1
Clean and Efficient Power Generation from Coal 24-25, Gliwice (Poland)
Francisco García Peña [email protected]
ELCOGAS, S.A. www.elcogas.es
ELCOGAS: ELCOGAS: R&D R&D activities towards zero activities towards zero emissions IGCC plantsemissions IGCC plants
![Page 2: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/2.jpg)
2
1. ELCOGAS COMPANY
2. PUERTOLLANO IGCC POWER PLANT
3. FUTURE OF IGCC TECHNOLOGY
4. ELCOGAS R&D INVESTMENT PLAN
5. CONCLUSIONS
INDEX
![Page 3: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/3.jpg)
3
ELCOGAS shareholders and percentage of capital
1. ELCOGAS COMPANYEuropean company established in April 1992 to undertake the
planning, construction, management and operation of a 335 MWISO IGCC plant located in Puertollano (Spain)
Babcock Wilcox Española
0,0%
Krupp Koppers0,04%Energías do Portugal
4,3%
EDF International31,4%
Iberdrola Generación12,0%
Hidrocantábrico4,3%
SIEMENS2,5%
Autocartera 0,3%ENEL
4,3%
ENDESA Generación40,9%
National Power0,0%
OPENCAST COAL MINE
PUERTOLLANO
REPSOL INDUSTRIAL COMPLEX
ELCOGAS IGCC PLANT
OPENCAST COAL MINEOPENCAST COAL MINE
PUERTOLLANO
REPSOL INDUSTRIAL COMPLEXREPSOL INDUSTRIAL COMPLEX
ELCOGAS IGCC PLANT
ELCOGAS IGCC PLANT
![Page 4: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/4.jpg)
4
1. ELCOGAS COMPANY
2. PUERTOLLANO IGCC POWER PLANT
• DESCRIPTION
• OPERATING DATA
3. FUTURE OF IGCC TECHNOLOGY
4. ELCOGAS R&D INVESTMENT PLAN
5. CONCLUSIONS
INDEX
![Page 5: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/5.jpg)
55
2. PUERTOLLANO IGCC POWER PLANT DESCRIPTION
GAS TURBINE
200 MWISO
Flue gas to stack
SteamHeat Recovery
Steam Generator STEAM
TURBINE
135MWISO
Hot combustion gasCondenser
Coal Petroleum CokeLimestone
Coalpreparation Gasifier
Slag
Sulfur (99.8%)
SulfurRecovery
Quench Gas
O2
Air
Clean syngas
Raw GasCoal - N2
HP Boiler
MP Boiler Waterwash
Fly ash
Claus gas
HP Steam
MP Steam
Air Separation Unit
N2
O2
Waste N2
Process description
Filtration Sulfur Removal
Tail Gas
Waterto treatment
G
G
Cooling tower
Compressed air
![Page 6: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/6.jpg)
6
COAL PET COKE FUEL MIX(50:50)
Moisture (%w) 11.8 7.00 9.40Ash (%w) 41.10 0.26 20.68C (%w) 36.27 82.21 59.21H (%w) 2.48 3.11 2.80N (%w) 0.81 1.90 1.36O (%w) 6.62 0.02 3.32S (%w) 0.93 5.50 3.21LHV (MJ/kg) 13.10 31.99 22.55
Power output and emissions
GASTURBINE
(MW)
STEAMTURBINE
(MW)
GROSSTOTAL(MW)
NETTOTAL(MW)
POWEROUTPUT
182.3 135.4 317.7 282.7
GROSS NETEFFICIENCY(LHV) 47.12% 42.2%
EMISSIONS g/kWh mg/Nm3 (6% Oxygen)SO2 0.07 25NOx 0.40 150
Particulate 0.02 7.5
2. PUERTOLLANO IGCC POWER PLANT DESCRIPTIONMain data
Design Fuel is a mixture 50:50 of coal & petcoke (currently operating at 45:55).
Successful tests with:- MBM 2% (50 tpd)- Olive oil wastes 8% (10% planned)- Washed coal, Venezuela petcoke …
![Page 7: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/7.jpg)
7
Raw and clean gas data
Actual average Design Actual average Design
CO (%) 59.26 61.25 CO (%) 59.30 60.51
H2 (%) 21.44 22.33 H2 (%) 21.95 22.08
CO2 (%) 2.84 3.70 CO2 (%) 2.41 3.87
N2 (%) 13.32 10.50 N2 (%) 14.76 12.5
Ar (%) 0.90 1.02 Ar (%) 1.18 1.03
H2S (%) 0.81 1.01 H2S (ppmv) 3 6
COS (%) 0.19 0.17 COS (ppmv) 9 6
HCN (ppmv) 23 38 HCN (ppmv) - 3
Raw Gas Clean Gas
2. PUERTOLLANO IGCC POWER PLANT DESCRIPTION
![Page 8: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/8.jpg)
8
1992
Jun 1996
Oct 1996
Jun 1997
Mar 1998
Nov 2000
Dec 2008
Main contracts award
First synchronization of gas turbine
Commercial operation with natural gas
Performance test of the Air Separation Unit
First switch over from natural gas to coal gas
First 1,000 GWh produced with coal gas as IGCC
Total: 17,551 GWh
IGCC: 11,476 GWh
Project milestones2. PUERTOLLANO IGCC POWER PLANT
Up to 2008, 4450 modifications have been installed in plant
![Page 9: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/9.jpg)
9
IGCC, NGCC and Total yearly production
9
1.162744
836
622
321343
301 452421 312 259 327
1.1301.1501.1291.2931.3711.595
1.391
911
3350
500
1.000
1.500
2.000
2.500
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
year
GW
hNGCC GWhIGCC GWh
752
1,171
1,5331,712
1,938
1,672 1,7441,550 1,462 1,389 1,489
2. PUERTOLLANO IGCC POWER PLANT: Operating data
1st 5 years: Learning curve
2003: Major overhaul Gas Turbine findings
2004 & 2005: Gas turbine main generation transformer isolation fault
2006: Gas turbine major overhaul & candle fly ash filters crisis
2007 & 2008: ASU WN2 compressor coupling fault and repair MAN TURBO
![Page 10: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/10.jpg)
10
Coal gas (mg/Nm3 at 6% O2 dry)
0,0150
400
650
500
200
5
200
25,8146,5
0100200300400500600700
SO2 NOx Particles
EU Directive 88/609/EECEU Directive 2001/80/EECELCOGAS Environmental PermitELCOGAS 2008 average
Emissions in NGCC and IGCC modes
29,24,2
291,7
12,5 4,2
250,0
6,3 0,8
204,0
050
100150200250300350
SO2 Particles NOx
Natural gas (mg/Nm3 at 6% O2 dry)
EEC 88/609
ELCOGAS Environmental Permit
ELCOGAS 2008 average
2. PUERTOLLANO IGCC POWER PLANT: Operating data
Emissions in NGCC mode
Emissions in IGCC mode
![Page 11: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/11.jpg)
11
1. ELCOGAS COMPANY
2. PUERTOLLANO IGCC PLANT DESCRITPION
3. FUTURE OF IGCC TECHNOLOGY
4. ELCOGAS R&D INVESTMENT PLAN
5. CONCLUSIONS
INDEX
![Page 12: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/12.jpg)
12
Step 1: Syngas production from gasification
Fly ashCharCl-CN-
SH2COSCO2
N2....
Step 2: “Shifting” or water-gas reaction
CO + H2O CO2 + H2
Step 3: H2 and CO2 separation
Carbon compound + O2 + H2O CO + H2 + Impurities
H2 CO2&
H2 production from fossil fuels involves CO2 generation ⇒To talk about “clean” H2 it is required to consider CCS
3. FUTURE OF IGCC TECHNOLOGY.H2 co-production and CCS
![Page 13: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/13.jpg)
13IPCC report. Bangkok meeting. May 2007 http://www.ipcc.ch/ipccreports/
CLIMATE CHANGE MITIGATION CLIMATE CHANGE MITIGATION -- IPCCIPCC
3. FUTURE OF IGCC TECHNOLOGY. CCS
![Page 14: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/14.jpg)
14
CLIMATE CHANGE MITIGATIONCLIMATE CHANGE MITIGATION3. FUTURE OF IGCC TECHNOLOGY. CCS
![Page 15: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/15.jpg)
15
1. ELCOGAS COMPANY
2. PUERTOLLANO IGCC PLANT DESCRITPION
3. FUTURE OF IGCC TECHNOLOGY
4. ELCOGAS R&D INVESTMENT PLAN
5. CONCLUSIONS
INDEX
![Page 16: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/16.jpg)
16
PUERTOLLANO IGCC ACTIONS PUERTOLLANO IGCC ACTIONS BASED ON THE OPPORTUNITY THAT AN IGCC PLANT REPRESENTS
CONTRIBUTION CAN BE RELEVANT IN:
• CLIMATE CHANGE MITIGATION
• ENERGY SUPPLY RELIABILITY
4. ELCOGAS R&D INVESTMENT PLAN
CO2 EMISSION REDUCTION IN UTILIZATION OF FOSSIL FUELS
H2 PRODUCTION BY GASIFICATION OF FOSSIL FUELS
DIVERSIFICATION OF RAW FUELS AND PRODUCTS
OTHER ENVIRONMENTAL IMPROVEMENTS
IGCC PROCESSES OPTIMISATION
DISSEMINATION OF RESULTS
MAIN LINES OF R&D PLAN ARE:
![Page 17: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/17.jpg)
17
Dissemination of results:• Forum participations. CO2, H2, and sustainability associations and Technological Platforms. European and Spanish. Coordinating working groups in Technological Spanish Platforms.• Participation in conferences, seminars, congresses. • Consulting services. Germany, China, Chile • Attending and promoting technical visits. Generally international visits.
www.elcogas.es
4. ELCOGAS R&D INVESTMENT PLAN
![Page 18: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/18.jpg)
18
Optimisation of IGCC processes: Oriented to improve availability & costs
4. ELCOGAS R&D INVESTMENT PLAN
Gasifier materials/Syngas corrosion processes
Ceramic filters
Test materials
Elimination of membrane water leakages at reaction chamber
Gas Turbineburners tests
![Page 19: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/19.jpg)
19
Other environmental improvements:
• Liquid wastes reduction. Change of waste water treatment plant
• Improvement of syngas cleaning systems.Currently participating in project AGAPUTE(RFCS, 2004-08, to study improvements in syngas cleaning). Hg task.
• Improvements in Sulphur Recovery plant. In progress several modifications to improve availability and to reduce S emissions.
• Operation and additives parametersoptimization. Included in AGAPUTE to study dosing of limestone, oxygen, steam, vs. concentration of contaminants in slags, fly ash and washing water
• Emissions reduction during start up and other transitory situations.
4. ELCOGAS R&D INVESTMENT PLAN
Overview of the test rig for mercury and carbonyls analysis
Cross correlation between limestone content in the fuel and Se bulk fly ash content
![Page 20: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/20.jpg)
20
Diversification of raw fuels and products: Project PIIBE (ESP-CENIT). To impulse biofuels technologies in Spain.
ELCOGAS coordinates the subproject about biodiesel from gasification by real co-gasification 10% of biomass and syngas characterization (F-T process in laboratory)
Agreement with a private European Company to install a pilot plant in IGCC of Puertollano to develop process to obtain gasoline from syngas
Project PEIXE VERDE. (ESP-PSE). Technical-economic study about uses of syngas as fuel for fishing ships in different scales of production
Co-gasification of car manufacture wastes (shredder fibres) was agreed with supplier.
Available to do tests of gasification of different fuels at large scale to help in design of new IGCC plants
Clean H2 production by gasification of fossil fuels: • H2 production in IGCC. Project HYDROSEP (RFCS, to study IGCC adaptation to H2 production) • Study and tests of new processes of H2 purification. Project SPHERA (ESP-CENIT)• Available to collaborate with new H2 & Fuel Cells Experimental National Centre of Puertollano
4. ELCOGAS R&D INVESTMENT PLAN
Biomass yard
![Page 21: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/21.jpg)
21
CO2 EMISSION REDUCTIONIGCC Efficiency Optimisation
Analysis of viability to improve efficiency based on Critical Assessment of Puertollano IGCC design (3-6% efficiency improvement and 20-30% fixed costs reduction)
Auxiliary consumption optimisation. New revisionDevelopment of tools to improve efficiency. Supervision on line
of main (120) equipment efficiency. Installed and in tests Integration optimisation. Improvement of controls to adjust heat
& mass balances in real operationAnd
CO2 capture for CCS with IGCC
4. ELCOGAS R&D INVESTMENT PLAN
![Page 22: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/22.jpg)
22
To demonstrate the feasibility of capture of CO2 and production of H2 in an IGCC that uses solid fossil fuels and wastes as main feedstock.
To obtain economic data enough to scale it to the full Puertollano IGCC capacity in synthetic gas production.
Project of pilot plant in existing IGCC of Puertollano is part of a Spanish national initiative, “Advanced technologies of CO2 conversion, capture and storage” and it is coordinated with other related projects:
Project # 2 is to explore CO2 capture with oxyfuel technology in a 20MW pilot plant. To be built in El Bierzo, NW of Spain (coordinator CIUDEN)
Project # 3 is to study and regulate geological storage in Spain (coordinator IGME)
Project #4 is to study public awareness of CCS technologies (coordinator CIEMAT)
ELCOGAS – UCLM – Ciemat – INCAR CSIC 13 M€ (initially 18.5 M€)
TARGETS
PARTICIPANTS & BUDGET
COORDINATED
4. ELCOGAS R&D INVESTMENT PLAN.CO2 line – “Singular and strategic project PSE-
CO2”
![Page 23: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/23.jpg)
23
4. ELCOGAS R&D INVESTMENT PLAN.CO2 line – “Singular and strategic project PSE-
CO2”
COMBINEDCYCLE
COAL + PETCOKE
GASIFICATIONRawgas FILTRATION
SYSTEM
CleangasPURIFICATION
& DESULPHURISATION
Clean Gas2% of total flow (3600 Nm3/h)
22.6 bar130 ºC
60.5 % CO22.1% H2
Tail Gas1,3 bar
MP steam
SHIFT REACTOR(Sour/Sweet)
CO2¿SH2?
CO2 AND SULPHURREMOVAL
(Chemical, aMDEA)
183,000 Nm3/h
100 t/d
CO + H2O → CO2 + H2
H299,99%
2 t/d
PIL
OT
PL
AN
T
Raw H2 (purity 80% )
40%
H2 rich gas:37,5 % CO250,0 % H23,0 % CO
H2PURIFICATION
(PSA UNIT)
Recycle gas compressor
Pilot plant size: 1:50 ~ 14 MWth
Existing Puertollano IGCC plant
![Page 24: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/24.jpg)
24
4. ELCOGAS R&D INVESTMENT PLAN.CO2 line – “Singular and strategic project PSE-
CO2”
3D view
View (Sept 09)General view of the ELCOGAS power plant
![Page 25: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/25.jpg)
25
Done:98 % engineering work97% equipments bought30% construction
EngineeringCO2 UnitPSA Unit
Civil workControl
ReactorsHeat exchangers
CatalystsPiping and fitting
Control valvesSafety and relief valves
Manual valvesElectrical components
On-line analysis system
Empresarios AgrupadosLinde-CaloricLindeConstrucciones Ocaña-CañasZeus ControlTecnicalTecnical and Boreal-VilaJohnson MattheyMasa, Sidsa and CuñadoSAMSONTyco Valves and ControlsSAIDIGE PowerABB Process Automation Division
Mechanical Erection: started on 17th August 2009End commissioning: March 2010End of programmed tests (under PSE): March 2011
KEY CONTRACTORS
CO2 Capture Pilot Plant. Status Aug 2009
![Page 26: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/26.jpg)
26
Pilot plant for CO2 capture & H2 production integrated in an IGCC
Activities to be done after PSE, as R&D platform: Water shift reaction catalyst optimization. Tests of different catalyst
New processes to separate CO2-H2
CO2 different treatment processes
Improvement of integration efficiency between CO2 separation processes and IGCC plant
Other proposals from Industry or Research community to use the IGCC plant and its pilot plant to develop of process, equipments, components or even pre-engineering of new plants with CCS and Zero emissions
4. ELCOGAS R&D INVESTMENT PLAN. CO2 line
![Page 27: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/27.jpg)
27
1. ELCOGAS COMPANY
2. PUERTOLLANO IGCC PLANT DESCRITPION
3. FUTURE OF IGCC TECHNOLOGY
4. ELCOGAS R&D INVESTMENT PLAN
5. CONCLUSIONS
INDEX
![Page 28: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/28.jpg)
28
5. CONCLUSIONS
IPCC Unless greenhouse gas emissions are cut by 50-80% by 2050 (especially CO2), the impact of global warming will be disastrous.
World energy demand Expected to double by 2050.
So We must act fast using a portfolio of solutions (mainly, energy efficiency improvement, renewables and CCS) to reduce CO2 emissions in the requiredmassive scale.
IGCC technology can contribute to this aim because:
Existing IGCC plants are an opportunity to develop cleaner electricity with fossil fuels
Diversification of fossil fuels use according to the reserves and total life cycle is absolutely necessary
Clean co-production of H2 and electricity is possible and can be adapted to market demand
Massive H2 production is currently possible and technology is available
![Page 29: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/29.jpg)
29
Thank you for your attention
Francisco García Peña [email protected]
ELCOGAS, S.A. www.elcogas.es
ELCOGAS: ELCOGAS: R&D R&D activities towards zero activities towards zero emissions IGCC plantsemissions IGCC plants
![Page 30: ELCOGAS: R&D activities towards zero emissions IGCC plantscleancoal.polsl.pl/pdf/Garcia_Pena.pdf · 2 compressor coupling fault and repair MAN TURBO. 10 Coal gas (mg/Nm3 at 6% O 2](https://reader030.vdocuments.us/reader030/viewer/2022040523/5e87ddfd832f5c65d400c5f7/html5/thumbnails/30.jpg)
30