Prepared by: Submitted to: Name/ Staff No/ Designatio n: Preej .J/114 928 /HSEO Name/ Staff No: Mohammed Moussa/1717 16/Project Manager ET S ON  ST R  GROUP  OF  OMP NIES  Doc. No:  DAILY HSE REPORT Revision No: 0  Report No: HSE/PJ/DHR/ 111  Date: 27/08/14 Page No. 01  Name of th e Proj ect/ Fa ctor y/ Workshop / Job No: Akoya by Damac ” Service Removal And Bulk Earth Works R155 Division/ Area: Ascon Road Construction / Dubai Name of the Proj ect Director / Site/ Worksho p Manager: Mohammed Moussa Staff No :171716 SECTION A: Project HSE Lea d No of employees worked 136Nos No. of LTI Nil No. of Man days lost  Nil No. of Hospit al Ref. cases Nil Man-hours worked 1360Hrs No. of First  Aid cases Nil No. of Near Miss Incidents reported  Nil No. of HSE Meeting conducted Nil SECTION B: Project HSE Officer/Engineer Sl. No. Data type Equipment/ Doc Ref. Observations Hazard Danger Level (LXSXE) Danger code Remedial Action Proposed/  Ad dit io nal c on tr ol m easur e /  App li cabl e Legal req ui rement t o comply  Act io n B y wi th Staff No & Name. Target date  Ac ti on t aken on 1 UC Mini roller being lifted with rope hooked to the excavator bucket teeth was noticed. Reg no E89415 Failure of rope, Failure of equipment, Personnel Injury 100 A a)Third part certified web sling to be used for lifting the load. b) Excavator are used as lifting equipment slings should be connected to manufacture designed and recomm ended lifting point and lifting with bucket teeth is strictly prohibited. Mr.Naser  A la a din 179457  27/08/14 27/08/14 2 UC Un protected manhole observed in under passage demolition area. Fall of person 100 A Provide hard barrication for the manhole with sign boards. Mr.Naser  A la a d in 179457 27/08/14 27/08/14 3 UC Observed compressed gas cylinder being laid on ground. subjected to impact, Fire 100 A Remove the excess compressed gas cylinders from the work place and cylinder should be keep in trolley securing with chain. Mr.Naser  A la a d in 179457  27/08/14 27/08/14

Upload: dore101

Post on 03-Jun-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EHS Observation Report Format

8/11/2019 EHS Observation Report Format

http://slidepdf.com/reader/full/ehs-observation-report-format 1/1

Prepared by: Submitted to:

Name/ Staff No/ Designation: Preej .J/114928/HSEO Name/ Staff No: Mohammed Moussa/171716/Project Manager

ET S ON ST R GROUP OF  OMP NIES

  Doc. No: 

DAILY HSE REPORT  Revision No: 0 

Report No: HSE/PJ/DHR/ 111  Date: 27/08/14 Page No. 01

 

Name of the Project/ Factory/ Workshop / Job No: “ Akoya by Damac ” Service Removal And Bulk Earth Works R155Division/ Area: Ascon Road Construction / DubaiName of the Project Director / Site/ Workshop Manager: Mohammed Moussa  Staff No :171716SECTION A: Project HSE Lead 

No of employeesworked

136Nos No. of LTI Nil  No. of Man days lost  Nil  No. of Hospital Ref. cases Nil 

Man-hours worked 1360HrsNo. of First Aid cases

NilNo. of Near MissIncidents reported 

Nil No. of HSE Meeting

conductedNil 

SECTION B: Project HSE Officer/Engineer 

Sl.No.

Datatype

Equipment/

Doc Ref.Observations Hazard

DangerLevel

(LXSXE)

Dangercode

Remedial Action Proposed/ Addit ional control measur e /

 App licable Legal requirement t ocomply

 Act ion By wi thStaff No & Name.

Targetdate

 Action t akenon

1 UC

Mini roller being lifted with ropehooked to the excavator bucket teethwas noticed.Reg no E89415 

Failure ofrope,

Failure ofequipment,

PersonnelInjury

100 A

a)Third part certified web sling tobe used for lifting the load.b) Excavator are used as liftingequipment slings should beconnected to manufacture

designed and recommended liftingpoint and lifting with bucket teeth isstrictly prohibited.

Mr.Naser Alaadin179457 

27/08/14 27/08/14

2 UCUn protected manhole observed inunder passage demolition area.

Fall of person 100 AProvide hard barrication for themanhole with sign boards.

Mr.Naser Alaadin179457

27/08/14 27/08/14

3 UCObserved compressed gas cylinderbeing laid on ground.

subjected toimpact, Fire

100 A

Remove the excess compressedgas cylinders from the work placeand cylinder should be keep in

trolley securing with chain.

Mr.Naser Alaadin

179457 

27/08/14 27/08/14