DPR PREPARATION Under IWMP. PLANNING Process and Resource Requirements. IWMP MAIN: OBJECTIVES. To restore: Ecological balance by harnessing, conserving, and developing degraded natural resources such as soil, vegetative cover and water. IWMP - BROAD OBJECTIVE:. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DPR PREPARATION  Under IWMP

DPR PREPARATION Under IWMP

PLANNING PLANNING Process and Process and

Resource Resource RequirementsRequirements

Page 2: DPR PREPARATION  Under IWMP

IWMP MAIN: OBJECTIVES

To restore:Ecological balance by harnessing, conserving,and developing degraded natural resources such as soil, vegetative cover and water.

Vimarsh , The Consultancy Group – A Corporate Presentation . 2

Page 3: DPR PREPARATION  Under IWMP

IWMP - BROAD OBJECTIVE:

OVERALL DEVELOPMENT OF WATERSHED COMMUNITY-NOT JUST CONFINED TO LAND DEVELOPMENT AND WATER CONSERVATION/HARVESTING BUT ALSO TO ENHANCE LIVELIHOOD OPPORTUNITIES AND PRODUCTION SYSTEMS

Vimarsh , The Consultancy Group – A Corporate Presentation . 3

Page 4: DPR PREPARATION  Under IWMP

WHY DPR?•VERY IMPORTANT AND

CRUCIAL ACTIVITY•NEEDS ASSESSMENT RELATING

TO LAND AND WATER•TRAINING NEEDS ASSESSMENT

OF ALL STAKEHOLDERS•TO IDENTIFY THE

BENEFICIARIES AND DOCUMENT THE SAME

Vimarsh , The Consultancy Group – A Corporate Presentation . 4

Page 5: DPR PREPARATION  Under IWMP

DPR FACILITATION

• REQUIRES STRONG PRA EXERCISE

• COMMUNITY BE MADE AWARE OF PROJECT BY CONDUCTING AWARENESS CAMPS IN EACH VILLAGE BEFORE STARTING WORK FOR DPR

Vimarsh , The Consultancy Group – A Corporate Presentation . 5

Page 6: DPR PREPARATION  Under IWMP

Key Requirements of Decentralized Planning

under IWMP Participatory planning be

undertaken at village level by the community itself; plans to reflect local specific needs addressed by local specific actions

Participation of functionaries from PIA in developing implementation plans at various levels

Vimarsh , The Consultancy Group – A Corporate Presentation . 6

Page 7: DPR PREPARATION  Under IWMP

Key Requirements of Decentralized Planning

under IWMP• Watershed Committees/Village

level committees be involved in planning and their capacity to be built to plan, own, manage and be accountable

Vimarsh , The Consultancy Group – A Corporate Presentation . 7

Page 8: DPR PREPARATION  Under IWMP

Methodology for Decentralized Planning Building Capacity of Watershed Committee/Village level committees

Initiating Bottom-up Planning at Village level;

Vimarsh , The Consultancy Group – A Corporate Presentation . 8

Page 9: DPR PREPARATION  Under IWMP

Bottom-up Planning

Bottom-up planning starting at village level

•Participatory Planning•Active Participation of PIA,

PRIs, Watershed Committees, WDT and village level committees.

•Ensure convergence – Mainly MNREGA

Vimarsh , The Consultancy Group – A Corporate Presentation . 9

Page 10: DPR PREPARATION  Under IWMP

Bottom-up Planning (2)

Bottom-up planning starting at village level

– Watershed Committees/Village level committees to appraise and approve the plan

– Planning Tools such as needs assessment and plan templates, appraisal criteria etc. will be used

– Prioritization of needs based on available allocations, with emphasis on needs of vulnerable populations/areas

Vimarsh , The Consultancy Group – A Corporate Presentation . 10

Page 11: DPR PREPARATION  Under IWMP

PRE DPR ACTIVITIES BEFORE COMMENCING

WORK FOR DPR CAPACITY BUILDING OF VARIOUS

STAKEHOLDERS FORMATION OF WCs AND VILLAGE

LEVEL COMMITTES, SHGs, UGs REGISTERATION OF WCs MANDATORY TO TAKE UP ENTRY POINT ACTIVITY

TO CREATE RAPPORT WITH VILLAGE COMMUNITY

Vimarsh , The Consultancy Group – A Corporate Presentation . 11

Page 12: DPR PREPARATION  Under IWMP

SECONDARY DATA REQUIREMENTS BEFORE COMMENCING WORK FOR

DPRPIA TO MAKE FOLLOWING SECONDARY DATA

AVAILABLEI. CONSTITUTION OF WATERSHED COMMITTEES AND ITS

REGISTERATION II. FORMATION OF VILLAGE LEVEL COMMITTEESIII. CONSTITUTION OF WDTIV. FORMATION OF SELF HELP GROUPSV. COPY OF PPRsVI. CADASTRAL MAPS OF WATERSHED VILLAGESVII.TOPO SHEETSVIII.NAME OF OFFICER DESIGNATED FOR ACCOMPANYING

FACILITATING AGENCY TO WATERSHED VILLAGES FOR PLANNING PROCESS

Vimarsh , The Consultancy Group – A Corporate Presentation . 12

Page 13: DPR PREPARATION  Under IWMP

ROLE OF STAKEHOLDERS

PIA, WDT, WC, VILLAGE LEVEL COMMITTEES• TO ACTIVATELY PARTICIPATE IN

PLANNING PROCESS AT EACH AND EVERY STEP AND ASSIST THE FACILITATING AGENCY FOR PREPARATION OF DPR

Vimarsh , The Consultancy Group – A Corporate Presentation . 13

Page 14: DPR PREPARATION  Under IWMP

WHAT SHOULD DPR INCLUDE?

BASIC INFORMATION OF PROJECT AREA:

I.DEMOGRAPHIC FEATURESII.SOCIO ECONOMIC PROFILEIII.PROBLEMS REQUIRING INTERVENTIONIV.EXPECTED OUTCOME AND BENEFITSV.PROPOSED INTERVENTIONS-PHYSICAL AND FINANCIALVimarsh , The Consultancy Group – A Corporate Presentation . 14

Page 15: DPR PREPARATION  Under IWMP

TEAM COMPOSITION – DPR PREPARATION

BY VIMARSHTECHNICAL TEAM:• TEAM LEADER• PRINCIPAL COORDINATOR• CO PRINCIPAL COORDINATORFIELD INVESTIGATION• FIELD INVESTIGATORS-TWO

MEMBERS FOR EACH SUB WATERSHEDVimarsh , The Consultancy Group – A Corporate Presentation . 15

Page 16: DPR PREPARATION  Under IWMP

BRIEF PROFILE OF PROJECTS SANCTIONED-

IWMPSr.No.

Project No. of sub watersheds

No. of villages

Treatment Area in ha

Project Cost in lacs

1 Hoshiarpur I 3 11 7887 946.44

2 Hoshiarpur II 2 9 6414 769.68

3 Hoshiarpur III

2 19 5200 624.00

4 Ropar I 6 44 11720 1406.40

5 Ropar II 2 14 2400 288.00

Vimarsh , The Consultancy Group – A Corporate Presentation . 16

Page 17: DPR PREPARATION  Under IWMP

STATUS – DPR PREPARATION

Sr.No.

Project No. of sub watersheds

Status-Baseline survey

1 Hoshiarpur I 3 Baseline survey completed in two sub watersheds. Commencing Baseline survey in 3rd watershed from 10th Jan.11 –Analyzing data-assessing needs

2 Hoshiarpur II 2 Commencing from 10th Jan.11

3 Hoshiarpur III 2 Baseline survey completed in all 19 villages-Analyzing data-assessing needs

4 Ropar I 6 Baseline survey completed in five sub watersheds-Analyzing data-assessing needs

5 Ropar II 2 Baseline survey completed in all villages-Analyzing data-assessing needs

Vimarsh , The Consultancy Group – A Corporate Presentatiation. 17

Page 18: DPR PREPARATION  Under IWMP

Vimarsh , The Consultancy Group – A Corporate Presentation . 18

THANK YOUVIMARSH, THE CONSULTANCY GROUP,