digital tools ready for a cost-effective decommissioning repository design (2012 - 15) el cabril...

19
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved. 1 WSE 12.1_Bl23 rev 2, 2017-04-24 Mats Olsson Manager Market Application Westinghouse Electric Sweden + 46 21 347466 [email protected] Digital tools ready for a cost-effective decommissioning

Upload: ledat

Post on 13-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

1 WSE 12.1_Bl23 rev 2, 2017-04-24

Mats Olsson

Manager Market Application

Westinghouse Electric Sweden

+ 46 21 347466

[email protected]

Digital tools ready for a cost-effective

decommissioning

Page 2: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

2

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

General perception about decommissioning :

• Low cost business

• Low technology level

• Limited or no engineering

”blue color work”

Digitalization??

Page 3: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

3

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

EDF Chooz A (France)

RVI and RV

Segmentation

(2010 - )

Sellafield (UK)

Decommissioning

Delivery Partner

(DDP) (2016-26)

Kozloduy (Bulgaria)

LILW Repository Design

(2012 - 15)

El Cabril

Repository

(Spain)

4-Year Operation

and

Engineering

Support (2013- )

Zorita (Spain) RVI

and RV

Segmentation and

Packaging

(2011 - 15) ATC (Spain) Centralized

Interim Storage for Spent Fuel

and High Level Waste (2013- )

Fukushima Unit 3 (Japan)

Spent Fuel removal (2012 - 14 )

ISPRA (Italy)

Decommissioning

Studies (2010 - 14)

Decommissioning Plans:

- Bohunice, Slovakia (2013-14)

- Chinshan, Taiwan (2014-16)

- Kousheng, Taiwan (2016-18)

KKM (CH)

Fuel Channels

Segmentation

KKP 1 (Germany)

RVI and RV Segmentation

and Packaging (2015 - )

Sanmen (China)

Waste Treatment Centre Barsebäck 1 & 2 (Sweden)

Reactor internals

Segmentation (2015 - )

Cementation Facilities (China)

- - Fuqing 5 & 6 (contracted)

- - Fuqing 1,2,3,4

- Changjiang 1&2

- Fangjiashan 1&2

- - Hongyanhe 1, 2, 3, 4

- - Yangjiang 1 & 2

- - Ningde 1 & 2

GKNI (Germany)

RVI and RV Segmentation

and Packaging (2015 - )

SVAFO (Sweden)

Bioshield demolition (2016 -)

Grand Gulf (USA)

Steam Dryer

segmentation (2012)

Ongoing Decommissioning Projects

Page 4: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

4

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

4

Waste Classification - Definitions

Buildings/materials/components categorized according

to plant contamination definitions (Blue, Yellow, Red) and

conventional (White):

Red - Highly contaminated/activated - Reactor Vessel and internals

- Primary Process Systems

- Biological Shield

Yellow - Medium contamination - Process systems

- Buildings and structures

- Turbine and Turbine Systems (BWR)

Blue – Low contamination - Buildings and structures

- BoP Systems

- Turbine and Turbine Systems (BWR)

White – Conventional handling - Buildings and structures

- BoP Systems

- Turbine and Turbine Systems (PWR)

Page 5: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

5

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

5

Waste by Volume

Nuclear

Dismantling &

Demolition

Contaminated

Waste

Conventional

Dismantling

& Demolition

Free Release

Page 6: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

6

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

6

Waste by Monetary Volume

34%

27% 15%

24%

Decommissioning cost for a Swedish NPP approx. 2 billion

SEK per plant (fuel and waste disposal not included)

7% of the waste generates > 70% of the cost!

Page 7: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

7

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Decommissioning - Success Factors

Safe, fast and cost effective:

• Significant scope – possibilities to optimize

• Planning/logistics – digital mappings, simulations, use of VR/AR

• Waste driven decommissioning - from characterization to free release

• Integrated dismantling – material and waste optimization/management

• Use of conventional techniques and experience in combination with

necessary nuclear procedures

• Environmental aspects - dismantling, hazardous materials, recycling

• Detailed upfront simulations - tooling, procedures,

radiation, handling, transportation etc.

Page 8: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

8

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Digitalization - CAD for Major Components

Segmentation of Steam Dryer

Page 9: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

9

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Digitalization - Drawings to 3D CAD Models

Upfront simulation/verification of

all tools, set-up’s and procedures

Page 10: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

10

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Cutting Planning in 3D CAD Models

Remove Hot-Leg Ring Cast concrete

Remove Insulation Ring Insulation with metal plates

Remove Cold-Leg Ring Cast concrete

Ring around Cold-leg

Water Protection Barrier

Insulation

Insulation ring

Insulation ring hatch

Insulation blocks

RPV support ring

and locks

Page 11: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

11

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Cutting and packaging –upfront preparation

Optimization of cutting and packing, including dose calculations and documentation

Page 12: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

12

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Sequence/Layout and Storage Planning

In CAD systems, VR as a complement

Page 13: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

13

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Lifting RPV – CAD simulations and Laser scannings

Page 14: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

14

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Several commercial products available

- Laser scanning/high-resolution photos

- Photogrammetry

- 3600 filming

- VR/AR

Point Cloud solutions for buildings and rooms

Page 15: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

15

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Point Cloud solutions for buildings and rooms

From plant layout to specific

buildings and rooms

.

Page 16: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

16

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Point Cloud solutions for buildings and rooms

Laser scanning and

high resolution 3D Photo:

- Google Street view

- Measurement directly

in the picture

- In-build navigation tool

- Possible to add dose

information

Page 17: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

17

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Point Cloud solutions – Gamma scanning

Multiple gamma camera 2D

pictures are transformed

to 3D and incorporated

into the cloud points:

Page 18: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

18

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

Radiation simulations and VR applications

Dose rate simulations based on gamma measurements

- separation of system

parts/components for

different waste routes

Dose simulations (exposure, shielding, procedures, training)

Page 19: Digital tools ready for a cost-effective decommissioning Repository Design (2012 - 15) El Cabril Repository ... KKM (CH) Fuel Channels ... Grand Gulf (USA) Steam Dryer

19

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Sweden AB. All Rights Reserved.

• Digitalization key for a safe, fast and cost effective

decommissioning

• Several commercial products available on the market

• Digitalized plant information makes it possible for upfront

simulations to optimize schedule, technology and costs

- Major components as RPV, RPI etc. digitalization via drawings to CAD

- Buildings and rooms, digitalization via point cloud solutions

- Dose information and measurements, gamma camera solutions

Summary

No longer fancy tools – already

efficient productions tools !