RFx: 2051400011 SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS DUBAI ELECTRICITY & WATER AUTHORITY P.O. BOX – 564 DUBAI, UNITED ARAB EMIRATES TEL: 971-4-324 4444 FAX: 971-4-324 8111 (HEAD OFFICE) E-MAIL: [email protected] WEB SITE : http://www.dewa.gov.ae

Upload: virasamir

Post on 24-Nov-2015

677 views

Category:

Documents


43 download

DESCRIPTION

Specification

TRANSCRIPT

  • RFx: 2051400011 SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS

    DUBAI ELECTRICITY & WATER AUTHORITY P.O. BOX 564

    DUBAI, UNITED ARAB EMIRATES

    TEL: 971-4-324 4444 FAX: 971-4-324 8111 (HEAD OFFICE) E-MAIL: [email protected]

    WEB SITE : http://www.dewa.gov.ae

  • TABLE OF CONTENTS PAGE NO. SECTION 1 : COMMERCIAL (2.1.1.1.0.01.Rev.10) FORM OF TENDER - COMM-1 SCHEDULE OF PRICES MAIN OFFER - COMM-4 ALTERNATIVE OFFER - COMM-5 ADVERTISEMENT - COMM-7 CONDITIONS OF TENDERING - COMM-8 SECTION 2 : STANDARD SPECIFICATIONS GENERAL DESIGN CRITERIA (DOCUMENT 1.1.0.0.0.01-REV.10) - Page 1 - 22 GENERAL TECHNICAL REQUIREMENTS FOR ELECTRICAL EQUIPMENTS (DOCUMENT 1.2.1.0.0.01-REV.04) - Page 1 - 13 GENERAL QUALITY ASSURANCE STANDARD FOR ELECTRICAL EQUIPMENTS (DOCUMENT 1.3.1.0.0.01-REV.01) - Page 1 - 3 CAPABILITY STANDARD FOR MANUFACTURERS OF ELECTRICAL EQUIPMENTS (DOCUMENT 1.4.1.0.0.01-REV.02) - Page 1 - 3 SECTION 3 : SPECIFIC REQUIREMENTS AND DEFINITE QUANTITIES SPECIFIC REQUIREMENTS & DEFINITE QUANTITIES - Page 1 - 9 SECTION 4 : TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATION FOR CAST RESIN DISTRIBUTION TRANSFORMERS (DOCUMENT 1.5.1.1.4.03-Rev.11) - Page 1 -15 TECHNICAL SPECIFICATION FOR WATT-HOUR METERS (DOCUMENT 1.5.1.5.9.04-Rev.08) - Page 1 10 TECHNICAL SPECIFICATION FOR INSTRUMENT TRANSFORMERS FOR TARIFF METERING (DOCUMENT 1.5.1.2.9.01-Rev.05) - Page 1 - 5 (i)

  • TABLE OF CONTENTS PAGE NO. SECTION 5 : SCHEDULES TO BE FILLED IN BY THE TENDERER MAIN OFFER SCHEDULE-A : SCHEDULE OF DELIVERY - SCHED-1 SCHEDULE-B : DATES OF READINESS FOR INSPECTION TESTING, DELIVERY & COMPLETION - SCHED-3 SCHEDULE-C : TECHNICAL PARTICULARS & GUARANTEES - SCHED-4 SCHEDULE-D : DEVIATIONS FROM THE SPECIFICATIONS - SCHED-16 SCHEDULE-E : MANUFACTURER & PLACE OF MANUFACTURE - SCHED-17 SCHEDULE-F : DETAILS OF PAST SUPPLY RECORDS - SCHED-19 SCHEDULE-G :DRAWINGS - SCHED-20 SCHEDULE-H :TOOLS & SPECIAL EQUIPMENT - SCHED-21 SCHEDULE-J :LIST OF RECOMMENDED SPARES TO BE PURCHASED AT THE OPTION OF DEWA - SCHED-22

    SECTION 5 : SCHEDULES TO BE FILLED IN BY THE TENDERER ALTERNATIVE OFFER SCHEDULE-A1 : SCHEDULE OF DELIVERY - SCHED-1 SCHEDULE-B1 : DATES OF READINESS FOR INSPECTION TESTING, DELIVERY & COMPLETION - SCHED-3 SCHEDULE-C1 : TECHNICAL PARTICULARS & GUARANTEES - SCHED-4 SCHEDULE-D1 : DEVIATIONS FROM THE SPECIFICATIONS - SCHED-16 SCHEDULE-E1 : MANUFACTURER & PLACE OF MANUFACTURE - SCHED-17 SCHEDULE-F1 : DETAILS OF PAST SUPPLY RECORDS - SCHED-19 SCHEDULE-G1 : DRAWINGS - SCHED-20 SCHEDULE-H1 : TOOLS & SPECIAL EQUIPMENT - SCHED-21 SCHEDULE-J1 : LIST OF RECOMMENDED SPARES TO BE PURCHASED AT THE OPTION OF DEWA - SCHED-22 SECTION 6 : SPECIMEN FORMS TENDER BOND - FORMS-1 PERFORMANCE BOND - FORMS-2 MATERIALS PERFORMANCE GUARANTEE - FORMS-3 Y2K COMPLIANCE CERTIFICATE - FORMS-4 Y2K COMPLIANCE CERTIFICATE - FORMS-5 FORM OF AGREEMENT - FORMS-6 SA 8000 STANDARD- SELF EVALUATION QUESTIONNAIRE -FORMS-11 (ii)

  • SECTION 1 : COMMERCIAL

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-1

    2.1.1.1.1.03

    FORM OF TENDER

    SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS

    The Chairman Board of Directors Dubai Electricity & Water Authority P.O. Box 564 DUBAI, UNITED ARAB EMIRATES ARABIAN GULF Dear Sir, 1. Having examined the Conditions of Tendering, Specifications and Schedules for the above-named materials, we the undersigned, submit our offer/offers to manufacture, supply, works test and deliver to Dubai Electricity and Water Authority Stores, Dubai the whole of the said materials in conformity with the said Conditions of Tendering, Specifications and Schedules for the sums as indicated below against each offer: 1. MAIN OFFER TOTAL TENDER DDP PRICE FOR DELIVERY AT DEWA

    STORES IN DUBAI a) Definite Equipment/materials

    in figures : ...............................

    b) Optional (if applicable) Schedule J

    in figures : ..............................

    TOTAL (a+b)

    in figures:.................................... in words:...................................... ...............................................

    2. ALTERNATIVE OFFER TOTAL TENDER DDP PRICE FOR DELIVERY AT DEWA

    STORES IN DUBAI a) Definite Equipment/materials

    in figures : ................................

    b) Optional (if applicable) Schedule - J1

    in figures : ...............................

    TOTAL (a+b)

    in figures:.................................... in words:...................................... ...............................................

    2. We understand that if we fail to fill in prices in the Optional Schedule (if applicable) listed under Schedule 'J' series; our whole Tender will be liable for rejection. 3. Discount, if any to be deducted from the above amount(s) is given below: O F F E R DISCOUNT IN PERCENTAGE 1. Main Offer

    ......% (in words ...............................)

    2. Alternative Offer

    ......% (in words ...............................)

    samir.viraTypewritten TextAED 72,435,000

    samir.viraTypewritten TextAED 117,500

    samir.viraTypewritten TextAED 72,552,500

    samir.viraTypewritten TextDirhams Seventy Two millions five

    samir.viraTypewritten Texthundred fifty two thousand five hundred only.

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

    samir.viraTypewritten TextNil

    samir.viraTypewritten TextNil

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-2 Dubai Electricity & Water Authority

    4. We understand that only such discounts as are shown in this Form of Tender shall be considered and that any discounts shown elsewhere will not be taken into account for tender evaluation and that the discount shall be applicable to the tender as a whole, as well as to all items/sections or parts thereof individually. 5. We undertake, if our Tender is accepted, to commence the Works upon receipt of written notification of acceptance of our Tender to manufacture, works test, complete and deliver at DEWA Stores in Dubai, the whole of the Works offered as per Schedules indicated against each offer. The periods shall be calculated from the date of your Fax/Telex/Letter awarding the Contract.

    DELIVERY AT DEWA STORES IN DUBAI O F F E R COMMENCEMENT COMPLETION 1. Main Offer

    .............Weeks

    .............Weeks

    2. Alternative Offer

    .............Weeks

    .............Weeks

    6. A guarantee period of 24 (Twenty Four) months will apply for all the materials from the date of delivery of the last consignment at DEWA Stores in Dubai under the Contract. 7. We agree to abide by this Tender for the period of 120 days from the closing date of the Tender and it shall remain binding upon us and may be accepted at any time before the expiration of that period. 8. Unless and until a formal agreement is prepared and executed, this Tender, together with your written acceptance thereof, shall constitute a binding Contract between us. 9. We agree that the Contract commencement date shall be the date of your Fax/Telex/Letter awarding the Contract to us. 10. We understand that you are not bound to accept the lowest or any Tender you may receive. 11. Where the Schedule of Prices is divided into items/sections for the purpose of Tendering or even if there is only one item in the Schedule of Prices, 'DEWA' reserves the right to accept the Tender either as a whole or any one or more items/sections or part thereof. 12. In the event of any delay in the delivery of the goods and equipment including any deemed delay in delivery of goods and equipment which when received are not full and complete by themselves and/or do not meet contract requirements other than for reasons for which an extension of time may be granted, we agree to pay liquidated damages as stated in the Conditions of Tendering. 13. We understand that we being the Tenderer, shall submit the Tender Bond in our name and in the event of our tender being accepted, the Contract shall be awarded to us. As required by the Contract, we shall be responsible for the execution of the Contract and for submission of Performance Bond, Materials Performance guarantee etc. (as applicable) in our name and all payments under the Contract shall be made to us. 14. We agree that in the event of our Tender being accepted, we will within 15 (fifteen) days of award of Contract, submit a Performance Bond for 10% of the Contract Price in accordance with the prescribed specimen.

    samir.viraTypewritten Text16

    samir.viraTypewritten Text52

    samir.viraTypewritten Text-

    samir.viraTypewritten Text-

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-3

    15. We shall be deemed to have fully informed ourselves of the following provision:-

    Any commission, advantage, gift, gratuity, reward or bribe given, promised or offered by or on behalf of the contractor or his agent or servant or any other person on his or their behalf to the Employer or to the Engineer or the Engineer's Representative or to any of their respective members, officers, servants, advisors, agents or employees or to any person on their behalf or on behalf of any of them in relation to the obtaining or to the execution of this or any other contract with the Employer, may in addition to any criminal liability which may be thereby incurred, subject the contractor to the cancellation of this and all other contracts which he may have entered into with the Employer and also to the payment of any loss or damage resulting from such cancellation. 16. We attach herewith the original Tender Bond No............................. dated................................. and valid till....................for an amount of Dirhams............................................................... issued from a Bank M/s................................................ in Dubai along with the Master Tender Document. Dated this day of 2014 SIGNATURE OF THE AUTHORISED REPRESENTATIVE : (TENDERER) NAME OF THE SIGNATORY : In the capacity of duly authorised to sign Tender for and on behalf of M/s. ADDRESS: CONTACT PERSON: DESIGNATION : FAX : TELEPHONE : (OFFICIAL SEAL) LOCAL AGENT (OFFICIAL SEAL):

    SIGNATURE : NAME : DESIGNATION: ADDRESS : FAX : TELEPHONE:

    GMN: NM

    samir.viraTypewritten TextChief Executive Officer

    samir.viraTypewritten TextM/s. Transtech Transformers LLC

    samir.viraTypewritten TextP.O Box 128488, ICAD II. Musaffah. Abu Dhabi

    samir.viraTypewritten TextMr.Muhammad Saleem

    samir.viraTypewritten TextMarketing and Sales Manager

    samir.viraTypewritten Text+971 2 5503068

    samir.viraTypewritten Text02 5502062

    samir.viraTypewritten TextMr. Ranganathan (Ivory Power Equipment Trading LLC)

    samir.viraTypewritten TextDirector

    samir.viraTypewritten TextP.O Box 103983. Dubai UAE

    samir.viraTypewritten Text+971 4 3594951

    samir.viraTypewritten Text+971 4 3594947

    samir.viraTypewritten Text22nd

    samir.viraTypewritten TextApril

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-4 Dubai Electricity & Water Authority

    2.1.1.1.2.02

    SCHEDULE OF PRICESTo be filled in by Tenderer

    SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS ITEM No.

    DESCRIPTION

    QUANTITY (Nos.)

    DDP PRICE AT DEWA STORES (Dhs.)

    UNIT TOTAL 1. 11/0.4kV, 1500 kVA Cast Resin

    Distribution Transformer with Enclosure and LV metering arrangement.

    645

    2. 11/0.4kV, 1000 kVA Cast Resin Distribution Transformer with Enclosure and LV metering arrangement.

    155

    TOTAL TENDER DDP PRICE FOR DELIVERY AT DEWA STORES DHS. Amount in Words: Dirhams ................................................. ........................................................................... NOTES: 1) In the first instance Tender Prices must be quoted in UAE Dirhams.

    However, if the Tenderer so desires, he may additionally quote in any foreign currency of his choice.

    2) The prices should include the applicable Insurance, Customs duty, Local Transportation and other incidental costs (if any) for delivery up to anyof the DEWA Stores in Dubai (excluding Hatta), i.e. the Prices to be quoted above shall be DDP (Delivered Duty Paid) as per INCOTERMS 2000, including unloading at DEWA Stores.

    3) Tenderers must submit catalogues/literatures of items offered along with their tender.

    LOCAL AGENT OFFICIAL SEAL TENDERER OFFICIAL SEALNAME OF THE AGENT: NAME OF THE TENDERER: SIGNATURE OF AUTHORISED REPRESENTATIVE:

    SIGNATURE OF AUTHORISED REPRESENTATIVE:

    NAME OF SIGNATORY: NAME OF SIGNATORY: DESIGNATION: DESIGNATION: ADDRESS: ADDRESS: FAX: TELEPHONE: FAX: TELEPHONE: GMN: NM

    MAIN OFFER

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-5

    2.1.1.1.2.02

    SCHEDULE OF PRICESTo be filled in by Tenderer

    PRICES BASED ON METAL RATES - ALTERNATIVE OFFER

    [Based on LME Rate per metric tonnes of Copper at US $ 7,211.50 /

    Aluminium at US $ 1,734.00

    SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS

    Item No.

    DESCRIPTION

    QTY.(Nos.)

    Price per unit at DEWA Stores

    (Dhs.)

    Variation Factor (i.e. change in price per unit for every 1 US $ rise or fall on LME metal price) for Copper/ Aluminium.

    TOTAL DDP PRICE AT

    DEWA STORES

    (Dhs.)

    1.

    11/0.4kV, 1500 kVA Cast Resin Distribution Transformer with Enclosure and LV metering arrangement

    645

    2.

    11/0.4kV, 1000 kVA Cast Resin Distribution Transformer with Enclosure and LV metering arrangement

    155

    TOTAL TENDER DDP PRICE FOR DELIVERY AT DEWA STORES Dhs.

    Amount in Words: Dirhams ................................................. ........................................................................... NOTES: 1) In the first instance Tender Prices must be quoted in UAE Dirhams.

    However, if the Tenderer so desires, he may additionally quote in any foreign currency of his choice.

    2) Variation Factors for Copper/Aluminium shall be the change in the price

    of 1 unit for every 1 US $ rise or fall in the price of 1 metric tonne of Copper/ Aluminium at London Metal Exchange (LME). Variation Factors quoted shall be in the same currency in which unit prices and total prices are quoted, unless explicitly stated otherwise by the tenderer.

    3) The prices should include the applicable Insurance, Customs Duty, Local

    Transportation and other incidental costs (if any) for delivery up to any of DEWA Stores in Dubai(excluding Hatta), i.e. the Prices to be quoted above shall be DDP (Delivered Duty Paid) as per INCOTERMS 2000, including unloading at DEWA Stores.

    4) Tenderers must submit catalogues/literatures of items offered along with their tender

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-6 Dubai Electricity & Water Authority

    5) If for any or all of the tendered items a tenderer has quoted under both

    main and alternative offers and DEWA decides to place an order (contract) with that tenderer for such items, the following conditions shall apply:

    Determination of the final unit and total prices for each of the items so quoted (irrespective of values that may be indicated against those items in the order, which shall be considered as provisional) shall be subject to the following:

    a) LME adjusted unit and total prices for items so quoted shall be

    determined based on per Metric Tonne (MT) cash settlement prices ruling on LME for Copper/ Aluminium on the next working day after the receipt of order by the successful tenderer. The successful tenderer shall, within 3 working days after the date of order, produce documentary evidence for cash settlement prices ruling on LME per MT of Copper/ Aluminium on the next working day after their receipt of order.

    b) If an item whose LME adjusted unit price {Ref. (a) above} results in a higher rate than its unit price quoted under the main offer, the unit rate of main offer shall be the one which is applicable to determine the order value for that item.

    c) If an item whose firm unit price (main offer) results in a higher rate than its LME adjusted unit price {Ref. (a) above}, the unit rate arrived at as per (a) above (LME adjusted price) shall be the one to determine the order value for that item.

    d) The final price of the contract works shall be arrived at after considering (b) and (c) above.

    Also, for additional orders, if any, those are placed by virtue of clause 2.6 of Page: COMM-9, the conditions stated above shall be applicable for the increase in quantities. Delivery time / period for the increased quantities shall be as mutually agreed between the parties and in case of disagreement;this shall be as decided by DEWA.

    LOCAL AGENT OFFICIAL SEAL TENDERER OFFICIAL SEALNAME OF THE AGENT: NAME OF THE TENDERER: SIGNATURE OF AUTHORISED REPRESENTATIVE:

    SIGNATURE OF AUTHORISED REPRESENTATIVE:

    NAME OF SIGNATORY: NAME OF SIGNATORY: DESIGNATION: DESIGNATION: ADDRESS: ADDRESS: FAX: TELEPHONE: FAX: TELEPHONE: GMN: NM

    SCHEDULE OF PRICES (Continued)

  • RFX - 2051400011

    DUBAI ELECTRICITY & WATER AUTHORITY COMM : 7

    ADVERTISEMENT

    DDUUBBAAII EELLEECCTTRRIICCIITTYY && WWAATTEERR AAUUTTHHOORRIITTYY

    PP.. OO.. BBOOXX 556644,, DDUUBBAAII

    TTeell:: 997711--44--332244 44444444 FFaaxx:: 997711--44--332244 88111111 EE--mmaaiill--ccoonnttrraaccttss@@ddeewwaa..ggoovv..aaee

    WWeebb SSiittee--hhttttpp::////wwwwww..ddeewwaa..ggoovv..aaee

    IInnvviitteess TTeennddeerr ffoorr

    TTEENNDDEERR RRFFxx NNOO.. 22005511440000001111

    SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS

    The Tender Documents are available with the Main Cashier at the Head Office, Dubai Electricity & Water Authority, Dubai, U. A. E. on all days (Sunday through Thursday) during 8 a.m. to 2.00p.m. on payment of Dhs. 3000.00/- (Dirhams Three Thousand Only) in cash or online through DEWA website under the link https://e-services.dewa.gov.ae/Tenders/Tender_List.aspx or through the link https://srm.dewa.gov.ae/irj/portal/anonymous, payable by credit cards, which is nonrefundable. Tenders must be valid for acceptance for 120 days from the closing date of the Tender. Tenderers are required to submit their offer online through our SRM System. A covering letter must be accompanied by an Original Tender Bond (in a sealed envelope) for an amount of not less than 5% of the total Tendered Price. The Tender Bond shall be strictly in accordance with the Authoritys prescribed specimen and shall be valid for 150 calendar days following the last date fixed for receipt of Tender. In case of Manual submission, for any reason, the completed Tender in Triplicate along with the Tender Bond or in case of Online Submission, the Original Tender Bond and Part of Tender Document, if any, that could not be uploaded in triplicate, should be enclosed in a plain cover and red wax-sealed, clearly marked Tender RFX 2051400011 SUPPLY OF CAST RESIN DISTRIBUTION TRANSFORMERS, should be addressed to The Chairman, Board of Directors, Dubai Electricity & Water Authority and delivered into the Tender Room at the Authoritys Head Office near Wafi Shopping Mall in Zabeel East, Dubai. The scanned copy of the Original Tender Bond must be uploaded in the Vendor Folder in SRM. The closing date for receipt of completed Tender is 11.00 hrs of Wednesday, April 23rd, 2014. For any further queries, the office of the Senior Manager-Contracts may be contacted. Participants in the Tender should submit the names of their Local Partners/Sponsors, having a valid Dubai Trade Licence along with a photocopy of their current licence. This advertisement is a complementary part of the Tender Documents.

    MMAANNAAGGIINNGG DDIIRREECCTTOORR && CCEEOO

    ********** ********** **********

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-8 Dubai Electricity & Water Authority

    2.1.1.1.4.10 DUBAI ELECTRICITY & WATER AUTHORITY

    P.O. Box 564, Dubai, UAE

    CONDITIONS OF TENDERING FOR SUPPLY CONTRACTS

    1. SCOPE This Conditions of Tendering" covers Contractual and Commercial Terms for Supply and Delivery of Goods/equipment to Dubai Electricity & Water Authority's Stores in Dubai as stated in this Tender Documents. 2. GENERAL CONDITIONS 2.1. Dubai Electricity & Water Authority (hereinafter referred to as "DEWA") has the right to reject any Tender which does not comply with the Conditions of Tendering. 2.2. Tenders must be valid for a period of 120 (one hundred and twenty) days from the closing date of the Tender as shown in the Invitation to Tender. 'DEWA' has the right by agreement with the Tenderer(s) to extend the period of validity of the Tender. 2.3 DEFINITION 2.3.1. The Tenderer shall be defined as the Organisation signing the Form of Tender. Only a Manufacturer or a local agent of the Manufacturer in UAE is allowed to become a Tenderer. 2.3.2 The words, DEWA, Employer or Authority used in this document are synonymous and shall refer to Dubai Electricity & Water Authority. 2.3.3. The Tender Bond required to be submitted along with the Form of Tender must be issued in the name of the Tenderer as defined in the above clause 2.3.1. 2.4 AWARD OF CONTRACT 2.4.1 The contract shall be awarded to the successful Tenderer who has duly submitted a Tender Bond in their name and signed the Form of Tender. 2.4.2 Where the Schedule of Prices is divided into items/sections for the purpose of Tendering or even if there is only one item in the Schedule of Prices, 'DEWA' reserves the right to accept the Tender either as a whole or any one or more items/sections or part thereof. 2.4.3 In all cases the Contract shall be deemed to commence as from the date of the telex/fax/letter awarding the Contract. 2.4.4 On award of the Contract, the successful Tenderer shall within 15 (fifteen) days of such award of Contract submit to 'DEWA' a Performance Bond in their name in an amount not less than 10% (ten percent) of the Contract Price. 2.4.5 If the Contract calls for a guarantee for the equipment/goods to be supplied under the Contract, the successful Tenderer shall submit to 'DEWA' a Materials Performance Guarantee in their name for an amount not less than 10% (ten percent) of the Contract Price.

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-9

    2.4.6 All payments shall be made to the Successful Tenderer to whom the Contract is awarded. 2.5 CORRUPT PRACICES The Contractor/Supplier/Service Provider shall not offer or give or agree to give to any person any gift or consideration of any kind as an inducement or reward for doing or forbearing to do or for having done or abstained from doing any act in relation to the obtaining or execution of this or any other contract with the Employer or for showing or forbearing to show favour or disfavour to any person in relation to this or any other contract with the Employer. The Contractor/Supplier/Service Provider shall not enter into this or any other contract with the Employer in the event that any such commission has been paid or agreed to be paid by him or on his behalf or to his knowledge, unless before the contract is made, particulars of any such commission and of terms and conditions of any agreement for the payment thereof have been disclosed in writing to the Employer. Any breach of this condition by the Contractor/Supplier/Service Provider or by anyone employed by him or acting on his behalf (whether with or without the knowledge of the Contractor/Supplier/Service Provider) shall entitle the Employer to determine the Contract. 2.6 INCREASE IN QUANTITY 2.6.1. 'DEWA' reserves the right to increase the quantity of any or all of the goods and equipment that are included in the Tender at any time during the execution of the Contract. No such further orders or variations shall involve an increase of more than 25% of the total price of the goods and equipment to be supplied under the Contract. Irrespective of the fact that an item among multiple items of a contract is successfully delivered in full or part or not, the order for such additional quantities may include any item of the contract. The supplier shall be obliged to supply all such additional materials at the same unit rates, lot size(s) and as per the same delivery period(s) or earlier (if agreed by the Supplier). Further, depending up on the quantity of the additional order, even if a lot size required becomes a fraction of the corresponding lot size, similar delivery period gap between the lots as offered for the original quantities shall be maintained. Again, in case one or more additional lots or fraction thereof is/are required in addition to the original number of lots for an item, then the lot size(s) for these additional or fractional lots shall be proportional to the original lot size(s) and the gap between these additional lots shall be as per the same variation pattern of delivery periods between the original lots, as stipulated in the Order/Letter of intent. 2.6.2 Contract Execution Period

    Contract execution period shall be considered to start from the date of order placement / letter of intent and shall end on the date of safe receipt of the full quantity of material at the Dubai Sea/Air Port in cases of prices quoted as Ex-works, FOB or CIF delivery up to a Dubai Port, and on the date of satisfactory receipt of the full quantity of material at DEWA stores/specified DEWA premises, in case of prices quoted as DDP delivery up to DEWA Stores/premises. 2.7 RESPONSIBILITY OF TENDERER 2.7.1. Each Tenderer shall examine the Tender documents carefully and make written request to 'DEWA' for interpretation or correction of any ambiguity inconsistency or error therein which he may discover upon examination of the Tender Documents. Any interpretation, change or correction by written addendum shall be binding on the Tenderer. Tenderers shall not relay upon any interpretation, change or correction given by another method. Failure of a Tenderer to receive any addendum issued by or on behalf of 'DEWA' shall not release such Tenderer from any obligations under his Tender.

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-10 Dubai Electricity & Water Authority

    2.7.2. In the event that the Tenderer shall by his own error or negligence have failed to submit the correct prices for the goods and equipment to be supplied, he shall nevertheless be bound by his Total Tender Price and shall have no claim against 'DEWA' for the payment of any additional amounts notwithstanding that on a careful inspection of such Tender 'DEWA' could reasonably be expected to have notified any such error or negligence. 2.7.3. Negligence on the part of the Tenderer in preparing his Tender shall not confer any right on the Tenderer to withdraw or amend his Tender. 2.7.4. 'DEWA' shall have no responsibility for or pay for any expenses or losses which may have been or may be incurred by any Tenderer in relation to the preparation and submission of his Tender. 2.7.5. The Tenderer (irrespective of whether his Tender is accepted or not) shall treat the details of the specification and other documents attached hereto as private and confidential. 2.8 BASIS OF EVALUATION 2.8.1 The Tenders shall be evaluated and a contract shall be awarded on the basis of conformity to our technical specifications/commercial terms and conditions as described in the Tender Documents. The evaluation shall also be based on the quality, performance and reliability of the equipment/materials to be supplied under this contract 2.8.2 'DEWA' does not bind itself to accept the lowest or any Tender nor is it bound to give any reason for the rejection of any Tender. Whilst 'DEWA' reserves the right to waive any informality or irregularity in any Tender submitted, 'DEWA also reserves the right to reject any Tender if the Tenderer fails to submit all details as required by the Tender Documents, or if the Tender is in any way incomplete or irregular. 2.9 INVITATION 2.9.01 Invitation to the Suppliers to tender through advertisements in the Newspapers or through letter/fax/telex is a complementary part of the Tender Documents. 2.10 APPLICABLE LAWS 2.10.1 These Tender Conditions and the terms and conditions of the Contract shall be construed and in all respects be governed by the laws and regulations of the Emirate of Dubai, and (to the extent that the same are applicable therein), the laws and regulations of the United Arab Emirates. 2.10.2 Compliance to Corporate Social Accountability Standard SA 8000 initiated

    CEPAA The Selected Supplier/Vendor shall endeavor to comply with the SA 8000 standard practice which are in line with the applicable rules of the Government of Dubai and UAE.

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-11

    OTHER TERMS 2.11. The Conditions of Tendering should be read and construed in conjunction with the attached Tender Documents. 2.12. The headings and titles and content of indices in these Conditions or elsewhere in the Contract shall not be deemed part thereof or be taken into consideration in the interpretation or construction of the Contract. 3. REJECTION OF TENDER 3.1. Open, Fax or Telex Tenders are not permitted and will be rejected. 3.2. If the Tender Bond is submitted by a party other than the Manufacturer or the local agent of the Manufacturer in UAE , the Tender will be liable for rejection. 3.3. If the Tender Bond value is found to be less than 5% of the Tendered price, the Tender will be liable for rejection. 3.4. If the Tenderer submits more than one offer (Main and Alternative offers) within his Tender, then he should submit Tender Bond for not less than 5% of his highest offer, otherwise his whole Tender will be liable for rejection. 3.5. If the Tenderer fails to fill in prices in the Optional Schedule (if applicable) in the Schedule 'J' series, his whole Tender will be liable for rejection. 3.6 Tenderer should take utmost care to ensure that Copies are identical to the Master document. If the copy is found to be different from the Master document, the tender shall be liable for rejection. 3.7 The offer submitted by a tenderer shall be liable for rejection , if during tender evaluation , the tenderer does not respond to post tender clarification request(s) by DEWA or does not submit sample(s) ,when it is so specified in the tender document or when a sample is requested by DEWA during evaluation process. Failing to respond or failing to respond in time to a request by DEWA for providing clarification or a request for submission of sample(s) shall lead to the Tenderer being considered a non-responsive participant and may result in his future offers to DEWA being disregarded or his being disqualified from participation in future tenders of the Authority. 4. PREPARATION AND SUBMISSION OF TENDER 4.1. PREPARATION: 4.1.1. Tenderers should submit their offers prepared in the English language in the Original Tender Documents issued by 'DEWA' or in documents identical in format and content to the originals. 4.1.2 Incase the Tender document is being downloaded on line from our web site, then the Tenderer should make two more complete copies of the printout and identify one of the copies as Master document by writing on it or putting a seal and rest two as Copy Tender document. The blank Form of Tender, Schedule of Prices and Schedules of Guaranteed particulars (if available) of all these three copies of the tender document then should be filled in, signed and stamped as described in Clause 4.1.3. 4.1.3. The Form of Tender and all relevant schedules must be completed in full either in ink or by typewriter. In the event that there shall be found to be any error in the Tender, the Tenderer shall not be entitled to revise the Tender price quoted.

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-12 Dubai Electricity & Water Authority

    4.1.4. The Form of Tender must be signed by the authorised signatories of the Tenderer and official seal of the Tenderer affixed thereto and 'DEWA' shall have the right to reject any Tender which is not so signed and stamped. 4.1.5. The Tender Documents and all Drawings, Catalogues etc. submitted with the Tender must be in the English Language. 4.1.6 CORRECTNESS OF THE TENDER 4.1.6.1. Tenderers must complete all parts of 'Schedule of Prices' relating to price in all respects. The total Tender Price quoted must be shown clearly in words and figures and in the event of any discrepancy between the amount expressed in words and the amount shown in figures, the former shall be deemed to be correct Tender Price. Any amendment must be initialed by the authorised signatory of the Tenderer signing the Form of Tender. 4.1.6.2. Unit price quoted against a particular item should be the DDP price as per the requirement of Tender Specifications, so that cost of every individual item becomes explicit. Showing only the cost against unit price and indicating other ancillary charges like Freight, Insurance, Local Transportation etc. as a separate combined price, is not acceptable. 4.1.6.3. Copy tender shall be identical with the Master tender. If erasures or other changes appear, each such erasure or change must be initialed by the authorised signatory of the Tenderer signing the Form of Tender. In the event of any discrepancies, the Master Tender Document will be considered the ruling tender document. 4.1.6.4. Tenderers must quote firm prices for delivery and unloading at 'DEWA' Stores in Dubai in UAE Dirhams unless otherwise stated in the price schedule. Tenderer's prices must be inclusive of sea worthy export packing in conformance with acceptable international standards. In the event of a Contract being awarded all payments will be in UAE Dirhams or the agreed currency. In case there shall be any discrepancy between the itemized prices and the total Tender Price, whichever shall be the lesser of the total sum of the itemized prices or the Total Tender Price as quoted shall be deemed as correct and this lesser price shall be binding on the Tenderer. 4.1.7 CURRENCY 4.1.7.1. In the first instance Tender Prices must be quoted in UAE Dirhams. However, if the Tenderer so desires, he may additionally quote in any foreign currency of his choice. 4.1.8 ALTERNATIVE OFFER 4.1.8.1. A Tenderer who elects to submit an Alternative Offer shall do so separately to the Main Offer by the closing date and time thereof. Details of the Alternative Offer shall be made in the relevant Alternative Offer schedules where such schedules are provided or if not so provided in a separate offer letter clearly indicating it to be an Alternative Offer. Goods and equipment to be supplied under the Alternative Offer must be of the same manufacturer as that of the Main Offer. 4.1.9 DEVIATION FROM TENDER DOCUMENTS

    4.1.9.1. Tenders must conform to schedules enumerated in the Tender Documents. Should however, there be any deviations, these must be clearly listed in a separate statement giving the page number, section, original clause, deviation and explanation.

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-13

    4.1.9.2. In the absence of such indication, it will be assumed that the Tenderer agrees to meet the requirements of Tender Document. If however, it is found that the Tender offer does not comply with the Tender Document, then any alterations to the Tender offer required to bring it in line with the Tender Document shall be carried out without any change in the Tender Price. 4.2. SUBMISSION: 4.2.1. The Tender and the accompanying documents, Master and Two copies, completed as directed, shall be enclosed in plain cover and red wax sealed, clearly marked with the Tender No. and Title and shall be addressed to The Chairman, Board of Directors, Dubai Electricity & Water Authority, P.O. Box 564, Dubai, U.A.E. and shall be delivered into the Tender Box at DEWA's Head Office near Wafi Shopping Mall in Zabeel East, Dubai not later than 11.00 a.m. of closing date for receipt of completed Tender as shown in the invitation to the Tender. The cover containing the Tender should not bear the name of the Tenderer or any mark identifying him. Tenders received after the closing time and date will not be accepted. 4.2.2 In case the closing date of a tender is declared as a holiday by the UAE/Dubai Government, the first working day after that unscheduled holiday period shall become the closing day of that tender. 4.2.3 The original Tender Bond must be attached to the Master Tender Documents. A copy of the Tender Bond must also be attached to each copy of the Tender. Surety Bond will not be accepted by 'DEWA'. 4.2.4 Tenderers should enclose with the Master Tender Documents the duplicate copy of the cash receipt obtained from 'DEWA' for payment of Tender Fees. 4.2.5 Tenderers must submit the names of their Local Partners/Sponsors along with a photocopy of their current Dubai Trade Licence.

    4.2.6 Tenderers must give evidence of their qualifications and capability to supply the goods and equipment included in the Tender in quality and quantity. This evidence must include details of orders previously executed by the Tenderer.

    4.2.7 Tenderers are required to provide with each Tender Document one set of complete drawings and descriptive literature relating to their offer for all the goods and equipment to be supplied. All samples and catalogues required in the tender documents must be submitted by the Tenderer simultaneously with his Tender. Such samples and catalogues shall comply with the required specifications in all respects unless any deviations there from have been specifically stated in the Tender which they accompany.

    4.2.8 All samples, drawings and catalogues written in the English language shall be complete and intact. A card duly signed and stamped by the Tenderer, with the item number, type, measurements and all the relevant details shall be attached to each sample. In the event that an incomplete sample shall be submitted, the specifications shown in the Tender documents shall be deemed to be binding on the Tenderer save that if the Tenderer shall have submitted a letter stating that his samples do not agree with the specifications, 'DEWA' may at its discretion either accept or reject the sample submitted. All samples, drawings and catalogues once submitted shall become the property of 'DEWA' who shall keep all such samples, drawings and catalogues as shall be submitted by the Tenderers. 4.2.9 Tenders must be submitted at the specified place, date and hour in accordance with the Invitation to Tender.

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-14 Dubai Electricity & Water Authority

    5. BONDS AND GUARANTEES 5.1. TENDER BOND 5.1.1. Each Tender shall be accompanied by a Tender Bond in UAE Dirhams (or in other currencies if stated in the price schedule) for an amount not less than 5% (five percent) of the Total Tender Price. The Bond shall be in the form of an unconditional and irrevocable Bank Guarantee issued from a leading Bank in Dubai in favour of 'DEWA' and must be strictly in accordance with the specimen attached. The above Tender Bond shall be valid for 150 Calendar days calculated from last date fixed for receipt of Tenders. 5.1.2. If the Tender Bond value is found to be less than 5% of the Tendered price, the Tender will be liable for rejection. 5.1.3. If the Tenderer submits more than one offer (Main and Alternative offers) within his Tender, then he should submit Tender Bond for not less than 5% of his highest offer, otherwise his whole Tender will be liable for rejection. 5.1.4. In the event that 'DEWA' and the Tenderer shall agree that the period of validity of Tenders shall be extended, the Tenderer shall also correspondingly extend the period of validity of Tender Bond. Failure to extend the period of validity of the Tender Bond will invalidate the Tender. 5.1.5. The costs of Tender Bond and the costs of any required extension to the Tender Bond shall be borne by the Tenderers. 5.1.6. The Tender Bond will be encashed by 'DEWA' in any of the following circumstances: a) If the Tenderer should, before the expiry date of its bid, withdraw his Tender or increase its bid prices and/or change the terms and conditions of its bid. b) If a successful Tenderer should fail for any reason to accept an award, sign a contract corresponding to its Tender or fail to establish a Performance Bond as required by the Tender Enquiry. 5.1.7. The Tender Bond of the successful Tenderer will be returned only upon the receipt of the Performance Bond by 'DEWA'. 5.1.8. The Tender Bond of the unsuccessful Tenderer(s) will be returned only after the Tender is finalised and the Performance Bond is received from the successful Tenderer or after the validity period of Tender Bond whichever is earlier. 5.2. PERFORMANCE BOND 5.2.1. On award of the Contract, the successful Tenderer shall within 15 (fifteen) days of such award of contract submit to 'DEWA' a Performance Bond in an amount not less than ten percent (10%) of the Contract Price in the form of an unconditional and irrevocable Bank Guarantee strictly in accordance with the specimen attached hereto in favour of 'DEWA' from a leading Bank in Dubai valid for a period of 90 days beyond the contractual date of the delivery of the last consignment under the Contract. 5.2.2. The costs of Performance Bond and the costs of any required extension to the Performance Bond shall be borne by the successful Tenderer. 5.2.3. 'DEWA' shall have the right to forfeit the Tenderer's performance Bond, if the Tenderer shall fail to perform and observe his obligations under the Contract

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-15

    5.2.4. The Performance Bond shall be released only on satisfactory completion of the contract and after the receipt of the Materials Performance Guarantee. 5.3. Y2K COMPLIANCE CERTIFICATE: If the Y2K Compliance is specified in the technical specifications of the Equipment/Device(s)/Machinery/ Hardware/Software to be supplied then along with the Performance Bond described in clause 5.2, the Manufacturer/Supplier has to submit a Y2K Compliance Certificate for their product(s) as per the specimen certificate form shown in pages: Forms Y2K-1 and Y2K-2.

    5.4. GUARANTEE PERIOD 5.4.1. A Guarantee period of 24 (Twenty four) months will apply for all the equipment/materials from the date of delivery of the last consignment at 'DEWA' Stores in Dubai under the Contract. If during the guarantee period any goods and/or services are required for the purpose of ensuring reliable and satisfactory performance of the goods supplied, these shall be provided by the Supplier at no extra cost to 'DEWA'. 5.5. MATERIALS PERFORMANCE GUARANTEE 5.5.1. The successful Tenderer shall submit to 'DEWA' a Materials Performance Guarantee for an amount not less than 10% of the Contract Price. This guarantee shall be in the form of an unconditional and irrevocable Bank Guarantee strictly in accordance with the format attached. The guarantee should be issued by a leading Bank in Dubai and should be valid for a period of not less than 24 (Twenty four) months from the date of certification of goods of the last consignment at 'DEWA' Stores under the Contract. The original of this guarantee should be submitted to 'DEWA' prior to certification of goods of the last consignment under the Contract. 'DEWA' shall reserve the right to forfeit the Tenderer's Materials Performance Guarantee if any of the materials supplied under the Contract does not meet 'DEWA's specifications or fails when set to work or is found defective. 5.5.2. The costs of Materials Performance Guarantee and the costs of any required extension to the Materials Performance Guarantee shall be borne by the successful Tenderer. 5.6 EXTENSION OF GUARANTEE PERIOD/ MATERIAL PERFORMANCE GUARANTEE If during the guarantee period of 24 months the equipment/ material supplied, develop similar/frequent faults while in use owing to defect in design or manufacturing defects or show similar/frequent manufacturing defect(s)while in our stock , then DEWA shall have the right to ask the supplier to extend the Guarantee period and the Material Performance Guarantee for a further period of two years beyond the initial two years guarantee period. 6. TERMS OF PAYMENT / COUNTRY OF ORIGIN

    6.1. COUNTRY OF ORIGIN 6.1.1.The Contractor/Supplier/Consultant/Bidder acknowledges that the import and customs laws and regulations of the United Arab Emirates shall apply to the furnishing and shipment of any product or component thereof or of any service to the United Arab Emirates. 6.1.2. Each delivery of materials by the Supplier/Contractor or any sub-Contractors shall be accompanied by a Certificate of Origin, issued by the Joint Arab Foreign Chamber of Commerce at the exporting country, or if not available, by the Local Chamber of Commerce at the exporting country, certifying the origin of the manufactured / supplied material and its manufacturers name, address and nationality. The issued Certificate of Origin has to be legalised / authenticated by the UAE Diplomatic Mission, or if not available, by any Arab

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-16 Dubai Electricity & Water Authority

    Diplomatic Mission at the exporting country. 6.2. TERMS OF PAYMENT

    6.2.1. Upon delivery / receipt of goods at our stores and their final Acceptance by 'DEWA' after local inspection, 100% payment of the cost of goods accepted and invoiced shall be released which is normally due within 90 days from the date of delivery. 6.2.2. The successful Tenderer will be required to submit the following documents at the time of any application for payment: A. a) If the materials are to be delivered to 'DEWA's Stores: i) Certificate of Origin in triplicate

    b) If 'DEWA' have to clear the materials from Dubai Port :

    i) Three copies of the Invoices which should be countersigned by Chamber of Commerce of country of origin and legalised by any Arab Embassy or Consulate.

    ii) Certificate of Origin in triplicate and legalised by any Arab Embassy or Consulate.

    iii) A certified copy of complete set of clean 'on board' Shipping Company's Bill of Lading/Air waybill/Postal Receipt whichever is appropriate.

    B. Inspection Certificate issued by 'DEWA'/'DEWA's authorised Inspectors after inspecting the equipment/materials at the Manufacturer's Works or inspection waiver letter/fax/telex issued by DEWA as specified in the Inspection Clause. 7. INSPECTION, SHIPMENT AND CUSTOMS 7.1. INSPECTION 7.1.1. An Inspection Certificate issued by 'DEWA'/'DEWA's authorised Inspectors must accompany the documents while applying for payment and this Inspection Certificate must state that they have inspected the goods at Manufacturers Works and found them to be in accordance with the Technical Specifications of the Contract/Order. The cost of such inspections shall be borne by 'DEWA'. Tenderers must if required, be prepared to provide for full routine inspection facilities without extra charges. 7.1.2 At least 21 days advance notification must be given to DEWA about the tests schedule at the manufacturers works or at independent Laboratory /testing body as the case may be. 7.1.3 Once the Supplier has served the 21 days advance notice, DEWA, shall select its inspection team and make travel plan and the travel and lodging arrangements. The Supplier should normally adhere to the inspection schedule and should not postpone or cancel the inspection visit. If the Supplier unilaterally postpones / cancels the inspection visit within the period which lies between the inspection date and 10 days prior to that date, DEWA will be entitled to levy a penalty of AED 5,000/- per cancellation, to cover the expenditure DEWA will incur towards Air ticket cancellation and Man-hours loss towards arrangement of Visas and internal processing for allowances and approval. 7.1.4. If for any reason the inspection is waived, then 'DEWA's letter/fax/telex confirming such waiver should accompany the documents for application of payment.

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-17

    7.2. SHIPMENT 7.2.1. The materials must be properly packed with adequate protection against damage during transport up to its final destination including rough handling during Sea, Air, Rail and road transport and transition from one to another. 7.2.2. Special steps shall be taken to guard against theft during transport. No small items, such as padlocks, nameplates and so forth, which could be torn off or unscrewed, shall be accessible. Cases, crates, barrels and drums shall be banded in such a manner as to obstruct the theft of any of the timber used for packing and the bands shall be so secured that they are not rendered ineffective by shrinkage of the wood. 7.2.3. All goods shipped by sea must be shipped by Conference Line Vessels over 1,000 GRT (Gross Registered Ton). All goods not shipped in containers must be shipped below deck. If the goods are shipped on deck, the risks of loss or damage to the goods will the responsibility of the Supplier. 7.3 SHIPPING MARKS 7.3.1. The following shipping marks, with all letters and numbers at least 15 cm. high, must be applied to each case in a consignment: CONSIGNEE

    DUBAI ELECTRICITY AND WATER AUTHORITY DUBAI, UNITED ARAB EMIRATES

    CONTRACT No. SIZE OR CAPACITY CONSIGNMENT/REFERENCE No. 7.4 PACKING OF MATERIALS & CONTAINERISATION 7.4.1 Packing shall be such that it affords adequate protection to the enclosed equipment/materials both against climatic conditions and against mechanical damage during transport to its final destination, including rough handling during sea, rail and road transport and transition from one to another. 7.4.2 Packing and Containerization should conform to the specification mentioned in the General Technical Requirements. 7.4.3 All packing cases shall remain the property of the Purchaser. 7.5. DELIVERY TERMS AND CUSTOMS DUTY 7.5.1 Unless otherwise agreed by the Supplier and DEWA, the terms of delivery for the supply of equipment/materials shall be DDP (Delivered Duty paid), i.e. delivery up to DEWA stores/premises at Dubai, including the unloading at DEWA stores/premises as per Incoterms 2000.

    7.5.2. Accordingly, the supplier shall be responsible for settling customs duty, leviable under UAE regulations for the equipment/materials of non-GCC origin (since GCC manufacture is exempt from Customs Duty) or otherwise not specially exempted under UAE Customs Rules/Regulations that are required to be imported to UAE under the supply contract.

    In case of material/equipment import as replacement of defective, damaged or otherwise rejected materials that were previously supplied, the customs duty, leviable under UAE regulations for the items concerned shall be on the Suppliers account.

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-18 Dubai Electricity & Water Authority

    8. INSURANCE, DELAYS AND ARBITRATION 8.1. INSURANCE 8.1.1. The insurance during transit should be provided by the Supplier at his cost and the cover must extend to final delivery at 'DEWA' Stores in Dubai. Insurance cover should be valid till the final certification of the goods by 'DEWA'.

    8.2. LIQUIDATED DAMAGES 8.2.1. If the Tenderer shall deliver late any goods or equipment at 'DEWA' Stores in Dubai, he shall pay 'DEWA' as liquidated damages at the rate of 1.25% per week and prorata for part thereof of the value of the goods and the equipment delayed. Without prejudice to the generality of the foregoing, in the event of partial or incomplete delivery or delivery of goods which do not otherwise comply with the Contract requirements, then delivery shall be deemed to be delayed by such time as it takes for further goods and equipment to be delivered at 'DEWA' Stores in Dubai in a manner complying with the Contract and liquidated damages shall be payable by the Tenderer in the same manner as aforesaid. In any case, where delivery is late or deemed to be late for reasons for which an extension of time may be granted, no liquidated damages will be payable. The maximum amount which shall be deducted by way of liquidated damages shall be 10% of the Contract value of the goods and the equipment delayed. The amount of liquidated damages shall be calculated according to the date of delivery at 'DEWA' Stores in Dubai. Liquidated damages shall also apply to partial shipment. 'DEWA' may without prejudice to any other method of recovery, deduct the amount of such liquidated damages from any monies in its hand, or which are due or may become due to the Tenderer. Tenderers should note that failure to meet the delivery dates due to non-availability of shipping space or shippers (including non or late availability of the same) will not be grounds for claiming exemption from the levy of liquidated damages. 8.2.2 The payment of Liquidated Damages shall not relieve the Contractor from the obligation to deliver the Goods/Equipment or from any other liabilities or obligation under the Contract or from meeting the Performance requirements. 8.2.3 In the event of delay beyond the Contractual delivery period, and the unsupplied goods or equipment, either as a whole or in part, having been subjected to the maximum Liquidated Damages of 10% of their value, DEWA shall be entitled to take in respect thereof the following measures, without prejudice to its other rights under the Contract:- To cancel the Contract for the unsupplied materials/equipment and to purchase

    goods of the same kind or similar thereto from any other supplier, recovering from the defaulting contractor any additional price that DEWA has to bear, together with 10% of the Performance Bond as administration expenses as well as the stipulated Liquidated Damages for the delay.

    8.3 STAGGERING OF DELIVERY If for whatsoever reason the requirement/priority of the material/equipment for which the tender has been floated changes, then at any time during the tender evaluation or during the execution of the Contract, until the commencement of the shipment of the last consignment of the contract, DEWA shall have the right to ask the supplier to stagger/delay the delivery of the whole or remaining quantity/quantities of the item(s) tendered/ordered. The supplier shall be obligated to supply the item(s) as per new delivery schedule that is advised by DEWA, without any additional cost to DEWA. The Liquidated damages claim, if any, shall then be calculated based on the new schedule of delivery date(s)and not on the basis of the original delivery date(s) that have

  • 2.1.1.1.0.01 REV.10, VERSION-02 RFx:2051400011

    Dubai Electricity & Water Authority Page: COMM-19

    been stipulated in the order/letter of intent. 8.4 TERMINATION OF CONTRACT 8.4.1 If, at any time during the currency of this Contract, DEWA shall, at its sole discretion, be of the opinion that the Contractor's performance of the Contract is unsatisfactory, DEWA shall have the right to terminate the Contract by giving 15 days notice to the Contractor. 8.4.2 In this event without prejudice to DEWA's rights under the Contract, the Contractor shall only be entitled to payments for the goods delivered and accepted by DEWA. 8.5. FORCE MAJEURE 8.5.1. Upon it becoming reasonably apparent that the delivery of the materials will be delayed, the Supplier shall forthwith give written notice of the cause of delay to 'DEWA' and if in the opinion of 'DEWA' the delivery of materials is likely to be or has been delayed beyond the Contract Time for completion (or beyond any extended time previously fixed) by Force Majeure, then 'DEWA' shall grant such extension of time as may be fair and reasonable under any circumstances. 8.5.2. Neither party shall be responsible for any failure to perform its obligation under the Contract due to any force majeure provided that if such failure is on the part of the Supplier and is the result of any failure for whatever reason by any sub-contractor of the Supplier, the force majeure provision shall not avail to the Supplier. 8.5.3. The expression 'Force Majeure' shall mean any unforeseeable cause beyond the control of either party such as an act of God, Judicial Orders, Act of Public Enemy, Wars, Revolutions, Fires, Floods, Epidemics, Governmental Decrees, Natural Calamities, which shall directly prevent such party from performing his contractual obligations provided that where any failure by the Supplier to perform his contractual obligations is in any way and for whatever reason caused by the non-availability of shipping space, or shippers (including the non or late availability of the same) the force majeure provision shall not avail to the Supplier. 8.6 ARBITRATION 8.6.1 If any dispute in connection with this contract shall arise between the parties, it shall in the first place be resolved amicably between the parties; or failing such resolution, without prejudice to the Dubai and United Arab Emirates Courts jurisdiction and subject to the agreement between the parties, the same may be referred to an Arbitration. Within 45 days of agreement by the parties for resolution through Arbitration, it shall be referred in writing by the party raising the dispute to an arbitration proceedings . In spite of the dispute, the Supplier/Service provider shall proceed with the supply/service with all due diligence, whether he or the Employer (DEWA) requires arbitration as hereinafter provided or not. 8.6.2. Unless otherwise agreed by the parties, the Arbitration panel shall be composed of three arbitrators, of whom each party shall appoint one arbitrator, and the two appointed arbitrators shall within 45 days of finalising the adopted procedure, appoint a 3rd Arbitrator as the Chairman of the panel. In case of disagreement, with regards to the selection of a person either as the arbitrator or the Chairman, within the specified period of 45 days, the same shall be appointed by the Dubai Chamber of Commerce & Industry, in accordance with the Rules of Commercial Conciliation & Arbitration of DIAC (Dubai International Arbitration Centre)

    8.6.3. The venue of the arbitration proceedings shall be Dubai, and will be subject to laws, customs and practices prevailing in the Emirate of Dubai, and shall be conducted in the English language, unless an other language is agreed upon between the parties.

  • RFx:2051400011 2.1.1.1.0.01 REV.10, VERSION-02

    Page: COMM-20 Dubai Electricity & Water Authority

    9. CONTRACT AGREEMENT 9.1. AGREEMENT 9.1.1. For Contracts where the Contract Price is Dhs.5,000,000/- and above, the successful Tenderer will be required to enter into an agreement with 'DEWA' in the Form of Agreement annexed hereto. Unless and until such Agreement is prepared and executed the Tender and all the relevant documents, relating to the same together with 'DEWA's letter accepting the Tender and awarding the contract shall constitute a binding Contract between the successful Tenderer and 'DEWA'. 9.1.2. In preparing his Tender, the Tenderer shall comply with these Tender Conditions, the Schedules and the Form of Agreement annexed hereto and in the event that 'DEWA' shall accept the tender and award the Contract to the Tenderer, these tender documents together with the completed tender shall form part of the Agreement between the Tenderer and 'DEWA'.

    ***** GMN: NM

  • SECTION 2 : STANDARD SPECIFICATIONS

  • 1.2.1.0.0.01-Rev.04

    1 of 13

    GENERAL TECHNICAL REQUIREMENTS

    FOR ELECTRICAL EQUIPMENTS 1 STANDARDS Except where modified by this Specification, equipment and materials shall

    conform to IEC (International Electrotechnical Commission) and ISO (International Standards Organisation) Recommendations. If relevant IEC and ISO Recommendations are not available then relevant National Standards shall be proposed by the Supplier for DEWA's approval.

    When IEC or ISO Recommendations or National Standards are referred to, the

    Edition shall be that current at the Date of Tender, together with any Amendments issued to that date.

    2 DESIGN AND STANDARDISATION Suppliers shall conform to following aspects while designing Equipments: No welding, filling or plugging of defective parts will be permitted and welding

    on Site must be kept to an absolute minimum. All apparatus shall operate without undue vibration and with the least practicable

    amount of noise. Operating boxes, kiosks, cubicles and similar enclosed compartments

    forming part of auxiliary equipment shall be adequately ventilated to restrict condensation. All contacts or relay coils and other parts shall be suitably protected against moisture. Anti-condensation heaters shall be provided inside each cubicle or where necessary each cubicle compartment. They shall be shrouded and located so as not to cause injury to personnel or damage to equipment. The thermostat shall be arranged to switch off the heater supply when the internal temperature exceeds 30-35C. Means shall be provided at each unit for isolating the supply. A common switch with a neon gas type lamp labeled "Cubicle heaters on" shall be mounted at a convenient point such that it will not require movement in the event of extension units being added.

    All outdoor apparatus including bushing insulators and fittings shall be so

    designed as to avoid pockets in which water can collect. The underside of all tanks shall be ventilated to prevent corrosion. Accessible means shall be provided for the easy lubrication of all bearings and

    where necessary, of any mechanism or moving part. Grease lubricators shall be fitted with hexagon nipples.

    All taper pins used in any mechanism shall be of the split type. Joints employing a gasket material shall be so constructed that the packing is

    maintained under sufficient compression in all parts, so that an efficient joint can be made without the use of jointing compounds. Gasket material shall be of the minimum thickness necessary and of proven composition when operating under the environmental conditions prevailing at the Site.

  • 1.2.1.0.0.01-Rev.04

    2 of 13

    All apparatus shall be designed to obviate the risk of accidental short-circuit due to

    animals, birds, and vermin. Openings in ventilated enclosures shall be so constructed to prevent the entry of vermin and insects and when located in public places insertion of any objects, for example, by children.

    3 GALVANISING Galvanising shall be applied by the hot dipped process. Drilling, punching,

    cutting, bending and removal of burrs shall be completed before galvanising. The zinc coating shall be clean, of uniform thickness and free from defects.

    Surfaces in contact with oil shall neither be zinc plated nor cadmium plated

    unless finished with an oil-resisting varnish. For zinc spray coating, surfaces shall be shot blasted before spraying. The average thickness of zinc coating for iron and steel articles shall be in

    accordance with BS 729 or other approved National Standard and that for steel wires to BS 443.

    Material on which galvanising has been damaged shall be re-dipped unless, in the

    opinion of the Engineer, the damage is local and can be repaired by applying a coat of galvanising repair paint. Where such repair is authorised, the damaged area shall be cleaned by wiping with clean rags saturated with mineral spirits or xylene followed by wire brushing. After wire brushing, the area shall be cleaned with solvent to remove residue and shall be given a minimum of two coats of zinc rich paint in accordance with the Manufacturer's instructions.

    4 NON-FERROUS METALS Aluminium and aluminium alloys shall be of high commercial quality. The

    composition, including the percentage and nature of any impurities, shall be stated in the Schedules.

    All copper conductors shall be manufactured from copper having a conductivity not

    less than 99.9% conforming to IEC 60028. 5 LABELS, NUMBER PLATES AND PHASE IDENTIFICATION DISCS All equipment shall be clearly and permanently labeled in English. Danger

    labels and fire protection equipment labels shall be in English and Arabic. Arabic translations shall be submitted for DEWA' approval.

    All switchgear shall be clearly and permanently identified with circuit designation in

    front and rear, number plates and phase discs of appropriate colours. Phase shall be distinguished as Red (R), Yellow (Y) and Blue (B) with voltage

    reaching their maximum values in that order and in respective colours. All control and relay panels, marshalling boxes, kiosks, distribution boxes and

    other cubicles shall be labeled to show the circuit with which it is associated. These labels shall be fitted to the front and back of all equipment.

    Labels, number plates and their fixing screws for outdoor use shall be of

    stainless steel or other corrosion resistant metals. Danger notice shall have red lettering on a white background or they may be

    pictorial as approved by DEWA. All other labels and number plates shall have black lettering on a white background.

  • 1.2.1.0.0.01-Rev.04

    3 of 13

    As far as reasonably possible, labels and the lettering shall comply with the

    approximate dimensions in millimeters given below:- Equipment Label Size (mm) Lettering (mm)

    Main labels on panels, cubicles, kiosks, junction and control boxes and similar equipment

    125 x 50

    20 x 1.5

    Control and changeover switches and similar items

    70 x 30

    12 x 1.5

    Fuses and links 35 x 15 5 x 1

    Relays and contacts 60 x 20 5 x 1 6 BOLTS AND NUTS Bolts and studs for electrical wiring connections shall preferably be of brass

    M6 size. Nuts and pins shall be locked in position with lock-nuts or lock washers. No bolt or stud shall project through its nut by more than 0.5 times diameter or

    four threads whichever is the less except for terminals and relay stems. Bolts, nuts and washers on outdoor equipment shall be of non-corroding

    material, where they are in contact with non-ferrous parts in conductor clamps and fittings and elsewhere if specially required.

    Suitable special spanners shall be provided for bolts and nuts which are not

    properly accessible by means of an ordinary spanner. 7 CLEANING AND PAINTING All coatings and protective which are required to withstand service fluids such

    as pipe, tank, pump, valve, water box and similar linings shall be applied in the works prior to shipping.

    Washing of any surface prior to the application and/or over coating of paint

    shall only be carried out with demineralised water or suitable approved solvent solutions.

    Paints shall only be thinned and/or mixed in accordance with the Manufacturer's

    instructions and all paints, solvent, resins, hardness and associated products shall be stored and used strictly in accordance with the Manufacturer's instructions and the applicable toxic, flammability and safety requirements for the particular products.

    Before painting or filling with oil, gas or compound, all ungalvanised parts shall

    be thoroughly cleaned, free from rust, scale, burrs, grease and moisture and all external rough surfaces on castings shall be filled.

  • 1.2.1.0.0.01-Rev.04

    4 of 13

    The following minimum painting requirements shall apply to all ferrous parts.

    EXTERNAL SURFACES

    APPARATUS PAINTING

    All ungalvanised surfaces other than nuts, bolts and washers which may be removed for maintenance

    a) One priming coat of corrosion inhibiting paint applied immediately after cleaning. b) Three coats of non-glossy, oil and weather-resisting paint applied after inspection, testing and before despatch

    Exposed, ungalvanised nuts, bolts and washers which may be removed for maintenance

    One coat of oil and weather resisting, non fading paint applied after erection

    Panels, cubicles, kiosks and apparatus boxes, for use indoors

    Three coats of paint

    Succeeding coats of paints shall be applied only after the previous coat is thoroughly dry to ensure a satisfactory finish. The final dry film thickness of outer painted surfaces shall not be less than 90 microns.

    INTERNAL SURFACES

    APPARATUS PAINTING

    Oil filled chambers and tanks One coat of oil resisting varnish paint

    Kiosks and apparatus boxes for use outdoors

    Three coats of paints, the final coat being an anti-condensation finish, coloured white or light gray

    Cubicles, kiosks and apparatus boxes, for use indoors

    Three coats of paint, the final coat being a white enamel

    Successive coats of paints shall be easily distinguishable by shade of colour and shall be applied to a clean, dry and properly prepared surface. Each coat shall be compatible with the previous coat. The Supplier shall provide an adequate supply of touch-up paint for making good minor damage which may occur during transport. The Contractor shall provide a procedure for carrying out remedial painting on Site, which shall include acceptable environmental conditions under which the remedial work may proceed. On contracts which include erection, all paint work which has been damaged during transport or erection shall be made good to the approval of DEWA.

  • 1.2.1.0.0.01-Rev.04

    5 of 13

    The colour and shade of all painted external surfaces shall be to RAL 7032 Light Grey. All pipe work shall be painted in accordance with the following colour code: _____________________________________ Content Colour _____________________________________ Compressed Air Blue SF6 gas Yellow Fire water Signal Red Diesel fuel oil Light Brown Lubricating oil Dark Brown _____________________________________ The crane and components shall be painted golden yellow. The SF6 pipes shall be painted yellow but all pipes associated with one gas zone shall be separately identified with an individual colour band every 300 mm.

    8 INSULATING OIL AND GAS Sufficient oil or gas shall be supplied to fill all oil or gas-filled equipment

    provided under this Contract. 9 CORONA AND RADIO INTERFERENCE All equipment shall be designed so as to minimize corona or other electrical

    discharge and radio interference. 10 PAD LOCKS Padlocks or other approved locking devices for circuit-breakers, isolating devices,

    control switches, valves, marshalling kiosks, cubicles, screened enclosures and other equipment shall be supplied under this Contract.

    All padlocks and other locks shall be provided with two identical keys each key shall

    be supplied complete with its own engraved durable identification label. Keys and locks shall be impressed with the Manufacturer's serial number. Wall-mounting cabinets suitable for the accommodation of padlocks and keys while

    not in use shall be supplied. 11 GUARDS Plate or mesh safety guards shall be provided for electrical apparatus and

    moving parts of machinery. 12 LUBRICATION

  • 1.2.1.0.0.01-Rev.04

    6 of 13

    Lubrication shall preferable be by the use of separate oil cups or the self-sealing

    type of grease nipples for each point. Grease nipples, shall, wherever possible, be of a uniform type, and the Supplier shall provide a grease gun for each type of grease nipple provided. A separate nipple shall be provided to lubricate each point.

    All lubrication filling points shall be located in easily accessible positions.

    Where practicable, extension piping shall be provided to bring lubrication points to a common access position or panel.

    Lubrication to motors and machinery in motion shall be arranged external to the

    guards. All plant and equipment having intakes or breathers or having lubricated parts

    exposed to atmosphere shall have adequate protection by filter or bellows against the ingress or absorption of process dust or ambient dust-laden air. Such dusts may be of a very fine nature and although mainly in the 30-70 micron range may be down to 10 microns or lower.

    13 INSPECTIONS AND TESTS GENERAL REQUIREMENTS The Dubai Electricity & Water Authority (DEWA) reserves the right to nominate

    Inspectors/Inspection Agencies to inspect and carry out necessary tests and/or measurements, at any stage of the manufacture and to reject all or any part of the equipment/materials not in accordance with the technical specifications as described in the Contractor's offer. In the event that an inspection is necessary then an inspection Certificate issued by DEWA's nominated Inspectors/Inspection Agencies should accompany the documents while applying for payment. If, for any reason, the inspection is waived then DEWA's letter/telex/fax conforming such waiver should accompany the documents.

    For the purpose of Inspection, the Contractor shall accord the DEWA's authorised

    Inspectors/Inspection Agencies access to all parts of the factory concerned with the manufacture of the equipment/materials and shall provide DEWA's authorised Inspectors/Inspection Agencies with such inspection facilities, testing apparatus and services as may reasonably be required.

    For inspection involving tests and facilities outside normal working procedure of

    the Contractor or for tests which cannot be conducted in the Contractors manufacturing premises, the Contractor shall highlight and notify the same in his offer.

    Should any re-inspection of the equipment/materials be required due to failure

    of the Contractor to provide the equipment/materials according to the specification, or should there be any additional involvement of the inspectors due to equipment being not offered for inspection as per contractual delivery schedule, then any charges/costs of such re-inspection or additional involvement will have to be borne by the Contractor.

  • 1.2.1.0.0.01-Rev.04

    7 of 13

    Equipment/materials once rejected shall not be considered as having been delivered under the Contract and the Contractor shall within the appropriate time for delivery provided by the Contract or such further time DEWA may allow deliver at Contractor's expenses satisfactory equipment/materials in replacement of the rejected equipment/materials.

    DEWA reserves the right to reject the equipment/materials or any part thereof after

    acceptance if it found not to conform to the Contract specification by reason of some defect latent or otherwise of materials or workmanship which was not discoverable after a reasonable examination of the equipment/materials.

    All the relevant drawings, specification and other such details as required as per

    Contract shall be sent to the DEWA at sufficiently early date to enable DEWA Engineers and/or their authorised Inspectors to become fully acquainted with the equipment/materials prior to the inspection and/or testing within the time stipulated in the Contract.

    The Contractor shall ensure that DEWA/DEWA's authorised

    Inspector/Inspection Agencies shall have the same inspection rights in respect of any Sub-contractor as the DEWA/DEWA's authorised Inspection/inspection Agency has in respect of Contractor. Not Less than twenty one (21) days notice of all tests shall be given to DEWA and DEWA's authorised inspectors in order that they may be present if they so desire . As many tests as, in the opinion of DEWA are possible, shall be arranged together. Four copies of the Contractor's records of all tests shall be furnished to DEWA. The inspection call shall be issued in the format attached in this specification (Annexure-A).

    All materials which are specified for tests at the Manufacturer's works shall

    satisfactorily pass such tests before painted/shipment. All instruments used for the purpose of testing shall be approved and if required

    shall be calibrated at the expense of the Contractor by such body as may be approved.

    Where type tests are specified, such tests shall be carried out in the presence of

    DEWA's representative or alternatively if the inspection is waived by the Purchaser, the Contractor shall provide certificates from a recognized International testing authority showing that such tests have been carried out satisfactorily on apparatus similar to that being supplied.

    Where routine tests are specified, these will be witnessed by our

    Inspector/Authorised Inspection Agency on Complete Quantity of material included in the order.

    The procedure and criteria for all the tests programmed for factory acceptance test

    and test schedule shall be submitted to DEWA by the Contractor at the time of submission of drawings.

    14 PACKING OF MATERIALS

  • 1.2.1.0.0.01-Rev.04

    8 of 13

    Packing shall be such that it affords adequate protection to the enclosed materials against mechanical damage during transport to its final destination and transition from one to another.

    Containers shall be of the fully enclosed weatherproof type (i.e. metal sides and

    roof) unless the size of plant to be shipped necessitates otherwise, in which case the type of container and method of shipping shall be subject to approval.

    For non-container shipments packings shall be stout close-boarded wooden cases

    of adequate thickness, suitably braced and banded and lined internally with water-resistant material.

    Certain types of outdoor equipment may be crated, provided that adequate

    protection of vulnerable parts is assured. All pipe flanges shall be fitted with wooden covers not less than 40 mm larger in diameter than the flange which shall be wired or bolted to the pipe. Steelwork sections and similar items may be bundled provided that the ends are adequately protected and the enclosing bands or wires are robust.

    For full container shipments, a degree of crating may still be required depending

    on the type of equipment involved and the Contractor shall state his intentions and obtain approval.

    Adequate battens and braces shall be provided to prevent movement of equipment

    within the container. Where appropriate due to the weight or nature of the equipment pallet type bases shall be provided to assist in loading and off-loading.

    Indoor electrical equipment, whether shipped in containers or packing cases,

    must be enclosed in welded polythene envelopes inside the packing cases. The envelopes should be sealed and have sufficient desiccant inside to absorb the initial moisture content plus an allowance for leakage.

    When in cases or crates or containers, all items shall be so secured that they

    are not free to move and cannot work loose in transport. If rotating parts are shipped within their bearings or mountings they must be adequately braced and restrained to prevent relative movement. Bags of loose items shall be placed in a supplementary case, each bag having stitched on to it a metal label indicating the number and nature of its contents. Where a filler material is used in a case to restrict movement or provide additional protection it must be inorganic and non-hygroscopic.

    All surfaces liable to corrosion shall be thoroughly cleaned and special steps,

    adapted to the nature of the materials and the time interval between packing and unpacking, shall be taken to prevent corrosion. These steps may constitute the greasing of surfaces, the application of a protective coat, enclosure of the items in a hermetically sealed container, consisting of paper, cellophane, plastic or zinc, the addition of vapour phase inhibitor paper to the package, or other approved means.

    Steps shall be taken to ensure that insulated materials cannot be damaged by

    moisture, moulds, insects or rodents. Items that include materials liable to be

  • 1.2.1.0.0.01-Rev.04

    9 of 13

    damaged by moisture shall be packed in hermetically sealed containers in which silica gel, or some other approved dehydrant, has been inserted.

    Cases shall be marked both with large lettering to show which side up the case is

    to be, and, if the contents are fragile, marked "FRAGILE" in large letters and the international wine glass symbol. In the case of container shipments individual crates or equipment on pallets shall also indicate any special handling or movement requirements or weight limitations. Packages shall be marked with their place of destination in such a way that rough handling or the effect of weather cannot remove or obliterate the marking. Each separate package shall be marked with the gross weight and for all lifts over two tones marks on the cases or equipment shall show where the weight is bearing and the correct positions for the slings.

    The cases shall, whenever possible, be so packed that they can safely be placed

    any side uppermost and no reliance shall be placed on the ability of those who will handle the case to read written instructions or to understand pictorial ones. Cases that have to be slung in a certain way shall, as far as possible, be so constructed that they cannot conveniently be slung in any other way and packages shall preferably be so large that they cannot be easily rolled over or thrown about; thus when practicable small cases shall be crated together to form one larger unit. Crates shall be sufficiently strong to be capable of being slung from the outside even when provision is also made for slings to be attached direct to a major article inside.

    Special steps shall be taken to guard against theft during transport. No small

    items, such as padlocks, nameplates and so forth, which could be torn off or unscrewed, shall be accessible.

    Cases, crates, barrels and drums shall be banded in such a manner as to obstruct

    the theft of any of the timber used for packaging, and the bands shall be so secured that they are not rendered ineffective by shrinkage of the wood.

    A descriptive and fully itemised list shall be prepared of the contents of each

    packing case or container. A copy of this list shall be placed in a waterproof envelope under a metal or other suitable plate securely fastened to the outside of one end of the case or container and its position adequately indicated by stenciling. Where appropriate drawings showing the erection marking of the items concerned shall be placed inside the case or with the equipment in the container.

    All stenciled markings on cases and crates, or other markings on descriptive metal

    tabs fixed to cable drums, bundles of structural steelwork and so forth, shall be applied in two places with a material which cannot wash off and shall be additional to any erection or other marks or impressions which may be specified elsewhere.

    All packing cases, and material including cable drums shall remain the property of DEWA.

    15 TOOLS AND EQUIPMENT The Supplier shall provide for each Substation steel boxes, complete w