dsm and ee portfolio services of eesldsm-india.org/wp-content/uploads/2014/06/mr... · dsm and ee...
TRANSCRIPT
DSM and EE Portfolio Services of EESL
Presentation
Saurabh Kumar
Managing Director
Date: 4th April, 2014
Venue: Lucknow
Energy Efficiency Services Limited
EESL Business - Objectives
Energy Efficiency Services Limited
• Create market access in public and private facilities – handholding, information dissemination, capacity building
• Develop projects for various sectors addressing specific barriers and challenges
• Design innovative risk mitigation measures to address technical, financial and regulatory risks
• Provide and secure funding at reasonable rates for project implementation
• Develop model templates necessary for project implementation by including the above
• Disseminate best practices to stakeholders so that replication can occur
EESL Business Models
Energy Efficiency Services Limited
• Partner with private sector entities
• Risk sharing mechanism developed – technical risk of the private sector partner and revenue risk of EESL
• Selection of private sector partner through open competitive bidding
• Enable financing for PPP projects at reasonable rates – through Banks/ FIs/ Bilaterals and Multilaterals
• Partnership policy evolved to ensure good projects do not languish due to lack of financing
EESL Financial Model
Energy Efficiency Services Limited
• Deemed savings approach
• Payments delinked to demonstration of savings
• ROE (post tax) of 15% (minimum)
• All other project costs on actuals
• Payment security through ESCROW, LCs
Energy Efficiency in Street Lights - Opportunity
Source: 18th EPS, CEA
Projected Growth in Consumption of energy by Street Lights (m KWh) per annum 8.5 b KWh consumption
annually (2012-13) – growing at CAGR of 7% Potential savings of upto 55% possible by retrofits by LEDs Additional 15-25% savings by intelligent street light management – daylight savings/ dimming, etc Savings of 5 b KWh possible at national level Cost savings of Rs. 2500 crores annually Investment required – Rs. 20,000 crores
EESL Street Lighting Methodology
• Authorisation from Municipality to EESL MoU
• Selection of road and light fixtures for demonstration
Finalisation of Demo project
• Retrofit with LED fixtures and measuring savings and light output Technology Demonstration
• Annuity per LED watt determined based on energy and O&M savings Annuity Determination
• The Payment security mechanism to be finalized. Payment Mechanism
• Implementation agreement signed Implementation
• Deemed saving approach used M & V
Overall cost (energy and O&M) savings to Municipalities
Project Pipeline
Energy Efficiency Services Limited
Sl. No. Name of ULB Nos. of Lights Estimated Investment
(Rs. Crore)
1 Kolkata Municipal Corporation 281000 295
2 Kerala ULB 520000 390
3 Andhra Pradesh ULB 340000 255
4 Ranchi Municipal Corporation 20000 30
5 Puducherry UT 41100 24
6 Ludhiana Municipal Corporation 90000 54
7 Mohali Municipal Corporation 20000 12
Total 13,12,100 1060
EESL MuDSM Investment – Ongoing
Sl. No. State Estimated Investment
(Rs. Crore)
1 West Bengal (4 MCs) 260
2 Chhattisgarh (6 MCs) 70
3 GUDC (10 ULBs) 200
4 MP (Jabalpur) 40
Total 570
EESL MuDSM Investment – Upcoming
Street Light – costs savings
Energy Efficiency Services Limited
Repair & Maintenance Cost Savings
S.No. Municipality
Present
Electricity Cost
INR in Lacs
Present O & M
Cost INR in
Lacs
Total (Before
LED
Retrofit)INR
in Lacs
Annuity
(Inclusive
of O &M)
INR in
Lacs
Electricity
Cost with
LED INR in
Lacs
Total
(After
Project)
INR in
Lacs
Monetray
Savings
annualy
INR in Lacs
1 Kolkata Municipal
Corporation 8,754 1,944 10,697 7,405 2,398 9,802 895
2 Sangali Municipal
Corporation 596 58 654 432 190 623 32
3 Solapur Municipal
Corporation 693 110 803 543 218 762 41
4 Nagpur Municipal
Corporation 2,053 300 2,353 1,585 590 2,175 177
5
Ludhiana
Municipal
Corporation
3,235 240 3,475 2,273 982 3,255 220
6
Faridababd
Municipal
Corporation
767 37 804 519 253 773 31
7 Jabalpur Municpal
Corporation 371 63 434 295 107 403 32
8 Trichur Municipal
Corporation 417 26 443 288 123 411 32
9
Hyderabad
Municipal
Corporation
13,205 163 13,368 8,484 4,001 12,484 883
10 Bikaner Municipal
Corporation 322 19 341 221 102 323 18
EESL Ag DSM Methodology
• MoU to be signed between DISCOM & EESL MoU
• Detailed energy audit for existing pumps DPR/ Re Validation Of DPR
• To assess actual energy savings and finalising technical specifications Technology Selection
• Agreement to be signed between DISCOM & EESL for implementation. Agreement
• The Payment security mechanism to be finalized -ESCROW Payment Mechanism
• EESL will implement the project based on own resources Implementation
• Deemed saving approach used M & V
Subsidy savings to States
EESL Ag DSM Business Model
Consumers
Farmer
Government / Regulatory Commission
• Reduction in Subsidy payments
• Policy Guidelines and Approvals
• Inclusion in Annual Revenue Requirement
• Sale of saved energy to other
consumers
• Free Energy Efficient Pump set
• Reduced Energy Bills
• Free Maintenance
• Quality Power Supply
Third Party Testing
Agreement
Utility / Discom
• Capital for Installation of new pumps
• Improved Collection efficiency
• Reduced Losses and Peak Load
• Subsidy Reduction due to saved energy
Contractor
• Design / Installation / Commissioning & R&M
• Demonstrate the energy savings
• Repair and Maintenance
Payment Security Package
Pump
Policy guidelines & Approvals
Electricity sales
Monitoring Agency
Regulator
Location Feeders Replaced
pump sets
Old kW Consumptio
n
New kW Consumptio
n
Reduction in kW
Consumption
Annual Energy Saving
(kWH)
Energy Saving in %
NIPPANI 200
BENADI 99 608.36 391.10 217.26 4,69,282 35.71 %
HANCHINAL 101 526.41 343.61 182.80 3,94,848 34.73 %
BYDAGI 390
KUMMUR 149 916.86 566.50 350.36 7,56,778 39.27 %
INGLAGONDI
95 603.07 369.60 233.47 5,04,295 39.51 %
NELLIKOPPA
146 1029.48 660.40 369.08 7,97,213 35.85 %
TOTAL 590 3684 kW 2331 kW 1353 KW 2.92 M Units 37 %
Energy Saving-HESCOM 590 Pumps
Hubli Ag DSM Project Pump Replacement-
(HESCOM & EESL Team ) Pump Replacement- Pump & Panel
Farmers Awareness campaign First Pump Replacement
Project Pipeline
Energy Efficiency Services Limited
EESL AgDSM Investment – Ongoing
EESL AgDSM Investment – Upcoming
Sl. No. Name of Electricity Distribution Company Nos. of pump
sets
Estimated Investment
(Rs. Crore)
1 Hubli Electricity Supply Company Limited
(HESCOM), Hubli, Karnataka
11013 55.00
2 Chamundeshwari Electricity Supply Company
(CESC), Mysore, Karnataka
1337 5.00
3 Bangalore Electricity Supply Company
(BESCOM), Bangalore, Karnataka
100,000 500
4 Central Power Distribution Company Limited of
AP
455 2.00
Total 1,12,805 557
Sl. No. Name of Electricity Distribution Company Nos. of pump sets Estimated
Investment
(Rs. Crore)
1. AVVNL, Ajmer 3997 25
2. JVVNL, Jaipur 1806 10
3. AP(East), Vishakhapatnam 2204 8
Total 8007 43
Innovative programme for replacement of incandescent with LEDs at Rs.
10 -25 each developed – BLY architecture followed
Leverages energy savings for cost recovery
In-principle approval of JERC obtained for first project in Puducherry
Project approved for Puducherry – 7.5 lakh incandescent to be replaced –
Started on 7th February.
Three models for cost recovery evolved
(a) Standards Offer Programme – long term contract with DISCOM to ‘buy’ energy
savings from EESL (Puducherry, West Bengal)
(b) Subsidy reduction of State Governments (Bihar and Jharkhand)
(c) Using DSM regulations
Household Lighting - DSM based efficient Lighting Project (DELP)
Energy Efficiency Services Limited
EESL DELP Methodology
• MoU/ Letter of intent between DISCOM & EESL MoU/ Letter of Intent
• Sample survey to ascertain population of ICLs and usage pattern Sample Survey
• To assess actual energy savings and finalising technical specifications of LED lamps Technology Selection
• Petition to be finalised for cost recovery for submission to ERC DSM-SOP Petition
• The Payment security mechanism to be finalized. Payment Mechanism
• EESL will implement the project based on own resources Implementation
• Deemed saving approach used as in BLY – AMS-II.J methodology M & V
Overall cost (energy) savings to DISCOMs
EESL DELP Market Potential
States ICL Sale in 2012
(Fig in crores)
Energy Savings
Potential (mKWh)
Cost Savings
(Fig in Rs crores)
AP 6.82 4530.526 2265.263
Assam 0.86 571.298 285.649
Bihar 6.2 4118.66 2059.33
Chattisgarh 1.8 1195.74 597.87
Delhi 5.1 3387.93 1693.965
Gujarat 4.21 2796.703 1398.3515
Haryana 1.91 1268.813 634.4065
HP 0.4 265.72 132.86
J & K 0.62 411.866 205.933
Jharkhand 1.56 1036.308 518.154
Karnataka 4.25 2823.275 1411.6375
Kerala 2.1 1395.03 697.515
Maharashtra 9.27 6158.061 3079.0305
Manipur 0.13 86.359 43.1795
Meghalaya 0.12 79.716 39.858
MP 3.6 2391.48 1195.74
Nagaland 0.12 79.716 39.858
Odisha 1.22 810.446 405.223
Punjab 1.81 1202.383 601.1915
Rajasthan 2.6 1727.18 863.59
TN 5.1 3387.93 1693.965
Tripura 0.2 132.86 66.43
UP 8.2 5447.26 2723.63
Uttrakhand 0.7 465.01 232.505
WB 6.2 4190.29 2095.15
Other states 0.7 465.01 232.505
Total quantity in Crore pieces 75.8 50365.57 25212.79
Project Pipeline
Energy Efficiency Services Limited
EESL DELP Investment – Ongoing
EESL DELP Investment – Upcoming
Sl. No. Name of Electricity Distribution Company No. of ICLs (in
lakhs)
Estimated
Investment
(Rs. Crore)
1 Puducherry Electricity Department 7.3 22
Total 7.3 22
Sl. No. Name of Electricity Distribution Company No. of ICLs (in
crores)
Estimated
Investment
(Rs. Crore)
1 Karnatka 4.25 1700
2 West Bengal 6.2 2480
3 Goa, A&N and Lakshadweep 1.0 400
4 Jharkhand 1.56 624
5 Rajasthan 2.6 1040
Total 20.81 6244*
*EESL is likely to invest about Rs. 1800 crores in the above projects during the next 3 years
DELP – Puducherry Launch The scheme was inaugurated by the Hon’ble Chief Minister of Puducherry on 7th February 2014
DELP – Puducherry Distribution During Launch
DELP – Ex-Counter Distribution
Implementation of energy efficiency measures in Yojana Bhavan –
project to be completed in first week of April – will become 5 STAR
rated building
Template prepared to initiate EE retrofits in government buildings –
submitted to Planning Commission
Audits completed in several other buildings – DPS RK Puram,
CONCOR, Pawan Hans
5 Hospitals in Maharashtra to be taken up
Buildings EE
Energy Efficiency Services Limited
Distribution EE Project – Submitted to CESC – investment of Rs.
150 crores – in principle approval received – formal agreements
being signed
Industrial EE Projects – Tata Steel and Arvind Mills – Tata Steel –
audit underway for Arvind Mills – audit to commence in April –
expected investment Rs. 150 crores
Cogeneration Project – DPR being prepared – investment decision
thereafter
Expected investment – Rs. 200 crores
Other Projects
Energy Efficiency Services Limited
BEE-DSM – MoU signed with BEE – DSM plan for 30 states to be
prepared by EESL – total allocation Rs. 26.2 crores
Utility DSM - Project for MSEDCL and BEST under submission to
MERC
SME Projects – GEF proposal prepared for implementation of
demonstration projects in MSME clusters – total value $ 4.5 m (Rs.
27 crores). Similar project of BEE likely to be given to EESL
DISCOM Audit– Audit for all 3 DISCOMs in Rajasthan started – total
value Rs. 80 lakhs – inquiries from 3 other DISCOMs
MOEF – BUR – Work being awarded to EESL for updating SNC –
total value Rs. 80 lakhs
Consultancy Work
Energy Efficiency Services Limited
REC – Implementing 2 projects worth Rs. 10 crores – one in final
stages of completion. 2 projects already completed
PFC – Projects worth Rs. 12 crores under implementation – one
project already commissioned
IRFC – Project of Rs. 4.5 crores awarded – 2 others worth Rs. 10
crores to be awarded in next FY
Promoter Companies- As per the CSR rules notified, REC and PFC
have a budget of around Rs. 150 crores – EESL gearing up for
additional business opportunity
CSR Projects
Energy Efficiency Services Limited
Thank You
Energy Efficiency Services Limited