
EMIS 7307
T&E Part 2
19
• DT&E by phase.– Prior to program start.
• Determine or at least estimate that the technology is feasible.
– Concept and technology development.• Assist in selecting between possible alternative
system concepts.
• Info for SRR and program start decision.
![Page 20: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/20.jpg)
EMIS 7307
T&E Part 2
20
• DT&E by phase.– During System Development and Demonstration.
• Risks can be reduced to acceptable levels.• From here on engineering efforts instead of experimental
efforts.• Supports decision to build an EDM.• System I&T is a part of this.• Includes EDM acceptance testing.• Includes the testing of the EDM to provide data for the
LRIP decision.
![Page 21: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/21.jpg)
EMIS 7307
T&E Part 2
21
• DT&E by phase.– During production and deployment phase.
• Prelude to IOT&E.
• Navy calls TECHEVAL.
– During full rate production and operations.• To verify corrections and/or improvements.
• In terms of calendar time and manhours consumed, DT&E is larger than OT&E and has mostly contractor involvement.
![Page 22: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/22.jpg)
EMIS 7307
T&E Part 2
22
Another view of DT&E
![Page 23: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/23.jpg)
EMIS 7307
T&E Part 2
23
DT&E For the MSs
![Page 24: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/24.jpg)
EMIS 7307
T&E Part 2
24
OT&E is complex in it’s simplicity!
![Page 25: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/25.jpg)
EMIS 7307
T&E Part 2
25
Types of OT&E
• Early Operational Assessment (EOA).– Performed for the Program Office and other
decision makers as a indicator of how operational things are “shaping up”.
– Done by operational testers but may be mostly analytical based on DT&E provided info.
• Initial OT&E– Supports full rate production decision.– Called OPEVAL by Navy.
![Page 26: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/26.jpg)
EMIS 7307
T&E Part 2
26
Types of OT&E cont’d.
• Follow-on OT&E (FOT&E)– After full rate production.– Conducted during fielding.– Checks on correction of IOT&E deficiencies.
![Page 27: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/27.jpg)
EMIS 7307
T&E Part 2
27
More comparisons
![Page 28: EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities](https://reader036.vdocuments.us/reader036/viewer/2022070407/56649e435503460f94b36e23/html5/thumbnails/28.jpg)
EMIS 7307
T&E Part 2
28
Lessons for the PM that you should know too.