Ashy Fly Ash & Bottom Ash
y Fuel, combustion methods,
flue gas treatments andboiler designs
y Fly Ash composition:
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 3/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 4/55
ASH HANDLINGy Method of collection, conveying, interim storage and
load out of various types of ash residuey Ash handling can be of two types
y Dry
y Wet
y Fly ash handling can either be dry or wet
y Bottom ash handling is generally wet until recently because
of its higher particle size (around 25 mm )y Fly ash can either be fine or course
y Fine fly ash has particle size form 50 200 micron whereascoarse fly ash has particle size greater than 200 micron .
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 5/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 6/55
BOTTOM ASH HANDLINGBOTTOM ASH H ANDLING
SYSTEMS
WATER IMPOUNDEDHOPPER
SUBMERGEDSCRAPER
CONVEYOR
DRY BOTTOM ASH SYSTEMS
WETDISPOSAL
WETDISPOSAL
DRY COLLECTION
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 7/55
WATER IMPOUNDED HOPPERy Old process
y Huge water consumption
y Receives, quenches,stores crushes andremove bottom ash
y Ash is discharged once in
6 to 8 hoursy Clinker grinder is
situated below it
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 8/55
RECIRCULATION SYSTEM
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 9/55
BOTTOM ASH HANDLING-SSCy SSC is placed beneath
the furnace
ySlurry is taken up to ade-watering slope beforedischarging
y Water serves as cooling
mediumy Water also acts as airlock
for ash hoppers to avoidair to enter the furnace
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 10/55
SSC contd.y Reduced water usage
y Reduced powerconsumption
y Reduced operational andmaintenance cost
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 11/55
Dry bottom ash handlingy Water is not used
y Increased boiler
efficiency y Reduced impurities
in stack
y Low maintenancecost and no waterrequired
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 12/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 13/55
ADVANTAGES OF DRY HANDLING OVER SSC
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 14/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 15/55
FLY-ASH HANDLING
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 16/55
FLY-ASH HANDLING
FLY ASH SYSTEMS
PRESSURECONVEYING
SYSTEM
DENSEPH ASE
DILUTEPH ASE
VACUUM SYSTEM
DILUTEPH ASE
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 17/55
PRESSURE SYSTEM
OPERATING PRESSURE IS 5 Kg/cm2
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 18/55
VACUUM SYSTEM
OPERATING PRESSURE IS 530mm
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 19/55
COMBINED PRESSURE AND
VACUUM SYSTEM
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 20/55
Comparison
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 21/55
Dilute Phasey Both vacuum & pressure
pneumatic systems
yHigh velocity
y low ash - to - air ratio
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 22/55
Dense phasey Pneumatic pressure
system conveying dense
ashy Low velocity
y High ash concentration
y Less energy due to its
smaller amount of conveying air
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 23/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 24/55
GENERAL DESIGN ASPECTSy Boiler design and configuration
y Disposal conditions
y Water availability y Type of coal
y Design capacity
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 25/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 26/55
ASH DISPOSAL SYSTEMS.I. NO ALTERNATIVE MERITS DEMERITS
1. Lean Slurry DisposalSystem(LSDS)
Silo area layoutis simpleCheaper
Large quantity of water requiredCivil cost is high
2. High ConcentrationSlurry DisposalSystem(HCSDS)
Less waterconsumptionLess disposalarea is required
Requires more spacenear silo
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 27/55
High Concentration Slurry Disposal
(HCSD)y Controlled and monitored
feeding for fly ash andbottom ash
y Agitator Retention Tank(ART).
y Carbon steel pipelines
y Higher concentration of about 60%
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 28/55
Advantagesy Ash spreads in layers enabling vertical filling, hence
land requirement is reduced.
y Pumping at higher concentration, hence low waterconsumption.
y Slurry flow rate is drastically reduced.
y Literally no water releases out, hence no waterretaining dams or recovery system is required.
y Reduced leaches at the ash disposal area.y Lower operating power consumption.
y Lower velocity, hence longer life for pipe line.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 29/55
FLY ASH DISPOSAL SYSTEMSLandfill: big bags
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 30/55
Embankment: ash placement
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 31/55
Embankment: top liner
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 32/55
Foundation: asphalt cover
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 33/55
Landfill: cover soil removed
Workshop Implementation of the Landfill Directive, 15thM
ay 2009, Tallinn, Estonia
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 34/55
Ash Bricks
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 35/55
ASH PONDS
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 36/55
SLURRY DISOPOSAL AND ASH
WATER RECOVERY SYSTEMHOPPER
SLURRY PUMP
SETTLING POND
STILLING POND
VERTICAL TURBINE PUMP
CLARIFLOCULATOR
ASH WATER TANK
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 37/55
ASH STORAGE SILOS
The Ash coming out of the unloading chute istransferred to waiting trucks for various uses
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 38/55
ADVANTAGESOF SILO SYSTEMy Commercial utilization of ash in :
Cement additives.
Brick plants.
Road making, etc.
y Saving of water a precious commodity.
y High reliability
y Least maintenance
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 39/55
Contd.y Environment concern:
In a period, when environmental protection andawareness is a major industrial and social concern,
Dense Phase pneumatic conveying, by totally enclosedhandling system, is particularly amenable to theenvironment.
All conventional problems of spillage, dust,contamination and storage are efficiently andsuccessfully eradicated.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 40/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 41/55
ASHGAT
E &HOUSIN
GThe Ash Gate and Housinginstalled below the bottom ash
storage hopper.
It controls the discharge from thestorage hoppers.
The gate operation is controlledhydraulically, providing a smoothoperation when opening and tightseating when closed.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 42/55
CLINKER GRINDERy Coarse bottom ash or
other coarsely sizedmaterial
y Reduce size forpneumatic conveyanceor other means of ashhandling.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 43/55
CYCLONESy Centrifugal ash receiver
y Top of a silo or storage hopper
y
The gases after reaching the endof the conical portion changes itsdirection and moves upwardstowards the outlet forming aninner vertex.
y Control high concentration.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 44/55
PULSE JET DUST COLLECTORS
y Receives the overflow airstreamfrom the ash receiver
y Collects ash particulates on the
surface of multiple fiber bagsy Clean (filtered) air overflows the
top of the dust collector, passingto the atmosphere or other
processing.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 45/55
ASH CONDITIONERS
y The ash conditioner is a totally
enclosed, paddle type mixer
designed to condition fly ash,
bottom ash, and other abrasive or
dusty materials.
y The unit (coupled with a rotary
feeder) features the ability to
accurately control both the
material feed rate and the water
supply flow rate, as well as ensure
a complete and controlled mixing
prior to discharge.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 46/55
SLURRY PUMPSy The slurry solution is pumped using it
to land fill or transported to a slurry
to lagoon for storage/disposal.
y Agitator pumps deliver kinetic energy
(energy of motion) to slurry
solids surrounding the pump intake,
re-suspending them into a fluid state.
y The slurry may be subsequently used
for a number of applications such as
in the building industry, for Cement
and Block production
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 47/55
High Pressure Ash Jet Pumps
y High pressure ash jet pumps are used to remove the clinker formed on the wall of furnaceby supplying water jet.
y Jet pumps works on a venturiprinciple. High pressure water delivered through the nozzlecreates vacuum.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 48/55
ASH UNLOADERSy Telescopic Unloading Chute
y A knife gate is fitted to the ash silo
bottom
y Telescoping interlocking cones which are encapsulated by a
fabric/elastomeric dust annulus
y Induced air flow generated by a
suction fan
yBag type pulse jet dust collector.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 49/55
PIPELI E PRODUCTS y Terminal Box : Used as a low profile
conveying pipeline termination to divertthe material flow tangentially into thetop of a silo / hopper. Standard size rangeto accommodate 50mm to 400mmdiameter pipelines.
y Dump Valves :y Used as a silo / hopper feeding valve
within the conveying pipeline.y Located on the silo / hopper roof it
diverts the material flow into the top of astorage hopper / silo or in it's by-pass
position allows the material f low to passthrough to a second storage hopper /silo.
y The sleeve design of Valves auto cleans with every cycle of operation on the gateor valve port because the sleeve will f lexto allow grits and solids to pass through .
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 50/55
Valves and Bendsy Switch Valvey To connect pipelines together either
in converging or divergingconfigurations.
y The most commonly used for the
Power Industry is the Dome Switch Valvey Bendsy Size range 50mm to 400mm diameter
pipelinesy Cast Ni-hard, Grade 250 iron or
basalt-lined mild steel bends areused.y For very abrasive slurries alumina
ceramic-lined mild steel bends areused
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 51/55
PIPESy Pipe : Standard Size range 50mm to 400mm diameter
pipelines.
y Conveying
Pipeline : Seamed mild steel pipe work (BS1387; BS3601; DIN2441/8; ANSI 836.1
standard pipe or equivalent) to construct the straightpipe sections . For long straight sections the pipeline isusually constructed by welded joints using 6-12 meterrandom pipe lengths depending on availability.
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 52/55
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 53/55
Requirement of BOPs During 11th
Plan
8/8/2019 Presentation by ETE'S_ash Handling Systems
http://slidepdf.com/reader/full/presentation-by-etesash-handling-systems 54/55
No. of Vendors In our Country