DPR PREPARATION Under IWMP. PLANNING Process and Resource Requirements. IWMP MAIN: OBJECTIVES. To restore: Ecological balance by harnessing, conserving, and developing degraded natural resources such as soil, vegetative cover and water. IWMP - BROAD OBJECTIVE:. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/1.jpg)
DPR PREPARATION Under IWMP
PLANNING PLANNING Process and Process and
Resource Resource RequirementsRequirements
![Page 2: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/2.jpg)
IWMP MAIN: OBJECTIVES
To restore:Ecological balance by harnessing, conserving,and developing degraded natural resources such as soil, vegetative cover and water.
Vimarsh , The Consultancy Group – A Corporate Presentation . 2
![Page 3: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/3.jpg)
IWMP - BROAD OBJECTIVE:
OVERALL DEVELOPMENT OF WATERSHED COMMUNITY-NOT JUST CONFINED TO LAND DEVELOPMENT AND WATER CONSERVATION/HARVESTING BUT ALSO TO ENHANCE LIVELIHOOD OPPORTUNITIES AND PRODUCTION SYSTEMS
Vimarsh , The Consultancy Group – A Corporate Presentation . 3
![Page 4: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/4.jpg)
WHY DPR?•VERY IMPORTANT AND
CRUCIAL ACTIVITY•NEEDS ASSESSMENT RELATING
TO LAND AND WATER•TRAINING NEEDS ASSESSMENT
OF ALL STAKEHOLDERS•TO IDENTIFY THE
BENEFICIARIES AND DOCUMENT THE SAME
Vimarsh , The Consultancy Group – A Corporate Presentation . 4
![Page 5: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/5.jpg)
DPR FACILITATION
• REQUIRES STRONG PRA EXERCISE
• COMMUNITY BE MADE AWARE OF PROJECT BY CONDUCTING AWARENESS CAMPS IN EACH VILLAGE BEFORE STARTING WORK FOR DPR
Vimarsh , The Consultancy Group – A Corporate Presentation . 5
![Page 6: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/6.jpg)
Key Requirements of Decentralized Planning
under IWMP Participatory planning be
undertaken at village level by the community itself; plans to reflect local specific needs addressed by local specific actions
Participation of functionaries from PIA in developing implementation plans at various levels
Vimarsh , The Consultancy Group – A Corporate Presentation . 6
![Page 7: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/7.jpg)
Key Requirements of Decentralized Planning
under IWMP• Watershed Committees/Village
level committees be involved in planning and their capacity to be built to plan, own, manage and be accountable
Vimarsh , The Consultancy Group – A Corporate Presentation . 7
![Page 8: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/8.jpg)
Methodology for Decentralized Planning Building Capacity of Watershed Committee/Village level committees
Initiating Bottom-up Planning at Village level;
Vimarsh , The Consultancy Group – A Corporate Presentation . 8
![Page 9: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/9.jpg)
Bottom-up Planning
Bottom-up planning starting at village level
•Participatory Planning•Active Participation of PIA,
PRIs, Watershed Committees, WDT and village level committees.
•Ensure convergence – Mainly MNREGA
Vimarsh , The Consultancy Group – A Corporate Presentation . 9
![Page 10: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/10.jpg)
Bottom-up Planning (2)
Bottom-up planning starting at village level
– Watershed Committees/Village level committees to appraise and approve the plan
– Planning Tools such as needs assessment and plan templates, appraisal criteria etc. will be used
– Prioritization of needs based on available allocations, with emphasis on needs of vulnerable populations/areas
Vimarsh , The Consultancy Group – A Corporate Presentation . 10
![Page 11: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/11.jpg)
PRE DPR ACTIVITIES BEFORE COMMENCING
WORK FOR DPR CAPACITY BUILDING OF VARIOUS
STAKEHOLDERS FORMATION OF WCs AND VILLAGE
LEVEL COMMITTES, SHGs, UGs REGISTERATION OF WCs MANDATORY TO TAKE UP ENTRY POINT ACTIVITY
TO CREATE RAPPORT WITH VILLAGE COMMUNITY
Vimarsh , The Consultancy Group – A Corporate Presentation . 11
![Page 12: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/12.jpg)
SECONDARY DATA REQUIREMENTS BEFORE COMMENCING WORK FOR
DPRPIA TO MAKE FOLLOWING SECONDARY DATA
AVAILABLEI. CONSTITUTION OF WATERSHED COMMITTEES AND ITS
REGISTERATION II. FORMATION OF VILLAGE LEVEL COMMITTEESIII. CONSTITUTION OF WDTIV. FORMATION OF SELF HELP GROUPSV. COPY OF PPRsVI. CADASTRAL MAPS OF WATERSHED VILLAGESVII.TOPO SHEETSVIII.NAME OF OFFICER DESIGNATED FOR ACCOMPANYING
FACILITATING AGENCY TO WATERSHED VILLAGES FOR PLANNING PROCESS
Vimarsh , The Consultancy Group – A Corporate Presentation . 12
![Page 13: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/13.jpg)
ROLE OF STAKEHOLDERS
PIA, WDT, WC, VILLAGE LEVEL COMMITTEES• TO ACTIVATELY PARTICIPATE IN
PLANNING PROCESS AT EACH AND EVERY STEP AND ASSIST THE FACILITATING AGENCY FOR PREPARATION OF DPR
Vimarsh , The Consultancy Group – A Corporate Presentation . 13
![Page 14: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/14.jpg)
WHAT SHOULD DPR INCLUDE?
BASIC INFORMATION OF PROJECT AREA:
I.DEMOGRAPHIC FEATURESII.SOCIO ECONOMIC PROFILEIII.PROBLEMS REQUIRING INTERVENTIONIV.EXPECTED OUTCOME AND BENEFITSV.PROPOSED INTERVENTIONS-PHYSICAL AND FINANCIALVimarsh , The Consultancy Group – A Corporate Presentation . 14
![Page 15: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/15.jpg)
TEAM COMPOSITION – DPR PREPARATION
BY VIMARSHTECHNICAL TEAM:• TEAM LEADER• PRINCIPAL COORDINATOR• CO PRINCIPAL COORDINATORFIELD INVESTIGATION• FIELD INVESTIGATORS-TWO
MEMBERS FOR EACH SUB WATERSHEDVimarsh , The Consultancy Group – A Corporate Presentation . 15
![Page 16: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/16.jpg)
BRIEF PROFILE OF PROJECTS SANCTIONED-
IWMPSr.No.
Project No. of sub watersheds
No. of villages
Treatment Area in ha
Project Cost in lacs
1 Hoshiarpur I 3 11 7887 946.44
2 Hoshiarpur II 2 9 6414 769.68
3 Hoshiarpur III
2 19 5200 624.00
4 Ropar I 6 44 11720 1406.40
5 Ropar II 2 14 2400 288.00
Vimarsh , The Consultancy Group – A Corporate Presentation . 16
![Page 17: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/17.jpg)
STATUS – DPR PREPARATION
Sr.No.
Project No. of sub watersheds
Status-Baseline survey
1 Hoshiarpur I 3 Baseline survey completed in two sub watersheds. Commencing Baseline survey in 3rd watershed from 10th Jan.11 –Analyzing data-assessing needs
2 Hoshiarpur II 2 Commencing from 10th Jan.11
3 Hoshiarpur III 2 Baseline survey completed in all 19 villages-Analyzing data-assessing needs
4 Ropar I 6 Baseline survey completed in five sub watersheds-Analyzing data-assessing needs
5 Ropar II 2 Baseline survey completed in all villages-Analyzing data-assessing needs
Vimarsh , The Consultancy Group – A Corporate Presentatiation. 17
![Page 18: DPR PREPARATION Under IWMP](https://reader030.vdocuments.us/reader030/viewer/2022020111/56813054550346895d9605d9/html5/thumbnails/18.jpg)
Vimarsh , The Consultancy Group – A Corporate Presentation . 18
THANK YOUVIMARSH, THE CONSULTANCY GROUP,