ekonomi teknik 1

Upload: sucyfeb

Post on 17-Oct-2015

64 views

Category:

Documents


5 download

TRANSCRIPT

  • PendahuluanMengapa ekonomi teknik diperlukan?

    Mengapa (engineers) perlu mengetahui aspek ekonomi dalam pekerjaan-pekerjaan keteknikan

  • WHAT IS ECONOMICS ?The study of how limited resources is used to satisfy unlimited human wants

  • LAND All gifts of nature, such as: water, air, minerals, sunshine, plant and tree growth, as well as the land itself which is applied to the production process.

  • LABOR The efforts, skills, and knowledge of people which are applied to the production process.

  • CAPITALReal Capital (Physical Capital )Tools, buildings, machinery -- things which have been produced which are used in further productionFinancial CapitalAssets and money which are used in the production processHuman CapitalEducation and training applied to labor in the production process

  • Mengapa sebuah pabrik dibangun?

    Bagaimana memastikan bahwa investasi yang ditanamkan akan mendatangkan pendapatan yang lebih besar?

    Bagaimana menghitung nilai pabrik apabila akan dipindahtangankan kepada pihak lain?

  • Bagaimana bendung dapat memberi manfaat bagi masyarakat luas? Bagi petani? Bagi upaya pengendalian banjir?Bagaimana mengetahui dampak ekonomi bagi pemindahan penduduk yang seringkali terjadi dalam proyek banjir? Apakah biaya ini sepadan dengan manfaat yang akan diperoleh?

  • Dari mana kita mengetahui manfaat pembangunan jalan?

    Bagaimana mengetahui kelayakan pembangunan jalan?

    Apakah ada bedanya kelayakan ekonomi dan finansial investasi kelayakan

  • Dalam pekerjaan-pekerjaan sipil yang dilakukan didaerah perdesaan, apa yang perlu diperhatikan untuk memastikan manfaat pembangunan bisa diperoleh secara optimal?

  • PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel ComputersPRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers300PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300PRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300Unused ResourcesPRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300UnavailableResourcesUnused ResourcesPRODUCTION POSSIBILITY FRONTIER

  • Video RecordersPersonel Computers500300Unused ResourcesPRODUCTION POSSIBILITY FRONTIER500

  • Video RecordersPersonel Computers500300Unused ResourcesPRODUCTION POSSIBILITY FRONTIER600400

  • Proses Pengambilan Keputusan

    step rational decision making proses:1. Mengenal Permasalahan2. Definisikan Tujuan3. Kumpulkan Data yang Relevan4. Identifikasi alternatif yang memungkinkan (feasible)5. Seleksi kriteria untuk pertimbangan alternatif terbaik6. Modelkan hubungan antara kriteria, data dan alternatif7. Prediksi hasil dari semua alternatif8. Pilih alternatif terbaik

  • Biaya ?Biaya HistorisBiaya mendatang (Future Cost)Biaya Kesempatan (Opportunity Cost)Biaya siklus hidup (penelitian, pengembangan, perancangan, pembuatan, pengetesan, operasional, perawatan

  • Biaya ?Biaya Modal (Kuiper,1971): jumlah semua pengeluaran yang dibutuhkan mulai dari prastudi sampai proyek selesai dibangun. Biaya modal terdiri dari: Biaya langsung (direct cost)ex: pembangunan jembatan: biaya pembebasan tanah, biaya galian dan timbunan, biaya beton bertulang, biaya konstruksi baja

  • Biaya ?Biaya tidak langsung (indirect cost)biaya yang tidak diduga dari biaya langsung (5 %, 10%, 15%, tergantung pada perencana atau pemilik)biaya teknik (engineering cost): biaya pembuatan desain, studi kelayakan, biaya pengawasanbunga

  • Biaya ?Biaya tahunan (annual cost)biaya selama proyek berlangsung, terdiri:bungadepresiasibiaya operasi pemeliharaan

  • Biaya ?Biaya tetap (fixed cost)Biaya yang besarnya tidak dipengaruhi oleh volume produksiex: biaya gedung, biaya tanah, biaya mesin, peralatanBiaya variabel (variable cost)Biaya yang besarnya tergantung pada volume produksiex: biaya bahan baku, biaya tenaga kerja langsung

  • Biaya Tetap Total (Total Fixed Cost), TFC = f (Konstan).Biaya Variabel Total (Total Variabel Cost), TVC = f (output atau Q).Total Cost (Total Cost), TC = TFC + TVCQBiaya ProduksiTFCTVCTC

  • Average Fixed Cost, AFC = TFC/QAverage Variabel Cost, AVC = AVC/QAverage Cost,

    Biaya Marjinal (Marginal Cost);MC = TC/ QBiaya ProduksiQACAVCTFCMC

    ***************