emergency response plan [compatibility mode]

Upload: karthikraj599

Post on 03-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    1/32

    Emergency Response

    Plan (ERP)

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    2/32

    Emergency - Definition

    An event at the site which may affect several

    other work areas within and may cause serious

    injuries, loss of life, serious affliction to health or

    serious damage to property.

    This may demand the rescue and relief

    measures on a war footing and at short notice.

    External resources may also be required to

    handle the situation.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    3/32

    Objective

    Preserving the life, property and environmentfrom the consequences of emergencies arising

    within the site.

    Systematic coordination of emergency controlaction to arrest escalation of emergency,

    To evacuate personnel within or outside the site

    where necessary and to rehabilitate them. Restoring normalcy in site operation with

    minimum loss of time.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    4/32

    Emergency Response Committee

    A committee for providing an orderly response

    to an emergency situation. Typical constitution may be

    Project Manager (Emergency controller) Nominated in-charge ( one who acts in absence of the PM)

    Accounts & Administration In charge

    HSE In charge

    Plant & Machinery In charge Section / Area In charges

    Time office In charge

    Store keeper

    Surveyor

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    5/32

    Roles & Responsibility - Project

    Manager

    Responsible for activating the emergency plan and

    assuming overall command

    Immediately arrange for on-spot meeting

    Take on-spot decision on the procedure to be

    adopted

    Arrange required facilities

    Communicate to client, and other concerned off icials

    at Head quarters / Regional office.

    In his absence nominated in charge shall act

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    6/32

    Roles & Responsibility

    Accounts & Administration In charge

    Attend the on-spot emergency meeting.

    Ensure first aid facilities

    Ensure arrangements for medical evacuationCoordinate with external agencies

    Plant & Machinery In charge

    Make arrangement for P&M, Operators and drivers

    required for rescue operations.

    Arrange Illumination as required

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    7/32

    Roles & Responsibility

    HSE In charge

    Inform Clients.

    Act as a co-ordinator for the ERC.

    Organize rescue team with rescue apparatus like

    (SCBA), gas detectors, stretchers etc

    Time Office in charge

    Collect details of manpower

    Ensure the availability of first aid facilities andemergency vehicle.

    Carry out head count at assembly point.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    8/32

    Roles & Responsibility Storekeeper

    Arrange materials like tools & tackles for rescueoperation

    Assist accounts and administration In charge.

    Responsibility of Surveyor Assist the ERC to identify the exact location of

    emergency

    Responsibility of Security Personnel

    Responsible to control the traffic on the road and keep

    clear from obstruction

    Temporarily suspend the entry of visitors and other

    workmen

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    9/32

    Emergency Control Room (ECR)

    A room to be identified as Emergency

    Control Room (ECR).

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    10/32

    Emergency Control Room (ECR) Shall be equipped with:

    Site layout showing assembly points and exit routes

    Road maps leading to the site

    List of telephone nos of key personnel & other externalagencies

    Dedicated telephone line

    List of safety equipment. List & location of fire fighting equipment.

    Emergency power

    Emergency hand lamps

    Hand operated alarm / siren

    Public announcement system Self contained breathing apparatus (SCBA)

    Gas Detectors

    Log book and stationery items

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    11/32

    333.306m(1

    093'6")

    ToDevarbi

    sanahalli

    3no'sDEWATERINGPUMP

    WATERCOLLECTIONPIT

    Main

    Gate

    Approach Road

    SRR2 Entry

    Safe Path Way

    First Aid

    Emergency Assembly Point

    Canteen

    SITE LAY OUT

    Toilet

    You are Here @

    EHS Training

    Center

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    12/32

    Any ERC Member

    receiving in formation of

    an incident

    Project Manager organizes

    to in form other ERC

    members to proceed to ECR

    Asses the situation and

    decide activation of ERP

    Alert all concerned as per

    the established

    communication system

    Decide on the action plan

    EnsureSituation

    under control

    HSE In charge

    Investigate with

    Section in charge

    and submit

    report

    Procee

    dtoE

    merge

    ncy

    Contr

    olRoo

    m

    ProceedtoEmergency

    ControlRoom

    ERC member start their activity like

    Medical Evaluation / arrangement ofrequired machineries / control assemblypoint and head count transfer of injured

    after rescue / information to client &

    regional office etc.

    Yes

    No

    Any ERC Member

    receiving in formation of

    an incident

    Project Manager organizes

    to in form other ERC

    members to proceed to ECR

    Asses the situation and

    decide activation of ERP

    Alert all concerned as per

    the established

    communication system

    Decide on the action plan

    EnsureSituation

    under control

    HSE In charge

    Investigate with

    Section in charge

    and submit

    report

    Procee

    dtoE

    merge

    ncy

    Contr

    olRoo

    m

    ProceedtoEmergency

    ControlRoom

    ERC member start their activity like

    Medical Evaluation / arrangement ofrequired machineries / control assemblypoint and head count transfer of injured

    after rescue / information to client &

    regional office etc.

    Yes

    No

    Emergency

    Management

    Flow Chart

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    13/32

    HSE In charge

    Investigate with

    Section in chargeand submit

    report

    Termination of

    Emergency and

    Debrief

    Ensure Workplace

    Safe for Working

    ERC decide

    on seeking

    external

    help

    Situation Under

    Control

    Follow up of action

    taken

    ERC member start their activi ty like

    Medical Evaluation / arrangement ofrequired machineries / control assembly

    point and head count transfer of injuredafter rescue / information to client &

    regional office etc.

    Take

    precautionary

    measure to make

    the workplacesafe

    No

    No

    Yes

    Yes

    Yes

    HSE In charge

    Investigate with

    Section in chargeand submit

    report

    Termination of

    Emergency and

    Debrief

    Ensure Workplace

    Safe for Working

    ERC decide

    on seeking

    external

    help

    Situation Under

    Control

    Follow up of action

    taken

    ERC member start their activi ty like

    Medical Evaluation / arrangement ofrequired machineries / control assembly

    point and head count transfer of injuredafter rescue / information to client &

    regional office etc.

    Take

    precautionary

    measure to make

    the workplacesafe

    No

    No

    Yes

    Yes

    Yes

    Emergency

    Management

    Flow Chart

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    14/32

    Declaration of Emergency

    Chairman of ERC declares the emergency.

    Declared by the established communication

    system such as alarm or siren.

    People have to stop the work and move

    towards assembly point.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    15/32

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    16/32

    Assembly point

    To be identified & clearly marked withsign boards

    Sign boards to be placed to indicate the

    direction to the assembly point fromdifferent work areas

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    17/32

    1)TCS office

    2)D.G. Room

    3)L&T Office

    4)Staff Canteen

    5) Batching Plant

    6)Workers Canteen

    7)stores

    8)P&M office

    9)Time office

    10) First aid centre

    11)Workers canteen

    12)Safety office

    13) Workers toilet

    14) Emergency assemblyt point

    15) Parking area.

    1

    7

    2 43

    5

    5

    6

    813

    11

    9

    EB-6

    EB-5

    EB-4 FORM

    YARD

    ASSEMB

    LY YARD

    STEEL

    YARD

    GENERALSERVICEBUILDING

    MOCK UP

    YARD

    UTILITY BUILDING AREA

    12

    14

    14

    Compound

    Entrance

    Roads for site use

    Main road

    Escape route

    ESCAPE ROUTE

    15

    14

    10

    Typical Escape

    Route with

    assembly

    points marked

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    18/32

    Head Count

    A system for accounting

    for personnel following

    an evacuation

    Shall be taken by the

    time office personnel inassembly point

    Method for accounting

    for suppliers andcustomers

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    19/32

    Emergency Communication

    System A standard emergency communication

    procedure to be developed and communicatedto all concerned

    Shall give clear guidelines on how

    To alert workers in case of emergency To evacuate or take other action

    To report emergencies

    Communication shall be through Siren, PublicAddress System or any other suitable system.

    The alarms shall be distinctive and recognized

    by all.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    20/32

    Emergency Contact

    Information

    NO NAME DESIGNATION MOBILE OFFICE RESIDENCE

    Key Personnel of L&T

    Project Manager

    Nominated In charge

    Accounts & Admin In-

    charge

    HSE In charge

    Time Office In-charge

    P&M In-charge

    Section / Area In charge

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    21/32

    Key Personnel of Client & Consultant

    Emergency Agencies

    Police station

    Fire

    Department

    State

    Electricity

    Board Office

    CycloneWarning

    Centre

    Regional

    Meteorologic

    al office

    Emergency Contact

    Information

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    22/32

    Local Authorities

    District Collector

    Councillor

    Statutory Authorities

    Electrical

    Inspectorate

    Factories

    Inspectorate

    State Pollution

    Control Board

    Regional Labour

    Commissioner

    Emergency Contact

    Information

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    23/32

    Hospitals

    Hospital 1

    (Distance from site

    in Kms)

    Hospital 2

    (Distance from site

    in Kms)

    Hospital 3

    (Distance from site

    in Kms)

    Others

    Local Railway

    Station

    Local Bus Terminus

    Nearest Airport

    Emergency Contact

    Information

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    24/32

    Fire Fighting Facilities List shall be readily available at

    Emergency control room Time office

    Other conspicuous locations.

    Location Type Capacity Numbers

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    25/32

    Emergency Safety Equipment List & their storage locations shall be

    readily available at Emergency control room

    Time office

    Other conspicuous locations.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    26/32

    Emergency Safety Equipment

    Self contained

    Breathing Apparatus(SCBA)

    Oxygen Resuscitator

    Hard Stretcher Portable Gas

    Detector

    High Power searchlight

    Hand tools (Axe,

    shovel)

    First Aid Equipment

    Full Body Harness

    Mega Phone

    Manual siren Ring buoys

    Explosimeter

    Oxygen indicator

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    27/32

    Emergency Handling Strategies for

    different Scenarios

    Typical Emergency situations

    Occupational Injury & Illness Fire & Explosion

    Release of toxic gas

    Security breaches Civil Disturbances / Political Emergency Evacuation

    Earthquake

    Flood

    Storm/Cyclone

    Other situations specific to the site to be included

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    28/32

    Training

    Training for emergency response shall address,

    Function and elements of emergency action plan Types of potential emergencies

    Notification, warning, and communicationsprocedures

    Emergency response procedures

    Evacuation, shelter, and accountability procedures

    Location and use of common emergency equipment

    Any other special hazards onsite such as flammable materials,

    toxic chemicals,

    radioactive sources.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    29/32

    Mock drills

    Shall be carried out at regular intervals Objective

    to ensure continued familiarity of the

    personnel to check if the hardware infrastructure is in

    good condition.

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    30/32

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    31/32

    Head count being taken

    Head count being taken

    HSE Engineer explains the need of mock drill

    Mock drill conducted at site

  • 8/12/2019 Emergency Response Plan [Compatibility Mode]

    32/32

    Thank You