Contents

1. POWER SECTOR DEVELOPMENT PLAN

2. ENERGY AUDIT PROGRAM

3. ISLAND POWER PROJECT EXPANSION

4. ENERGY CONSERVATION CAMPAIGN

LAGOS STATE GOVERNMENT

POWER SECTOR DEVELOPMENT PLAN

Power Development Public Lighting Energy Awareness

Energy Audit Program Public Lighting Guidelines and

Standards

Street lighting Maintenance Plan

Household Energy and Emissions calculator

Renewable Energy Policy

Waste to Energy Projects

Solar Bulbs Initiative

Public Lighting Rehabilitation Plan

Industrial Estates Electrification

Independent Power Projects

Renewable Energy

Energy Awareness for Children

Youth Energy Career Program

INDEPENDENT POWER PROJECTS

PROJECTS AKUTE POWER

ISLAND POWER ALAUSA POWER

DESCRIPTION 12.15 MW plant runs on natural

Gas. The plant supplies power to

the Akute Intake Facility of Lagos

Water Corporation (LWC)

10 MW plant runs on

Compressed Natural Gas (CNG)

with diesel back up. The plant

supplies power to Courts,

Hospitals and Street lights

within Lagos Island

To construct a 10.4 MW plant

that will run on natural gas and

supply power to the Alausa

Secretariat and environs

STATUS OPERATIONAL OPERATIONAL

CONSTRUCTION

FEATURES The Akute Intake Facility is

responsible for 80% of water supply

in Lagos

LWC can now pump over 130

million gallons of water daily

The fastest executed power

plant (9 months)

The project includes a

dedicated 18 km distribution

network

The project will provide 24 hr

power therefore allow LASG to

function more effective

INDEPENDENT POWER PROJECTS

PROJECTS PENINSULA INTEGRATED POWER

IKEJA GRA POWER INDUSTRIAL ESTATES

DESCRIPTION To construct a 6.5 MW plant that

will run on Compressed Natural

Gas (CNG) to supply power to Lekki

water works, Victoria Island water

works and public lighting within

Lekki Phase 1 and Victoria Island

extension

To construct a 10 MW plant

that will run on natural gas or

Compressed Natural Gas (CNG)

to supply power to Lagos State

Teaching Hospital (LASUTH)

and LASG Old Secretariat

To construct small, medium and

large scale power plants for the

following LASG industrial

estates :

1. Isolo Industrial estate

2. Matori Industrial estate

3. Imota Agro Allied estate

4. Ikorodu Industrial estate

PROPOSED

COMPLETION

DATE

2013 2013 2013 – 2015

HOUSEHOLD ENERGY AND EMISSIONS CALCULATOR

www.lseb.gov.ng

LAGOS STATE ENERGY AUDIT PROGRAM

No Area Number of

locations

surveyed

Number of Sectors

Identified

Installed

Capacity (MW)

Number of

Generators

1 Somolu Printing

community

271 15 11 300

2 Matori Industrial estate 148 20 40 196

3 Ilupeju Industrial estate 144 18 25 105

4 Ikorodu Industrial

estate

11 4 135 31

5 Lagos Island (Broad

street & Marina only)

599 25 100 252

6 Ikeja GRA 789 31 68 804

7 Oba Akran 516 32 69 548

8 Agidingbi 645 36 70 820

9 Omole I 936 10 13 789

10 Omole II 1531 12 43 2410

11 Dolphin Estate 1544 12 22 1098

LAGOS STATE ENERGY AUDIT PROGRAM

ENERGY AUDIT PROGRAM

• Somolu Printing community

• Matori Industrial estate

• Ilupeju Industrial estate

• Ikorodu Industrial estate

• Lagos Island

• Ikeja GRA

• Oba Akran

• Agidingbi

• Omole I & II

• Dolphin Estate • Iporin • Gbagada • Magodo I & II

LAGOS STATE ENERGY AUDIT PROGRAM

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

MAGODO I - ENERGY AUDIT

ISLAND POWER EXPANSION (IPP2)

For Lagos State Government to develop, through public private partnership (PPP), the first integrated and fully independent power generation, distribution and public lighting solution in

Nigeria. This will provide 24 hrs uninterrupted power supply to crucial Lagos State facilities within the health, education, security, water, waste management, science & technology, judicial, sport

and transportation sectors in Lagos Island.

ISLAND POWER EXPANSION (IPP2)

BACKGROUND •The Island Power project is a 10MW Independent power project that also includes an 18km dedicated underground distribution network which supplies power to the •General Hospital (Lagos Island); •High Court (Catholic Mission Street); •High Court Annex (TBS); •Magistrates Court (JLC Taylor Court); •Island Maternity Hospital (Lagos Island); • State House (Marina), •E-learning centre, inner and outer Marina Street lights and street light installations on 20 Streets within Lagos Island.

ISLAND POWER EXPANSION (IPP2)

ISLAND POWER PROJECT POWER PLANT

INNER AND OUTER MARINA SUB STATION 1

INNER AND OUTER MARINA SUB STATION 2

INNER AND OUTER MARINA SUB STATION 3

STATE HOUSE CAR PARK SUB STATION

ONIKAN UNDER BRIDGE SUB STATION

ONIKAN UNDER BRIDGE PUBLIC LIGHTING

COWRY BRIDGE/ BONNY CAMP AHMADU BELLO LIGHTING

STATE HOUSE MARINA

GENERAL HOSPITAL, LAGOS

ISLAND MATERNITY AND HEALTH SERVICE COMMISSION

CITY HALL

FREEDOM PARK LAGOS ISLAND LCDA

E LEARNING CENTRE

MASSEY CHILDREN’S HOSPITAL

HIGH COURT

HIGH COURT ANNEX

CAMPOS STADIUM

ONIKAN HEALTH CENTRE

ONIKAN WATER WORKS

TBS/ ONIKAN STREET LIGHTING SUB STATION

OBALENDE TRANS -FORMATION SUB STATION

IGBOSERE MAGISTRATE COURT (JlC TAYLOR COURT)

SURA/ SIMPSON STREET LIGHTING SUB STATION

BOYS & GIRLS JUNIOR AND SENIOR ACADEMY

DOLPHIN JUNIOR AND SENIOR SCHOOLS

EPETEDO & EBUTE ELEFUN JUNIOR AND SENIOR SCHOOLS

LAGOS ISLAND STREET LIGHTING SUB STATION FOR 20 STREETS

PUBLIC LIGHTING SUBSTATION FOR AN ADDITIONAL 15KM OF LIGHTING

Facilities connected to IPP

Proposed Facilities to be connected to IPP

Existing distribution network

Proposed distribution network

LEGEND

Island Power Plant (IPP)

OBA' OF LAGOS PALACE

LAWMA TRANSFER LOADING STATION

OKESUNA & LAFIAJI JUNIOR AND SENIOR SCHOOLS

ISLAND POWER PROJECT POWER PLANT

INNER AND OUTER MARINA SUB STATION 1

INNER AND OUTER MARINA SUB STATION 2

INNER AND OUTER MARINA SUB STATION 3

STATE HOUSE CAR PARK SUB STATION

ONIKAN UNDER BRIDGE SUB STATION

ONIKAN UNDER BRIDGE PUBLIC LIGHTING

COWRY BRIDGE/ BONNY CAMP AHMADU BELLO LIGHTING

STATE HOUSE MARINA

GENERAL HOSPITAL, LAGOS

ISLAND MATERNITY AND HEALTH SERVICE COMMISSION

CITY HALL

FREEDOM PARK LAGOS ISLAND LCDA

E LEARNING CENTRE

MASSEY CHILDREN’S HOSPITAL

HIGH COURT

HIGH COURT ANNEX

CAMPOS STADIUM

ONIKAN HEALTH CENTRE

ONIKAN WATER WORKS

TBS/ ONIKAN STREET LIGHTING SUB STATION

OBALENDE TRANS -FORMATION SUB STATION

IGBOSERE MAGISTRATE COURT (JlC TAYLOR COURT)

DOLPHIN JUNIOR AND SENIOR SCHOOLS

EPETEDO & EBUTE ELEFUN JUNIOR AND SENIOR SCHOOLS

LAGOS ISLAND STREET LIGHTING SUB STATION FOR 20 STREETS

PUBLIC LIGHTING SUBSTATION FOR AN ADDITIONAL 15KM OF LIGHTING

Facilities connected to IPP

Proposed Facilities to be connected to IPP

Existing distribution network

Proposed distribution network

LEGEND

Island Power Plant (IPP)

OBA' OF LAGOS PALACE

LAWMA TRANSFER LOADING STATION

OKESUNA & LAFIAJI JUNIOR AND SENIOR SCHOOLS

DOLPHIN WATER WORKS

SURA/ SIMPSON STREET LIGHTING SUB STATION

BOYS & GIRLS JUNIOR AND SENIOR ACADEMY

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

The Problem

- Approximately 1% of Lagosians currently practice Energy Conservation

- On average Lagos State receives 1000MW of Electrical Power from the grid

- Lagos has a population of over 18million people

- The Energy is not sufficient but still being Wasted

- Energy Wastage is most popular within the Low income citizens

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

The Purpose of the Awareness Campaign is to enlighten

Lagosians on:

• Understanding Energy and Electrical terms

• Current Energy Consumption

• Minimising Energy Wastage

• Different Sources of Electrical Power

• Improved Energy Consumption Habits

• How using less energy will save them money

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN

Thank you for listening