    FAILURE OF A

    TECHNOLOGY PROJECT

    Saleem Sabir-22

    Asadullah Bappi- 12

    Talal Shahid-23Arsalan- 34

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    2/27

    Dysfunctional DecisionMain! is a

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    3/27

    "#y Tec#nolo!y P$o%ects Fail&

    Denver Airport Baggage Handling

    System-An Illustration of ineectualdecision making

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    4/27

    'yno(sis

    • Denver Airport Baggage handlingsystem failure is a classic example ofDysfunctional decision making

     This session ill look upon!

    "# Decisions that set the pro$ect on thepath to disaster

    %# &orces 'ehind those decisions

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    5/27

    )ac!$oun*

    • (orld)s largest automated 'aggagehandlings system

    • *eed for greater airport capacity#

    • *eed of ne state of the art airport thatould cement Denver)s position as an airtransportation hu'

    • "+,S# .m airport as to 'e the largestairport in /S having capacity to handlemore than 0,1,,,1,,, passengers annually#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    6/27

    )ac!$oun*

    • By automating 'aggage handling1the aircraft turnaround time illreduce to as little as 2, 3inutes I#e#1

    more operations and a competitiveadvantage for airport

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    7/27

    'yste+ at a !lance

    "# 44 Airport gates in 2 concourses

    %# "5 miles of track and 0 miles of conveyor'elts

    2# 2",, Standard carts and +0, oversi6ed carts+# "+ million feet of iring

    0# *etork of more than ",, 78)s to control 9o

    :# 0,,, electric motors

    5# %5,, photocells1 +,, radio receivers and 0;laser arrays

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    8/27

    )ac!$oun* Continue*,

    • Despite the good intentions planrapidly dissolved as!

    "# /nderestimation of pro$ectscomplexity resulted in sno'allingthe pro'lems and pu'lic humiliationfor everyone involved

    %# Airport opening as delayed 'y afull ": months

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    9/27

    )ac!$oun* Continue*,

    2# systemas $ust a shado of original plan?

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    10/27

    )ac!$oun* Continue*,

    • @ather Than automating all 2concourses into one integratedsystem1 the system as used in a

    single concourse1 'y a single airlineand only for out'ound 9ights#@emaining 'aggage handling as

    done via simple conveyor plusmanual tug and trolley system 'uiltas an alternative hen it 'ecame

    clear that idea fully 9opped#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    11/27

     The system *ever (orkedell and in Aug %,,01

    /nited Airline announcedthat they ill a'andonthe system completely#

    ="1,,,1,,,C3onth

    3aintenance 8ost-

    Tu! . t$olleysyste+

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    12/27

    DIA )a!!a!e 'yste+De/elo(+ent Ti+eline

    http://var/www/apps/conversion/tmp/scratch_6/Danver%20International%20Airport%20Baggage%20Handling%20System%20Failure.pdfhttp://var/www/apps/conversion/tmp/scratch_6/Danver%20International%20Airport%20Baggage%20Handling%20System%20Failure.pdf

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    13/27

    Basic 3ode &ailure Analysis

    • System)s 8omplexity /nderestimated

    • ine Balancing &ailure

    • Algorithm as a nightmare in the

    mathematical modeling of Eueue 'ehavior#• &ailure to anticipate the num'er of 8arts correctly#

    • 7ro$ect initiated too late 'ased uponcomplexity and risk involved#

    • /nder

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    14/27

    .ey Decisions leading todisaster

    "# 8hange in Strategy#

    %# The decision to 7roceed#

    2# Schedule 1 Scope and Budget8ommitments#

    +# Acceptance of 8hange reuests#

    0# Design a physical 'uilding structure#:# The Decision to seek a dierent

    7ath#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    15/27

    "#8hange in Strategy#

    •  To Fears ate decision#

    •  Timing of the decision extremely poor# – /nited Airline

     –

    8ontinental Airline• Additional To years needed to meet the

    reuirements#

    • 8hange of 3indset#

    • Additional Grgani6ational @esponsi'ilities#

    • &ailure to understand ho to 'uild aautomatic 'aggage handling system#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    16/27

    %#The Decision to 7roceed

    • Breir *eidle 7atron#

    • Analysis of 2 Bids ";;2#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    17/27

    %#The Decision to 7roceed

    • Slinger)s 7erspective – State of the art Airport and Baggage

    handling system#

     – Slinger)s previous experience on manualconveyor)s ith tug and trolley system#

     – 8ivil

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    18/27

    %#The Decision to 7roceed

    • &rom BA

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    19/27

    2#Schedule 1 Scope and 'udget

    commitments

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    20/27

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    21/27

    0# Design of the 7hysical Building

    Structure

    • @ather than 'eing separate entities1 the 'aggage system and thephysical 'uilding represented a single integrated system# Sharingthe physical space and services such as the electrical supply thedesigners of the physical 'uilding and the designers of the'aggage system needed to ork as one integrated team#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    22/27

    0# Design of the 7hysical Building

    Structure

    •  To make eective decisions a'out ho to design the physical'uilding1 the designers of the physical 'uilding needed to 'eorking alongside people ho had expertise in designing 'aggagesystems#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    23/27

    :# The Decision to Seek a Dierent

    7ath

    • 3ayor slashed pro$ect and ordered that a manual trolley system'uilt at an additional cost of =0"3

    • By the time the 3ayor took action1 the airport as already :months 'ehind schedule and four opening dates had already 'eenmissed#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    24/27

    Gther &ailure 7oints

    • eadership 8hange

    • Architectural and Design issues

     –  The system had more than ",, individual 78s that erenetorked together# &ailure of any one of the 78s could resultin an outage as there as no automatic 'ackup for failed

    components#

     –  The system as una'le to detect $ams and as a result hen a $am occurred1 the system simply kept piling up more and more'ags making the $am that much orse#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    25/27

    8onclusion

    "# The /nderestimation of 8omplexity

    %# A lack of planning resulting insu'seuent changes in strategy

    2#

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    26/27

    8onclusion

    5# 8ommunication Breakdons

    4# 7oor Design

    ;# &ailure to perform risk management

  • 8/18/2019 DIA Beggage Handling System Filure Presentation

    27/27

    0UE'TION'

    &